CN203976878U - Electric heat treating furnace at the bottom of steel pipe energy-saving formula roller - Google Patents
Electric heat treating furnace at the bottom of steel pipe energy-saving formula roller Download PDFInfo
- Publication number
- CN203976878U CN203976878U CN201420469264.7U CN201420469264U CN203976878U CN 203976878 U CN203976878 U CN 203976878U CN 201420469264 U CN201420469264 U CN 201420469264U CN 203976878 U CN203976878 U CN 203976878U
- Authority
- CN
- China
- Prior art keywords
- heater
- furnace
- steel pipe
- roller
- furnace roller
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model relates to steel pipe heat treatment equipment field, especially electric heat treating furnace at the bottom of a kind of steel pipe energy-saving formula roller, it comprises body of heater and is arranged on the furnace roller of body of heater lower end, in body of heater inside, be provided with nichrome wire, at body of heater, with respect to the front end of furnace roller direction of motion, be provided with heat recovery chamber, lower end in heat recovery chamber is provided with furnace roller equally, at body of heater, with respect to the rear end of furnace roller direction of motion, is provided with preheating chamber, in the lower end of preheating chamber, is provided with equally furnace roller; In heat recovery chamber, be provided with blast pipe, blast pipe is put in heat recovery chamber's inner disk winding, and is connected to preheating chamber inside by pipe connecting.Electric heat treating furnace at the bottom of this steel pipe energy-saving formula roller, it adopts electric-heating-wire-heating, can reduce exhaust emission, heat on the steel pipe that simultaneously thermal treatment can be completed fully reclaims, for to entering the preheating of the steel pipe before body of heater, successful, it is poor to the Heating temperature of steel pipe to greatly reduce in body of heater, reduce energy consumption, cost-saving, increase economic efficiency.
Description
Technical field
The utility model relates to steel pipe heat treatment equipment field, electric heat treating furnace at the bottom of especially a kind of steel pipe energy-saving formula roller.
Background technology
In existing enterprise, the thermal treatment of steel pipe is mostly adopted and burns coal or liquefied gas as heat source of supply, energy consumption is large, and the required cost of the processing of steel pipe per ton is greatly about 500-600 unit left and right, and cost is relatively high.After simultaneously steel pipe is heated to 1100 ℃ of left and right and finishes dealing with in body of heater, transfer to body of heater outside and carry out coolingly, this part heat on steel pipe directly distributes, and cannot recycle.
Utility model content
The purpose of this utility model is that electric heat treating furnace at the bottom of a kind of steel pipe energy-saving formula roller that can effectively reduce energy consumption, environmental protection is more provided in order to solve the deficiency of above-mentioned technology.
In order to achieve the above object, electric heat treating furnace at the bottom of the designed steel pipe energy-saving formula roller of the utility model, it comprises body of heater and is arranged side by side the furnace roller in body of heater lower end, in the upper end of body of heater inside and the lower end of the furnace roller of body of heater inside be all disposed with nichrome wire, at body of heater, with respect to the front end of furnace roller direction of motion, be provided with heat recovery chamber, lower end in heat recovery chamber is provided with furnace roller equally, the height of the furnace roller in heat recovery chamber is less than or equal to the height of the furnace roller in body of heater, at body of heater, with respect to the rear end of furnace roller direction of motion, be provided with preheating chamber, lower end at preheating chamber is provided with furnace roller equally, the height of the furnace roller in preheating chamber is greater than or equal to the height of the furnace roller in body of heater, in heat recovery chamber, be provided with blast pipe, blast pipe is put in heat recovery chamber's inner disk winding, and is connected to preheating chamber inside by pipe connecting, and the port of the pipe connecting in preheating chamber is provided with air outlet.
Technique scheme heats by nichrome wire in body of heater, and heating power more strengthens, and device structure is simplified more, simultaneously and environmental protection more, can not produce the material to environment such as waste gas, simultaneously accurate to heating and temperature control; The setting of heat recovery chamber and preheating chamber simultaneously, heat on steel pipe can be passed to the air in blast pipe in heat recovery chamber, by pipe connecting, warm air is delivered in preheating chamber and before body of heater, just now carries out preheating to entering again, make its temperature can be preheated to 300-400 ℃, thereby reduced the temperature head heating in body of heater, reduced greatly the energy that steel pipe is processed required consumption, energy conservation is obvious, and can shorten heat-up time, improve process for processing efficiency.
As optimization, in the upper end of body of heater inside and the lower end of the furnace roller of body of heater inside be interval with support bar, support bar is identical with furnace roller direction, described nichrome wire winding is on support bar.This structure can make nichrome wire fixing more firm in body of heater, improves its use properties.
As optimization, in the gap of the support bar of the furnace roller below in described body of heater between adjacent two furnace rollers.The circulation transmission of the convenient stove intimate heat of this structure, avoids furnace roller nichrome wire is blocked and cause the heat on nichrome wire to transmit.
Between described heat recovery chamber and body of heater, laminating arranges, and between preheating chamber and body of heater, laminating arranges, and on the port being connected between heat recovery chamber and body of heater and between preheating chamber and body of heater, is provided with the door that can freely swing, and the height of the lower surface of door is higher than the height of furnace roller.The setting of this structure, make whole structure compacter, and can intercept the circulation of the air between body of heater and heat recovery chamber and preheating chamber, avoid by a large amount of freezing airs, being entered in body of heater in conveying steel pipe process, a large amount of warm airs flow out in body of heater, affect heating efficiency, therefore this structure can effectively reduce the loss of energy, improve energy utilization rate, door can freely swing simultaneously, to the conveying of the steel pipe of different diameter, can not impact.
Described air outlet is arranged in the preheating chamber near body of heater one end, and the direction of air outlet is for charging place towards preheating chamber and be tilted to down.The setting of this structure, what make hot blast blows to aligning steel pipe, and from inside to outside, makes the hottest wind on the steel pipe of the most close body of heater, thus the temperature when being conducive to improve steel pipe and entering body of heater improves the use properties of equipment, save energy.
Electric heat treating furnace at the bottom of the resulting steel pipe energy-saving of the utility model formula roller, it adopts electric-heating-wire-heating, can reduce exhaust emission, heat on the steel pipe that simultaneously thermal treatment can be completed fully reclaims, for to entering the preheating of the steel pipe before body of heater, successful, it is poor to the Heating temperature of steel pipe to greatly reduce in body of heater, reduce energy consumption, cost-saving, increase economic efficiency.
On existing equipment, while adopting coal or Sweet natural gas, as raw material, steel pipe is heated to 1100 ℃, it is 500-600 unit that average steel pipe per ton needs cost; And on this equipment, use after electrically heated and heat recuperation, steel pipe per ton is heated to 1100 ℃, required cost is on average between 100-200 unit.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Embodiment
Below by embodiment, the utility model will be further described by reference to the accompanying drawings.
Embodiment 1:
As shown in Figure 1, electric heat treating furnace at the bottom of the steel pipe energy-saving formula roller that the present embodiment is described, it comprises body of heater 1 and is arranged side by side the furnace roller 2 in body of heater 1 lower end, in the upper end of body of heater 1 inside and the lower end of the furnace roller 2 of body of heater 1 inside be all disposed with nichrome wire 4, at body of heater 1, with respect to the front end of furnace roller 2 direction of motion, be provided with heat recovery chamber 5, lower end in heat recovery chamber 5 is provided with furnace roller 2 equally, the height of the furnace roller 2 in heat recovery chamber 5 equals the height of the furnace roller 2 in body of heater 1, at body of heater 1, with respect to the rear end of furnace roller 2 direction of motion, be provided with preheating chamber 6, lower end at preheating chamber 6 is provided with furnace roller 2 equally, the height of the furnace roller 2 in preheating chamber 6 equals the height of the furnace roller 2 in body of heater 1, in heat recovery chamber 5, be provided with blast pipe 7, blast pipe 7 is put in heat recovery chamber's 5 inner disk windings, and is connected to preheating chamber 6 inside by pipe connecting 8, and the port of the pipe connecting 8 in preheating chamber 6 is provided with air outlet 9, in the upper end of body of heater 1 inside and the lower end of the furnace roller 2 of body of heater 1 inside be interval with support bar 3, support bar 3 is identical with furnace roller 2 directions, described nichrome wire 4 windings are on support bar 3, in the gap of the support bar 3 of furnace roller 2 belows in described body of heater 1 between adjacent two furnace rollers 2.
Between described heat recovery chamber 5 and body of heater 1, laminating arranges, between preheating chamber 6 and body of heater 1, laminating arranges, on the port being connected between heat recovery chamber 5 and body of heater 1 and between preheating chamber 6 and body of heater 1, be provided with the door 10 that can freely swing, the height of the lower surface of door 10 is higher than the height of furnace roller 2; Described air outlet 9 is arranged in the preheating chamber 6 near body of heater 1 one end, and the direction of air outlet 9 is for charging place towards preheating chamber 6 and be tilted to down.
Claims (6)
1. electric heat treating furnace at the bottom of a steel pipe energy-saving formula roller, it comprises body of heater and is arranged side by side the furnace roller in body of heater lower end, it is characterized in that: in the upper end of body of heater inside and the lower end of the furnace roller of body of heater inside be all disposed with nichrome wire, at body of heater, with respect to the front end of furnace roller direction of motion, be provided with heat recovery chamber, lower end in heat recovery chamber is provided with furnace roller equally, the height of the furnace roller in heat recovery chamber is less than or equal to the height of the furnace roller in body of heater, at body of heater, with respect to the rear end of furnace roller direction of motion, be provided with preheating chamber, lower end at preheating chamber is provided with furnace roller equally, the height of the furnace roller in preheating chamber is greater than or equal to the height of the furnace roller in body of heater, in heat recovery chamber, be provided with blast pipe, blast pipe is put in heat recovery chamber's inner disk winding, and is connected to preheating chamber inside by pipe connecting, and the port of the pipe connecting in preheating chamber is provided with air outlet.
2. electric heat treating furnace at the bottom of a kind of steel pipe energy-saving formula roller according to claim 1, it is characterized in that: in the upper end of body of heater inside and the lower end of the furnace roller of body of heater inside be interval with support bar, support bar is identical with furnace roller direction, and described nichrome wire winding is on support bar.
3. electric heat treating furnace at the bottom of a kind of steel pipe energy-saving formula roller according to claim 2, is characterized in that: in the gap of the support bar of the furnace roller below in described body of heater between adjacent two furnace rollers.
4. according to electric heat treating furnace at the bottom of a kind of steel pipe energy-saving formula roller described in claim 1 or 2 or 3, it is characterized in that: between described heat recovery chamber and body of heater, laminating arranges, between preheating chamber and body of heater, laminating arranges, on the port being connected between heat recovery chamber and body of heater and between preheating chamber and body of heater, be provided with the door that can freely swing, the height of the lower surface of door is higher than the height of furnace roller.
5. according to electric heat treating furnace at the bottom of a kind of steel pipe energy-saving formula roller described in claim 1 or 2 or 3, it is characterized in that: described air outlet is arranged in the preheating chamber near body of heater one end, and the direction of air outlet is for charging place towards preheating chamber and be tilted to down.
6. electric heat treating furnace at the bottom of a kind of steel pipe energy-saving formula roller according to claim 4, is characterized in that: described air outlet is arranged in the preheating chamber near body of heater one end, and the direction of air outlet is for charging place towards preheating chamber and be tilted to down.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420469264.7U CN203976878U (en) | 2014-08-20 | 2014-08-20 | Electric heat treating furnace at the bottom of steel pipe energy-saving formula roller |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420469264.7U CN203976878U (en) | 2014-08-20 | 2014-08-20 | Electric heat treating furnace at the bottom of steel pipe energy-saving formula roller |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203976878U true CN203976878U (en) | 2014-12-03 |
Family
ID=51974341
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420469264.7U Expired - Fee Related CN203976878U (en) | 2014-08-20 | 2014-08-20 | Electric heat treating furnace at the bottom of steel pipe energy-saving formula roller |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203976878U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107299216A (en) * | 2017-06-21 | 2017-10-27 | 华北理工大学 | A kind of heater for rolling steel |
-
2014
- 2014-08-20 CN CN201420469264.7U patent/CN203976878U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107299216A (en) * | 2017-06-21 | 2017-10-27 | 华北理工大学 | A kind of heater for rolling steel |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203440235U (en) | Toughened glass heating furnace | |
CN204115399U (en) | A kind of associating dehumidifying drying equipment | |
CN204085068U (en) | A kind of solar energy of built-in circulation air path and air energy barn | |
CN203976878U (en) | Electric heat treating furnace at the bottom of steel pipe energy-saving formula roller | |
CN202566116U (en) | Electric far infrared food tunnel furnace | |
CN201885528U (en) | Chain part drying equipment | |
CN201567292U (en) | Heating device for annealing furnace | |
CN203216232U (en) | Quick constant temperature baking oven | |
CN202494347U (en) | Comprehensive energy saving device utilizing surplus heat of tunnel type kiln furnace, | |
CN202521228U (en) | Temperature-controllable high-sugar degree liquid anti-crystallization conveying device | |
CN206403088U (en) | Hot blast tea carding drying integral machine | |
CN204824593U (en) | Glass tempering gas -fired heater | |
CN207585349U (en) | A kind of cathode carbon pieces phosphorus pig iron casting preheating furnace | |
CN203700171U (en) | Glass plate heating furnace | |
CN204020224U (en) | A kind of high efficiency printing drying system | |
CN203112688U (en) | Novel glass tempering furnace | |
CN202297701U (en) | Single-roller inclined hardening furnace | |
CN202792867U (en) | Biomass drying heating system | |
CN201941103U (en) | Energy-saving plastic dryer | |
CN205987421U (en) | Hot -blast case | |
CN204616951U (en) | Tea leaf water-removing device | |
CN204329529U (en) | A kind of drying unit of bamboo panel | |
CN103884192A (en) | Device for preheating raw materials by microwaves and recombination energy | |
CN110252617A (en) | A kind of powder coating process baking and curing gas radiation heating device | |
CN204227920U (en) | A kind of furnace construction with heat recovery function |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20141203 Termination date: 20210820 |
|