CN204063456U - The new fan operation controller of a kind of timeliness - Google Patents

The new fan operation controller of a kind of timeliness Download PDF

Info

Publication number
CN204063456U
CN204063456U CN201420476207.1U CN201420476207U CN204063456U CN 204063456 U CN204063456 U CN 204063456U CN 201420476207 U CN201420476207 U CN 201420476207U CN 204063456 U CN204063456 U CN 204063456U
Authority
CN
China
Prior art keywords
time relay
switch
contactor
coil
control loop
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420476207.1U
Other languages
Chinese (zh)
Inventor
李兆青
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baicheng Electromechanical Engineering Technology Hubei Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201420476207.1U priority Critical patent/CN204063456U/en
Application granted granted Critical
Publication of CN204063456U publication Critical patent/CN204063456U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Relay Circuits (AREA)

Abstract

The utility model provides the new fan operation controller of a kind of timeliness, at least comprise hand control switch and new blower fan major loop, also be provided with change-over switch, the time relay, run switch and contactor, described time relay manner of execution be electric time delay, wherein the normally opened contact of very first time relay and the coil tandem of contactor are the first sequential circuit, it is the second sequential circuit that the coil of second time relay is connected in series with contactor normally opened contact, the normally closed electric shock of second time relay and the coil tandem of very first time relay are the 3rd sequential circuit, above-mentioned three sequential circuits also connect rear formation automatic control loop, be connected in series with contactor coil again after described run switch is connected in series with hand control switch and form Non-follow control loop, automatic control loop is all connected with selector switch with Non-follow control loop.This controller can control automatically to new blower fan, makes its intermittent unlatching automatically, greatly reduces energy consumption.

Description

The new fan operation controller of a kind of timeliness
Technical field
The utility model provides the new fan operation controller of a kind of central air-conditioning, particularly relates to a kind of operation controller that can carry out time setting, belongs to electro-mechanical arts.
Background technology
All central air-conditioning being installed in current building, in central air-conditioning, generally all Aided design can being installed by new blower fan, for improving indoor environment, regulating air quality.New blower fan is a kind of effective air cleaning facility, room air can be made to produce circulation, on the one hand outside the air discharge chamber of foul indoor, on the other hand outdoor ozone through sterilization, after the measures such as sterilization, filtration, be input to indoor again, allowing in room is all the air of fresh clean all the time.
But new blower fan and the fresh air pipeline of design and installation in building system at present in most of the cases do not use, main cause is the Starting mode inconvenience of traditional start/stop, more and the staff of new blower fan quantity because of Mei Dong building after generally opening not in time or forget closedown, significantly increase operation of air conditioner energy consumption, cause air-conditioning system operating cost high, staff is difficult to accept thus do not open new blower fan without hesitation, so the VMC in the central air-conditioning of general building is in most cases ornaments, both investment was added, regulating action is not had again to improving air quality.
Summary of the invention
The utility model provides the new fan operation controller of a kind of timeliness, solves the deficiency in background technology, and this controller can control automatically to new blower fan, makes its intermittent unlatching automatically, greatly reduces energy consumption.
Realizing the technical scheme that the utility model above-mentioned purpose adopts is:
The new fan operation controller of a kind of timeliness, at least comprise hand control switch and new blower fan major loop, breaker is provided with in described new blower fan major loop, fuse and electrothermal relay, also be provided with change-over switch, the time relay, run switch and contactor, described time relay manner of execution be electric time delay, the time relay is provided with two, be respectively very first time relay and second time relay, wherein the normally opened contact of very first time relay and the coil tandem of contactor are the first sequential circuit, it is the second sequential circuit that the coil of second time relay is connected in series with contactor normally opened contact, the normally closed electric shock of second time relay and the coil tandem of very first time relay are the 3rd sequential circuit, above-mentioned three sequential circuits also connect rear formation automatic control loop, be connected in series with contactor coil after described run switch is connected in series with hand control switch again and form Non-follow control loop, hand control switch and contactor normally opened contact also connect formation self-locking, automatic control loop is all connected with selector switch with Non-follow control loop, is provided with automatic catch, manual and lock catch in described selector switch, and when being switched to automatic catch, automatic control loop connects new blower fan major loop by selector switch, when being switched to manual, Non-follow control loop connects new blower fan major loop by selector switch.
Described major loop is provided with power supply indicator.
Run indicator is serially connected with after described contactor coil.
The timeliness that the utility model provides new fan operation controller compared with prior art has following advantage: this controller can improve the method for operation of original new fan starting/stopping, be provided with manual and automatic two kinds of patterns, need under manual mode artificially manually to control new blower fan, in automatic mode can by carrying out set of time to the time relay, thus new blower fan intermittence is opened, stop 20 minutes as being set to unlatching after two minutes.So, can either ensure that outdoor fresh air enters indoor and improves indoor air ambient, energy consumption can be reduced greatly again.
Accompanying drawing explanation
The circuit diagram of the new fan operation controller of timeliness that Fig. 1 provides for the utility model.
Detailed description of the invention
Below in conjunction with accompanying drawing, detailed specific description is done to the utility model.
The circuit diagram of the new fan operation controller of the timeliness provided in the present embodiment as shown in Figure 1, at least comprise hand control switch ST2 and new blower fan major loop, in described new blower fan major loop, be provided with circuit breaker Q F, fuse FU and electrothermal relay KH and power supply indicator HR.In described controller, sea is provided with change-over switch SAC, the time relay, run switch ST1 and contactor KM.Described time relay manner of execution be electric time delay, the time relay is provided with two, be respectively very first time relay K T1 and the second time relay KT2, wherein the normally opened contact of very first time relay K T1 and the coil tandem of contactor KM are the first sequential circuit, it is the second sequential circuit that the coil of the second time relay KT2 is connected in series with contactor KM normally opened contact, the normally closed electric shock of the second time relay KT2 and the coil tandem of very first time relay K T1 are the 3rd sequential circuit, and above-mentioned three sequential circuits also connect rear formation automatic control loop.
Form Non-follow control loop with contactor KM coil tandem again after described run switch ST1 is connected in series with hand control switch ST2, after described contactor KM coil, be serially connected with run indicator HG.Hand control switch ST2 and contactor KM normally opened contact also connect formation self-locking.
Above-mentioned automatic control loop is all connected with selector switch SAC with Non-follow control loop, is provided with automatic catch, manual and lock catch in described selector switch SAC, and when being switched to automatic catch, automatic control loop connects new blower fan major loop by selector switch; When being switched to manual, Non-follow control loop connects new blower fan major loop by selector switch.
The operation principle of the timeliness that the present embodiment provides new fan operation controller is as follows: when change-over switch SAC is positioned at right position manual gear, 1., 2. contact is connected, and Non-follow control loop connects new blower fan major loop.Now closed hand control switch ST2, contactor KM coil obtains electric, and contactor normal open switch KM is closed forms self-locking, and run indicator HG is bright, and blower fan brings into operation, and manually presses run switch ST1, and circuit is cut off, and new blower fan is out of service, realizes Non-follow control.
When change-over switch SAC is positioned at left position automatic catch, 3., 4. contact is connected, and automatic control loop connects new blower fan major loop.Second time relay KT2 normally-closed contact is in the normal state closed, very first time relay K T1 coil obtains electric, after time expand T1, very first time relay K T1 normally opened contact KT1 closes, contactor KM coil obtains electric, contactor KM normal open switch closes, run indicator HG is bright, and new blower fan brings into operation.While contactor normal open switch KM is closed, the second time relay KT2 coil obtains electric, the second time relay KT2 normally-closed contact action after time expand T2, KT2 normally-closed contact disconnects, very first time relay K T1 coil losing electricity, due to the present embodiment select the time relay be electric time delay, so switch immediate response during power down, very first time relay K T1 normally opened contact disconnects, contactor KM coil losing electricity, contactor KM switch disconnects, second time relay KT2 coil losing electricity, second time relay KT2 normally-closed contact is closed open type new round circulation again, thus realize automatically controlling, time expand T2 is the fan operation time.Can realize disconnecting after the T1 time by this and start the T2 time, suppose that ratio according to 10:1 is to arrange T1 and T2, so energy consumption is only original 10%.

Claims (3)

1. the new fan operation controller of timeliness, at least comprise hand control switch and new blower fan major loop, breaker is provided with in described new blower fan major loop, fuse and electrothermal relay, it is characterized in that: be also provided with change-over switch, the time relay, run switch and contactor, described time relay manner of execution be electric time delay, the time relay is provided with two, be respectively very first time relay and second time relay, wherein the normally opened contact of very first time relay and the coil tandem of contactor are the first sequential circuit, it is the second sequential circuit that the coil of second time relay is connected in series with contactor normally opened contact, the normally closed electric shock of second time relay and the coil tandem of very first time relay are the 3rd sequential circuit, above-mentioned three sequential circuits also connect rear formation automatic control loop, be connected in series with contactor coil after described run switch is connected in series with hand control switch again and form Non-follow control loop, hand control switch and contactor normally opened contact also connect formation self-locking, automatic control loop is all connected with selector switch with Non-follow control loop, is provided with automatic catch, manual and lock catch in described selector switch, and when being switched to automatic catch, automatic control loop connects new blower fan major loop by selector switch, when being switched to manual, Non-follow control loop connects new blower fan major loop by selector switch.
2. the new fan operation controller of timeliness according to claim 1, is characterized in that: described major loop is provided with power supply indicator.
3. the new fan operation controller of timeliness according to claim 1, is characterized in that: be serially connected with run indicator after described contactor coil.
CN201420476207.1U 2014-08-21 2014-08-21 The new fan operation controller of a kind of timeliness Expired - Fee Related CN204063456U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420476207.1U CN204063456U (en) 2014-08-21 2014-08-21 The new fan operation controller of a kind of timeliness

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420476207.1U CN204063456U (en) 2014-08-21 2014-08-21 The new fan operation controller of a kind of timeliness

Publications (1)

Publication Number Publication Date
CN204063456U true CN204063456U (en) 2014-12-31

Family

ID=52204952

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420476207.1U Expired - Fee Related CN204063456U (en) 2014-08-21 2014-08-21 The new fan operation controller of a kind of timeliness

Country Status (1)

Country Link
CN (1) CN204063456U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105571085A (en) * 2016-02-29 2016-05-11 广东志高暖通设备股份有限公司 Air conditioner and starting and stopping control circuit thereof
CN106452196A (en) * 2016-10-31 2017-02-22 中国核动力研究设计院 Motor starting control circuit and method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105571085A (en) * 2016-02-29 2016-05-11 广东志高暖通设备股份有限公司 Air conditioner and starting and stopping control circuit thereof
CN106452196A (en) * 2016-10-31 2017-02-22 中国核动力研究设计院 Motor starting control circuit and method
CN106452196B (en) * 2016-10-31 2018-07-17 中国核动力研究设计院 Motor start control circuit and control method

Similar Documents

Publication Publication Date Title
CN104132420B (en) Low-power-consumption standby circuit device, air conditioner and control method of air conditioner
CN110119118B (en) Low-cost energy-saving wireless remote automatic on-off device and method applied to AGV
CN103208709B (en) Wireless intelligent socket
CN104110800A (en) Air conditioner, and on-off control method and on-off control system for resistive load
CN108571461B (en) Fan control device, fan system and frequency converter system
CN102664460A (en) Load remote automatic control power supply device
CN204063456U (en) The new fan operation controller of a kind of timeliness
CN101749826A (en) Energy saving method and controller thereof for non-residential air conditioner
CN203423383U (en) Power-off energy-saving house power distribution system
CN204495978U (en) A kind of high efficiency light fixture ageing oven
CN207368432U (en) A kind of low-voltage cabinet illumination air draft circuit
CN203242852U (en) Wireless intelligent socket
CN202305689U (en) Multiway heating wire detection circuit and refrigerator provided with same
CN208124562U (en) A kind of autonomous suspend mode control circuit of air-conditioner outdoor unit
CN205448164U (en) Automatic air conditioner defrost control system
CN202254111U (en) Air conditioner control device
CN106338125B (en) A kind of the electric heater control device and control method of air conditioner
CN204371738U (en) Intelligence auxiliary monitoring blower fan control system
CN203275969U (en) Centralized energy saving controller
CN219477662U (en) EPS illumination output control device
CN204141793U (en) A kind of Central air-conditioning unit chilled water control circuit
CN204648587U (en) A kind of central air-conditioning energy-saving system
CN204576111U (en) The small-sized load control box of timing adjustable circular start-stop
CN204462783U (en) GD packs unit emergency power pack switch automation operating system
CN203720671U (en) Linkage system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: BAICHENG ELECTRICAL ENGINEERING TECHNOLOGY (HUBEI)

Free format text: FORMER OWNER: LI ZHAOQING

Effective date: 20150325

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 430000 WUHAN, HUBEI PROVINCE TO: 430070 WUHAN, HUBEI PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20150325

Address after: 430070, No. seven, Kanto science and Technology Industrial Park, East Lake Development Zone, Wuhan, Hubei, 7-4-318

Patentee after: Baicheng Electromechanical Engineering Technology (Hubei) Co.,Ltd.

Address before: 430000 Hubei Province, Wuhan city Wuchang District No. 53 unit 2 Minglun Street No. 10-1

Patentee before: Li Zhaoqing

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141231

Termination date: 20210821