CN204059906U - Elevator hoistways Integral lifting type steel scaffold - Google Patents

Elevator hoistways Integral lifting type steel scaffold Download PDF

Info

Publication number
CN204059906U
CN204059906U CN201420489519.6U CN201420489519U CN204059906U CN 204059906 U CN204059906 U CN 204059906U CN 201420489519 U CN201420489519 U CN 201420489519U CN 204059906 U CN204059906 U CN 204059906U
Authority
CN
China
Prior art keywords
horizontal load
skewed horizontal
vertical rod
type steel
elevator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420489519.6U
Other languages
Chinese (zh)
Inventor
林王剑
何利剑
安俊
郭利然
吴惠平
田龙忠
董平
于文轩
倪新容
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUBEI ZHONGDI DINGTIAN CONSTRUCTION AND ENGINEERING Co Ltd
WUYANG CONSTRUCTION GROUP CO Ltd
Hangzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
HUBEI ZHONGDI DINGTIAN CONSTRUCTION AND ENGINEERING Co Ltd
WUYANG CONSTRUCTION GROUP CO Ltd
Hangzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUBEI ZHONGDI DINGTIAN CONSTRUCTION AND ENGINEERING Co Ltd, WUYANG CONSTRUCTION GROUP CO Ltd, Hangzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd filed Critical HUBEI ZHONGDI DINGTIAN CONSTRUCTION AND ENGINEERING Co Ltd
Priority to CN201420489519.6U priority Critical patent/CN204059906U/en
Application granted granted Critical
Publication of CN204059906U publication Critical patent/CN204059906U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Types And Forms Of Lifts (AREA)

Abstract

The utility model discloses a kind of elevator hoistways Integral lifting type steel scaffold, it is characterized in that, comprise skewed horizontal load, vertical rod, horizon bar and operation platform; The upper end of vertical rod is by being fixedly welded on bottom operation platform, and lower end is fixedly connected with skewed horizontal load; Skewed horizontal load has upper support end and bottom support end; Upper support end has an angular cut, and support on elevator shaft body of wall inwall, bottom support end has an Origuchi, and Origuchi is set up on elevator shaft side bar; Horizon bar is fixed by fastener and vertical rod and skewed horizontal load.The utility model structure is simple, highly versatile, good stability, lifting can be adopted to winch to the scope of operation with the construction of construction work floor, increase work efficiency, economical and practical.Efficiently solve tube material in elevator shaft because to overstock for a long time, material deformation, the problem such as corrosion, reduce potential safety hazard, simplify elevator shaft shear wall formwork operating platform working procedure, accelerate construction speed, can material turnover be improved, reduce construction cost.

Description

Elevator hoistways Integral lifting type steel scaffold
Technical field
The utility model belongs to building engineering field, in particular to a kind of job site elevator hoistways Integral lifting type steel scaffold, structure is simple, highly versatile, good stability, lifting can be adopted to winch to the scope of operation with the construction of construction work floor, increase work efficiency, economical and practical.
Background technology
Present stage, construction site is high-rise, small sized multiple story building has elevator hoistways structure.Elevator hoistways is the central core of circulation of job site building vertical transport, and primary protection point when being also main structure construction, will guarantee this place's construction safety in structure construction.
Traditional high rise elevator well handling frame was set up when basement is constructed, and adopt common fastener type steel pipe scaffold, scaffold building height increases with structure construction; And meanwhile, elevator pit processes the state of long-term ponding substantially at structure construction procedure, corrosion bottom scaffolding steel pipe, reduces the useful cross section of bottom steel pipe, weakens its bearing capacity; When the later stage removes, the super-long-term of inner support body uses, fastener loosens, pipe deformation, support body stability are poorer, and potential safety hazard is large.In addition, being detained at the steel pipe scaffold of elevator shaft inside for a long time, is also a no small expense to the running cost of whole project, and this mode causes the occupancy of scaffolding steel pipe large, sets up cost high, the problems such as circulation difficulty.
Summary of the invention
In order to overcome the deficiency of existing elevator hoistways operating platform, the utility model provides a kind of elevator hoistways Integral lifting type steel scaffold, and its structure is simple, highly versatile, good stability, lifting can be adopted to winch to the scope of operation with the construction of construction work floor, increase work efficiency, economical and practical.
Elevator hoistways Integral lifting type steel scaffold, is characterized in that, comprises skewed horizontal load 1, vertical rod 2, horizon bar 3 and operation platform 5; The upper end of vertical rod 2 is by being fixedly welded on bottom operation platform 5, and lower end is fixedly connected with skewed horizontal load 1; Skewed horizontal load 1 has upper support end 7 and bottom support end 6; Upper support end 7 has an angular cut, and support on elevator shaft body of wall inwall 4, bottom support end 6 has an Origuchi, and Origuchi is set up on elevator shaft side bar; Horizon bar 3 is fixed by fastener and vertical rod 2 and skewed horizontal load 1.
Further, described operation platform 5 for thickness be the riffled iron steel plate of 3 mm.
Described vertical rod 2 to elevator shaft body of wall inwall is provided with the operating distance of 400-500mm.
Described skewed horizontal load 1 is 16# i iron.
Described skewed horizontal load 1 is 45-60 ° with horizon angle α.
Described vertical rod 2 and horizon bar 3 are diameter 48mm steel pipe.
The size of above-mentioned each parts all can adjust according to the size in elevator hole and story height.
Adopting elevator hoistways Integral lifting type steel scaffold of the present utility model, without the need to setting up scaffold in elevator shaft inside the end of to top (or segmentation), simplifying the construction technology of operating platform, save lease equipment consumption, reduce hiring cost; Directly can be shelved on first step operating platform bottom template when elevator shaft inner side template is installed, not need embedded bar to support; Elevator shaft inner side template can with operating platform entirety upwards hoisted in position after removing, time saving and energy saving.Simultaneously because bottom adopts i shaped steel as mesa base stressed member, more guaranteed on bearing capacity, improve the safety of operating platform.
Elevator hoistways Integral lifting type steel scaffold structure of the present utility model is simple, highly versatile, good stability, lifting can be adopted to winch to the scope of operation with the construction of construction work floor, can increase work efficiency, economical and practical.Solve the drawback of the operating platforms such as traditional elevator hoistway position reinforcing bar binding, carpenter's formwork, casting and compacting of concrete.The utility model efficiently solve tube material in elevator shaft because to overstock for a long time, material deformation, the problem such as corrosion, reduce potential safety hazard, and simplify elevator shaft shear wall formwork operating platform working procedure, accelerate construction speed, can material turnover be improved, reduce construction cost.
Elevator hoistways Integral lifting type steel scaffold of the present utility model can only be used for personnel's constructing operation and a small amount of operation tool, forbids to stack the material such as reinforcing bar, steel pipe in a large number on steel platform.
Accompanying drawing explanation
Fig. 1 is the structural representation of a kind of embodiment of the utility model.
Fig. 2 is the A-A sectional view of the Integral lifting of elevator hoistways shown in Fig. 1 type steel scaffold.
Wherein, 1-skewed horizontal load; 2-vertical rod; 3-horizon bar; 4-elevator shaft body of wall inwall; 5-operation platform; 6-skewed horizontal load bottom support end; 7-skewed horizontal load upper support end.
Below in conjunction with accompanying drawing, the utility model is described in detail.
Detailed description of the invention
Elevator hoistways Integral lifting type steel scaffold as shown in Figure 1-2, comprises skewed horizontal load 1, vertical rod 2, horizon bar 3 and operation platform 5.Operation platform 5 is the checkered steel plate of length 2200mm, width 2050mm, thickness 3 mm.
The upper end of vertical rod 2 is by being fixedly welded on bottom operation platform 5, and lower end is fixedly connected with skewed horizontal load 1; Vertical rod 2 to elevator shaft body of wall inwall is provided with the operating distance of 400-500mm.
Skewed horizontal load 1 is 16# i iron, has upper support end 7 and bottom support end 6; Upper support end 7 has an angular cut, and support on elevator shaft body of wall inwall 4, bottom support end 6 has an Origuchi, and Origuchi is set up on elevator shaft side bar; Skewed horizontal load 1 and horizon angle α are 45-60 °.
Horizon bar 3 is fixed by fastener and vertical rod 2 and skewed horizontal load 1.Vertical rod 2 and horizon bar 3 are diameter 48mm steel pipe.
The size of above-mentioned each parts all can adjust according to the size in elevator hole and story height.
Elevator hoistways Integral lifting type steel scaffold structure of the present utility model is simple, highly versatile, good stability, lifting can be adopted to winch to the scope of operation with the construction of construction work floor, can increase work efficiency, economical and practical.Efficiently solve tube material in elevator shaft because to overstock for a long time, material deformation, the problem such as corrosion, reduce potential safety hazard, and simplify elevator shaft shear wall formwork operating platform working procedure, accelerate construction speed, can material turnover be improved, reduce construction cost.

Claims (6)

1. elevator hoistways Integral lifting type steel scaffold, is characterized in that, comprises skewed horizontal load (1), vertical rod (2), horizon bar (3) and operation platform (5); The upper end of vertical rod (2) is by being fixedly welded on operation platform (5) bottom, and lower end is fixedly connected with skewed horizontal load (1); Skewed horizontal load (1) has upper support end (7) and bottom support end (6); Upper support end (7) has an angular cut, and support on elevator shaft body of wall inwall (4), bottom support end (6) has an Origuchi, and Origuchi is set up on elevator shaft side bar; Horizon bar (3) is fixed by fastener and vertical rod (2) and skewed horizontal load (1).
2. elevator hoistways Integral lifting type steel scaffold as claimed in claim 1, is characterized in that, described operation platform (5) for thickness be the riffled iron steel plate of 3 mm.
3. elevator hoistways Integral lifting type steel scaffold as claimed in claim 1, it is characterized in that, described vertical rod (2) is provided with the operating distance of 400-500mm to elevator shaft body of wall inwall.
4. elevator hoistways Integral lifting type steel scaffold as claimed in claim 1, it is characterized in that, described skewed horizontal load (1) is 16# i iron.
5. elevator hoistways Integral lifting type steel scaffold as claimed in claim 1, is characterized in that, described skewed horizontal load (1) and horizon angle α are 45-60 °.
6. elevator hoistways Integral lifting type steel scaffold as claimed in claim 1, it is characterized in that, described vertical rod (2) and horizon bar (3) are diameter 48mm steel pipe.
CN201420489519.6U 2014-08-27 2014-08-27 Elevator hoistways Integral lifting type steel scaffold Expired - Fee Related CN204059906U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420489519.6U CN204059906U (en) 2014-08-27 2014-08-27 Elevator hoistways Integral lifting type steel scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420489519.6U CN204059906U (en) 2014-08-27 2014-08-27 Elevator hoistways Integral lifting type steel scaffold

Publications (1)

Publication Number Publication Date
CN204059906U true CN204059906U (en) 2014-12-31

Family

ID=52201449

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420489519.6U Expired - Fee Related CN204059906U (en) 2014-08-27 2014-08-27 Elevator hoistways Integral lifting type steel scaffold

Country Status (1)

Country Link
CN (1) CN204059906U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106703388A (en) * 2017-01-13 2017-05-24 中国五冶集团有限公司 Construction scaffold platform erected in super-high-layer building elevator shaft
CN109322477A (en) * 2018-11-19 2019-02-12 中国水利水电第十工程局有限公司 A kind of tool-type mobile steel platform in elevator
CN109563709A (en) * 2016-06-28 2019-04-02 安全工业责任有限公司 Inclination rig for vertical shaft installation

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109563709A (en) * 2016-06-28 2019-04-02 安全工业责任有限公司 Inclination rig for vertical shaft installation
CN106703388A (en) * 2017-01-13 2017-05-24 中国五冶集团有限公司 Construction scaffold platform erected in super-high-layer building elevator shaft
CN109322477A (en) * 2018-11-19 2019-02-12 中国水利水电第十工程局有限公司 A kind of tool-type mobile steel platform in elevator

Similar Documents

Publication Publication Date Title
CN202023360U (en) Hydraulic climbing die plate for building construction
CN204059906U (en) Elevator hoistways Integral lifting type steel scaffold
CN204781927U (en) Elevartor shaft formwork and elevartor shaft concrete placement operation platform
CN203878965U (en) Device for construction of elevator shaft
CN205348727U (en) A promote formula operation platform for in shaft
CN202370234U (en) Tool type elevator hoistway construction platform
CN205296799U (en) Construction of elevator well and protection platform
CN107687251A (en) A kind of hoistway operation platform and building method
CN202577925U (en) Lifting type platform in elevator shaft
CN103075001A (en) Steel tube fastener slip form platform system
CN202882376U (en) Elevator shaft template support platform
CN203891442U (en) High-rise elevator shaft template supporting platform
CN103112766A (en) Construction elevator suspending over basement roof of building and construction method thereof
CN203320922U (en) Supporting device for forming of elevator shaft template
CN205955165U (en) Elevator shaft operation platform
CN204126237U (en) A kind of elevator hoistway construction platform
CN211714541U (en) Special handling frame for installing shear wall template in elevator shaft
CN203755677U (en) Lower suspension hoisting type hoisting device for reinforced concrete floor construction
CN202672694U (en) Shaft construction circulation operating platform
CN211257761U (en) Lifting type elevator shaft operating platform
CN103498551A (en) Lift shaft section steel construction operating platform
CN203559574U (en) Elevator shaft formwork supporting movable support
CN202530737U (en) Elevator shaft supporting platform
CN203050071U (en) Steel operating platform for lift shaft
CN205348763U (en) Early support head of tearing open of building templates screw thread formula

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141231

Termination date: 20180827