CN203989576U - The high point of portable secured band suspension - Google Patents
The high point of portable secured band suspension Download PDFInfo
- Publication number
- CN203989576U CN203989576U CN201420394570.9U CN201420394570U CN203989576U CN 203989576 U CN203989576 U CN 203989576U CN 201420394570 U CN201420394570 U CN 201420394570U CN 203989576 U CN203989576 U CN 203989576U
- Authority
- CN
- China
- Prior art keywords
- fixed
- wire rope
- steel wire
- suspension
- suspension arrangement
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Emergency Lowering Means (AREA)
Abstract
The utility model relates to the high point of a kind of portable secured band suspension, comprise suspension arrangement, steel wire rope and wirerope-winding axle, in the structural beams of steel construction or cement framework, interval is fixed with a plurality of suspension arrangements, on the plurality of suspension arrangement, install the steel wire rope that is fixed for hanging safety belt, steel wire rope one end is firmly fixed on the suspension arrangement of starting, and the other end of steel wire rope is wrapped on wirerope-winding axle.The utility model fixed form is flexible, is widely used on steel construction, concrete frame, convenient and swift, safe and reliable, save again engineering measure expense, improved efficiency of construction, had market widely, simple in structure, easy and simple to handle, avoided personal injury, realized safety work.
Description
Technical field
The utility model belongs to safety operation field, is applicable to the dynamo-electric situation that lacks safety belt hanging point in work high above the ground that waits of installing, the especially a kind of high point of the portable secured band suspension that can effectively guarantee personal safety.
Background technology
In process pipelines construction, in the dynamo-electric work progress such as the installation of electric meter cable testing bridge, cable laying, a lot of job positions are positioned at piping lane or steel construction highest point, because safety belt does not have hanging point, causes and cannot correctly use, form potential safety hazard.Conventionally take to set up the measures such as scaffold guard rail, cause cost to increase and affect the duration.
Utility model content
The purpose of this utility model is to overcome the deficiencies in the prior art part, and the high point of a kind of portable secured band suspension is provided, and native system is installed safety belt hanging point in high-altitude, firmly firm, and construction is simple, is convenient to transportation and installs.
The utility model solves its technical problem and takes following technical scheme to realize:
The high point of a kind of portable secured band suspension, it is characterized in that: comprise suspension arrangement, steel wire rope and wirerope-winding axle, in the structural beams of steel construction or cement framework, interval is fixed with a plurality of suspension arrangements, on the plurality of suspension arrangement, install the steel wire rope that is fixed for hanging safety belt, steel wire rope one end is firmly fixed on the suspension arrangement of starting, and the other end of steel wire rope is wrapped on wirerope-winding axle; Suspension arrangement comprises fixed head, column, retainer ring, locking clamping apparatus and nut, and fixed head upper center is vertically fixed with a column, and this column upper end is coaxially fixed with a retainer ring, and this retainer ring is used for installing fixedly steel wire rope; Fixed head bilateral symmetry is shaped with locating hole, and in installing hole corresponding to these both sides plug-in mounting locking clamping apparatus, this locking clamping apparatus bottom is sleeved in structural beams, locking clamping apparatus upper end was plugged in fixed head and was fixed by nut.
And fixed head bilateral symmetry is shaped with a plurality of different locating holes, the locking clamping apparatus of corresponding a plurality of different sizes.
Advantage of the present utility model and good effect are:
1, native system carry out that process pipelines welding and electric, instrument cable crane span structure are installed and cable laying work progress in, safety belt can be hung on safety rope, met the high requirement of hanging low use of safety belt, guaranteed construction safety, saved simultaneously and set up scaffold guard rail expense, improved efficiency of construction.
2, the utility model fixed form is flexible, is widely used on steel construction, concrete frame, convenient and swift, safe and reliable, save again engineering measure expense, improved efficiency of construction, had market widely, simple in structure, easy and simple to handle, avoided personal injury, realized safety work.
Accompanying drawing explanation
Fig. 1 is system construction drawing of the present utility model;
Fig. 2 is the structural front view of single suspension arrangement in the utility model;
Fig. 3 is the left view of Fig. 2.
Reference numeral represents: 1 wirerope-winding axle; 2 structural beams; 3 steel wire ropes; 4 suspension arrangements; 5 retainer rings; 6 columns; 7 fixed heads; 8 nuts; 9 locking clamping apparatus.
The specific embodiment
Below in conjunction with accompanying drawing and by specific embodiment, the utility model is described in further detail, and following examples are descriptive, are not determinate, can not limit protection domain of the present utility model with this.
The high point of a kind of portable secured band suspension, comprise suspension arrangement 4, steel wire rope 3 and wirerope-winding axle 1, in the structural beams 2 of steel construction or cement framework, interval is fixed with a plurality of suspension arrangements, on the plurality of suspension arrangement, install the steel wire rope that is fixed for hanging safety belt, steel wire rope one end is firmly fixed on the suspension arrangement of starting, and the other end of steel wire rope is wrapped on wirerope-winding axle.
The concrete structure of suspension arrangement is referring to accompanying drawing 1 and accompanying drawing 2, suspension arrangement comprises fixed head 7, column 6, retainer ring 5, locking clamping apparatus 9 and nut 8, fixed head upper center is vertically fixed with a column, and this column upper end is coaxially fixed with a retainer ring, and this retainer ring is used for installing fixedly steel wire rope;
Fixed head bilateral symmetry is shaped with locating hole, and in installing hole corresponding to these both sides plug-in mounting locking clamping apparatus, the locking clamping apparatus that the present embodiment is used is U-shaped jig, and this locking clamping apparatus bottom is sleeved in structural beams, and locking clamping apparatus upper end was plugged in fixed head and fixed by nut.
In order to adapt to different sizes, fixed head bilateral symmetry is shaped with a plurality of different locating holes, the U-shaped jig of corresponding a plurality of different sizes, the attached U-shaped jig that Figure 2 shows that two kinds of sizes.
This device using method:
On steel construction or cement framework, use the fixed mount vertical columns of different size, the pillar of starting oppositely draws fixation, safety rope is connected with the pillar of starting, retainer ring through intermediate studdle top, according to length, to afterbody post top portion fixed head, be fixed, redundance is stayed on bobbin, carrying out process pipelines welding and electric, in the installation of instrument cable crane span structure and cable laying work progress, safety belt can be hung on safety rope, met the high requirement of hanging low use of safety belt, guaranteed the safety of construction, saved the scaffold guard rail expense of setting up simultaneously, improved efficiency of construction.
Although disclose for the purpose of illustration embodiment of the present utility model and accompanying drawing, but it will be appreciated by those skilled in the art that: within not departing from the spirit and scope of the utility model and claims, various replacements, variation and modification are all possible, therefore, scope of the present utility model is not limited to embodiment and the disclosed content of accompanying drawing.
Claims (2)
1. a portable secured band height is put suspension, it is characterized in that: comprise suspension arrangement, steel wire rope and wirerope-winding axle, in the structural beams of steel construction or cement framework, interval is fixed with a plurality of suspension arrangements, on the plurality of suspension arrangement, install the steel wire rope that is fixed for hanging safety belt, steel wire rope one end is firmly fixed on the suspension arrangement of starting, and the other end of steel wire rope is wrapped on wirerope-winding axle;
Suspension arrangement comprises fixed head, column, retainer ring, locking clamping apparatus and nut, and fixed head upper center is vertically fixed with a column, and this column upper end is coaxially fixed with a retainer ring, and this retainer ring is used for installing fixedly steel wire rope; Fixed head bilateral symmetry is shaped with locating hole, and in installing hole corresponding to these both sides plug-in mounting locking clamping apparatus, this locking clamping apparatus bottom is sleeved in structural beams, locking clamping apparatus upper end was plugged in fixed head and was fixed by nut.
2. the high point of portable secured band according to claim 1 suspension, is characterized in that: fixed head bilateral symmetry is shaped with a plurality of different locating holes the locking clamping apparatus of corresponding a plurality of different sizes.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420394570.9U CN203989576U (en) | 2014-07-17 | 2014-07-17 | The high point of portable secured band suspension |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420394570.9U CN203989576U (en) | 2014-07-17 | 2014-07-17 | The high point of portable secured band suspension |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203989576U true CN203989576U (en) | 2014-12-10 |
Family
ID=52029655
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420394570.9U Expired - Fee Related CN203989576U (en) | 2014-07-17 | 2014-07-17 | The high point of portable secured band suspension |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203989576U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110279953A (en) * | 2019-05-10 | 2019-09-27 | 贵州乌江水电开发有限责任公司沙沱发电厂 | A kind of safety rope device for Generator Outlet Switchgear maintenance |
-
2014
- 2014-07-17 CN CN201420394570.9U patent/CN203989576U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110279953A (en) * | 2019-05-10 | 2019-09-27 | 贵州乌江水电开发有限责任公司沙沱发电厂 | A kind of safety rope device for Generator Outlet Switchgear maintenance |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204355957U (en) | A kind of novel pipeline anchor ear lifting connection structure | |
CN204138210U (en) | A kind of regularization tower crane service platform and escape way | |
CN105275253A (en) | Equal-diameter rod erecting device and application method thereof | |
CN202150653U (en) | Auxiliary hanger for overhaul of safety belt | |
CN202061286U (en) | Hanging device of safety belt for overhauling transformer | |
CN203989576U (en) | The high point of portable secured band suspension | |
CN204475363U (en) | A kind of major diameter pre-embedded bolt fixing device for installing | |
CN202822531U (en) | Safety rope fixing support | |
CN205132955U (en) | Hoist and mount operation of electric power industry low latitude is with hoist and mount frame | |
CN204241323U (en) | Insulation ropes test unit | |
CN203750064U (en) | Portable safety belt fixing device for power equipment framework | |
CN202767547U (en) | Nuclear plant construction safety rope fixing clamping rod | |
CN205170234U (en) | Cantilever crane | |
CN103520852A (en) | Spacing-adjustable safety belt hanging device for disconnecting switch overhaul | |
CN203559314U (en) | Track fixing device of thickener | |
CN203345999U (en) | Special multifunctional lifting frame for busbar bridge | |
CN203961258U (en) | Builder's jack foot guard structure | |
CN204266607U (en) | A kind of high-voltage line protective frame | |
CN203632113U (en) | Portable safety string bag for electric pole | |
CN203288976U (en) | Isolating switch hoisting device | |
CN203119388U (en) | Multifunctional mounting rack for changing tension-resistant crossarm | |
CN202333523U (en) | Transformer substation framework hoisting device | |
CN205089034U (en) | Constant diameter pole pole setting ware | |
CN205275038U (en) | A mounting system that is used for long guide post of nuclear power to transport | |
CN205134920U (en) | Simple and easy aerial working platform device of building engineering |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20141210 Termination date: 20150717 |
|
EXPY | Termination of patent right or utility model |