CN204151804U - A kind of steel sheet pile cofferdam structure - Google Patents

A kind of steel sheet pile cofferdam structure Download PDF

Info

Publication number
CN204151804U
CN204151804U CN201420463514.6U CN201420463514U CN204151804U CN 204151804 U CN204151804 U CN 204151804U CN 201420463514 U CN201420463514 U CN 201420463514U CN 204151804 U CN204151804 U CN 204151804U
Authority
CN
China
Prior art keywords
pile
steel sheet
steel
lower floor
precast concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420463514.6U
Other languages
Chinese (zh)
Inventor
刘晓敏
余流
高璞
郭靖
周俊龙
石丰祥
李飞
薛钺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Engineering Division Co Ltd
Third Construction Engineering Co Ltd of China Construction Sixth Engineering Division Co Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
Third Construction Engineering Co Ltd of China Construction Sixth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd, Third Construction Engineering Co Ltd of China Construction Sixth Engineering Division Co Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN201420463514.6U priority Critical patent/CN204151804U/en
Application granted granted Critical
Publication of CN204151804U publication Critical patent/CN204151804U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The utility model discloses a kind of steel sheet pile cofferdam structure, it comprises the multiple steel sheet piles being arranged on foundation ditch surrounding, location steel pile tube outside the steel sheet-pile cofferdam arranged outside that steel sheet pile is formed, planar positioning structure outer end, upper strata is fixedly connected with location steel pile tube top, outside and the other end holds out against steel sheet pile in the horizontal direction arranges, inner side location steel pile tube is provided with inside steel sheet-pile cofferdam, upper strata enclose purlin be fixedly connected on inner side location steel pile tube and steel sheet-pile cofferdam between top, purlin is enclosed on upper strata and multiple upper stratas steel inner support is fixedly linked, four brackets are had at every root steel pile casting upper weld, lower floor's precast concrete inner support is set up on bracket, each end of lower floor's precast concrete inner support and lower floor enclose purlin and are fixedly linked, lower floor encloses purlin and is fixed on the inwall of steel sheet-pile cofferdam, the lower floor's precast concrete inner support being positioned at steel pile casting position is completely covered with precast concrete plank.Adopt this structure effectively can control the vertical precision of steel sheet pile.

Description

A kind of steel sheet pile cofferdam structure
Technical field
The utility model relates to a kind of steel sheet pile cofferdam structure.
Background technology
Along with high-grade highway, generally the building of railway, get more and more across river, bridge engineering for sea-crossing, for underwater support table construction, the construction technology adopting steel sheet-pile cofferdam to carry out water proof more and more becomes the focus of concern.When bearing platform construction position water is darker, cushion cap bottom surface, more than mud face, needs design bearing platform construction template separately, and normal the laying with cofferdam inner support of bearing platform construction template position is conflicted, and increases steel sheet-pile cofferdam design difficulty.In addition, during steel sheet pile cofferdam construction, steel sheet pile inserted to play verticality is difficult to control, and adopts common individual layer guiding construction technology often to occur the phenomenons such as steel sheet pile inserted to play off normal, inclination.
Summary of the invention
The purpose of this utility model is the deficiency overcoming prior art, provides a kind of steel sheet pile cofferdam structure, adopts this structure effectively can control the vertical precision of steel sheet pile, inner support and cushion cap bed die can be united two into one simultaneously, improve operating efficiency, saved cost.
For achieving the above object, the utility model adopts following technical proposals:
A kind of steel sheet pile cofferdam structure, it comprises the multiple steel sheet piles being arranged on foundation ditch surrounding, location steel pile tube outside the steel sheet-pile cofferdam arranged outside that steel sheet pile is formed, planar positioning structure outer end, upper strata is fixedly connected with location steel pile tube top, outside and the other end holds out against steel sheet pile in the horizontal direction arranges, inner side location steel pile tube is provided with inside steel sheet-pile cofferdam, upper strata enclose purlin be fixedly connected on inner side location steel pile tube and steel sheet-pile cofferdam between top, purlin is enclosed on upper strata and multiple upper stratas steel inner support is fixedly linked, four brackets are symmetrically welded with vertically on the every root steel pile casting top being positioned at steel sheet pile, well ellbeam formula lower floor precast concrete inner support is set up on bracket, each end of well ellbeam formula lower floor precast concrete inner support is all enclosed purlin by built-in fitting and lower floor and is fixedly linked, lower floor encloses purlin and is fixed on the inwall of steel sheet-pile cofferdam, the well ellbeam formula lower floor precast concrete inner support being positioned at steel pile casting position is completely covered with the precast concrete plank of the bottom template as cushion cap.
The beneficial effects of the utility model are: lower floor's precast concrete inner support entirety can be transferred before drawing water, when setting steel sheet pile, purlin Collaborative Control steel sheet pile verticality can be enclosed with upper strata planar positioning structure and upper strata, solve and adopt common individual layer guiding construction technology often to occur the phenomenons such as steel sheet pile inserted to play off normal, inclination; Precast concrete inner support is laid the bed die that precast concrete plank can be used as bearing platform construction, precast concrete inner support and cushion cap bed die are united two into one, do not need to design separately bearing platform construction template, and conflicting of solving that bearing platform construction template position lays with cofferdam inner support; Precast concrete inner support integral rigidity can be utilized in addition large, good stability, effectively can control the distortion of steel sheet pile when drawing water construction, ensureing the resistance to overturning of steel sheet-pile cofferdam.The utility model effectively can control the vertical precision of steel sheet pile, improves operating efficiency simultaneously, has saved cost.
Accompanying drawing explanation
Fig. 1 is that a kind of steel sheet pile cofferdam structure of the utility model is at lower floor's precast concrete internal supporting part cross-sectional configuration schematic diagram;
Fig. 2 is that a kind of steel sheet pile cofferdam structure of the utility model is at upper strata steel internal supporting part cross-sectional configuration schematic diagram;
Fig. 3 is the longitudinal plane structure schematic diagram of a kind of steel sheet pile cofferdam structure of the utility model;
Fig. 4 is that the lower floor's precast concrete inner support in a kind of steel sheet pile cofferdam structure of the utility model is enclosed purlin with lower floor and is connected partial schematic diagram.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail.
A kind of steel sheet pile cofferdam structure of the present utility model as shown in drawings, it comprises the multiple steel sheet piles 1 being arranged on foundation ditch surrounding, location steel pile tube 10 outside the steel sheet-pile cofferdam arranged outside that steel sheet pile is formed, upper strata planar positioning structure 12 outer end is fixedly connected with location steel pile tube top, outside and the other end holds out against steel sheet pile in the horizontal direction arranges, inner side location steel pile tube 11 is provided with inside steel sheet-pile cofferdam, upper strata enclose purlin 2-1 be fixedly connected on inner side location steel pile tube and steel sheet-pile cofferdam between top, purlin is enclosed on upper strata and multiple upper stratas steel inner support 4 is fixedly linked, four brackets 9 are symmetrically welded with vertically on every root steel pile casting 8 top being positioned at steel sheet pile, well ellbeam formula lower floor precast concrete inner support is set up on bracket, each end of well ellbeam formula lower floor precast concrete inner support 3 is all enclosed purlin 2-2 by built-in fitting 7 with lower floor and is fixedly linked, lower floor encloses purlin and is fixed on the inwall of steel sheet-pile cofferdam, the well ellbeam formula lower floor precast concrete inner support being positioned at steel pile casting position is completely covered with the precast concrete plank 5 of the bottom template as cushion cap 6.
Construction method of the present utility model comprises the following steps: (1) sets inner side location steel pile tube 11 and outside location steel pile tube 10 in steel sheet-pile cofferdam medial and lateral, installs fixing upper strata planar positioning structure 12 in outside positioning steel tube stake upper inside wall; (2) outrigger being connected with lower floor's precast concrete support integral system by suspension rod is mounted to steel pile casting 8 top, make lower floor's precast concrete support the position arriving bottom integral system and steel pile casting is preset bracket, described lower floor's precast concrete supports integral system to be undertaken welding being formed by well ellbeam formula lower floor precast concrete inner support 3 being enclosed purlin 2-2 with lower floor by built-in fitting 7; (3) on inner side location steel pile tube 11, upper strata is installed and encloses purlin 2-1, inserted to play steel sheet pile 1 between purlin and upper strata planar positioning structure is enclosed on upper strata, the positioning action being supported integral system by lower floor's precast concrete ensures steel sheet pile inserted to play in vertical direction, enclose purlin with upper strata behind steel sheet pile inserted to play location to weld, then enclose purlin internal fixtion on upper strata and upper strata steel inner support 4 is installed; (4) water in steel sheet-pile cofferdam is extracted out, after in cofferdam, water level is down to predetermined absolute altitude, stablize water level in cofferdam, the bracket position welding bracket 9 that steel pile casting is preset makes it to support the well ellbeam formula lower floor precast concrete inner support 3 that lower floor's precast concrete supports integral system, then weldable steel sheet pile and lower floor enclose purlin, finally remove suspension rod, remove outrigger; (5) by the elevation of predetermined cushion cap 6 bottom, and ensure the overlap joint of steel pile casting and cushion cap necessity, cut off unnecessary steel pile casting, well ellbeam formula lower floor precast concrete inner support hangs installation precast concrete plank, described precast concrete plank 5 arranges leveling layer, leveling layer installs cushion cap template, carries out cushion cap concrete construction; (6) after bearing platform construction completes, remove cushion cap template, releasing well ellbeam formula lower floor's precast concrete inner support and lower floor enclose the connection of purlin, increase water level in cofferdam, make water level inside and outside cofferdam identical, and purlin is enclosed on dismounting upper strata steel inner support and upper strata, pulls out steel sheet pile.

Claims (1)

1. a steel sheet pile cofferdam structure, it comprises the multiple steel sheet piles being arranged on foundation ditch surrounding, it is characterized in that: location steel pile tube outside the steel sheet-pile cofferdam arranged outside that steel sheet pile is formed, planar positioning structure outer end, upper strata is fixedly connected with location steel pile tube top, outside and the other end holds out against steel sheet pile in the horizontal direction arranges, inner side location steel pile tube is provided with inside steel sheet-pile cofferdam, upper strata enclose purlin be fixedly connected on inner side location steel pile tube and steel sheet-pile cofferdam between top, purlin is enclosed on upper strata and multiple upper stratas steel inner support is fixedly linked, four brackets are symmetrically welded with vertically on the every root steel pile casting top being positioned at steel sheet pile, well ellbeam formula lower floor precast concrete inner support is set up on bracket, each end of well ellbeam formula lower floor precast concrete inner support is all enclosed purlin by built-in fitting and lower floor and is fixedly linked, lower floor encloses purlin and is fixed on the inwall of steel sheet-pile cofferdam, the well ellbeam formula lower floor precast concrete inner support being positioned at steel pile casting position is completely covered with the precast concrete plank of the bottom template as cushion cap.
CN201420463514.6U 2014-08-15 2014-08-15 A kind of steel sheet pile cofferdam structure Expired - Fee Related CN204151804U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420463514.6U CN204151804U (en) 2014-08-15 2014-08-15 A kind of steel sheet pile cofferdam structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420463514.6U CN204151804U (en) 2014-08-15 2014-08-15 A kind of steel sheet pile cofferdam structure

Publications (1)

Publication Number Publication Date
CN204151804U true CN204151804U (en) 2015-02-11

Family

ID=52509932

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420463514.6U Expired - Fee Related CN204151804U (en) 2014-08-15 2014-08-15 A kind of steel sheet pile cofferdam structure

Country Status (1)

Country Link
CN (1) CN204151804U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105133627A (en) * 2015-07-28 2015-12-09 安徽省新路建设工程集团有限责任公司 Construction method for single-wall steel sheet pile cofferdam in running water state
CN105256810A (en) * 2015-09-25 2016-01-20 江苏东合南岩土科技股份有限公司 Construction method for round underground continuous wall two-in-one structure
CN111411638A (en) * 2020-04-29 2020-07-14 石家庄铁道大学 Steel sheet pile cofferdam and construction method thereof
CN111794256A (en) * 2020-08-10 2020-10-20 中国建筑第八工程局有限公司 Construction method of underwater pile cap in river flood discharge area

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105133627A (en) * 2015-07-28 2015-12-09 安徽省新路建设工程集团有限责任公司 Construction method for single-wall steel sheet pile cofferdam in running water state
CN105256810A (en) * 2015-09-25 2016-01-20 江苏东合南岩土科技股份有限公司 Construction method for round underground continuous wall two-in-one structure
CN105256810B (en) * 2015-09-25 2017-03-22 江苏东合南岩土科技股份有限公司 Construction method for round underground continuous wall two-in-one structure
CN111411638A (en) * 2020-04-29 2020-07-14 石家庄铁道大学 Steel sheet pile cofferdam and construction method thereof
CN111411638B (en) * 2020-04-29 2024-04-26 石家庄铁道大学 Steel sheet pile cofferdam and construction method thereof
CN111794256A (en) * 2020-08-10 2020-10-20 中国建筑第八工程局有限公司 Construction method of underwater pile cap in river flood discharge area

Similar Documents

Publication Publication Date Title
CN104196042B (en) A kind of steel sheet pile cofferdam structure construction method
CN104389313B (en) The positioning and plumbing device of Two bors d's oeuveres type i iron lattice column and positioning and plumbing method thereof
CN204151804U (en) A kind of steel sheet pile cofferdam structure
CN205296874U (en) Information -based construction monitor positioning device of stake integration
CN103195076B (en) Muddy Bottoms deep-excavation tower crane foundation construction method
CN204940312U (en) A kind of integral lifting lowering system of steel cofferdam
CN102828469B (en) Positioning mounting construction method for triangular steel constructed pillar of inclined-leg steel box
CN103806464B (en) Large-scale high ferro station and subway cross top-down construction method up and down
CN204040035U (en) A kind of positioning guiding structure of steel pile casting
CN105569064A (en) Arrangement type sunk well foundation construction method applicable to deepwater bare rock
CN104631338A (en) Steel boxed cofferdam and positioning construction method
CN109183812B (en) Construction method of combined deep foundation pit supporting structure
CN103866693A (en) Installing method of reinforced concrete bowstring rod arch bridge arch ribs and hanging auxiliary bridge
CN101936009B (en) Deep-water single-wall steel hanging box cofferdam and construction method thereof
CN201843143U (en) Deep water single-wall steel suspension box cofferdam
CN204000905U (en) A kind of Double-Wall Steel Boxed Cofferdam with binder deep water bearing platform construction
CN104775439B (en) A kind of pattern foundation pit supporting structure sealing integral structure and its construction method
CN204266132U (en) Adopt the railway Frame Pier crossbeam of D type beam
CN208650087U (en) Steel pipe column fast-positioning device for contrary sequence method
CN102296600B (en) Method for positioning middle pile of spread built subway station
CN203755296U (en) Underground diaphragm wall construction building envelope
CN204225135U (en) A kind of monolithic cofferdam inner support lifting gear
CN106087991B (en) Stake top absolute altitude is in natural ground dug pile construction method below
CN105297731A (en) Reverse construction method steel stand column positioning device and positioning method
CN210766861U (en) Portal formula building pile foundation underpins structure under narrow and small space

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150211

Termination date: 20180815