CN204098319U - A kind of ceiling structure - Google Patents

A kind of ceiling structure Download PDF

Info

Publication number
CN204098319U
CN204098319U CN201420370447.3U CN201420370447U CN204098319U CN 204098319 U CN204098319 U CN 204098319U CN 201420370447 U CN201420370447 U CN 201420370447U CN 204098319 U CN204098319 U CN 204098319U
Authority
CN
China
Prior art keywords
main joist
taper roof
full silk
muscle
furred ceiling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420370447.3U
Other languages
Chinese (zh)
Inventor
柯学
谭许胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Jing Gong Decoration Design Engineering Co Ltd
Original Assignee
Shenzhen Jing Gong Decoration Design Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Jing Gong Decoration Design Engineering Co Ltd filed Critical Shenzhen Jing Gong Decoration Design Engineering Co Ltd
Priority to CN201420370447.3U priority Critical patent/CN204098319U/en
Application granted granted Critical
Publication of CN204098319U publication Critical patent/CN204098319U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

A kind of ceiling structure, comprises the furred ceiling be made up of main joist, rider keel, facing, multiple full silk being vertically connected to taper roof hangs muscle; Described full silk hang muscle taper roof to hang muscle mounting points be taper roof bottom margin to point line of ink marker and each isocontour intersection point such as each spacing on top, the lower end that described full silk hangs muscle is connected with inverted U-shaped fastener bolt, described inverted U-shaped fastener lower end is flexibly connected with the main joist of furred ceiling by screw, described rider keel is fixedly connected with main joist, under described facing is fixed on main joist and rider keel.Without the need to arranging steelframe conversion layer, the taper roof of any gradient can be adapted to; Taper roof is uniformly distributed full silk and hangs muscle, and job site only needs to adopt according to numbering to be screwed, structure accurate positioning, is easy to install, and the shape of furred ceiling and area can need design according to scene.

Description

A kind of ceiling structure
Technical field
The utility model relates to furred ceiling.
Background technology
Along with the enhancing of China's economic strength, traditional Chinese culture is also praised highly, and the taper roof of traditional architecture is also widely used in modern architecture.Especially Chinese style villa, building is taper roof, particularly club roof, its pitched roof width and highly all larger, and this high spatial taper roof generally needs to arrange steelframe conversion layer, and shortcoming is that steel product cost is high, raising cost, prolongation construction period.
Utility model content
The technical problems to be solved in the utility model is to provide a kind of ceiling structure be installed under taper roof.
In order to solve the problems of the technologies described above, the utility model provides a kind of ceiling structure, comprises the furred ceiling be made up of main joist, rider keel, facing, multiple full silk being vertically connected to taper roof hangs muscle; Described full silk hang muscle taper roof to hang muscle mounting points be taper roof bottom margin to point line of ink marker and each isocontour intersection point such as each spacing on top, the lower end that described full silk hangs muscle is connected with inverted U-shaped fastener bolt, described inverted U-shaped fastener lower end is flexibly connected with the main joist of furred ceiling by screw, described rider keel is fixedly connected with main joist, under described facing is fixed on main joist and rider keel.
As preferred embodiment, described full silk is hung muscle upper end and is connected with taper roof by expansion bolt.
As preferred embodiment, the length that described full silk hangs muscle is 0.9m ~ 1.2m.
As preferred embodiment, point spacing of the line of ink marker on taper roof bottom margin such as described spacing is 1m.
As preferred embodiment, the distance between described isohypse is 1m.
The utility model ceiling structure comprises the furred ceiling that the full silk be vertically connected under taper roof hangs muscle, inverted U-shaped fastener and is made up of main joist, rider keel and facing, described full silk hangs muscle and determines in the following way in the mounting points on taper roof: use horizontal tube setting-out to go out isohypse, isohypse; 2, by the line of ink marker, each equidistant points is connected with top in the equidistant segmentation of taper roof bottom margin with steel ruler; 3, point line of ink marker such as each spacing and each isocontour intersection point are and hang muscle mounting points, each full silk is hung muscle and is connected to by expansion bolt correspondingly and hangs muscle mounting points, full silk hangs muscle lower end and is connected with inverted U-shaped fastener, inverted U-shaped fastener lower end is flexibly connected with the main joist of furred ceiling by screw, thus under making furred ceiling be fixed on taper roof, compared with prior art its advantage is:
1, without the need to arranging steelframe conversion layer, only need arrange and hang muscle and can install furred ceiling according to hanging muscle mounting points, reduce cost, shorten construction period, and can adapt to the taper roof of any gradient, flexibility is strong;
2, hanging muscle mounting points by presetting, ensure that taper roof is uniformly distributed full silk and hangs muscle, and the full silk of every one deck hanging muscle in same level, ensures that full silk hangs the connection uniform force of muscle to furred ceiling, ensures structural strength;
3, all parts are factory's customization processing, and on-the-spot split composition integral slab is fast, and job site only needs to adopt according to numbering to be screwed, structure accurate positioning, is easy to install, and the shape of furred ceiling and area can need design according to scene.
Accompanying drawing explanation
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail:
Fig. 1 is that the perpendicular of taper roof cuts open structural representation.
Fig. 2 is the schematic front view of the equidistant segmentation in taper roof.
Fig. 3 is the schematic top plan view of the equidistant segmentation in taper roof.
Fig. 4 is the structural representation of the utility model ceiling structure.
Fig. 5 is the partial enlarged drawing in A portion in Fig. 4.
Detailed description of the invention
Be illustrated in figure 1 the perpendicular of taper roof and cut open structural representation, described taper roof 300 undercarriage is provided with movable Scaffold 400 to construct, and during construction, movable Scaffold 400 wheel must be fixed.Be illustrated in figure 4 the structural representation of the utility model ceiling structure, this figure is horizontal direction phantom drawing, is clear display all parts, and each the full silk saved in the middle part of furred ceiling 100 hangs muscle 200.Described furred ceiling 100 is made up of main joist 110, rider keel 120 and facing 130, and described rider keel 120 is fixedly connected with main joist 110, and described facing 130 is fixed on main joist 110 and rider keel 120 times, and described facing 130 comprises difficult combustion plate, wood veneer etc.
As shown in Figures 2 and 3, described full silk hangs muscle 200 and determines in the following way at the link position (namely hanging muscle mounting points 310) on taper roof 300: 1, use horizontal tube setting-out to go out isohypse 320, the distance between isohypse 320 is preferably 1m; 2, is connected with top by each equidistant points by the line of ink marker in the equidistant segmentation of taper roof 300 bottom margin (point a segment distance be preferably 1m) with steel ruler, formation spacing etc. divides the line of ink marker 330; 3, point line of ink marker such as each spacing 330 is with the intersection point of each isohypse 320 and hangs muscle mounting points 310.Hang described in each in muscle mounting points 310 and hole, boring requirement deviation is in 2 millimeters, Aperture deviation is less than 1% (crossing conference causes expansion bolt to loosen), then expansion bolt is installed, described full silk hangs muscle 200 upper end and is vertically connected to taper roof 300 by expansion bolt and hangs muscle mounting points 310 one_to_one corresponding with described, and full silk hangs muscle 200 lower end and is connected with inverted U-shaped fastener 210 bolt.As shown in Figure 5, when installing furred ceiling 100, described inverted U-shaped fastener 210 lower end is flexibly connected with the main joist 110 of furred ceiling 100 by screw 220, then is connected with main joist 110 by rider keel 120, carry out leveling straightening, ensure smooth, between keel, seam Deviation Control is in 0.5mm, and Deviation Control that seam is straight is in 1mm, facade vertical missing controls in one thousandth, surface finish controls in ± 1mm, keel shoe because be upper people design, so its supporting capacity need be more than or equal to 2.5KN/ ㎡.The length that described full silk hangs muscle 200 is preferably 0.9m ~ 1.2m.Because main joist 110 can rotate in inverted U-shaped fastener 210, therefore furred ceiling 100 can adapt to the taper roof 300 of any gradient.The shape of furred ceiling 100 described in the present embodiment is isosceles trapezoid, and (not shown) is closed by the square furred ceiling of level in the space that furred ceiling 100 top encloses, and the furred ceiling of this level is connected with top, taper roof 300.The all parts of the utility model are factory's customization processing, and on-the-spot split composition integral slab is fast, and job site only needs to adopt according to numbering to be screwed, and the shape of furred ceiling 100 and area can need design according to scene.Structure accurate positioning, be easy to install, meet Expected Results, eliminate the steelframe conversion layer that traditional large space furred ceiling is usual, its cost reduces greatly, and the duration shortens greatly.

Claims (5)

1. a ceiling structure, is characterized in that: comprise the furred ceiling (100) be made up of main joist (110), rider keel (120), facing (130), multiple full silk being vertically connected to taper roof (300) hangs muscle (200);
Described full silk hangs muscle (200) and hangs muscle mounting points (310) for point line of ink marker (330) such as each spacing of taper roof (300) bottom margin to top and the intersection point of each isohypse (320) in taper roof (300), the lower end that described full silk hangs muscle (200) is connected with inverted U-shaped fastener (210) bolt, described inverted U-shaped fastener (210) lower end is flexibly connected with the main joist (110) of furred ceiling (100) by screw (220), described rider keel (120) is fixedly connected with main joist (110), under described facing (130) is fixed on main joist (110) and rider keel (120).
2. a kind of ceiling structure as claimed in claim 1, is characterized in that: described full silk is hung muscle (200) upper end and is connected with taper roof (300) by expansion bolt.
3. a kind of ceiling structure as described in claim 1 ~ 2 any one, is characterized in that: the length that described full silk hangs muscle (200) is 0.9m ~ 1.2m.
4. a kind of ceiling structure as claimed in claim 3, is characterized in that: point spacing of the line of ink marker (330) on taper roof (300) bottom margin such as described spacing is 1m.
5. a kind of ceiling structure as claimed in claim 4, is characterized in that: the distance between described isohypse (320) is 1m.
CN201420370447.3U 2014-07-07 2014-07-07 A kind of ceiling structure Expired - Fee Related CN204098319U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420370447.3U CN204098319U (en) 2014-07-07 2014-07-07 A kind of ceiling structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420370447.3U CN204098319U (en) 2014-07-07 2014-07-07 A kind of ceiling structure

Publications (1)

Publication Number Publication Date
CN204098319U true CN204098319U (en) 2015-01-14

Family

ID=52266761

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420370447.3U Expired - Fee Related CN204098319U (en) 2014-07-07 2014-07-07 A kind of ceiling structure

Country Status (1)

Country Link
CN (1) CN204098319U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110528767A (en) * 2019-08-20 2019-12-03 泰源工程集团股份有限公司 A kind of complex model furred ceiling closing in cell cube fabrication and installation method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110528767A (en) * 2019-08-20 2019-12-03 泰源工程集团股份有限公司 A kind of complex model furred ceiling closing in cell cube fabrication and installation method

Similar Documents

Publication Publication Date Title
CN202017346U (en) Late poured band hanging formwork structure
CN203144881U (en) Large-span stone arch bridge arch ring supporting system
CN201794296U (en) Small slab span cast-in-situ beam ribbed floor slab early-dismantling template support system
CN205171782U (en) Frame curtain system between stone material edge list
CN204098319U (en) A kind of ceiling structure
CN202000265U (en) Concrete construction formwork for high pier of bridge
CN103590529A (en) Super-large space cured-surface iron suspended ceiling
CN202882446U (en) Horse stool suspended by steel bars
CN205088951U (en) Many function combination jackscrew
CN203603472U (en) On-site pouring formwork of European-style balcony bay window
CN106448454A (en) Municipal street nameplate
CN202467147U (en) Hanging basket mounting bracket for building outer vertical face with two side gables
CN206205455U (en) A kind of construction centre mounted type pours leveling unit
CN204487047U (en) T profile group founds sectional fixture
CN204139570U (en) Containing the pre-buried fastening devices of detachable overhanging type steel beam of horizontal fixation kit
CN208845017U (en) Large span stone wood composite structure decorated archway
CN203603342U (en) Extra-large space curved-face iron art ceiling
CN202544875U (en) Front canopy type temporary supporting suspension device for anchor pole supporting tunnel construction
CN203188612U (en) Beam frame type building template system
CN202000266U (en) Supporting structure of bridge coping template
CN206298831U (en) The positioning tool of the prefabricated beam body bearing screw hole being arranged on bearing beam stone
CN202899643U (en) Full steel pipe adjustable ejector rod support
CN205206330U (en) Novel early tear head open
CN208965801U (en) The connection structure of rigid wall beam support
CN205134344U (en) Assembled template structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150114

Termination date: 20200707

CF01 Termination of patent right due to non-payment of annual fee