CN204174594U - Hydropower station construction ventilation well construction - Google Patents

Hydropower station construction ventilation well construction Download PDF

Info

Publication number
CN204174594U
CN204174594U CN201420637968.0U CN201420637968U CN204174594U CN 204174594 U CN204174594 U CN 204174594U CN 201420637968 U CN201420637968 U CN 201420637968U CN 204174594 U CN204174594 U CN 204174594U
Authority
CN
China
Prior art keywords
ventilation
well
tower body
construction
ventilation well
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420637968.0U
Other languages
Chinese (zh)
Inventor
王仁坤
华大恩
夏勇
鲁毅
杨敬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Chengdu Engineering Co Ltd
Original Assignee
PowerChina Chengdu Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Chengdu Engineering Co Ltd filed Critical PowerChina Chengdu Engineering Co Ltd
Priority to CN201420637968.0U priority Critical patent/CN204174594U/en
Application granted granted Critical
Publication of CN204174594U publication Critical patent/CN204174594U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Ventilation (AREA)

Abstract

The utility model discloses a kind of hydropower station construction ventilation well construction, relate to hydraulic engineering field, a kind of hydropower station construction ventilation well construction that can not take intake tower tower body top usable floor area is provided.Hydropower station construction ventilation well construction comprises tower body and tunnel, is provided with ventilation well in tower body, and ventilation bottom is communicated with tunnel, and the well head of ventilation well is positioned at tower body top, and ventilation well quantity is two, and the well head of two ventilation wells lays respectively at tower body both sides.Power station intake tower ventilation well construction also can comprise windbreak, and windbreak is arranged at tower body top and around well head.Logical gas well mouth of the present utility model can not take intake tower tower body top usable floor area, and the work in every being conducive to carrying out to tower body top offers convenience; Foreign material amount is easily sucked when can also reduce the ventilation of ventilation well to a certain extent.

Description

Hydropower station construction ventilation well construction
Technical field
The utility model relates to hydraulic engineering field, especially designs a kind of hydropower station construction ventilation well construction.
Background technology
Hydropower station construction structure as shown in Figure 1, arranges Emergency Gate in tower body, and the tunnel of spreading, then connects working radial gate.Ventilate well after Emergency Gate, on the side wall of gate shaft, from tunnel one through to crest elevation.During maintenance, open working radial gate and to release hole internal water accumulation, by ventilation well toward tonifying Qi in tunnel, such ponding could steadily flow out.After having overhauled, Emergency Gate cuts out, and generally by arranging bypass pipe at gate shaft side, if time dash head is not high, directly can also arrange movable wicket on Emergency Gate, gives the bath of flood discharging tunnel below.At this time working radial gate is closed, and the air in tunnel can only be discharged outward by ventilation well, if discharge not in time, can form air bag, affect flood discharge safe operation in hole.
The effect of well of ventilating as shown in the above is ventilation or discharge air in tunnel in tunnel.Existing ventilation well is vertically arranged, and the well head of its upper end is positioned at the centre at intake tower top, and take the usable floor area that tower body top is limited, the work in every carried out to tower body top is made troubles.In addition, because of unshielded measure, during the ventilation of ventilation well, easily foreign material are sucked.
Utility model content
The technical problems to be solved in the utility model is: provide a kind of hydropower station construction ventilation well construction that can not take intake tower tower body top usable floor area.
In order to solve the problem, the technical scheme adopted is: hydropower station construction ventilation well construction comprises tower body and tunnel, ventilation well is provided with in tower body, ventilation bottom is communicated with tunnel, the well head of ventilation well is positioned at tower body top, ventilation well quantity is two, and the well head of two ventilation wells lays respectively at tower body both sides.
Further: hydropower station construction ventilation well construction comprises windbreak, and windbreak is arranged at tower body top and around well head.
The beneficial effects of the utility model are: the well head of two ventilation wells is laid respectively at tower body both sides, then well head can not take intake tower tower body top usable floor area, and the work in every being conducive to carrying out to tower body top offers convenience.
Accompanying drawing explanation
Fig. 1 is hydropower station construction ventilation well construction longitdinal cross-section diagram;
Fig. 2 is hydropower station construction ventilation well construction top view;
Fig. 3 is hydropower station construction ventilation well construction view in transverse section;
Be labeled as in figure: tower body 1, ventilation well 2, gate shaft 3, Emergency Gate 4, tunnel 5, working radial gate 6, well head 7, windbreak 8.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the utility model is further illustrated.
Hydropower station construction ventilation well construction comprises tower body 1 and tunnel 5, be provided with ventilation well 2 in tower body 1, be communicated with bottom ventilation well 2 with tunnel 5, the well head 7 of ventilation well 2 is positioned at tower body 1 top, ventilation well 2 quantity is two, and the well head 7 of two ventilation wells 2 lays respectively at tower body 1 both sides.
The well head of two ventilation wells is laid respectively at tower body both sides, then well head can not take intake tower tower body top usable floor area, and the work in every being conducive to carrying out to tower body top offers convenience.
The shape of ventilation well 2 can be as shown in Figure 3.
Easily suck foreign material amount to reduce when ventilation well 2 is ventilated, hydropower station construction ventilation well construction comprises windbreak 8, and windbreak 8 is arranged at tower body 1 top and around well head 7.Windbreak 8 can enter ventilation well 2 by stop portions foreign material, easily sucks foreign material amount when reducing the ventilation of ventilation well to a certain extent.

Claims (2)

1. hydropower station construction ventilation well construction, comprise tower body (1) and tunnel (5), ventilation well (2) is provided with in tower body (1), ventilation well (2) bottom is communicated with tunnel (5), the well head (7) of ventilation well (2) is positioned at tower body (1) top, it is characterized in that: ventilation well (2) quantity is two, and the well head (7) of two ventilation wells (2) lays respectively at tower body (1) both sides.
2. hydropower station construction according to claim 1 ventilation well construction is characterized in that: comprise windbreak (8), and windbreak (8) is arranged at tower body (1) top and around well head (7).
CN201420637968.0U 2014-10-29 2014-10-29 Hydropower station construction ventilation well construction Active CN204174594U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420637968.0U CN204174594U (en) 2014-10-29 2014-10-29 Hydropower station construction ventilation well construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420637968.0U CN204174594U (en) 2014-10-29 2014-10-29 Hydropower station construction ventilation well construction

Publications (1)

Publication Number Publication Date
CN204174594U true CN204174594U (en) 2015-02-25

Family

ID=52563413

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420637968.0U Active CN204174594U (en) 2014-10-29 2014-10-29 Hydropower station construction ventilation well construction

Country Status (1)

Country Link
CN (1) CN204174594U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104947637A (en) * 2015-07-07 2015-09-30 中国电建集团成都勘测设计研究院有限公司 Diversion tunnel blockage gate detecting system and detecting method
CN111139798A (en) * 2020-01-17 2020-05-12 中国电建集团贵阳勘测设计研究院有限公司 Reinforcing tower well type inlet sluicing tunnel down-the-hole arc door ventilation structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104947637A (en) * 2015-07-07 2015-09-30 中国电建集团成都勘测设计研究院有限公司 Diversion tunnel blockage gate detecting system and detecting method
CN104947637B (en) * 2015-07-07 2016-08-17 中国电建集团成都勘测设计研究院有限公司 Blocking sluice gate of diversion tunnel detecting system and detection method
CN111139798A (en) * 2020-01-17 2020-05-12 中国电建集团贵阳勘测设计研究院有限公司 Reinforcing tower well type inlet sluicing tunnel down-the-hole arc door ventilation structure

Similar Documents

Publication Publication Date Title
CN204174594U (en) Hydropower station construction ventilation well construction
CN207092033U (en) A kind of flood discharging tunnel
CN203785212U (en) Dehumidifier
CN204356739U (en) A kind of gate structure with New type ventilating hole
CN203132290U (en) Double-layer stoving line
CN204278242U (en) Dust arrester and concrete mixing plant
CN203498970U (en) Toilet deodorizing and backflow preventing mechanism with gas hood water seal structure
CN203307786U (en) Trash rack opening-closing device
CN203810025U (en) Air compressor air storage tank capable of dewatering automatically
CN203270739U (en) Deodorization and exhaust device for toilet
CN203111923U (en) Pneumatic suspended ore drawing chute device
CN202063702U (en) Automatic filling machine with sealed shell
CN204461049U (en) For the waste heat recovery device of tunnel cave
CN204664739U (en) The tail gas conveying device that tail gas refluxes can be prevented
CN204344157U (en) A kind of geomantic omen converter
CN204738281U (en) Electroless energy -conserving moisturizing device of diversion siphon
CN204113683U (en) A kind of wind conveyer
CN203947777U (en) The husky device of a kind of suction
CN203642626U (en) Air drying device for plastic brace
CN203736115U (en) Down suction mouth assembly of down suction machine
CN203500853U (en) Slurry diversion pipe structure
CN203392702U (en) Foldable external-scaffold safety protection door for building hoist
CN202499919U (en) Smoke collecting device with double smoke pipes
CN203213536U (en) Negative-pressure exhaust passage shared by high-low kitchen and bath
CN205435016U (en) Double -effect concentrator

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant