CN203961808U - A kind of full screw earth auger construction CFG stake positioner at night - Google Patents

A kind of full screw earth auger construction CFG stake positioner at night Download PDF

Info

Publication number
CN203961808U
CN203961808U CN201420369103.0U CN201420369103U CN203961808U CN 203961808 U CN203961808 U CN 203961808U CN 201420369103 U CN201420369103 U CN 201420369103U CN 203961808 U CN203961808 U CN 203961808U
Authority
CN
China
Prior art keywords
drill bit
positioner
pen
pedestal
night
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420369103.0U
Other languages
Chinese (zh)
Inventor
常春章
张云昭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinan Railway Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd
Original Assignee
Jinan Railway Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinan Railway Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd filed Critical Jinan Railway Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd
Priority to CN201420369103.0U priority Critical patent/CN203961808U/en
Application granted granted Critical
Publication of CN203961808U publication Critical patent/CN203961808U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Earth Drilling (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model belongs to building engineering field, be specifically related to full screw earth auger construction CFG stake positioner at night, this positioner comprises the pedestal that is arranged on drill bit side, and the inverted T shape laser positioning pen arranging on pedestal composition, adopt the positioner of this structure, when use, only the laser positioning pen on it need be opened, make the laser beam of its ejaculation and the stake corresponding location that can complete drill bit of bit line of finishing in advance on ground, and can easily pedestal be disassembled from drill bit, do not affect the normal work of drill bit, the low equipment of whole apparatus cost is easy to get, and implementation result is good.

Description

A kind of full screw earth auger construction CFG stake positioner at night
Technical field:
The utility model belongs to building engineering field, is specifically related to full screw earth auger construction CFG stake positioner at night.
Background technology:
CFG stake has another name called CFG, is added water and is mixed and stirred by rubble, aggregate chips, sand, flyash mixed cement, the variable intensity stake with some strength of making by various forming machinery.CFG stake is a kind of Low Intensity Concrete Piles, can make full use of the bearing capacity acting in conjunction of inter-pile soil, and can transmit load in deep foundation, has good technical performance and economic effect; It generally need not calculate arrangement of reinforcement, and can utilize industrial waste flyash and aggregate chips to make admixture, and construction costs is cheap, in the time that building lot is processed construction, is widely used.But general CFG pile driving construction uninterrupted construction in equal 24 hours, and the earth that the anchor point of the follow-up stake of CFG pile driving construction had often previously been constructed covers, especially carry on construction work at night, the location of stake is more difficult, and once follow-up stake location is inaccurate, bring great trouble can to whole engineering, have a strong impact on the progress of engineering.
Summary of the invention
The problems that exist for prior art, the utility model provides a kind of full screw earth auger simple in structure construction CFG stake positioner at night, this positioner comprises the pedestal that is arranged on drill bit side, and the inverted T shape laser positioning pen arranging on pedestal composition, adopt the positioner of this structure, when use, only the laser positioning pen on it need be opened, make the laser beam of its ejaculation and the stake corresponding location that can complete drill bit of bit line of finishing in advance on ground, and can easily pedestal be disassembled from drill bit, do not affect the normal work of drill bit, the low equipment of whole apparatus cost is easy to get, and implementation result is good.
The utility model is by the following technical solutions: a kind of full screw earth auger construction CFG stake positioner at night, and this positioner comprises the pedestal that is arranged on drill bit side, and the inverted T shape laser positioning pen arranging on pedestal composition;
Wherein said inverted T shape laser positioning pen is made up of with pen with means for holding it in right position II and pen with means for holding it in right position III vertical with pen with means for holding it in right position I and that be on same level axis a pen with means for holding it in right position I vertical with drill axis;
Described pedestal is flexibly connected with drill bit, can disassemble from drill bit;
Described drill bit is arranged on gadder.
Adopt the positioner of this structure, only need to be by accurately location, ground stake position, and draw and establish horizontal location line and perpendicular positioning line above each position, in the time that used night, only the laser positioning pen on pedestal need be opened, the laser beam that pen with means for holding it in right position I is penetrated is corresponding with the perpendicular positioning line of finishing in advance on ground, afterwards by adjusting the front and back position of drill bit, the laser beam that pen with means for holding it in right position II and pen with means for holding it in right position III are penetrated is corresponding with the horizontal location line of finishing in advance on ground, can complete the location of drill bit, even if the earth that the anchor point of follow-up like this stake had often previously been constructed covers, as long as can also see the position line on stake position, just can overlap positioner by this accurately locates drill bit, facilitate follow-up construction operation, simultaneously owing to can being connected by slide rail or other movable connection methods between pedestal and drill bit, after having located, can conveniently pedestal be disassembled from drill bit together with pen with means for holding it in right position above, so just can not affect the normal work of drill bit, and can be according to the requirement of different station, adjust at any time pedestal and the position of pen with means for holding it in right position above, expanded the versatility of equipment.
In sum, adopt the positioner of this structure, when use, only the laser positioning pen on it need be opened, make the laser beam of its ejaculation and the stake corresponding location that can complete drill bit of bit line of finishing in advance on ground, and can easily pedestal be disassembled from drill bit, do not affect the normal work of drill bit, the low equipment of whole apparatus cost is easy to get, and implementation result is good.
Brief description of the drawings
Fig. 1 is the structural representation of full screw earth auger construction CFG stake positioner at night described in the utility model;
Fig. 2 be in Fig. 1 bit part look up enlarged drawing;
Fig. 3 is the use state reference map of full screw earth auger construction CFG stake positioner at night described in the utility model;
In figure, 1 is gadder, and 2 is drill bit, and 3 is pedestal, and 4 is pen with means for holding it in right position I, and 5 is pen with means for holding it in right position II, and 6 is pen with means for holding it in right position III, and 7 is perpendicular positioning line, and 8 is horizontal location line.
Detailed description of the invention
A kind of full screw earth auger construction CFG stake positioner at night, this positioner comprises the pedestal 3 that is arranged on drill bit 2 sides, and the inverted T shape laser positioning pen composition arranging on pedestal 3;
Wherein said inverted T shape laser positioning pen is made up of with pen with means for holding it in right position II 5 and pen with means for holding it in right position III 6 vertical with pen with means for holding it in right position I 4 and that be on same level axis a pen with means for holding it in right position I 4 vertical with drill bit 2 axis;
Described pedestal 3 is flexibly connected with drill bit 2, can disassemble from drill bit 2;
Described drill bit 2 is arranged on gadder 1;
In the time that used night, only the laser positioning pen on pedestal need be opened, the laser beam that pen with means for holding it in right position I 4 is penetrated is corresponding with the perpendicular positioning line 7 of finishing in advance on ground, afterwards by adjusting the front and back position of drill bit, the laser beam that pen with means for holding it in right position II 5 and pen with means for holding it in right position III 6 are penetrated is corresponding with the horizontal location line 8 of finishing in advance on ground, the location that can complete drill bit.

Claims (3)

1. a full screw earth auger construction CFG stake positioner at night simple in structure, it is characterized in that: this positioner comprises the pedestal (3) that is arranged on drill bit (2) side, and at the upper inverted T shape laser positioning pen composition arranging of pedestal (3);
Wherein said inverted T shape laser positioning pen is made up of with pen with means for holding it in right position II (5) and pen with means for holding it in right position III (6) vertical with pen with means for holding it in right position I (4) and that be on same level axis a pen with means for holding it in right position I (4) vertical with drill bit (2) axis.
Night according to claim 1 positioner, it is characterized in that: described pedestal (3) is flexibly connected with drill bit (2).
Night according to claim 1 positioner, it is characterized in that: described drill bit (2) is arranged on gadder (1).
CN201420369103.0U 2014-07-04 2014-07-04 A kind of full screw earth auger construction CFG stake positioner at night Expired - Fee Related CN203961808U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420369103.0U CN203961808U (en) 2014-07-04 2014-07-04 A kind of full screw earth auger construction CFG stake positioner at night

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420369103.0U CN203961808U (en) 2014-07-04 2014-07-04 A kind of full screw earth auger construction CFG stake positioner at night

Publications (1)

Publication Number Publication Date
CN203961808U true CN203961808U (en) 2014-11-26

Family

ID=51922407

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420369103.0U Expired - Fee Related CN203961808U (en) 2014-07-04 2014-07-04 A kind of full screw earth auger construction CFG stake positioner at night

Country Status (1)

Country Link
CN (1) CN203961808U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110273430A (en) * 2019-06-10 2019-09-24 中国二十冶集团有限公司 A kind of night stake point location construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110273430A (en) * 2019-06-10 2019-09-24 中国二十冶集团有限公司 A kind of night stake point location construction method

Similar Documents

Publication Publication Date Title
CN203924085U (en) A kind of caisson structure that is applied to collecting well
CN204174787U (en) The syndeton of precast concrete exterior wall and steel work
CN102912808A (en) Spiral CFG pile and cement stirring pile combined composite foundation construction method
CN105464079A (en) Forming construction method of long-spiral pore-forming pile-slab-pile supporting and anti-seepage continuous wall
CN203961808U (en) A kind of full screw earth auger construction CFG stake positioner at night
CN104895079A (en) Reverse construction method for piling steel sheet piles
CN103726508A (en) Prefabricated reinforced concrete board molding bed and construction method
CN101666085B (en) Prefabricated part composite cement soil wall and construction method thereof
CN104131578B (en) Stream is moulded basement cushion cap base plate under shape soil property and is inverted construction technology and structure
CN102677671B (en) Construction method of precast pile in thick-slag-stone-layer field
CN203411988U (en) Independent medium-sized pile foundation
CN202706049U (en) Reinforced concrete basin open caisson
CN204590241U (en) The fast-assembling steel structure basis of barracks is built in a kind of hillside fields
CN212052851U (en) Foundation reinforcing structure for ancient building foundation in soft soil area
CN204531575U (en) Cement pole Reinforcement Reinforced Concrete Structure
CN205296177U (en) Dado bearing structure suitable for hole friction pile stake hole is dug in manual work
Hui Effect on existing building by foundation pit excavation
CN203603147U (en) Device capable of accurately positioning multi-axis deep mixing pile
CN203701089U (en) Structure for manual hole digging and pile splicing on reinforced concrete drain pipe retaining wall
CN208996641U (en) A kind of tube filling pedestal pile construction equipment
CN202578513U (en) Filling pile aiguille
CN203129622U (en) Stone and garden rockery stone connecting and reinforcing structure
CN105507338A (en) Campshed and inserted piled slab combined supporting water-plugging continuous wall forming construction method
CN205998106U (en) A kind of taper pile bearing platform type wing wall structure
CN105649050A (en) Combined pile machine

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141126

Termination date: 20150704

EXPY Termination of patent right or utility model