CN204174586U - Underground gate chamber air admission system - Google Patents
Underground gate chamber air admission system Download PDFInfo
- Publication number
- CN204174586U CN204174586U CN201420647182.7U CN201420647182U CN204174586U CN 204174586 U CN204174586 U CN 204174586U CN 201420647182 U CN201420647182 U CN 201420647182U CN 204174586 U CN204174586 U CN 204174586U
- Authority
- CN
- China
- Prior art keywords
- ventilation
- hole
- room
- flood discharging
- discharging tunnel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Ventilation (AREA)
Abstract
The utility model relates to a kind of underground gate chamber air admission system, particularly a kind of underground gate chamber air admission system being applied to Hydraulic and Hydro-Power Engineering technical field.The utility model provides a kind of problem that both can solve multiple flood discharging tunnel and ventilate simultaneously, can reduce engineering quantity again, saves manpower, financial resources, shortens construction period, and the underground gate chamber air admission system less to building structure stability influence.Comprise flood discharging tunnel, Service gate room, air supply passage, described Service gate room comprises room and lower room, and described ventilation is propped up hole and drawn from ventilation Zhu Dongzhong branch, and each root ventilation hole is communicated with a flood discharging tunnel.Adopt the form of structure that the main hole of ventilation combines with a ventilation hole, multiple like this flood discharging tunnel just can share a main hole of ventilation by a ventilation hole, and do not need to build multiple independent ventilation system comprising complete structure, greatly reduce the construction of underground passage, save construction period construction cost time.
Description
Technical field
The utility model relates to a kind of underground gate chamber air admission system, particularly a kind of underground gate chamber air admission system being applied to Hydraulic and Hydro-Power Engineering technical field.
Background technology
Flood discharging tunnel is the building drained off floodwater by bank hydraulic tunnel; Be in the stem of flood discharging tunnel, middle part and afterbody according to Service gate, flood discharging tunnel can be divided into formula and gate afterbody formula in the middle part of gate stem formula, gate; Gate and opening and closing device are located at the control appliance on the various water hole road of hydraulic structure, is the important component part of hydraulic structure, can be divided into Service gate, Emergency Gate and Emergency Gate by job specification; The effect of ventilating after gate: bear the tonifying Qi task of Service gate in aperture situation at different levels, reduce negative pressure behind the door, stabilization of fluidized, avoids building that vibration and cavitation corrosion occur, the lower towing tension that reduction acts on gate and additional water pressure.Fully should be able to ventilate after the water inlet of flood discharging tunnel or middle part gate, to ensure to improve flow-shape, prevent the cavitation corrosion that is harmful to and oscillation phenomenon.For this reason, generally after gate, air vent is arranged for water inlet, for the middle part gate that buried depth is larger, how to carry out tonifying Qi by the mode arranging ventilation hole.Have an independently air admission system after the gate of a current flood discharging tunnel, it is large to build independently air admission system engineering quantity, wastes manpower, financial resources, also easily has an impact to the duration, and too much use air admission system also can affect the stability of building structure.Therefore also there is no a kind of problem that both can solve multiple flood discharging tunnel and ventilate simultaneously in prior art, can engineering quantity be reduced again, save manpower, financial resources, shorten construction period, and the underground gate chamber air admission system less to building structure stability influence.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of problem that both can solve multiple flood discharging tunnel and ventilate simultaneously, engineering quantity can be reduced again, save manpower, financial resources, shorten construction period, and the underground gate chamber air admission system less to building structure stability influence.
For solving the problems of the technologies described above, the underground gate chamber air admission system that the utility model adopts, comprise flood discharging tunnel, Service gate room, air supply passage, described Service gate room comprises room and lower room, described flood discharging tunnel is communicated with Service gate room, described air supply passage one end is for entering hole, the other end is communicated with Service gate room, described flood discharging tunnel is two or more, and the axis of flood discharging tunnel is parallel to each other, described air supply passage comprises the main hole of ventilation and a ventilation hole, described ventilation is propped up hole and is arranged on room place under Service gate room, described ventilation is propped up hole and is drawn from ventilation Zhu Dongzhong branch, each root ventilation hole is communicated with a flood discharging tunnel.
Further, the main hole of described ventilation comprises introduces section and vertical section, and described introducing section will be entered hole and be communicated with vertical section, and described ventilation is propped up hole and is communicated with vertical section, and described vertical section is arranged along the direction vertical with flood discharging tunnel axis.
Further, also comprise lower curved section, described lower curved section one end is communicated with vertical section, and the other end is communicated with a ventilation hole.
The beneficial effects of the utility model are: adopt the form of structure that the main hole of ventilation combines with a ventilation hole, under Service gate room, room place arranges the ventilation be connected with each flood discharging tunnel and props up hole, and a ventilation hole enters into underground to a certain degree by main hole of ventilating, draw again after the flood discharging tunnel be arranged in parallel, multiple like this flood discharging tunnel just can share a main hole of ventilation by a ventilation hole, and do not need to build multiple independent ventilation system comprising complete structure, greatly reduce the construction of underground passage, save construction period construction cost time, avoid the transition excavation at the end over the ground, avoid the impact on underground structural stability.Be divided in main for ventilation hole and introduce section and vertical section, vertical section is vertical with flood discharging tunnel puts the length that can shorten main hole of ventilating, and reduces construction works amount.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the location diagram of the main hole of ventilation and flood discharging tunnel;
Fig. 3 is the location diagram of Service gate room and lower curved section;
Fig. 4 is the location diagram of a ventilation hole and Service gate room;
Component, position and numbering in figure: flood discharging tunnel 1, Service gate room 2, upper room 3, lower room 4, enter hole 5, a ventilation hole 6, introduce section 7, vertical section 8, lower curved section 9.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described in further detail.
As Fig. 1, Fig. 2, shown in Fig. 3 and Fig. 4, underground of the present utility model gate chamber air admission system, comprise flood discharging tunnel 1, Service gate room 2, air supply passage, described Service gate room 2 comprises room 3 and lower room 4, described flood discharging tunnel 1 is communicated with Service gate room 2, described air supply passage one end is for entering hole 5, the other end is communicated with Service gate room 2, described flood discharging tunnel 1 is two or more, and the axis of flood discharging tunnel 1 is parallel to each other, described air supply passage comprises the main hole of ventilation and a ventilation hole 6, described ventilation is propped up hole 6 and is arranged on 2 times rooms 4, Service gate room place, described ventilation is propped up hole 6 and is drawn from ventilation Zhu Dongzhong branch, each root ventilation hole 6 is communicated with a flood discharging tunnel 1.Adopt the form of structure that the main hole of ventilation combines with a ventilation hole 6, in Service gate room, 2 times rooms 4 place arranges the ventilation be connected with each flood discharging tunnel 1 and props up hole 6, and a ventilation hole 6 enters into underground to a certain degree by the main hole of ventilation, draw again after the flood discharging tunnel 1 be arranged in parallel, multiple like this flood discharging tunnel 1 just can share a main hole of ventilation by a ventilation hole 6, and do not need to build multiple independent ventilation system comprising complete structure, greatly reduce the construction of underground passage, save construction period construction cost time, avoid the transition excavation at the end over the ground, avoid the impact on underground structural stability.
The main hole of described ventilation comprises introduces section 7 and vertical section 8, and described introducing section 7 will be entered hole 5 and be communicated with vertical end, and described ventilation is propped up hole 6 and is communicated with vertical section 8, and described vertical section 8 is arranged along the direction vertical with flood discharging tunnel 1 axis.Be divided in main for ventilation hole and introduce section 7 and vertical section 8, vertical section 8 is vertical with flood discharging tunnel 1 puts the length that can shorten main hole of ventilating, and reduces construction works amount.Adjustment trend is started in introducing section 7 in the position near first flood discharging tunnel 1 during concrete enforcement, ventilate after the one section of channel transition direction in main hole is adjusted to and subvertical direction, flood discharging tunnel 1 axis, changeover portion steadily, not easily sharply changes the trend of passage as far as possible.
Also comprise lower curved section 9, described lower curved section 9 one end is communicated with vertical section 8, and the other end is communicated with a ventilation hole 6.Lower curved section 9 is used for that vertical section 8 is propped up hole 6 with the ventilation being arranged on 2 times rooms 4, Service gate room and is communicated with, and because lower curved section 9 and vertical section 8 junction are higher than itself and a ventilation junction, hole 6, therefore lower curved section 9 is in downward-sloping trend.
The trend of the utility model gas is: first from entering the vertical section 8 of hole 5 by the main hole of introducing section 7 arrival ventilation in the main hole of ventilation, then through from vertical section 8 and arrival lower curved section 9, be diverted to each ventilation hole 6 from lower curved section 9, finally enter into corresponding flood discharging tunnel 1 by each ventilation hole 6.So just achieve the function utilizing an aerating system to ventilate to multiple flood discharging tunnel 1.
Claims (3)
1. underground gate chamber air admission system, comprise flood discharging tunnel (1), Service gate room (2), air supply passage, described Service gate room (2) comprises room (3) and lower room (4), described flood discharging tunnel (1) is communicated with Service gate room (2), described air supply passage one end is for entering hole (5), the other end is communicated with Service gate room (2), it is characterized in that: described flood discharging tunnel (1) is two or more, and the axis of flood discharging tunnel (1) is parallel to each other, described air supply passage comprises the main hole of ventilation and a ventilation hole (6), described ventilation is propped up hole (6) and is arranged on room (4) place under Service gate room (2), described ventilation is propped up hole (6) and is drawn from ventilation Zhu Dongzhong branch, each root ventilation hole (6) is communicated with a flood discharging tunnel (1).
2. underground as claimed in claim 1 gate chamber air admission system, it is characterized in that: the main hole of described ventilation comprises introduces section (7) and vertical section (8), described introducing section (7) will be entered hole (5) and will be communicated with vertical section (8), described ventilation is propped up hole (6) and is communicated with vertical section (8), and described vertical section (8) is arranged along the direction vertical with flood discharging tunnel (1) axis.
3. underground as claimed in claim 2 gate chamber air admission system, it is characterized in that: also comprise lower curved section (9), described lower curved section (9) one end is communicated with vertical section (8), and the other end is communicated with a ventilation hole (6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420647182.7U CN204174586U (en) | 2014-10-31 | 2014-10-31 | Underground gate chamber air admission system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420647182.7U CN204174586U (en) | 2014-10-31 | 2014-10-31 | Underground gate chamber air admission system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204174586U true CN204174586U (en) | 2015-02-25 |
Family
ID=52563405
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420647182.7U Active CN204174586U (en) | 2014-10-31 | 2014-10-31 | Underground gate chamber air admission system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204174586U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105839603A (en) * | 2016-05-16 | 2016-08-10 | 中国电建集团成都勘测设计研究院有限公司 | Air replenishing structure of hydropower middle lock chamber |
CN106919772A (en) * | 2017-04-24 | 2017-07-04 | 中国电建集团成都勘测设计研究院有限公司 | High-velocity flow free flow drain cavern gas supplementary structure method of construction and gas supplementary structure |
CN109667249A (en) * | 2018-12-25 | 2019-04-23 | 中国电建集团贵阳勘测设计研究院有限公司 | Air supplement device for drainage lock chamber system |
CN111794194A (en) * | 2020-07-23 | 2020-10-20 | 中国电建集团成都勘测设计研究院有限公司 | Side wall type air supply tunnel structure of flood discharge tunnel |
-
2014
- 2014-10-31 CN CN201420647182.7U patent/CN204174586U/en active Active
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105839603A (en) * | 2016-05-16 | 2016-08-10 | 中国电建集团成都勘测设计研究院有限公司 | Air replenishing structure of hydropower middle lock chamber |
CN106919772A (en) * | 2017-04-24 | 2017-07-04 | 中国电建集团成都勘测设计研究院有限公司 | High-velocity flow free flow drain cavern gas supplementary structure method of construction and gas supplementary structure |
CN106919772B (en) * | 2017-04-24 | 2023-06-20 | 中国电建集团成都勘测设计研究院有限公司 | Construction method of air supplementing structure of high-speed water flow open flow water drain hole and air supplementing structure |
CN109667249A (en) * | 2018-12-25 | 2019-04-23 | 中国电建集团贵阳勘测设计研究院有限公司 | Air supplement device for drainage lock chamber system |
CN111794194A (en) * | 2020-07-23 | 2020-10-20 | 中国电建集团成都勘测设计研究院有限公司 | Side wall type air supply tunnel structure of flood discharge tunnel |
CN111794194B (en) * | 2020-07-23 | 2022-03-11 | 中国电建集团成都勘测设计研究院有限公司 | Side wall type air supply tunnel structure of flood discharge tunnel |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204174586U (en) | Underground gate chamber air admission system | |
CN101963066A (en) | Method for drawing out methane from bedding plane of coal seam by hydraulic fracturing | |
CN203270527U (en) | Device for preventing gas explosion after gate closing and plugging of diversion tunnel | |
CN203320497U (en) | Tail water maintenance gate for power station | |
CN205348132U (en) | Tower water inlet of bank | |
CN203855944U (en) | Outgoing line hole structure for underground powerhouse | |
CN103680288B (en) | A kind of tunnel micro-benching tunnelling method technique teaching simulation body | |
CN105421312A (en) | Air vent with diversion tunnel reconstructed into arc-shaped gate control and arrangement method | |
CN103161143B (en) | A kind of Diversion Tunnel vertical shaft lock chamber structure be arranged in hidden body | |
CN205348131U (en) | Diversion tunnel rebuilds to air vent after radial gate control | |
CN205455045U (en) | Agricultural is with multi -functional irrigation burette | |
CN204715318U (en) | Diversion tunnel gate shaft structure in mountain | |
CN204825820U (en) | Pressure regulating well structure using traffic hole as upper chamber | |
CN208545859U (en) | Convenient for the top plate of underground parking garage structure of cable laying | |
CN204608729U (en) | Earth dam water-supply-pipe leakage preventing structure | |
CN103114601A (en) | Cut-off method of rapid-hardening high-spray grouting of strong leakage stratum and device thereof | |
CN204435330U (en) | The interim ecological bleeder pipe plugging system of a kind of water power hydraulic engineering | |
CN202832561U (en) | Oblique type small duct slip-casting apparatus | |
CN208456663U (en) | A kind of barnyard slurries device for filling | |
CN203925578U (en) | Shield-tunneling construction sewage reutilization device | |
CN206205109U (en) | A kind of underground workshop seepage drainage manifold arrangement | |
CN203808032U (en) | Chamber plug concrete drain pipe controllable device | |
CN104047634B (en) | Shield construction waste water recycling device | |
CN103898880B (en) | The method of reservoir Diversion Tunnel backfill reconstruction flood discharging tunnel | |
CN204268731U (en) | A kind of solar water heater being provided with siphon device water-supply-pipe can be emptying |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |