CN204142845U - Based on the stack bus bar proving installation of PEBB - Google Patents

Based on the stack bus bar proving installation of PEBB Download PDF

Info

Publication number
CN204142845U
CN204142845U CN201420369043.2U CN201420369043U CN204142845U CN 204142845 U CN204142845 U CN 204142845U CN 201420369043 U CN201420369043 U CN 201420369043U CN 204142845 U CN204142845 U CN 204142845U
Authority
CN
China
Prior art keywords
module
bus bar
stack bus
igbt
proving installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420369043.2U
Other languages
Chinese (zh)
Inventor
雷仕建
葛向文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Bronze Technologies Ltd
Original Assignee
Shenzhen Bronze Technologies Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Bronze Technologies Ltd filed Critical Shenzhen Bronze Technologies Ltd
Priority to CN201420369043.2U priority Critical patent/CN204142845U/en
Application granted granted Critical
Publication of CN204142845U publication Critical patent/CN204142845U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Inverter Devices (AREA)

Abstract

A kind of stack bus bar proving installation based on PEBB, comprise three-phase commutation bridge, intermediate dc electric capacity, IGBT module, stack bus bar and control module, described stack bus bar comprises positive bus-bar and negative busbar, described intermediate dc electric capacity and described IGBT module are connected between described positive bus-bar and described negative busbar, external ac power source is connected to described stack bus bar by described three-phase commutation bridge, described control module comprises control module and the power module be connected with described control module respectively, IGBT drives and protection module, alternating voltage detection module and output electric current measure module, described external ac power source also connects described alternating voltage detection module and described power module respectively, the output terminal of described IGBT module provides the check point of described output electric current measure module, described IGBT drives and protection module is connected to described IGBT module.The test data of this proving installation is all measured and is obtained in actual moving process, and real result is reliable, and installation cost is cheap.

Description

Based on the stack bus bar proving installation of PEBB
Technical field
The utility model relates to Power Electronic Technique, particularly relates to a kind of stack bus bar proving installation based on PEBB (PowerElectric Building Block, power electronics constructing module).
Background technology
Along with the progress of technology, high-voltage large-capacity power electronic equipment is widely applied in transmission and distribution networks, form device voltage and the capacitance grade of these equipment, even volume is also increasing, the parasitic parameter of device is remarkable all the more on the impact of whole equipment performance, cause difficulty in circuit structure design increasing, so the parameter measurement of Primary Component seems particularly important.Mainly use testing tool to measure in off-line case to the test of stack bus bar at present, but in the test result of off-line and actual moving process, larger deviation may appear in the situation of equipment, the reliability of test is lower.
Utility model content
Fundamental purpose of the present utility model is for the deficiencies in the prior art, provides a kind of with low cost and to the device that stack bus bar is measured in actual moving process, improve reliability, the accuracy of test.
For achieving the above object, the utility model is by the following technical solutions:
A kind of stack bus bar proving installation based on PEBB, comprise three-phase commutation bridge, intermediate dc electric capacity, IGBT module, stack bus bar and control module, described stack bus bar comprises positive bus-bar and negative busbar, described intermediate dc electric capacity and described IGBT module are connected between described positive bus-bar and described negative busbar, external ac power source is connected to described stack bus bar by described three-phase commutation bridge, described control module comprises control module and the power module be connected with described control module respectively, IGBT drives and protection module, alternating voltage detection module and output electric current measure module, described external ac power source also connects described alternating voltage detection module and described power module respectively, the output terminal of described IGBT module provides the check point of described output electric current measure module, described IGBT drives and protection module is connected to described IGBT module.
According to preferred embodiment, the utility model can also adopt following technical characteristics:
Described control module also comprises communication module, and described control module connects man-machine interface or host computer by described communication module.
Described device also comprises three-phase regulator and step-up transformer, and described external ac power source is connected to described three-phase commutation bridge by described three-phase regulator and described step-up transformer successively.
Also be provided with isolating switch between described three-phase regulator and described external ac power source, described external ac power source is by being divided into two-way after described isolating switch, and a road is connected to described three-phase regulator, and another road is connected to described alternating voltage detection module.
Also be provided with air switch between described power module and described external ac power source, a phase firewire of described external ac power source and a phase zero line are by being connected to described power module after described air switch.
The output terminal of described IGBT module is connected with three-phase reactor, and the current signal on every phase reactor feeds back to described output electric current measure module by current sensor.
The beneficial effects of the utility model:
Adopt the utility model, can measure stack bus bar based under actual motion state, proving installation can test the parameter of stack bus bar and IGBT tie point and with low cost respectively.In proper testing process, external power source power demand is very little, compares the test of off-line type, and the test data of this proving installation is all measured and obtained in actual moving process, and real result is reliable and with low cost.
Accompanying drawing explanation
Fig. 1 is the circuit diagram of the utility model based on a kind of embodiment of the stack bus bar proving installation of PEBB.
Embodiment
Below in conjunction with accompanying drawing, embodiment of the present utility model is elaborated.It is emphasized that following explanation is only exemplary, instead of in order to limit scope of the present utility model and application thereof.
In embodiment of the present utility model, a kind of stack bus bar proving installation based on PEBB comprises three-phase commutation bridge, intermediate dc electric capacity, the IGBT module that heating radiator is housed and control module 1, and can equalizing resistance be furnished with, also can comprise the utility appliance such as isolating switch 2, three-phase regulator 3, step-up transformer 4, air switch S and threephase load reactor A, B, C in addition.Stack bus bar comprises positive bus-bar and negative busbar, and connect intermediate dc electric capacity and IGBT module, external ac power source is connected to stack bus bar.Control module 1 comprises power module, control module, IGBT driving and protection module, alternating voltage detection module, output electric current measure module and communication module.The output terminal of three IGBT half-bridges connects at external application wire or copper bar, and provides the test point of current detection module.IGBT in control module 1 drives and protection module is connected to IGBT module by cable, provides driving and the defencive function of IGBT.Control module 1 is by communication module, and serial communication connects man-machine interface or host computer, and man-machine interface or host computer can display device states, and control module 1 can accept the control command that man-machine interface or host computer issue.
Be illustrated in figure 1 the stack bus bar proving installation based on PEBB of specific embodiment, test the AC380V that power supply used is three-phase four-wire system, by being divided into two-way after isolating switch 2, a road is connected to the alternating voltage detection module of control module 1; Another road is connected to three-phase regulator 3, is connected to step-up transformer 4, is connected to the stack bus bar in PEBB by three-phase commutation bridge after being made into direct current afterwards.In addition, choosing an a phase firewire W and phase zero line N from three-phase alternating-current supply input, by being connected to the power module of control module 1 after air switch S, providing power supply needed for work.The drive singal of the IGBT in stack bus bar proving installation is provided by the control module in control module 1.The lead-out terminal of PEBB is connected to threephase load reactor, and the current signal of every phase reactor feeds back to the output electric current measure module in control module 1 by current sensor.Can by the copper bar of output terminal through current sensor, copper bar does not contact with current sensor.Control module 1 is connected with host computer or man-machine interface by communication module.
In test process, three-phase regulator 3 can be regulated according to the stack bus bar of different voltage withstand class, guarantee that DC voltage is within the tolerance range of stack bus bar.The electric current that can be used by man-machine interface or host computer setting test according to the stack bus bar of different current class.DC voltage during test is adjustable, output current is adjustable.Issue control command to control module 1 by man-machine interface or host computer, this is instruction morphingly sent in IGBT module for corresponding control signal by cable by control module 1, and control IGBT turns on and off, and the order that each IGBT opens shutoff is optional.Meanwhile, the running status of self also can be fed back to man-machine interface or host computer by serial communication by control module 1.Can the turning on and off of each IGBT module of self-defining, thus the parameter of different tie point is measured.This proving installation has the advantage can testing stack bus bar correlation parameter under actual motion state, and measurement result true and reliablely can reflect stack bus bar and IGBT tie point every important parameter in actual use and serviceability.
Above content combines concrete/preferred embodiment further detailed description of the utility model, can not assert that concrete enforcement of the present utility model is confined to these explanations.For the utility model person of an ordinary skill in the technical field; without departing from the concept of the premise utility; its embodiment that can also describe these makes some substituting or modification, and these substitute or variant all should be considered as belonging to protection domain of the present utility model.

Claims (6)

1. the stack bus bar proving installation based on PEBB, it is characterized in that, comprise three-phase commutation bridge, intermediate dc electric capacity, IGBT module, stack bus bar and control module, described stack bus bar comprises positive bus-bar and negative busbar, described intermediate dc electric capacity and described IGBT module are connected between described positive bus-bar and described negative busbar, external ac power source is connected to described stack bus bar by described three-phase commutation bridge, described control module comprises control module and the power module be connected with described control module respectively, IGBT drives and protection module, alternating voltage detection module and output electric current measure module, described external ac power source also connects described alternating voltage detection module and described power module respectively, the output terminal of described IGBT module provides the check point of described output electric current measure module, described IGBT drives and protection module is connected to described IGBT module.
2. stack bus bar proving installation as claimed in claim 1, it is characterized in that, described control module also comprises communication module, and described control module connects man-machine interface or host computer by described communication module.
3. stack bus bar proving installation as claimed in claim 1, it is characterized in that, also comprise three-phase regulator and step-up transformer, described external ac power source is connected to described three-phase commutation bridge by described three-phase regulator and described step-up transformer successively.
4. stack bus bar proving installation as claimed in claim 3, it is characterized in that, also isolating switch is provided with between described three-phase regulator and described external ac power source, described external ac power source is by being divided into two-way after described isolating switch, one road is connected to described three-phase regulator, and another road is connected to described alternating voltage detection module.
5. the stack bus bar proving installation as described in any one of Claims 1-4, it is characterized in that, also be provided with air switch between described power module and described external ac power source, a phase firewire of described external ac power source and a phase zero line are by being connected to described power module after described air switch.
6. the stack bus bar proving installation as described in any one of Claims 1-4, is characterized in that, the output terminal of described IGBT module is connected with three-phase reactor, and the current signal on every phase reactor feeds back to described output electric current measure module by current sensor.
CN201420369043.2U 2014-07-03 2014-07-03 Based on the stack bus bar proving installation of PEBB Expired - Lifetime CN204142845U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420369043.2U CN204142845U (en) 2014-07-03 2014-07-03 Based on the stack bus bar proving installation of PEBB

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420369043.2U CN204142845U (en) 2014-07-03 2014-07-03 Based on the stack bus bar proving installation of PEBB

Publications (1)

Publication Number Publication Date
CN204142845U true CN204142845U (en) 2015-02-04

Family

ID=52419525

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420369043.2U Expired - Lifetime CN204142845U (en) 2014-07-03 2014-07-03 Based on the stack bus bar proving installation of PEBB

Country Status (1)

Country Link
CN (1) CN204142845U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104777345A (en) * 2015-04-22 2015-07-15 四川英杰电气股份有限公司 Current detecting circuit and feedback control circuit applied to laminated control power supply and power supply
CN106153330A (en) * 2016-09-05 2016-11-23 中国海洋大学 A kind of circumference valve port characteristic testing stand

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104777345A (en) * 2015-04-22 2015-07-15 四川英杰电气股份有限公司 Current detecting circuit and feedback control circuit applied to laminated control power supply and power supply
CN104777345B (en) * 2015-04-22 2017-06-13 四川英杰电气股份有限公司 Current detection circuit, feedback control circuit and power supply for lamination control power supply
CN106153330A (en) * 2016-09-05 2016-11-23 中国海洋大学 A kind of circumference valve port characteristic testing stand
CN106153330B (en) * 2016-09-05 2018-12-11 中国海洋大学 A kind of circumferential direction valve port characteristic testing stand

Similar Documents

Publication Publication Date Title
CN104820157A (en) Direct-current single-pole ground fault determination method of flexible direct-current power transmission system
CN103972969A (en) Charging pile
CN109581177A (en) IGBT power module dipulse automatically testing platform and its test method
CN110011531A (en) Circuit of power factor correction and air conditioner
CN105226610A (en) A kind of Transformer Close magnetizing inrush current arrester
CN104007396A (en) Device and method for searching for loop channeling electric fault in direct current systems
CN109194245A (en) A kind of servo-driver and its detection method with input phase failure detection function
CN105141209A (en) Method and device for reducing exciting current of transformer during bypass conduction of isolating uninterrupted power supply (UPS)
CN204142845U (en) Based on the stack bus bar proving installation of PEBB
CN105656318B (en) Alternating current-direct current energy regenerative type electronic simulation load device and its control method
CN205039524U (en) Transformer combined floodgate excitation surge current annihilator
CN201674405U (en) High voltage frequency converter with four-quadrant operation function
CN205120903U (en) Electromagnetic type voltage transformer response withstand voltage test system
CN203894367U (en) Thyristor shunting detection circuit for voltage source transverter
CN204515032U (en) A kind of proving installation of energy feedback unit
CN206523614U (en) A kind of energy consumption type alternating current electronic load
CN108462382A (en) PFC circuit, PFC circuit control method and air conditioner
CN204681157U (en) A kind of intelligent double-power control system
CN207664638U (en) A kind of grid-connected VSG devices of distributed generation resource
CN108539835B (en) AC-DC battery charging device
CN204613387U (en) For the electric supply installation that current transformer detects
CN109541458A (en) A kind of common DC bus type aircraft starting-generating system analogy method and device
CN104155625B (en) For the servicing unit of current mutual inductor with high transforming ratio field-checking in GIS
CN103546022A (en) Industry and mining direct-current electric locomotive general power source
CN208874490U (en) A kind of servo-driver with input phase failure detection function

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 518057 Guangdong province Shenzhen city Nanshan District high tech park, North Song Ping Road No. 1 Lite Technology Building South 11 floor

Patentee after: SHENZHEN BRONZE TECHNOLOGIES Ltd.

Address before: 518057 Guangdong province Shenzhen city Nanshan District high tech park, North Song Ping Road No. 1 Lite Technology Building South 11 floor

Patentee before: Shenzhen Bronze Technologies Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20150204