CN203961809U - Super large caliber Drilling Water mud collar structure - Google Patents

Super large caliber Drilling Water mud collar structure Download PDF

Info

Publication number
CN203961809U
CN203961809U CN201420395211.5U CN201420395211U CN203961809U CN 203961809 U CN203961809 U CN 203961809U CN 201420395211 U CN201420395211 U CN 201420395211U CN 203961809 U CN203961809 U CN 203961809U
Authority
CN
China
Prior art keywords
circle body
cement
cement circle
super large
large caliber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420395211.5U
Other languages
Chinese (zh)
Inventor
李付星
陈亮
李沛霖
李传琪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuzhou University of Technology
Original Assignee
Xuzhou University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuzhou University of Technology filed Critical Xuzhou University of Technology
Priority to CN201420395211.5U priority Critical patent/CN203961809U/en
Application granted granted Critical
Publication of CN203961809U publication Critical patent/CN203961809U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)
  • Earth Drilling (AREA)

Abstract

Super large caliber Drilling Water mud collar structure, this cement coil structures has the cement circle body of a positive annular, in the top edge of cement circle body, be provided with a protruding wild goose tail projection, in the lower edge of cement circle body, be provided with a wild goose stern notch being connected with wild goose tail projection shiding matching, on cement circle body sidewall, have axial groove, in groove, coincide and be stained with wall casing, in the top edge of the cement circle of foot, have cross supporting frame fixing hole.Described wall casing is a kind of plastic conduit or metal tube, has several through holes on the outer wall of this pipe.This kind of super large caliber Drilling Water mud collar is simple in structure, easy construction, and firm reliable, globality is strong, is the reliable structure of super large caliber drill drilling operation.

Description

Super large caliber Drilling Water mud collar structure
Technical field
the utility model relates to the cement coil structures in a kind of drillng operation, especially a kind of super large caliber Drilling Water mud collar structure.
Background technology
at present, all smaller for the drilling well bore of drillng operation, its drilling well wall wall around will well solve, but, concerning the well wall of super large caliber drilling well, its difficulty of construction is just more difficult, because super large drilling well relative aperture is larger, generally all more than 5 meters, what have reaches tens meters, even twenties meters even, bigbore like this drilling well, and the volume and weight of its well wall is just huge especially, due to these two huge, its construction technology, transportation and operation are just very difficult.
Utility model content
in order to solve construction operation and the transportation problem of super large caliber Drilling Water mud collar in drillng operation, the utility model provides a kind of super large caliber Drilling Water mud collar structure, and this cement coil structures is simple, easy construction, firm reliable, globality is strong, is the reliable structure of super large caliber drill drilling operation.
the utility model solves the concrete scheme that its technical problem adopts: this super large caliber Drilling Water mud collar structure comprises wild goose tail projection, wall casing, wild goose stern notch and bracing frame fixing hole, this cement coil structures has the cement circle body of a positive annular, in the top edge of cement circle body, be provided with a protruding wild goose tail projection, in the lower edge of cement circle body, be provided with a wild goose stern notch being connected with wild goose tail projection shiding matching, on cement circle body sidewall, have axial groove, in groove, coincide and be bonded with wall casing, in the top edge of the cement circle body of foot, have cross supporting frame fixing hole, this hole can make the joint that stretches out of the cross supporting frame electromagnetic liquid cylinder pressure of super large caliber rig insert fixing.When wellbore construction, on the ground near selected drilling well, first cement circle forming and hardening, then be pulled on the level land of selected well head top, on cement circle, progressively install super large caliber rig, then start drillng operation, because this super large caliber rig is constantly discharged the earth of cement circle body bottom, cement circle progressively sinks, until it is concordant with ground to sink to the top edge of cement circle body, this super large caliber rig is stopped operation, on the top edge face of cement circle body, be coated with and spread the cement circle cementing agent preparing, then second prefabricated cement circle body is pushed into be coated with and wipes on the cement circle body of cement bonding agent, allow the wild goose tail projection of first cement circle and the wild goose stern notch of second cement circle body coincide fixing, the wall casing that makes in addition cement circle body also mutually coincide peg graft fixing, and then unlatching super large caliber drill drilling operation, after again the earth of cement circle body bottom being got rid of, second cement circle body progressively follows up again to fall by the pressure of weight own, when cement circle edge suitable for reading is again concordant with ground, reuse technique above, making the wild goose tail projection of second cement circle body and the wild goose stern notch of the 3rd cement circle body align to coincide fixes, its upper and lower wall casing also again coincide to peg graft and fixes, again open this super large caliber drill drilling operation, go round and begin again like this, cement circle body constantly superposes, until rig is drilled into the drilling depth needing.
wall casing described in this is a kind of plastic conduit or metal tube, on the outer wall of this pipe, have several through holes, the effect of this through hole has two, an effect is after the earth of cement circle bottom is excluded totally, because the frictional force of cement circle body and the borehole wall is too large, even be greater than the weight of cement circle, impel cement circle body can not continue to fall, now, to water filling in wall casing, make on the cement circle body borehole wall around after water pouring, its frictional force declined and be less than the weight of cement circle body, thereby impelling cement circle constantly to fall; Second effect is after whole drillng operation completes, grout injection from this wall casing, cement paste is diffused in borehole wall earth around from the through hole of wall casing surrounding to be gone, thereby reach integral cement circle body and shaft wall structure better in conjunction with fixing, to tackle because the deformation of address from now on changes to integral cement circle body with harmful effect, thereby reach the long-term more stable and stronger of integral cement circle body, avoid the accident of revealing and being out of shape to occur.
the beneficial effects of the utility model are, this kind of super large caliber Drilling Water mud collar structure, and this cement coil structures is simple, easy construction, firm reliable, globality is strong, is the reliable structure of super large caliber drill drilling operation.
Accompanying drawing explanation
below in conjunction with drawings and Examples, the utility model is described in further detail.
fig. 1 is structural principle schematic diagram of the present utility model.
fig. 2 is that the utility model is at the installation site schematic diagram of super large caliber drilling well rig total installed capacity.
in figure, 1. wild goose tail is protruding, 2. cement circle body, 3. wall casing, 4. wild goose stern notch, 5. sidewall, 6. bracing frame fixing hole, 7. electromagnetic liquid cylinder pressure, 8. cross supporting frame.
The specific embodiment
in the drawings, this super large caliber Drilling Water mud collar structure comprises wild goose tail projection 1, wall casing 3, wild goose stern notch 4 and bracing frame fixing hole 6, this cement coil structures has the cement circle body 2 of a positive annular, in the top edge of cement circle body 2, be provided with a protruding wild goose tail projection 1, in the lower edge of cement circle body 2, be provided with a wild goose stern notch 4 being connected with wild goose tail projection 1 shiding matching, on cement circle body sidewall 5, have axial groove, in groove, coincide and be bonded with wall casing 3, in the top edge of the cement circle body 2 of foot, have cross supporting frame 8 fixing holes 6, this hole can make the joint that stretches out of the cross supporting frame 8 electromagnetic liquid cylinder pressures 7 of super large caliber rig insert fixing.When wellbore construction, on the ground near selected drilling well, first cement circle forming and hardening, then be pulled on the level land of selected well head top, on cement circle 5, progressively install super large caliber rig, then start drillng operation, because this super large caliber rig is constantly discharged the earth of cement circle body 2 bottoms, cement circle progressively sinks, until it is concordant with ground to sink to the top edge of cement circle body 2, this super large caliber rig is stopped operation, on the top edge face of cement circle body 2, be coated with and spread the cement circle cementing agent preparing, then second prefabricated cement circle body 2 is pushed into be coated with and wipes on the cement circle body 2 of cement bonding agent, allow the wild goose stern notch 4 of 1 and second cement circle body 2 of wild goose tail projection of first cement circle coincide fixing, the wall casing 3 that makes in addition cement circle body 2 also mutually coincide peg graft fixing, and then unlatching super large caliber drill drilling operation, after again the earth of cement circle body 2 bottoms being got rid of, second cement circle body 2 leans on the pressure of weight own progressively to follow up again to fall, when cement circle edge suitable for reading is again concordant with ground, reuse technique above, make the wild goose stern notch 4 of 1 and the 3rd cement circle body 2 of wild goose tail projection of second cement circle body 2 align identical fixing, its upper and lower wall casing 3 also again coincide to peg graft and fixes, again open this super large caliber drill drilling operation, go round and begin again like this, cement circle body 2 constantly superposes, until rig is drilled into the drilling depth needing.
wall casing 3 described in this is a kind of plastic conduit or metal tube, on the outer wall of this pipe, have several through holes, the effect of this through hole has two, an effect is after the earth of cement circle bottom is excluded totally, because the frictional force of cement circle body 2 and the borehole wall is too large, even be greater than the weight of cement circle, impel cement circle body 2 can not continue to fall, now, to water filling in wall casing 3, make on cement circle body 2 borehole wall around after water pouring, its frictional force declined and be less than the weight of cement circle body 2, thereby impelling cement circle constantly to fall; Second effect is after whole drillng operation completes, grout injection from this wall casing 3, cement paste is diffused in borehole wall earth around from the through hole of wall casing 3 surroundings to be gone, thereby better combination is fixing with shaft wall structure to reach integral cement circle body 2, to tackle because the deformation of address from now on changes to integral cement circle body 2 with harmful effect, thereby reach the long-term more stable and stronger of integral cement circle body 2, avoid the accident of revealing and being out of shape to occur.

Claims (2)

1. a kind of super large caliber Drilling Water mud collar structure, comprise wild goose tail projection (1), wall casing (3), wild goose stern notch (4) and bracing frame fixing hole (6), it is characterized in that: this cement coil structures has the cement circle body (2) of a positive annular, in the top edge of cement circle body (2), be provided with a protruding wild goose tail projection (1), in the lower edge of cement circle body (2), be provided with a wild goose stern notch (4) being connected with wild goose tail projection (1) shiding matching, on cement circle body sidewall (5), have axial groove, in groove, coincide and be bonded with wall casing (3), in the top edge of the cement circle body (2) of foot, have cross supporting frame fixing hole (6).
2. a kind of super large caliber Drilling Water mud collar structure according to claim 1, is characterized in that: the wall casing described in this (3) is a kind of plastic conduit or metal tube, has several through holes on the outer wall of this pipe.
CN201420395211.5U 2014-07-17 2014-07-17 Super large caliber Drilling Water mud collar structure Expired - Fee Related CN203961809U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420395211.5U CN203961809U (en) 2014-07-17 2014-07-17 Super large caliber Drilling Water mud collar structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420395211.5U CN203961809U (en) 2014-07-17 2014-07-17 Super large caliber Drilling Water mud collar structure

Publications (1)

Publication Number Publication Date
CN203961809U true CN203961809U (en) 2014-11-26

Family

ID=51922408

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420395211.5U Expired - Fee Related CN203961809U (en) 2014-07-17 2014-07-17 Super large caliber Drilling Water mud collar structure

Country Status (1)

Country Link
CN (1) CN203961809U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104100205A (en) * 2014-07-17 2014-10-15 徐州工程学院 Cement ring structure of ultralarge-diameter drill well and construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104100205A (en) * 2014-07-17 2014-10-15 徐州工程学院 Cement ring structure of ultralarge-diameter drill well and construction method
CN104100205B (en) * 2014-07-17 2017-02-15 徐州工程学院 Cement ring structure of ultralarge-diameter drill well and construction method

Similar Documents

Publication Publication Date Title
CN102926770B (en) Underground draining and grouting process in thin bedrock and thick loose sand layer rich water areas
CN102852141B (en) Rock-socketed pipe pile foundation with pile core by concrete pouring and pile side by static pressure grouting and construction method for rock-socketed pipe pile foundation
CN204370469U (en) A kind of drilled pile long leg jacket offshore wind turbine foundation
CN102409674B (en) Cloth bag wall protection micro pile and construction method thereof
CN103031847B (en) Reducing overlap joint combined type orifice pipe grouting method
CN204252934U (en) Test boring device for plugging
CN203569561U (en) Novel pile forming device of steel pipe protection wall cast-in-place piles following up drill
CN203961809U (en) Super large caliber Drilling Water mud collar structure
CN201443382U (en) Downhole dosing device
CN205502044U (en) Be applied to precipitation structure in grittiness water -bearing stratum under building
CN204125941U (en) Uplift pile structure
CN204370462U (en) Open-cut station water drainage of deep foundation pit system
CN105178966A (en) Grouting process for water blocking by wall breaking for mine vertical shafts
CN203977417U (en) Ribs built-in steel casing for a kind of pile of deep water pile foundation
CN104100205A (en) Cement ring structure of ultralarge-diameter drill well and construction method
CN204040029U (en) A kind of anchor pole pore-forming bar planting slip casting integrative construction device
CN109322624A (en) A kind of anchor hole bottom hole Counterboring apparatus
CN205713982U (en) A kind of pile foundation construction drilling equipment being applicable to karst area
CN204199277U (en) The spiral building stake of filling concrete
CN205477511U (en) Prevent releasing hydraulic fracturing hole sealing device
CN201148615Y (en) Steel tube pile foundation built by inseminate steel bar
CN204357355U (en) Combined screw thread soil compaction pore-forming sand drain drill bit
CN204326061U (en) A kind of pile tube be drawn out easily
CN209385062U (en) A kind of anchor hole bottom hole Counterboring apparatus
CN203808057U (en) Pile bottom rear grouting cast-in-place belled pile

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141126

Termination date: 20160717

CF01 Termination of patent right due to non-payment of annual fee