CN204111206U - Oil-well rig blowout preventer unit hangs the system of moving - Google Patents

Oil-well rig blowout preventer unit hangs the system of moving Download PDF

Info

Publication number
CN204111206U
CN204111206U CN201420532777.8U CN201420532777U CN204111206U CN 204111206 U CN204111206 U CN 204111206U CN 201420532777 U CN201420532777 U CN 201420532777U CN 204111206 U CN204111206 U CN 204111206U
Authority
CN
China
Prior art keywords
blowout preventer
preventer unit
guide rail
conveying track
moving
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420532777.8U
Other languages
Chinese (zh)
Inventor
汪靖享
王东
买成华
王安义
董兴华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baoji Oilfield Machinery Co Ltd
Original Assignee
Baoji Oilfield Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baoji Oilfield Machinery Co Ltd filed Critical Baoji Oilfield Machinery Co Ltd
Priority to CN201420532777.8U priority Critical patent/CN204111206U/en
Application granted granted Critical
Publication of CN204111206U publication Critical patent/CN204111206U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)

Abstract

The utility model discloses a kind of oil-well rig blowout preventer unit and hang the system of moving, the steel structure base on both sides is respectively provided with a longitudinal beam, two longitudinal beam lower surfaces are provided with hanging beam dolly, the steamboat on hanging beam dolly top is connected with the longitudinal beam hook on steel structure base, and hanging beam dolly bottom is fixedly connected with guide rail; Be slidably fitted with blowout preventer unit bont in guide rail, the mobile steamboat on blowout preventer unit bont top is connected with guide rail hook; Be installed with conveying track in steel structure base bottom, the outer end of conveying track is fixing above deck by bracing frame, is provided with travelling bogie in conveying track.The utility model realizes the movement arbitrarily of blowout preventer unit X-Y both direction, reduces production time, enhances productivity.

Description

Oil-well rig blowout preventer unit hangs the system of moving
Technical field
The utility model belongs to technical field of petroleum machinery, relates to a kind of oil-well rig blowout preventer unit and hangs the system of moving.
Background technology
In oil-well rig cluster wells drilling process, blowout preventer unit can move along with the change of pithead position, tradition blowout preventer unit is hung the system of moving and only can be hung in one direction along guide rail and move blowout preventer unit, blowout preventer unit moves in another direction, needs other transports to hang and moves or stocking system, control step is many, complexity is high, increases a large amount of production time.
Utility model content
The purpose of this utility model is to provide a kind of oil-well rig blowout preventer unit and hangs the system of moving, solve in prior art only to hang in one direction along guide rail and move blowout preventer unit, move in another direction, need other transports to hang and move or stocking system cooperation, there is control step many, the problem that complexity is high.
The technical scheme that the utility model adopts is, a kind of oil-well rig blowout preventer unit hangs the system of moving, the steel structure base on both sides is respectively provided with a longitudinal beam, two longitudinal beam lower surfaces are provided with hanging beam dolly, the steamboat on hanging beam dolly top is connected with the longitudinal beam hook on steel structure base, and hanging beam dolly bottom is fixedly connected with guide rail; Be slidably fitted with blowout preventer unit bont in guide rail, the mobile steamboat on blowout preventer unit bont top is connected with guide rail hook; Be installed with conveying track in steel structure base bottom, the outer end of conveying track is fixing above deck by bracing frame, is provided with travelling bogie in conveying track.
Oil-well rig blowout preventer unit of the present utility model hangs the system of moving, and its feature is also:
Guide rail two ends is respectively arranged with stopper.
Travelling bogie upper surface middle is installed with transition Connection Block.
The beneficial effects of the utility model are, 1), in cluster wells operation, traditional blowout preventer unit is hung the system of moving and can only be hung along a direction and move blowout preventer unit, and blowout preventer unit moves in another direction, hangs moving device by other.This novel blowout preventer group is hung the system of moving and is realized the movement arbitrarily of blowout preventer unit X-Y both direction, reduces production time, enhances productivity.2) hang the system of moving and all adopt pressurized air or hydraulic-driven, manipulation is simple, and reliability is high, high safety.3) highly versatile, by changing transition Connection Block, being applicable to multiple blowout preventer unit and hanging and move.
Accompanying drawing explanation
Fig. 1 is the utility model oil-well rig blowout preventer unit lifting system front elevation;
Fig. 2 is the utility model oil-well rig blowout preventer unit lifting system birds-eye view;
Fig. 3 is that the utility model blowout preventer unit is hung in X direction and moved process schematic one;
Fig. 4 is that the utility model blowout preventer unit is hung in X direction and moved process schematic two;
Fig. 5 is that the utility model blowout preventer unit is hung in X direction and moved process schematic three;
Fig. 6 is that the utility model blowout preventer unit is hung in X direction and moved process schematic four;
Fig. 7 is that the utility model blowout preventer unit is hung along Y-direction and moved process schematic one;
Fig. 8 is that the utility model blowout preventer unit is hung along Y-direction and moved process schematic two.
In figure, 1. hanging beam dolly, 2. guide rail, 3. blowout preventer unit bont, 4. conveying track, 5. transition Connection Block, 6. travelling bogie, 7. bracing frame, 8. stopper, 9. steel structure base, 10. blowout preventer unit.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the utility model is described in detail.
With reference to Fig. 1, Fig. 2, structure of the present utility model is, the steel structure base 9 on both sides is respectively provided with a longitudinal beam (along Y-direction), two longitudinal beam lower surfaces are provided with hanging beam dolly 1, hanging beam dolly 1 adopts pressurized air or hydraulic-driven and gear rack arrangement, the steamboat on hanging beam dolly 1 top is connected with the longitudinal beam hook on steel structure base, realize a whole set of blowout preventer unit to hang the system of moving and move in the Y direction, hanging beam dolly 1 bottom bolt is fixedly connected with guide rail 2 (in X direction);
Blowout preventer unit bont 3 is slidably fitted with in guide rail 2, blowout preventer unit bont 3 adopts pressurized air or hydraulic-driven, the mobile steamboat on blowout preventer unit bont 3 top is connected with guide rail 2 hook, realize a whole set of blowout preventer unit to hang and move system follows track 2 and move in the X direction, guide rail 2 two ends is respectively arranged with stopper 8, prevents blowout preventer unit elevator system 3 from the landing of guide rail two ends;
Conveying track 4 is installed with in steel structure base 9 bottom, the outer end of conveying track 4 is fixing above deck by bracing frame 7, travelling bogie 6 is provided with in conveying track 4, travelling bogie 6 adopts pressurized air or hydraulic-driven, its underpart steamboat is connected with conveying track 4, moves freely along conveying track 4; Transition Connection Block 5 is installed with, for placing blowout preventer unit in travelling bogie 6 upper surface middle.
Working process of the present utility model is,
First, blowout preventer unit 10 first winches on travelling bogie 6 by Platform lifting devices, and its underpart bolt and transition Connection Block 5 are fixed, and it is inner that blowout preventer unit 10 is transported to steel structure base 9 along conveying track 4 by travelling bogie 6;
Then, blowout preventer unit bont 3 promotes blowout preventer unit 10 to pithead position or storage location, and blowout preventer unit is carried out X-direction along guide rail 2 by blowout preventer unit bont 3 and moved, as shown in Fig. 3, Fig. 4, Fig. 5, Fig. 6 order;
Or blowout preventer unit bont 3 promotes blowout preventer unit 10, control hanging beam dolly 1 and carry out Y-direction along the longitudinal beam of steel structure base 9 and move, as shown in Fig. 7, Fig. 8 order.

Claims (3)

1. an oil-well rig blowout preventer unit hangs the system of moving, its feature is: on the steel structure base (9) on both sides, be respectively provided with a longitudinal beam, two longitudinal beam lower surfaces are provided with hanging beam dolly (1), the steamboat on hanging beam dolly (1) top is connected with the longitudinal beam hook on steel structure base, and hanging beam dolly (1) bottom is fixedly connected with guide rail (2); Be slidably fitted with blowout preventer unit bont (3) in guide rail (2), the mobile steamboat on blowout preventer unit bont (3) top is connected with guide rail (2) hook; Conveying track (4) is installed with in steel structure base (9) bottom, the outer end of conveying track (4) is fixing above deck by bracing frame (7), be provided with travelling bogie (6) in conveying track (4), travelling bogie (6) bottom steamboat is connected with conveying track (4).
2. oil-well rig blowout preventer unit according to claim 1 hangs the system of moving, and its feature is: described guide rail (2) two ends is respectively arranged with stopper (8).
3. oil-well rig blowout preventer unit according to claim 1 hangs the system of moving, and its feature is: described travelling bogie (6) upper surface middle is installed with transition Connection Block (5).
CN201420532777.8U 2014-09-16 2014-09-16 Oil-well rig blowout preventer unit hangs the system of moving Expired - Fee Related CN204111206U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420532777.8U CN204111206U (en) 2014-09-16 2014-09-16 Oil-well rig blowout preventer unit hangs the system of moving

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420532777.8U CN204111206U (en) 2014-09-16 2014-09-16 Oil-well rig blowout preventer unit hangs the system of moving

Publications (1)

Publication Number Publication Date
CN204111206U true CN204111206U (en) 2015-01-21

Family

ID=52328543

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420532777.8U Expired - Fee Related CN204111206U (en) 2014-09-16 2014-09-16 Oil-well rig blowout preventer unit hangs the system of moving

Country Status (1)

Country Link
CN (1) CN204111206U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105217479A (en) * 2015-09-01 2016-01-06 山东科瑞机械制造有限公司 A kind of slant rig BOP hangs moving device
CN107965281A (en) * 2017-11-22 2018-04-27 宝鸡石油机械有限责任公司 A kind of marine module drilling rig preventer board migration device and movement method
CN110107238A (en) * 2019-04-18 2019-08-09 中国船舶及海洋工程设计研究院(中国船舶工业集团公司第七0八研究所) A kind of suitable surface preventer combination subsea blow out preventer group lays recovery system and method
CN112313391A (en) * 2017-10-11 2021-02-02 巴西石油公司 Apparatus, system and method for transporting and installing blowout preventer stack for land-based drilling rig
CN115028065A (en) * 2022-08-11 2022-09-09 山东华骏金成能源设备有限公司 Blowout preventer transferring device and using method thereof

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105217479A (en) * 2015-09-01 2016-01-06 山东科瑞机械制造有限公司 A kind of slant rig BOP hangs moving device
CN112313391A (en) * 2017-10-11 2021-02-02 巴西石油公司 Apparatus, system and method for transporting and installing blowout preventer stack for land-based drilling rig
CN107965281A (en) * 2017-11-22 2018-04-27 宝鸡石油机械有限责任公司 A kind of marine module drilling rig preventer board migration device and movement method
CN107965281B (en) * 2017-11-22 2020-02-18 宝鸡石油机械有限责任公司 Offshore module drilling rig blowout preventer moving device and moving method
CN110107238A (en) * 2019-04-18 2019-08-09 中国船舶及海洋工程设计研究院(中国船舶工业集团公司第七0八研究所) A kind of suitable surface preventer combination subsea blow out preventer group lays recovery system and method
CN110107238B (en) * 2019-04-18 2021-07-23 中国船舶及海洋工程设计研究院(中国船舶工业集团公司第七0八研究所) Laying and recovering system and method suitable for surface blowout preventer combined seabed blowout preventer group
CN115028065A (en) * 2022-08-11 2022-09-09 山东华骏金成能源设备有限公司 Blowout preventer transferring device and using method thereof

Similar Documents

Publication Publication Date Title
CN204111206U (en) Oil-well rig blowout preventer unit hangs the system of moving
CN104444840B (en) Mining hydraulic boom hoisting
CN103288010B (en) A kind of fork lift truck structure
CN207226920U (en) A kind of tower crane lifting body
CN104632088A (en) Petroleum drilling machine tower-shaped derrick sleeving mounting method
CN203559597U (en) Sliding device convenient to operate
CN204824031U (en) Manual hydraulic lift truck of rail mounted
CN104555828B (en) Fork truck automatic operating system
CN206014344U (en) Oil-well rig preventer hangs shifting and safeguards integrated apparatus
CN206088905U (en) Guide tracked lift
CN103523637B (en) Become rail elevator
CN203612879U (en) Stretchable and movable lifting platform
CN203593491U (en) Elevator traveling cable deflection-preventing device
CN203345962U (en) Crown block easy to hang
CN204677223U (en) A kind of underground coal mine fully-mechanized mining working surface hydraulic support loading apparatus
CN204474084U (en) A kind of goods lifting conveying elevator
CN204237414U (en) Elevator door self-closing device
CN205633955U (en) Transport table suitable for all kinds of big or small electromechanical device
CN204310797U (en) The horizontal bar gate type safety guard of automatic open-close can be run with guide tracked elevator
CN203486845U (en) Hydraulic jacking device of storage tank
CN205772985U (en) A kind of straddle truck equipment of civil engineering
CN203603499U (en) Concrete placing boom
CN205036346U (en) Embedded driller roon structure of oil -well rig driller concubine
CN202531070U (en) Blowout preventer transfer device
CN204646308U (en) A kind of transporting bracket device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150121

Termination date: 20150916

EXPY Termination of patent right or utility model