CN203983863U - On shoulder and carry line coaster - Google Patents

On shoulder and carry line coaster Download PDF

Info

Publication number
CN203983863U
CN203983863U CN201420427976.2U CN201420427976U CN203983863U CN 203983863 U CN203983863 U CN 203983863U CN 201420427976 U CN201420427976 U CN 201420427976U CN 203983863 U CN203983863 U CN 203983863U
Authority
CN
China
Prior art keywords
ground wire
rope
line
pulley
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420427976.2U
Other languages
Chinese (zh)
Inventor
李占文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Maintenance Branch of State Grid Hebei Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Maintenance Branch of State Grid Hebei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Maintenance Branch of State Grid Hebei Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201420427976.2U priority Critical patent/CN203983863U/en
Application granted granted Critical
Publication of CN203983863U publication Critical patent/CN203983863U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

The utility model relate to a kind of for installing, the instrument of overhead transmission line or cable, be specifically related to the Line tool of carrying of a kind of ultra-high-tension power transmission line ground wire.In existing high-tension line there is the problems such as complicated operation, activity duration be long in carry line and the erection method of ground wire, and have certain work uncertainty.The utility model comprises pulley mechanism, cinch cord and hand chain lever hoist, and wherein, cinch cord two ends are connected with the two ends of ground wire preformed armor rods winding layer respectively, after cinch cord take-up operation, ground wire can be inserted into target location.The utility model has been simplified installation and the built on stilts operation of high-tension line ground wire, significantly reduce the activity duration, once-through operation can be in place ground wire preformed armor rods winding layer, there is design succinct, easy to implement, the advantage such as make and maintenance cost is lower, be applicable to various circuits and the workplace such as install, make somebody a mere figurehead, there is wide promotion and application prospect.

Description

On shoulder and carry line coaster
Technical field
The utility model relate to a kind of for installing, the instrument of overhead transmission line or cable, be specifically related to the Line tool of carrying of a kind of ultra-high-tension power transmission line ground wire and optical cable.
Background technology
While setting up ultra-high-tension power transmission line, need to install preformed armor rods and strain clamp additional being set up in the additional ground wire of electric tower cross-arm.Existing method of operation is generally: first, operating personnel are according to the installation site of field wiring situation estimation preformed armor rods and strain clamp; Secondly, operating personnel use special spiral shell button instrument to complete preformed armor rods and strain clamp installation; Finally, ground wire is inserted into electric tower cross-arm place.In installation process, the stressing conditions due to preformed armor rods and strain clamp and ground wire is comparatively complicated at the scene, and after setting up, the position of preformed armor rods and strain clamp is usually offset.If after ground wire has set up, there is relatively large deviation in the estimation of discovery preformed armor rods and strain clamp and installation site and target location, need to ground wire be dismantled and be moved to operating desk from electric tower cross-arm, again ground wire is inserted into electric tower cross-arm after readjusting preformed armor rods and strain clamp position.Existing method of operation complex steps, comparatively consuming time, even if skilled craftsman operates, the conservative estimation of its one-stop operation time is at least 4 hours.In addition, existing method of operation need to be estimated the installation site of preformed armor rods and strain clamp, needs operating personnel to possess the practical work experience compared with horn of plenty.In existing high-tension line there is the problems such as complicated operation, activity duration be long in carry line and the erection method of ground wire, and have certain work uncertainty.The upper anti-of high-tension line ground wire that proposes a kind of handled easily carried the Line tool, is problem demanding prompt solution in current installation, built on stilts and maintenance high-tension line.
Utility model content
For the deficiencies in the prior art, the utility model provides a kind of shouldering on simple in structure, convenient and practical to carry line coaster, on this, shoulder and carry line coaster and can guarantee after ground wire sets up, the part that preformed armor rods and strain clamp are installed is accurately set up in target location, and reduction activity duration by a relatively large margin and reduce labour intensity.
For solving above technical problem, the technical solution of the utility model is:
In one, shoulder and carry line coaster, comprise the pulley mechanism and the tightening system that are fixedly installed on electric tower cross-arm; Wherein, pulley mechanism comprises pulley support and is arranged on the pulley in pulley support by rotating shaft; Tightening system comprises the rope connecting in turn , cucurbit and rope ; Rope be positioned at the groove of described pulley, rope and rope free end be fixedly connected with ground wire by knot that can be undone by a pull.
Concrete, described cucurbit is hand chain lever hoist.
Concrete, rope for nylon rope, rope comprise steel wire rope and nylon rope; One end of steel wire rope is connected with described cucurbit, and its other end is connected with nylon rope by U-shaped link.
Concrete, pulley mechanism is arranged on electric tower cross-arm top, and pulley mechanism is that on-fixed is connected or bolt connects with the connected mode of electric tower cross-arm.
The common composition of pulley mechanism, tightening system and the ground wire isosceles triangle vertical with electric tower cross-arm; Pulley mechanism is positioned at isosceles triangle vertex position, and ground wire forms the fixing base of length of isosceles triangle, and tightening system forms two waists of isosceles triangle, by cucurbit, tightening system is carried out to folding and unfolding to change the length of isosceles triangle two waists.
The beneficial effects of the utility model: the pulley mechanism that 1, is arranged on electric tower cross-arm top is shouldered the ground wire of carrying line coaster and carry on being and provided support, and has ensured to install overall working stability; 2, when pulley makes tightening system folding and unfolding, freely, protection tightening system is avoided wearing and tearing, extends tightening system useful life in motion; 3, the steel wire rope part of tightening system is positioned at pulley groove, is conducive to tightening system and carries out folding and unfolding when action, keeps the stable of its operation; 4, hand chain lever hoist is for device provides power, have volume little, from heavy and light, the feature such as simple to operate, easy to use; 5, tightening system two ends are fixedly connected with by knot that can be undone by a pull with the two ends of preformed armor rods winding layer on ground wire respectively, when site operation, can adjust at any time the position of two knots that can be undone by a pull according to the actual installation position of preformed armor rods winding layer, ensure that ground wire is inserted into after electric tower cross-arm, its preformed armor rods winding layer position can accurately be positioned at target location, if only use the one end in tightening system to be fixedly connected with and to propose line operation with ground wire, although can realize the anti-function of carrying line and overhead ground wire, the ground portion that adds preformed armor rods winding layer accurately cannot be set up in to target location; 6, the common composition of pulley mechanism, tightening system and the ground wire isosceles triangle vertical with electric tower cross-arm, has ensured to install overall stability.The utility model design is succinct, easy to implement, make and maintenance cost lower, be applicable to various circuits and the workplace such as install, make somebody a mere figurehead, there is wide promotion and application prospect.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the schematic diagram of Fig. 1 left view.
Wherein, 1 pulley, 2 pulley supports, 3 ropes , 4 cucurbits, 5 ropes , 5-1 steel wire rope, the U-shaped link of 5-2,5-3 nylon rope, 6, ground wire, 6-1 preformed armor rods winding layer, 7 electric tower cross-arms.
Embodiment
Below in conjunction with accompanying drawing, the utility model is described in further detail.
With reference to Fig. 2, self-control pulley mechanism, its middle pulley 1 diameter of phi 280mm, pulley external diameter Φ 325mm, pulley rim width 37mm, pulley support 2 is that 2 block lengths are ∠ 45 × 45 × 5 angle steel of 100mm; The steel wire rope 5-1 part of tightening system is Φ 11mm steel wire rope, according to trigonometric function, in conjunction with lifting and the decline scope of the installation site of pulley mechanism, ground wire 6 target locations, ground wire 6, determines in tightening system and restricts 3, the length of the each several part such as steel wire rope 5-1, nylon rope 5-3.
On shoulder the operation of carrying line coaster and comprise the following steps: first, by on shoulder carry line coaster be arranged on ground wire preformed armor rods winding layer target location directly over, its key is the installation site of pulley mechanism, should ensure that the isosceles triangle being made up of pulley mechanism, tightening system and ground wire 6 is perpendicular to electric tower cross-arm 7; Secondly,, to the row unwrapping wire operation of cinch cord mechanism, will on tightening system, restrict 3 and rope 5 free end is fixed on respectively the two ends of preformed armor rods winding layer 6-1 on ground wire by knot that can be undone by a pull; Finally, tightening system is carried out to take-up operation, until on shoulder the target location of carrying line coaster ground wire 6 is promoted to electric tower cross-arm 7.In actual use, above shoulder the single operation time of carrying line coaster and be about 20 minutes.The utility model has been simplified installation and the built on stilts operation of high-tension line ground wire, has significantly reduced the activity duration, and once-through operation can be in place ground wire preformed armor rods winding layer, has reached the technique effect of expection.
The above execution mode is only preferred embodiment of the present utility model, and is not the exhaustive of the feasible enforcement of the utility model.For persons skilled in the art, any apparent change of under the prerequisite that does not deviate from the utility model principle and spirit, it having been done, within all should being contemplated as falling with claim protection range of the present utility model.

Claims (3)

1. on, shoulder and carry a line coaster, it is characterized in that comprising the pulley mechanism and the tightening system that are fixedly installed on electric tower cross-arm (7); Described pulley mechanism comprises pulley support (2) and is arranged on the pulley (1) in pulley support (2) by rotating shaft; Described tightening system comprises the rope connecting in turn (3), cucurbit (4) and rope (5); Described rope (5) be positioned at the groove of described pulley (1), described rope (3) and rope (5) free end is fixedly connected with ground wire (6) by knot that can be undone by a pull.
2. according to shouldering and carry line coaster in one claimed in claim 1, it is characterized in that described cucurbit (4) is for hand chain lever hoist.
3. according to shouldering and carry line coaster in the one described in claim 1 or 2, it is characterized in that described rope (3) be nylon rope, described rope (5) comprise steel wire rope (5-1) and nylon rope (5-3); One end of described steel wire rope (5-1) is connected with described cucurbit (4), and its other end is connected with nylon rope (5-3) by U-shaped link (5-2).
CN201420427976.2U 2014-07-31 2014-07-31 On shoulder and carry line coaster Expired - Fee Related CN203983863U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420427976.2U CN203983863U (en) 2014-07-31 2014-07-31 On shoulder and carry line coaster

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420427976.2U CN203983863U (en) 2014-07-31 2014-07-31 On shoulder and carry line coaster

Publications (1)

Publication Number Publication Date
CN203983863U true CN203983863U (en) 2014-12-03

Family

ID=51981279

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420427976.2U Expired - Fee Related CN203983863U (en) 2014-07-31 2014-07-31 On shoulder and carry line coaster

Country Status (1)

Country Link
CN (1) CN203983863U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104113014A (en) * 2014-07-31 2014-10-22 国家电网公司 Upward carrying wire lifting trolley

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104113014A (en) * 2014-07-31 2014-10-22 国家电网公司 Upward carrying wire lifting trolley

Similar Documents

Publication Publication Date Title
CN105839988A (en) Self-vertical positioning pole erecting device and construction method thereof
CN106099754B (en) A kind of 10kV overhead distributions insulation platform for live operation and its installation method
CN105186378A (en) Power transmission line channel crossing protection mechanism
CN105162039A (en) Portable grounding wire transmitter and using method
CN106229889B (en) A kind of transmission line of electricity lifting device for aerial wires
CN203998746U (en) Portable suspension installation
CN104113014A (en) Upward carrying wire lifting trolley
CN206237060U (en) A kind of manual hinge-wheel type strainer for power transmission line
CN205489271U (en) Transmission line aerial earth wire lifter
CN203983863U (en) On shoulder and carry line coaster
CN206650368U (en) Fixed firm high altitude power maintenance gets thing ware
CN103779809B (en) The two oidiospore wire pitch operational method of charged adjustment
CN203278097U (en) Electric pole cross arm erecting device
CN202405695U (en) Lifting tool for overhead ground wire of steel pipe pole
CN202197048U (en) Double angle steel hanging point lifting and connecting tool for tower use
CN202039638U (en) Lead screw lifting type insulating cross arm
CN102237654B (en) Method for replacing jumper string using tool at double angle hanging point
CN204407790U (en) A kind of insulation gin pole for getting out wire jumper
CN103601033B (en) Bundling wire square forming device
CN105119203A (en) Lifting tool for comprehensive live overhaul of distribution network
CN210712913U (en) Pulley inhaul cable device for fixing inclined roof concrete foundation
CN204118374U (en) The earth lead point protection device in succession of earth connection
CN205489269U (en) Overhead earth wire hoisting device for high tension transmission line
CN202474699U (en) Portable heavy object transmitter for telegraph pole
CN203423430U (en) Insulator maintenance device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141203