CN203998636U - Twin rope grab three multiplying power duplex structures - Google Patents
Twin rope grab three multiplying power duplex structures Download PDFInfo
- Publication number
- CN203998636U CN203998636U CN201420423546.3U CN201420423546U CN203998636U CN 203998636 U CN203998636 U CN 203998636U CN 201420423546 U CN201420423546 U CN 201420423546U CN 203998636 U CN203998636 U CN 203998636U
- Authority
- CN
- China
- Prior art keywords
- pulley
- hawser
- deck
- deck beam
- suspension bracket
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The utility model relates to a kind of twin rope grab three multiplying power duplex structures, on deck beam, be hinged with strut, bottom at through beam is hinged with bucket body, the bottom of strut is hinged on the middle part, back of bucket body, in the upper surface left part of deck beam, the first cable wire guide wheel is installed, in the upper surface right part of deck beam, the second cable wire guide wheel is installed, on deck beam, be provided with the first deck beam pulley and the second deck beam pulley, on through beam, be provided with the first through beam pulley, the second through beam pulley and the 3rd through beam pulley, above deck beam, be provided with suspension bracket, the first hawser shackle is installed in the left part of suspension bracket, the second hawser shackle is installed in the right part of suspension bracket, unload to buckle by the second rig thimbler at the second hawser and be connected with hawser.The utility model structure is safer, and stressed even when grab bucket opens and closes, the held stationary that makes to grab bucket not to tilt.Cable stress of the present utility model is stressed less than the three multiplying power grab buckets of common double rope, also can select little No. one in the time of hawser type selecting.
Description
Technical field
The utility model relates to a kind of grab bucket, and the utility model especially relates to a kind of twin rope grab three multiplying power duplex structures.
Background technology
On the solid bolster grabbing bucket in switching steel rope one end of tradition twin rope grab, the other end extend out to a side of deck beam and the switching Suo Xianglian of hoisting crane, while opening and closing work, is subject to force unbalance, causes grab bucket not steady.
Summary of the invention
The purpose of this utility model is to overcome the deficiencies in the prior art, while providing a kind of structural safety, grab bucket to open and close stressed evenly, the held stationary that makes to grab bucket, twin rope grab three multiplying power duplex structures that the suffered resistance of hawser is little.
The technical scheme providing according to the utility model, described twin rope grab three multiplying power duplex structures, comprise deck beam and through beam, on deck beam, be hinged with strut, bottom at through beam is hinged with bucket body, the bottom of strut is hinged on the middle part, back of bucket body, in the upper surface left part of deck beam, the first cable wire guide wheel is installed, in the upper surface right part of deck beam, the second cable wire guide wheel is installed, on deck beam, be provided with the first deck beam pulley and the second deck beam pulley, on through beam, be provided with the first through beam pulley, the second through beam pulley and the 3rd through beam pulley, above deck beam, be provided with suspension bracket, the first hawser shackle is installed in the left part of suspension bracket, the second hawser shackle is installed in the right part of suspension bracket, unload to buckle by the second rig thimbler at the second hawser and be connected with hawser, hawser penetrates and enters the first through beam pulley by deck beam from the second cable wire guide wheel, walk around the first through beam pulley and enter the first deck beam pulley, walk around the first deck beam pulley and enter the second through beam pulley, walk around the second through beam pulley and enter the second deck beam pulley, walk around the second deck beam pulley and enter the 3rd through beam pulley, walk around the 3rd through beam pulley and pass the first cable wire guide wheel by deck beam, finally being connected to the second hawser by the first rig thimbler unloads and buckles.
Be fixed with elevator chain mounting ear at the upper surface of deck beam, on elevator chain mounting ear, elevator chain be installed.
Be provided with suspension bracket shackle at the middle part of suspension bracket.
The utility model is run through by same hawser, and without being connected with through beam, structure is safer.In grab bucket, opening and closing hawser can regulate two ends equal in length by shackle placed in the middle on suspension bracket automatically, plays equilibrium activity, reaches stressed consistent.Stressed even when switching, the held stationary that makes to grab bucket not to tilt.The utility model has solved that twin rope grab can not do balance block structure and grab bucket is tilted while causing work problem.Meanwhile, cable stress of the present utility model is stressed less than the three multiplying power grab buckets of common double rope, also can select little No. one in the time of hawser type selecting.
Brief description of the drawings
Fig. 1 is front view of the present utility model.
Fig. 2 is left view of the present utility model.
Fig. 3 is hawser coiling schematic diagram of the present utility model.
Detailed description of the invention
Below in conjunction with specific embodiment, the utility model is described in further detail.
These twin rope grab three multiplying power duplex structures, comprise deck beam 1 and through beam 2, on deck beam 1, be hinged with strut, bottom at through beam 2 is hinged with bucket body, the bottom of strut is hinged on the middle part, back of bucket body, in the upper surface left part of deck beam 1, the first cable wire guide wheel 3.1 is installed, in the upper surface right part of deck beam 1, the second cable wire guide wheel 3.2 is installed, on deck beam 1, be provided with the first deck beam pulley 1.1 and the second deck beam pulley 1.2, on through beam 2, be provided with the first through beam pulley 2.1, the second through beam pulley 2.2 and the 3rd through beam pulley 2.3, above deck beam 1, be provided with suspension bracket 8, the first hawser shackle 7.1 is installed in the left part of suspension bracket 8, the second hawser shackle 7.2 is installed in the right part of suspension bracket 8, in the second hawser shackle 7.2, be connected with hawser 5 by the second rig thimbler 6.2, hawser 5 penetrates and enters the first through beam pulley 2.1 by deck beam 1 from the second cable wire guide wheel 3.2, walk around the first through beam pulley 2.1 and enter the first deck beam pulley 1.1, walk around the first deck beam pulley 1.1 and enter the second through beam pulley 2.2, walk around the second through beam pulley 2.2 and enter the second deck beam pulley 1.2, walk around the second deck beam pulley 1.2 and enter the 3rd through beam pulley 2.3, walk around the 3rd through beam pulley 2.3 and pass the first cable wire guide wheel 3.1 by deck beam 1, finally be connected in the second hawser shackle 7.2 by the first rig thimbler 6.1.
Be fixed with elevator chain mounting ear 10 at the upper surface of deck beam 1, elevator chain 4 is installed on elevator chain mounting ear 10.
Be provided with suspension bracket shackle 9 at the middle part of suspension bracket 8.
The utility model is run through by same hawser 5, and without being connected with through beam 2, structure is safer.Grab bucket upper cable 5 can regulate two ends equal in length by suspension bracket shackle placed in the middle on suspension bracket 89 automatically, plays equilibrium activity, reaches stressed consistent.Stressed even when switching, the held stationary that makes to grab bucket not to tilt.Solve that twin rope grab can not do balance block structure and grab bucket is tilted while causing work problem.That simultaneously three multiplying power duplex structure steel ropes are subject to the three multiplying powers grab buckets of force rate common double rope is stressed little, also can select little No. one in the time of hawser 5 type selecting.
The utility model utilizes pulley three multiplying power features, run through the first deck beam pulley 1.1, the second deck beam pulley 1.2, the first through beam pulley 2.1, the second through beam pulley 2.2 and the 3rd through beam pulley 2.3 by a hawser 5 from entering out, finally connect two ends by a suspension bracket 8 and converge into a suspension centre and reach balance, one that reaches twin rope grab three multiplying powers opens and closes pulsation-free object.
Claims (3)
1. twin rope grab three multiplying power duplex structures, comprise deck beam (1) and through beam (2), on deck beam (1), be hinged with strut, bottom at through beam (2) is hinged with bucket body, the bottom of strut is hinged on the middle part, back of bucket body, it is characterized in that: the first cable wire guide wheel (3.1) is installed in the upper surface left part of deck beam (1), the second cable wire guide wheel (3.2) is installed in the upper surface right part of deck beam (1), on deck beam (1), be provided with the first deck beam pulley (1.1) and the second deck beam pulley (1.2), on through beam (2), be provided with the first through beam pulley (2.1), the second through beam pulley (2.2) and the 3rd through beam pulley (2.3), be provided with suspension bracket (8) in deck beam (1) top, the first hawser shackle (7.1) is installed in the left part of suspension bracket (8), the second hawser shackle (7.2) is installed in the right part of suspension bracket (8), above be connected with hawser (5) by the second rig thimbler (6.2) in the second hawser shackle (7.2), hawser (5) penetrates and passes through deck beam (1) from the second cable wire guide wheel (3.2) and enters the first through beam pulley (2.1), walk around the first through beam pulley (2.1) and enter the first deck beam pulley (1.1), walk around the first deck beam pulley (1.1) and enter the second through beam pulley (2.2), walk around the second through beam pulley (2.2) and enter the second deck beam pulley (1.2), walk around the second deck beam pulley (1.2) and enter the 3rd through beam pulley (2.3), walk around the 3rd through beam pulley (2.3) and pass the first cable wire guide wheel (3.1) by deck beam (1), finally be connected in the second hawser shackle (7.2) by the first rig thimbler (6.1).
2. twin rope grab three multiplying power duplex structures as claimed in claim 1, is characterized in that: be fixed with elevator chain mounting ear (10) at the upper surface of deck beam (1), elevator chain (4) is installed on elevator chain mounting ear (10).
3. twin rope grab three multiplying power duplex structures as claimed in claim 1, is characterized in that: be provided with suspension bracket shackle (9) at the middle part of suspension bracket (8).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420423546.3U CN203998636U (en) | 2014-07-29 | 2014-07-29 | Twin rope grab three multiplying power duplex structures |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420423546.3U CN203998636U (en) | 2014-07-29 | 2014-07-29 | Twin rope grab three multiplying power duplex structures |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203998636U true CN203998636U (en) | 2014-12-10 |
Family
ID=52038667
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420423546.3U Withdrawn - After Issue CN203998636U (en) | 2014-07-29 | 2014-07-29 | Twin rope grab three multiplying power duplex structures |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203998636U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104118801A (en) * | 2014-07-29 | 2014-10-29 | 无锡市新华起重工具有限公司 | Double-rope grab three-multiplying-power duplex structure |
-
2014
- 2014-07-29 CN CN201420423546.3U patent/CN203998636U/en not_active Withdrawn - After Issue
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104118801A (en) * | 2014-07-29 | 2014-10-29 | 无锡市新华起重工具有限公司 | Double-rope grab three-multiplying-power duplex structure |
CN104118801B (en) * | 2014-07-29 | 2015-12-30 | 无锡市新华起重工具有限公司 | Twin rope grab three multiplying power double structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202643182U (en) | Steel wire rope compensating system of single-boom gantry crane | |
CN103964316A (en) | Multifunctional and multipurpose portal crane | |
CN105110140B (en) | A kind of rope traction lifting system of loads change self adaptation | |
CN201914868U (en) | Tower crane attached mounting-demounting hoisting device | |
CN203998636U (en) | Twin rope grab three multiplying power duplex structures | |
CN202116184U (en) | Multipoint self-balancing lifting appliance of cable crane | |
CN201517016U (en) | Special sling for a centrifugal concrete pile long die | |
CN204342257U (en) | A kind of large-scale component turning device | |
CN204310693U (en) | A kind of suspension hook being provided with Anti-hook releasing device | |
CN201560041U (en) | Balance beam with rope loosening monitoring | |
CN206645749U (en) | Electric block type multi-lay winding hoist engine | |
CN203558756U (en) | All-directional manual lift crane for ship | |
CN206665952U (en) | A kind of novel hanging tool | |
CN203382365U (en) | Lifting appliance system for lifting thin, long and thin-wall equipment integrally | |
CN206188203U (en) | Coincide floor overhead hoist | |
CN104649127A (en) | Flexible self-balance multi-suspension-point hanging beam structure | |
CN104118801B (en) | Twin rope grab three multiplying power double structure | |
CN207390887U (en) | A kind of hanging apparatus | |
CN206407796U (en) | A kind of mine hoist | |
CN202214169U (en) | Fixed gantry crane | |
CN202542743U (en) | Auxiliary reeving mechanism for mounting tower crane | |
CN204434122U (en) | The two loading trolley of tower crane | |
CN205442379U (en) | Balanced sling | |
CN103663181A (en) | Marine omni-directional manual crane | |
CN206384721U (en) | Four ropes grab bucket double structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20141210 Effective date of abandoning: 20151230 |
|
C25 | Abandonment of patent right or utility model to avoid double patenting |