CN204112185U - Carbon fiber card fourth - Google Patents
Carbon fiber card fourth Download PDFInfo
- Publication number
- CN204112185U CN204112185U CN201420570218.6U CN201420570218U CN204112185U CN 204112185 U CN204112185 U CN 204112185U CN 201420570218 U CN201420570218 U CN 201420570218U CN 204112185 U CN204112185 U CN 204112185U
- Authority
- CN
- China
- Prior art keywords
- rod
- carbon fiber
- iii
- card
- fiber card
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Road Paving Structures (AREA)
Abstract
The utility model provides a kind of carbon fiber card fourth that can be coupled together by the cement pavement that two sections split preferably, comprise the carbon fiber body of rod, the described carbon fiber body of rod is made up of the body of rod I, the body of rod II and the body of rod III 3 sections, the other end that the described body of rod I is positioned at one end of the body of rod II, the described body of rod III is positioned at the body of rod II, the described body of rod I, the body of rod II and the body of rod III surround half frame-type structure.
Description
Technical field
The utility model relates to a kind of carbon fiber card fourth.
Background technology
Be generally section construction during cement pavement construction, on slope pavement, easily cause cement pavement between two sections split and affect road life after long-time use like this.
Summary of the invention
Technical problem to be solved in the utility model is to provide a kind of carbon fiber card fourth that can be coupled together by the cement pavement that two sections split preferably.
For solving above-mentioned existing technical problem, the utility model adopts following scheme: carbon fiber card fourth, comprise the carbon fiber body of rod, the described carbon fiber body of rod is made up of the body of rod I, the body of rod II and the body of rod III 3 sections, the other end that the described body of rod I is positioned at one end of the body of rod II, the described body of rod III is positioned at the body of rod II, the described body of rod I, the body of rod II and the body of rod III surround half frame-type structure.
As preferably, described carbon fiber body of rod surface has epoxy resin.
As preferably, described carbon fiber body of rod surface has salient point.
As preferably, the described body of rod I and the body of rod III be arranged in parallel.
Beneficial effect:
The carbon fiber card fourth that the utility model adopts technique scheme to provide, carbon fibre material is adopted to make the body of rod, intensity is more than 2 times of reinforced steel bar strength, there is excellent corrosion resistance, low-density, non-conductive not heat conduction, its coefficient of thermal expansion is close with cement pavement, when connecting two ends cement road, carbon fiber card fourth and cement road can not produce large thermal stresses, and construction install convenience, only need punch fluting on the cement road of two ends, the body of rod II and the body of rod III are respectively stretched in the hole of one section of cement road, the body of rod I correspondence is arranged in the groove that two sections of cement roads are opened, then cement is used, concrete etc. cover.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the schematic diagram that the utility model is applied in cement road repairing construction.
Detailed description of the invention
As shown in Figure 1, carbon fiber card fourth, comprise the carbon fiber body of rod, it is characterized in that: the described carbon fiber body of rod is made up of the body of rod I 1, the body of rod II 2 and the body of rod III 33 sections, the other end that the described body of rod I 1 is positioned at one end of the body of rod II 2, the described body of rod III 3 is positioned at the body of rod II 2, the described body of rod I 1, the body of rod II 2 and the body of rod III 3 surround half frame-type structure.Described carbon fiber body of rod surface has epoxy resin.Described carbon fiber body of rod surface has salient point 4.The described body of rod I 1 and the body of rod III 3 be arranged in parallel.
As shown in Figure 2, when using in cement road repairing construction, respectively in present two sections of cement road 05 must make a call to a hole, the distance at Liang Gekong center is equal with the distance between the body of rod I 1 and the body of rod III 3, then on cement pavement, open the groove that is communicated with two holes, the special epoxy glue of carbon fiber is coated in hole and groove, then carbon fiber card fourth is installed, the body of rod I 1 be arranged in a hole, the body of rod III 3 is arranged in another hole, the body of rod II 2 is arranged in groove, make carbon fiber card fourth and cementitious integral, then landfill can be covered get up by concrete with cement.
Claims (4)
1. carbon fiber card fourth, comprise the carbon fiber body of rod, it is characterized in that: the described carbon fiber body of rod is made up of the body of rod I (1), the body of rod II (2) and the body of rod III (3) three section, the other end that the described body of rod I (1) is positioned at one end of the body of rod II (2), the described body of rod III (3) is positioned at the body of rod II (2), the described body of rod I (1), the body of rod II (2) and the body of rod III (3) surround half frame-type structure.
2. carbon fiber card fourth according to claim 1, is characterized in that: described carbon fiber body of rod surface has epoxy resin.
3. carbon fiber card fourth according to claim 1, is characterized in that: described carbon fiber body of rod surface has salient point (4).
4. carbon fiber card fourth according to claim 1, is characterized in that: the described body of rod I (1) and the body of rod III (3) be arranged in parallel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420570218.6U CN204112185U (en) | 2014-09-29 | 2014-09-29 | Carbon fiber card fourth |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420570218.6U CN204112185U (en) | 2014-09-29 | 2014-09-29 | Carbon fiber card fourth |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204112185U true CN204112185U (en) | 2015-01-21 |
Family
ID=52329515
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420570218.6U Active CN204112185U (en) | 2014-09-29 | 2014-09-29 | Carbon fiber card fourth |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204112185U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104328724A (en) * | 2014-09-29 | 2015-02-04 | 嘉兴安立得建设工程有限公司 | Carbon fiber connecting clamper |
-
2014
- 2014-09-29 CN CN201420570218.6U patent/CN204112185U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104328724A (en) * | 2014-09-29 | 2015-02-04 | 嘉兴安立得建设工程有限公司 | Carbon fiber connecting clamper |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204112185U (en) | Carbon fiber card fourth | |
CN203320979U (en) | Reinforcing device of high-strength bolt hoop bracket | |
CN104328724A (en) | Carbon fiber connecting clamper | |
CN204230439U (en) | A kind of copper pipe bus transition joint fixture | |
CN204615333U (en) | A kind of novel spring stockbridge damper | |
CN204753350U (en) | Combination bridge | |
CN204530644U (en) | A kind of multichannel gool prefabricated component | |
CN204213510U (en) | Two O type circle socket joint thread connection set | |
CN204457797U (en) | A kind of top longitudinal beam structure of subway station | |
CN204311817U (en) | A kind of combined type composite material shaft tower | |
CN201981782U (en) | Girder body template used in buildings, bridges and culverts | |
CN103883155A (en) | Portable pole | |
CN204315175U (en) | A kind of anti-lost reflective circuit pole tag repeatedly used | |
CN204356834U (en) | A kind of vertical bearing plate of rainwater-collecting module | |
CN204940671U (en) | A kind of civil construction fragment of brick | |
CN202787480U (en) | Grating made of pultruded glass sections | |
CN203947839U (en) | Cement pole is reinforced anti-corrosive apparatus | |
CN204024367U (en) | A kind of thermal insulation door panel | |
CN205231694U (en) | Shrinkage terminal pipe | |
CN201826399U (en) | Matched structure of bi-directionally-clamped sag rod and purlin web plate | |
CN204681042U (en) | Syndeton between single-unit cable trough | |
CN202659640U (en) | Limiting rod | |
CN204435559U (en) | A kind of end connected node being applicable to FRP bar | |
CN204645277U (en) | Integrated house skeleton cross-connecting structure | |
CN204139299U (en) | A kind of plastic cement collecting-tank splicing structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20160920 Address after: Jiaxing City, Zhejiang province 314414 Haining City Ding Qiao Zhen Li Qun Cun Yan Jia No. 15, Yongfeng group Patentee after: Haining Anjie Composite Material Co., Ltd. Address before: Jiaxing City, Zhejiang province 314414 Haining City Ding Qiao Zhen Li Qun Cun Yan Jia No. 15, Yongfeng group Patentee before: JIAXING ANLIDE CONSTRUCTION ENGINEERING CO., LTD. |