CN203967529U - A kind of arrangement of 220kV power distribution equipment - Google Patents

A kind of arrangement of 220kV power distribution equipment Download PDF

Info

Publication number
CN203967529U
CN203967529U CN201420432631.6U CN201420432631U CN203967529U CN 203967529 U CN203967529 U CN 203967529U CN 201420432631 U CN201420432631 U CN 201420432631U CN 203967529 U CN203967529 U CN 203967529U
Authority
CN
China
Prior art keywords
tube type
power distribution
distribution equipment
type bus
gil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201420432631.6U
Other languages
Chinese (zh)
Inventor
高美金
陈飞
高亚栋
金国胜
周惠文
俞辰颖
尹康
徐俞音
何英静
黄忠华
胡宇鹏
童军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Economic and Technological Research Institute of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Economic and Technological Research Institute of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Economic and Technological Research Institute of State Grid Zhejiang Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201420432631.6U priority Critical patent/CN203967529U/en
Application granted granted Critical
Publication of CN203967529U publication Critical patent/CN203967529U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Gas-Insulated Switchgears (AREA)

Abstract

The utility model discloses a kind of arrangement of 220kV power distribution equipment.It is the hard bus of cast and flexible conductor that the 220kV side main bus bar of conventional substation is used many, and because plain conductor is to be arranged in air, so wire phase spacing must guarantee enough safe distances, and then increased the floor space of power distribution equipment.Of the present utility model being characterised in that vertically drawn respectively A, B, C three-phase sleeve pipe from GIL tube type bus, and a side of GIL tube type bus is provided with three isolated circuit breakers on same straight line; Described three isolated circuit breakers and GIL tube type bus are arranged in parallel, and three described isolated circuit breakers adopt flexible conductor to be connected with A, B, the C three-phase sleeve pipe of GIL tube type bus respectively.The utility model has greatly reduced the floor space of power distribution equipment on the one hand, and a kind of high reliability, less trouble, power distribution equipment arrangement form that maintenance is few are provided on the other hand.

Description

A kind of arrangement of 220kV power distribution equipment
Technical field
The utility model relates to power system device, specifically a kind of arrangement of 220kV power distribution equipment.
Background technology
Conventional outdoor substation 220kV power distribution equipment adopts conventional outdoor equipment mostly.220kV conventional equipment quantity is many, overall dimensions large, it is wide to take up an area, and the tie point between equipment is many, causes the hidden danger point of fault many.Easily there is corrosion in the factor impacts such as equipment climate environment, shortens service life of equipment, having used a large amount of isolated switchgears in transformer station at present, need to often carry out repair and maintenance, greatly affects power supply reliability.
At the 220kV of conventional substation side main bus bar, present stage is used many have hard bus of cast and two kinds of wires of flexible conductor, the wire of these two kinds of patterns is all exposed to be arranged in air, particularly in the more serious area of some damage ratios, just need to often carry out cleaning.Because plain conductor is to be arranged in air, so wire phase spacing must guarantee enough safe distances, and then increased the floor space of power distribution equipment.
Utility model content
Technical problem to be solved in the utility model is to overcome the defect that above-mentioned prior art exists, and provides a kind of arrangement of 220kV power distribution equipment, to reduce the floor space of power distribution equipment.
For this reason, the technical solution adopted in the utility model is as follows: a kind of arrangement of 220kV power distribution equipment, comprise GIL tube type bus, it is characterized in that, from GIL tube type bus, vertically draw respectively A, B, C three-phase sleeve pipe, distance between adjacent casing is 3-4m, and a side of GIL tube type bus is provided with three isolated circuit breakers on same straight line;
Described three isolated circuit breakers and GIL tube type bus are arranged in parallel, and horizontal range is between the two 3.5-4.5m, and three described isolated circuit breakers adopt flexible conductor to be connected with A, B, the C three-phase sleeve pipe of GIL tube type bus respectively.
As the further of technique scheme improved and supplemented, the utility model is taked following technical measures:
Described GIL tube type bus is erected on a plurality of erection columns.
Distance between adjacent casing most preferably is 3.5m.
Described isolated circuit breaker and the horizontal range between GIL tube type bus most preferably are 4m.
The beneficial effect the utlity model has is as follows: greatly reduced on the one hand the floor space of power distribution equipment, a kind of high reliability, less trouble, power distribution equipment arrangement form that maintenance is few are provided on the other hand.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the end view of Fig. 1.
Fig. 3 is floor plan of the present utility model.
In figure, 1-GIL tube type bus, 2-A phase sleeve pipe, 3-B phase sleeve pipe, 4-C phase sleeve pipe, the isolated circuit breaker of 5,6,7-, 8-erection column.
Embodiment
Below in conjunction with specification drawings and specific embodiments, the utility model is described in further detail.
The arrangement of 220kV power distribution equipment as shown in the figure, from GIL tube type bus 1, vertically draw respectively A, B, C three-phase sleeve pipe 2,3,4, distance between adjacent casing is 3-4m, and a side of GIL tube type bus 1 is provided with three isolated circuit breakers 5,6,7 on same straight line; Described three isolated circuit breakers and GIL tube type bus are arranged in parallel, and horizontal range is between the two 3.5-4.5m, and three described isolated circuit breakers adopt flexible conductor to be connected with A, B, the C three-phase sleeve pipe of GIL tube type bus respectively.Described GIL tube type bus 1 is erected on a plurality of erection columns 8.
Below only with regard to the utility model preferred embodiment, be described, but can not be interpreted as it is limitations on claims.The utility model is not only confined to above embodiment, and its concrete structure allows to change.All various variations of doing in the protection range of the utility model independent claims are all in protection range of the present utility model.

Claims (4)

1. the arrangement of a 220kV power distribution equipment, comprise GIL tube type bus (1), it is characterized in that, from GIL tube type bus (1), vertically draw respectively A, B, C three-phase sleeve pipe (2,3,4), distance between adjacent casing is 3-4m, and a side of GIL tube type bus (1) is provided with three isolated circuit breakers (5,6,7) on same straight line;
Described three isolated circuit breakers and GIL tube type bus are arranged in parallel, and horizontal range is between the two 3.5-4.5m, and three described isolated circuit breakers adopt flexible conductor to be connected with A, B, the C three-phase sleeve pipe of GIL tube type bus respectively.
2. the arrangement of 220kV power distribution equipment according to claim 1, is characterized in that, described GIL tube type bus (1) is erected on a plurality of erection columns (8).
3. the arrangement of 220kV power distribution equipment according to claim 1 and 2, is characterized in that, the distance between adjacent casing is 3.5m.
4. the arrangement of 220kV power distribution equipment according to claim 1 and 2, is characterized in that, described isolated circuit breaker and the horizontal range between GIL tube type bus are 4m.
CN201420432631.6U 2014-08-01 2014-08-01 A kind of arrangement of 220kV power distribution equipment Withdrawn - After Issue CN203967529U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420432631.6U CN203967529U (en) 2014-08-01 2014-08-01 A kind of arrangement of 220kV power distribution equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420432631.6U CN203967529U (en) 2014-08-01 2014-08-01 A kind of arrangement of 220kV power distribution equipment

Publications (1)

Publication Number Publication Date
CN203967529U true CN203967529U (en) 2014-11-26

Family

ID=51928073

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420432631.6U Withdrawn - After Issue CN203967529U (en) 2014-08-01 2014-08-01 A kind of arrangement of 220kV power distribution equipment

Country Status (1)

Country Link
CN (1) CN203967529U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104184051A (en) * 2014-08-01 2014-12-03 国家电网公司 Arrangement structure of 220 kV distribution apparatus

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104184051A (en) * 2014-08-01 2014-12-03 国家电网公司 Arrangement structure of 220 kV distribution apparatus

Similar Documents

Publication Publication Date Title
CN201351375Y (en) Concrete pole with earthing device
CN104314355B (en) A kind of T connection steel pipe pole of cross-arm abnormity
CN204088899U (en) The vertical wire outlet structure of Novel outdoor GIS power distribution equipment
CN102427203B (en) Method for arranging air insulated switchgear (AIS) power distribution unit of smart substation
CN203967529U (en) A kind of arrangement of 220kV power distribution equipment
CN203260976U (en) Cable termination tower
CN204067880U (en) A kind of power distribution equipment arrangement back-to-back
CN109066320B (en) HGIS equipment applied to double-bus outgoing line
CN202353005U (en) Insulating platform for high-voltage direct current change-over switch
CN204258114U (en) A kind of 500kV substation equipment arrangement
CN207282908U (en) The 500kV power distribution equipments arranged using half c-type
CN204011013U (en) The sealing syndeton of a kind of transformer, high-tension cable cable end and lightning arrester
CN204597311U (en) A kind of 500kV HGIS power distribution equipment arrangement of 3/2 breaker connection
CN204706781U (en) A kind of 500 kilovolts of HGIS controller switching equipments, controller switching equipment group and power distribution equipments
CN203787789U (en) T and pi mixed net rack wiring structure applied to high voltage distribution
CN104184051A (en) Arrangement structure of 220 kV distribution apparatus
CN202949188U (en) Cable busbar connector insulation protective device
CN203573821U (en) High-voltage parallel capacitor
CN207559421U (en) A kind of arrangement of GIS device
CN107332149B (en) Transformer substation main transformer low-voltage side field and arrangement method thereof
CN202633757U (en) Auxiliary ground ring for low-voltage grounding
CN204230648U (en) Based on the outdoor power distribution unit of Novel tank-type circuit breaker
CN206575071U (en) A kind of tree-like door frame outlet structure of 330kV open airs GIS power distribution equipments
CN204098598U (en) A kind of T connection steel pipe pole of cross-arm abnormity
CN203312706U (en) Insulator fastening wrench

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20141126

Effective date of abandoning: 20160824

C25 Abandonment of patent right or utility model to avoid double patenting