CN204161151U - A kind of neutral-section passing system - Google Patents

A kind of neutral-section passing system Download PDF

Info

Publication number
CN204161151U
CN204161151U CN201420548579.0U CN201420548579U CN204161151U CN 204161151 U CN204161151 U CN 204161151U CN 201420548579 U CN201420548579 U CN 201420548579U CN 204161151 U CN204161151 U CN 204161151U
Authority
CN
China
Prior art keywords
circuit
neutral
permanent magnet
comparator
divide
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420548579.0U
Other languages
Chinese (zh)
Inventor
白申义
李刚
周水斌
王晓锋
安永帅
任红旭
马仪成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XJ Electric Co Ltd
Xuchang XJ Software Technology Co Ltd
Original Assignee
XJ Electric Co Ltd
Xuchang XJ Software Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XJ Electric Co Ltd, Xuchang XJ Software Technology Co Ltd filed Critical XJ Electric Co Ltd
Priority to CN201420548579.0U priority Critical patent/CN204161151U/en
Application granted granted Critical
Publication of CN204161151U publication Critical patent/CN204161151U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Train Traffic Observation, Control, And Security (AREA)

Abstract

The utility model relates to a kind of neutral-section passing system, comprising: permanent magnetic mechanism switch, for judging the individual-phase control device excessively producing divide-shut brake instruction, and for calculating the permanent magnet mechanism controller of divide-shut brake opening time; Cross individual-phase control device and connect permanent magnet mechanism controller, permanent magnet mechanism controller control linkage permanent magnetic mechanism switch; Permanent magnet mechanism controller comprises sampling module and IGBT drive module, and sampling module comprises the Acquisition Circuit, rectifying circuit, the mistake zero-sum frequency detection circuit that connect successively; Cross zero-sum frequency detection circuit to comprise: comparator and isolated drive circuit; Rectification circuit output end connects the input end of comparator, and the mouth of comparator connects input end, the mouth of isolation drive and the mouth of sampling module of isolation drive.IGBT drive module comprises divide-shut brake coil driving circuits and coil breakage self-inspection loop.

Description

A kind of neutral-section passing system
Technical field
The utility model relates to a kind of neutral-section passing system, belongs to contact nets in electrified railways automatic passing over of neutral section technical field.
Background technology
It is manual switchover on car that phase-splitting is crossed in traditional electric locomotive, so not only expends driver's energy, increases labour intensity, and totally unfavorable to safe in operation, and driver slightly neglects misoperation, and electric arc will be drawn to burn electric arc shackle.Along with the fast development of railway electrification and the speed-raising of electric locomotive, locomotive is per hour will cross tens electric phase-splittings, driver operation difficulty, at high slope heavy duty section, the undue phase time train of power-off significantly slows down, and high hillside fields section plays speed difficulty, the motion time of throat section can be extended, reduce circuit capacity.For solving above outstanding problem, automatic passing over of neutral section oneself become one of gordian technique of China railways speed-raising and Developing High-speed electrified railway.
Only have a few countries research at present in the world and adopt automatic neutral-section passing device, technical scheme has three types substantially: automatic switching mode on floor switches automatic switchover, on-pole switch automatic switchover, car.These three kinds of automatic passing over of neutral section schemes are all the commutation switching action automatically carrying out power circuit under the effect of control setup, although overcome the deficiency of manual switchover mode, also bring new problem: suitable voltage-phase can not be selected to carry out automatic passing over of neutral section; And producing excess current and over voltage during locomotive phase splitting folding split-phase switch, this can cause transient state to impact to equipment of itself and electrical network, and over voltage and shoving understands the electric life of the split-phase switch that cause damage to Switch main body and circuit, reduce.
Application number 2010101904185, the documents that denomination of invention is " a kind of novel ground method for controlling passing neutral section and device " discloses a kind of novel ground method for controlling passing neutral section and device, according to arrange locomotive posit ion transducer in orbit and for measure contact system voltage-phase contact system voltage detection module to the determination of contact system voltage-phase, control all-controlling power electronics device with controller and form cut-offfing of binistor and realize electric locomotive ground and switch phase splitting without impact; Although this documents is in zero crossing automatic passing over of neutral section, avoid over voltage and shove, but this documents just carries out collection line voltage after receiving track signal and divide-shut brake instruction, the process gathered needs certain hour and may break down in treating process, this just may cause can not wanting to carry out breaking-closing operating in seeking time, so reliability is lower.
Utility model content
The purpose of this utility model is to provide a kind of neutral-section passing system, must not cause the problem that phase-splitting reliability is lower by continuous collecting line voltage in order to solution.
For achieving the above object, scheme of the present utility model comprises a kind of neutral-section passing system, comprising: permanent magnetic mechanism switch, for judging the individual-phase control device excessively producing divide-shut brake instruction, and for calculating the permanent magnet mechanism controller of divide-shut brake opening time; Cross individual-phase control device and connect permanent magnet mechanism controller, permanent magnet mechanism controller control linkage permanent magnetic mechanism switch; Permanent magnet mechanism controller comprises sampling module and IGBT drive module.
Sampling module comprises the Acquisition Circuit, rectifying circuit, the mistake zero-sum frequency detection circuit that connect successively; Cross zero-sum frequency detection circuit to comprise: comparator and isolated drive circuit; Rectification circuit output end connects the input end of comparator, and the mouth of comparator connects input end, the mouth of isolated drive circuit and the mouth of sampling module of isolated drive circuit.
IGBT drive module comprises divide-shut brake coil driving circuits and coil breakage self-inspection loop.
Comparator has two input ends, the mouth of an input termination rectifying circuit; Another input termination VREF (Voltage Reference).
Comparator output terminal connects the input end of the optic coupling element of isolated drive circuit.
Filter circuit is connected with between Acquisition Circuit and rectifying circuit.
Rail is provided with axle count sensor, and the connection of note axle sensor signal output part is described crosses individual-phase control device.
Permanent magnetic mechanism switch is made up of IGBT, and permanent magnet mechanism controller trigging control connects described IGBT.
Coil breakage self-inspection loop comprises the alarm contact of coil breakage alarm loop and IGBT circuit.
Employing of the present utility model be a kind of circuit structure of continuous collecting voltage, comparator in zero-sum frequency detection circuit and isolated drive circuit was inputed to by steps such as collection, filtering, rectifications, divide-shut brake opening time can be directly doped at any time according to electrical network phase selection voltage, like this when divide-shut brake instruction arrives, divide-shut brake opening time can be provided rapidly, stability and reliability higher.
Accompanying drawing explanation
Fig. 1 is the structural representation of neutral-section passing system specific embodiment;
Fig. 2 is that the one that embodiment provides crosses zero-sum frequency detection circuit schematic diagram;
Fig. 3 is that IGBT drives sub-switch circuit;
Fig. 4 is phase-controlled schematic flow sheet.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described in more detail.
The utility model relates to a kind of neutral-section passing system, comprising: permanent magnetic mechanism switch, for judging the individual-phase control device excessively producing divide-shut brake instruction, and for calculating the permanent magnet mechanism controller of divide-shut brake opening time; Cross individual-phase control device and connect permanent magnet mechanism controller, permanent magnet mechanism controller control linkage permanent magnetic mechanism switch; Permanent magnet mechanism controller comprises sampling module and IGBT drive module, and sampling module comprises the Acquisition Circuit, rectifying circuit, the mistake zero-sum frequency detection circuit that connect successively, crosses zero-sum frequency detection circuit and comprises: comparator and isolated drive circuit.IGBT drive module comprises divide-shut brake coil driving circuits and coil breakage self-inspection loop.
Rectification circuit output end connects the input end of comparator, and the mouth of comparator connects input end, the mouth of isolated drive circuit and the mouth of sampling module of isolated drive circuit.
For convenience of description, the permanent magnet mechanism controller in the utility model selects a kind of intelligent phase selection unicoil permanent magnetic actuator controller to be detailed description of the invention.
Figure 1 shows that the structural representation of neutral-section passing system, the utility model is applied in electrified railway system, and on rail, axle count sensor is equipped with at J1, J2, J3 place.For the axle count sensor at J3 place, when train is come, the axle count sensor at J3 place produces axle-counting signal and gave individual-phase control device, crosses individual-phase control device and judges to produce divide-shut brake instruction according to axle-counting signal.
Acquisition Circuit in the sampling module of intelligent phase selection unicoil permanent magnetic actuator controller gathered the control combined floodgate far away order of individual-phase control device, control separating brake order far away and electrical network phase selection voltage, in order to filtering high-order interfering signal, can first after a filter circuit filtering again through the ac-dc conversion of rectifying circuit, inputed to zero-sum frequency detection circuit.
Fig. 2 is that in sampling module, one crosses zero-sum frequency detection circuit schematic diagram, phase selection voltage after rectification sent into the comparator in zero-sum frequency detection circuit, export to isolation drive again, export after the optic coupling element of isolation drive, just can obtain that dutycycle is 50%, frequency is the square-wave signal of 50Hz.
The comparator crossed in zero-sum frequency detection circuit take VREF (Voltage Reference) as benchmark, if VREF (Voltage Reference) ground connection, when namely VREF (Voltage Reference) is zero, comparator is now a zero-crossing comparator.Input end connects rectification and exports, export and connect isolated drive circuit, as shown in Figure 2, U1 is an optic coupling element, optic coupling element exports just can obtain that dutycycle is 50%, frequency is the square-wave signal of 50Hz, the positive rise of square-wave signal and falling edge are the zero crossings of alternating-current voltage/AC voltage, also can calculate zero-acrross ing moment many times.When VREF (Voltage Reference) is non-vanishing, be the magnitude of voltage of a setting, at this moment comparator is not just a zero-crossing comparator, and the positive rise of the square-wave signal that optocoupler exports and falling edge neither zero crossings.So this sampling module can select suitable voltage-phase to carry out phase-splitting as required.
Fig. 3 is that IGBT drives sub-switch circuit, and when permanent magnet mechanism controller CPU sends combined floodgate order, IGBT driving chip drives IGBT conducting, and make IGBT-A and IGBT-D conducting simultaneously, carry out closing operation, IGBT-A ' and IGBT-B ' is divide-shut brake coil interface; Same when CPU sends separating brake order, IGBT driving chip drives IGBT conducting, makes IGBT-B and IGBT-C conducting simultaneously, carries out sub-switching operation, has carried out the design of coil breakage warning circuit and the design of IGBT alarm contact simultaneously.For self-inspection and judge permanent magnet mechanism controller connect permanent magnetic mechanism switch coil and whether break.
The utility model can select suitable voltage-phase to carry out automatic passing over of neutral section, for convenience of description, here carry out automatic passing over of neutral section as detailed description of the invention using voltage-phase zero-acrross ing moment, but the utility model is not limited to voltage-phase zero-acrross ing moment carries out automatic passing over of neutral section.
After sampling module calculates phase selection electric voltage frequency, cycle, each zero-acrross ing moment, just can calculate divide-shut brake opening time.Divide-shut brake opening time then, intelligent phase selection unicoil permanent magnetic actuator controller sends trigger command to permanent magnetic mechanism switch, make the IGBT conducting in permanent magnetic mechanism switch, coil in permanent magnetic mechanism switch passes into counter-current and carries out sub-switching operation, pass into forward current and carry out closing operation, this completes the switching of automatic passing over of neutral section on-off system, thus ensure that electric locomotive passed through phase separation point and reliability service smoothly.
Very short owing to crossing phase-separating section distance, the time that electric locomotive is needed by this distance is also very short, in order to the time preventing this of short duration does not find suitable voltage-phase to carry out divide-shut brake, one phase selection time was set: if still do not find suitable voltage-phase moment to complete divide-shut brake action within the phase selection time, then when the phase selection time arrives, directly make the IGBT conducting in permanent magnetic mechanism switch, carry out breaking-closing operating.Even if do not find the voltage-phase moment that one suitable within the phase selection time, the action message of permanent magnetic mechanism switch also can be ensured.This completes the switching of automatic passing over of neutral section, make electric locomotive pass through phase separation point smoothly.
Fig. 4 is phase-controlled schematic flow sheet, first the frequency of phase selection voltage, cycle and zero-acrross ing moment can be calculated by sampling module, draw above parameter, according to the phase time of specifying, namely selected suitable voltage-phase just can go out divide-shut brake opening time by computational prediction in real time, carries out this always and circulate in this neutral-section passing system.When there being divide-shut brake order, choose the divide-shut brake opening time that now computational prediction goes out, if can option principle be carried out within the fixing phase selection time, then phase selection success; If exceed the phase selection time, still do not find suitable voltage-phase to drive moment, then Direct driver IGBT conducting, carry out breaking-closing operating, drive the moment even if do not find within the phase selection time, can ensure the action message of permanent magnetic mechanism switch yet.
Intelligent phase selection unicoil permanent magnetic actuator controller can also check the CPU information that controller is sent up and software version number and CRC check code by USB configuration tool, display protection point information, and can carry out fixed value modification solidification etc.Sampling channel can show the ac and dc current magnitude of voltage of collection in real time, and can ensure the sampling precision requirement to exchanging value by amendment drift and coefficient.Can be carried out the download solidification of director demon by USB interface, upgrading upgrades, and can throw the supervision of moving back to some input and outputs, unicoil permanent magnetic actuator controller has comparatively high-intelligentization level in conjunction with USB configuration tool simultaneously.
Be presented above concrete embodiment, but the utility model is not limited to described embodiment.Basic ideas of the present utility model are above-mentioned basic scheme, and for those of ordinary skill in the art, according to instruction of the present utility model, designing the model of various distortion, formula, parameter does not need to spend creative work.The change carried out embodiment when not departing from principle of the present utility model and spirit, amendment, replacement and modification still fall in protection domain of the present utility model.

Claims (7)

1. a neutral-section passing system, comprising: permanent magnetic mechanism switch, for judging the individual-phase control device excessively producing divide-shut brake instruction, and for calculating the permanent magnet mechanism controller of divide-shut brake opening time; Cross individual-phase control device and connect permanent magnet mechanism controller, permanent magnet mechanism controller control linkage permanent magnetic mechanism switch; Permanent magnet mechanism controller comprises sampling module and IGBT drive module, it is characterized in that,
Described sampling module comprises the Acquisition Circuit, rectifying circuit, the mistake zero-sum frequency detection circuit that connect successively;
Described zero-sum frequency detection circuit of crossing comprises: comparator and isolated drive circuit;
Described rectification circuit output end connects the input end of comparator, and the mouth of comparator connects the input end of isolated drive circuit, the mouth of isolated drive circuit and the mouth of sampling module;
Described IGBT drive module comprises divide-shut brake coil driving circuits and coil breakage self-inspection loop.
2. neutral-section passing system according to claim 1, is characterized in that, described comparator has two input ends, the mouth of an input termination rectifying circuit; Another input termination VREF (Voltage Reference).
3. neutral-section passing system according to claim 2, is characterized in that, described comparator output terminal connects the input end of the optic coupling element of isolated drive circuit.
4. neutral-section passing system according to claim 3, is characterized in that, is connected with filter circuit between described Acquisition Circuit and rectifying circuit.
5. neutral-section passing system according to claim 3, is characterized in that, rail is provided with axle count sensor, and the connection of note axle sensor signal output part is described crosses individual-phase control device.
6. neutral-section passing system according to claim 3, is characterized in that, permanent magnetic mechanism switch is made up of IGBT, and permanent magnet mechanism controller trigging control connects described IGBT.
7. neutral-section passing system according to claim 1, is characterized in that, described coil breakage self-inspection loop comprises the alarm contact of coil breakage alarm loop and IGBT circuit.
CN201420548579.0U 2014-09-23 2014-09-23 A kind of neutral-section passing system Expired - Fee Related CN204161151U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420548579.0U CN204161151U (en) 2014-09-23 2014-09-23 A kind of neutral-section passing system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420548579.0U CN204161151U (en) 2014-09-23 2014-09-23 A kind of neutral-section passing system

Publications (1)

Publication Number Publication Date
CN204161151U true CN204161151U (en) 2015-02-18

Family

ID=52534870

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420548579.0U Expired - Fee Related CN204161151U (en) 2014-09-23 2014-09-23 A kind of neutral-section passing system

Country Status (1)

Country Link
CN (1) CN204161151U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104276056A (en) * 2014-09-23 2015-01-14 许继电气股份有限公司 Neutral-section passing system
CN106828199A (en) * 2017-03-30 2017-06-13 北京全路通信信号研究设计院集团有限公司 A kind of railway electrification section cable anti-interference system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104276056A (en) * 2014-09-23 2015-01-14 许继电气股份有限公司 Neutral-section passing system
CN106828199A (en) * 2017-03-30 2017-06-13 北京全路通信信号研究设计院集团有限公司 A kind of railway electrification section cable anti-interference system
CN106828199B (en) * 2017-03-30 2023-03-17 北京全路通信信号研究设计院集团有限公司 Cable anti-interference system for electrified railway section

Similar Documents

Publication Publication Date Title
CN106452280B (en) A kind of high-speed motor control interleaving buck converte
CN103745883B (en) A kind of combined type Arcless AC Contactor with transistors breakdown diagnostic function
CN201724988U (en) Input phase failure detector for power unit of high-voltage frequency converter
CN102545388B (en) A kind of Intelligent controller of permanent magnet mechanism breaker
CN209119805U (en) Surge protection device
CN109445336A (en) ON-OFF control circuit and on-off control system
CN201294387Y (en) Energy-saving capacitance compensation switching controller
CN104276056A (en) Neutral-section passing system
CN204161151U (en) A kind of neutral-section passing system
CN208849663U (en) Protection circuit of inverter and servosystem
CN202797994U (en) Combination switch for switching of reactive power compensation capacitor
CN205355812U (en) Looks control system is selected to 12kV permanent magnetism vacuum circuit breaker intelligence
CN201160036Y (en) Low-power consumption intelligent zero crossing throwing and cutting controller
CN203965858U (en) A kind of greenhouse actuator controller
CN201478728U (en) Intelligent type electric control cabinet
CN209266221U (en) Electric switch-on device and threephase switch device
CN104555764A (en) Rotary braking system and tower crane control system
CN103578803A (en) Driving control device of double-way permanent magnetic mechanism
CN206004404U (en) A kind of power supply switch circuit and automatic divide-shut brake intelligent breaker
CN109572476A (en) A kind of charging pile device
CN206422593U (en) Alternating Current Power Supply automatic switch-over circuit based on MSP430F149
CN101252059B (en) Bistable state permanent magnetism alternating current contactor with rapid charging and discharging control characteristics
CN100446141C (en) Power supply pulse controller of breaker
CN209600307U (en) A kind of charging pile device
CN207426673U (en) The hardware circuit of control and protective switch equipment

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150218

Termination date: 20200923