CN203961322U - Prefabricated panel installation adjusting device - Google Patents

Prefabricated panel installation adjusting device Download PDF

Info

Publication number
CN203961322U
CN203961322U CN201420400264.1U CN201420400264U CN203961322U CN 203961322 U CN203961322 U CN 203961322U CN 201420400264 U CN201420400264 U CN 201420400264U CN 203961322 U CN203961322 U CN 203961322U
Authority
CN
China
Prior art keywords
prefabricated panel
connecting rod
adjusting device
adapter sleeve
installation adjusting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420400264.1U
Other languages
Chinese (zh)
Inventor
赵保华
瞿国庆
吴梦先
唐国夫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FANGCHENGGANG ZHONGYI HEAVY INDUSTRY Co Ltd
Original Assignee
FANGCHENGGANG ZHONGYI HEAVY INDUSTRY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FANGCHENGGANG ZHONGYI HEAVY INDUSTRY Co Ltd filed Critical FANGCHENGGANG ZHONGYI HEAVY INDUSTRY Co Ltd
Priority to CN201420400264.1U priority Critical patent/CN203961322U/en
Application granted granted Critical
Publication of CN203961322U publication Critical patent/CN203961322U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a kind of prefabricated panel installation adjusting device, this device comprises adapter sleeve cylindraceous (3), the inner side, two ends of adapter sleeve (3) has screw thread, and the two ends of adapter sleeve (3) respectively coaxial threaded are connected with connecting rod (2), wherein the other end of a connecting rod (2) is hinged with the U-shaped snap ring (4) for clamping prefabricated panel (5), and the other end of another root connecting rod (2) is with to be fixed on ground base (1) hinged.This prefabricated panel installation adjusting device is simple in structure, easily manufactures, and can regulate safely and effectively the verticality of prefabricated panel, than with the artificial righting body of wall that goes, more convenient reliable.

Description

Prefabricated panel installation adjusting device
Technical field
The utility model relates to technical field of building construction, is specifically related to a kind of prefabricated panel installation adjusting device.
Background technology
Along with social fast development, for safety, can build up the enclosure wall of a circle in the surrounding on building operations ground, and for enclosure wall construction speed and economic consideration, piling up of the direct entirety of concrete wall that often use has been built up is now assembled.Under normal circumstances, first on the ground that will place wallboard, put some cement, wallboard directly hangs in the above by loop wheel machine.Prefabricated panel is piled up in process in lifting, due to wallboard Bao Yougao again, is generally to adopt fixture that wallboard is sling, and then falls on the ground; In this process, need workman to come wallboard righting, this is difficult to ensure the verticality of wallboard, and safety is poor.
Utility model content
The technical problems to be solved in the utility model is to provide a kind of prefabricated panel installation adjusting device, can improve well stability and the safety of wallboard lifting operation.
For solving the problems of the technologies described above, the utility model provides a kind of prefabricated panel installation adjusting device, this device comprises adapter sleeve cylindraceous, the inner side, two ends of adapter sleeve has screw thread, and the two ends of adapter sleeve respectively coaxial threaded are connected with connecting rod, wherein the other end of a connecting rod is hinged with the U-shaped snap ring for clamping prefabricated panel, and the other end of another root connecting rod is with to be fixed on ground base hinged.
Preferably, the sidewall of described adapter sleeve is provided with connected entrance, to keep the balance of adapter sleeve inner and outer air pressure, is convenient to adjust position and the length of connecting rod.
Preferably, described connecting rod adopts the steel pipe of caliber 25~30mm, wall thickness 2~4mm.
Further, on described U-shaped snap ring, be provided with screw, screw direction is perpendicular to the recess sidewall of U-shaped snap ring, and in screw, wears the fastening bolt for fastening prefabricated panel.
The beneficial effects of the utility model are: this prefabricated panel installation adjusting device is simple in structure, easily manufacture, and can regulate safely and effectively the verticality of prefabricated panel, than with the artificial righting body of wall that goes, more convenient reliable.
Brief description of the drawings
Fig. 1 is the front view of the utility model preferred embodiment;
Fig. 2 is the top view of embodiment in Fig. 1.
Number in the figure: 1, base; 2, connecting rod; 3, adapter sleeve; 4, U-shaped snap ring; 5, prefabricated panel; 6, fastening bolt.
Detailed description of the invention
Below preferred embodiment of the present utility model is described, should be appreciated that preferred embodiment described herein is only for description and interpretation the utility model, and be not used in restriction the utility model.
As depicted in figs. 1 and 2, the prefabricated panel installation adjusting device of the present embodiment comprises adapter sleeve 3 cylindraceous, the inner side, two ends of adapter sleeve 3 has screw thread, and the two ends of adapter sleeve 3 respectively coaxial threaded are connected with connecting rod 2, wherein the other end of a connecting rod 2 is hinged with the U-shaped snap ring 4 for clamping prefabricated panel 5, and the other end of another root connecting rod 2 is with to be fixed on ground base 1 hinged.
Wherein, the sidewall of adapter sleeve 3 is provided with two connected entrances, and connected entrance is symmetricly set in the both sides of adapter sleeve 3; Described connecting rod 2 is the steel pipe of caliber 25~30mm, wall thickness 2~4mm.
In addition, on U-shaped snap ring 4, be provided with screw, screw direction is perpendicular to the recess sidewall of U-shaped snap ring 4, groove perpendicular to connecting rod 2 axially, in screw, wear the fastening bolt 6 for fastening prefabricated panel 5.
Before prefabricated panel 5 liftings, first clamp prefabricated panel 5 with U-shaped snap ring 4, and clamp by fastening bolt 6, then it is up to standard that the position of adjusting device makes the verticality of prefabricated panel 5, after prefabricated panel 5 is in place, device is removed and will take off U-shaped snap ring 4, proceed the lifting operation of other prefabricated panel 5, finish until install.

Claims (4)

1. prefabricated panel installation adjusting device, it is characterized in that: this device comprises adapter sleeve cylindraceous (3), the inner side, two ends of adapter sleeve (3) has screw thread, and the two ends of adapter sleeve (3) respectively coaxial threaded are connected with connecting rod (2), wherein the other end of a connecting rod (2) is hinged with the U-shaped snap ring (4) for clamping prefabricated panel (5), and the other end of another root connecting rod (2) is with to be fixed on ground base (1) hinged.
2. prefabricated panel installation adjusting device according to claim 1, is characterized in that: the sidewall of described adapter sleeve (3) is provided with connected entrance.
3. prefabricated panel installation adjusting device according to claim 1, is characterized in that: the steel pipe that described connecting rod (2) is caliber 25~30mm, wall thickness 2~4mm.
4. prefabricated panel installation adjusting device according to claim 1, it is characterized in that: on described U-shaped snap ring (4), be provided with screw, screw direction vertically runs through the recess sidewall of U-shaped snap ring (4), and in screw, wears the fastening bolt (6) for fastening prefabricated panel (5).
CN201420400264.1U 2014-07-18 2014-07-18 Prefabricated panel installation adjusting device Expired - Fee Related CN203961322U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420400264.1U CN203961322U (en) 2014-07-18 2014-07-18 Prefabricated panel installation adjusting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420400264.1U CN203961322U (en) 2014-07-18 2014-07-18 Prefabricated panel installation adjusting device

Publications (1)

Publication Number Publication Date
CN203961322U true CN203961322U (en) 2014-11-26

Family

ID=51921923

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420400264.1U Expired - Fee Related CN203961322U (en) 2014-07-18 2014-07-18 Prefabricated panel installation adjusting device

Country Status (1)

Country Link
CN (1) CN203961322U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104074367A (en) * 2014-07-18 2014-10-01 防城港中一重工有限公司 Mounting adjustment device for prefabricated wall panel
CN105019670A (en) * 2015-04-20 2015-11-04 中国十七冶集团有限公司 Position-adjusting device for precast concrete wall panel
CN106592989A (en) * 2016-12-23 2017-04-26 中国建筑第八工程局有限公司 Positioning and installing device of tower crane embedded part and installing method thereof
CN108952185A (en) * 2018-07-30 2018-12-07 青岛理工大学 A kind of prefabricated lining installation and guide device

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104074367A (en) * 2014-07-18 2014-10-01 防城港中一重工有限公司 Mounting adjustment device for prefabricated wall panel
CN105019670A (en) * 2015-04-20 2015-11-04 中国十七冶集团有限公司 Position-adjusting device for precast concrete wall panel
CN106592989A (en) * 2016-12-23 2017-04-26 中国建筑第八工程局有限公司 Positioning and installing device of tower crane embedded part and installing method thereof
CN106592989B (en) * 2016-12-23 2019-06-14 中国建筑第八工程局有限公司 A kind of tower crane built-in fitting positioning installation apparatus and its installation method
CN108952185A (en) * 2018-07-30 2018-12-07 青岛理工大学 A kind of prefabricated lining installation and guide device
CN108952185B (en) * 2018-07-30 2020-06-26 青岛理工大学 Wallboard installation guider in prefabrication

Similar Documents

Publication Publication Date Title
CN104074367A (en) Mounting adjustment device for prefabricated wall panel
CN203961322U (en) Prefabricated panel installation adjusting device
CN203097307U (en) Horizontal adjuster for adjusting outer wallboard in installation of assembling type outer wallboard
CN203808484U (en) Integrated cantilevered and attached external scaffolding
CN206859722U (en) A kind of moving type security band stationary fixture
CN202596184U (en) Lifting node for assembly type large wallboard
CN205653902U (en) Floor entrance to a cave block structure
CN204151819U (en) The concavo-convex connector of the multiplex foundation for tower crane of insert combined type
CN201730352U (en) Building support
CN203924353U (en) Screw built-in fitting
CN204139627U (en) The anti-wear cover cage of wire rope
CN202416869U (en) Novel building engineering basement exterior wall split bolt
CN204434076U (en) Lifting hook capable of adjusting attitude of shield machine component in underground hoisting process of shield machine
CN105442868A (en) Adjustable steel-structure reticulated shell spliced scaffold
CN202992537U (en) Foundation bolt
CN104153590A (en) Quick positioning and adjusting device for prefabricated residence superimposed wallboard
CN204299142U (en) A kind of unloading-structure of builder's jack
CN103556813B (en) Steel pipe scaffold wall-connecting piece
CN204202616U (en) Concrete structure settlement monitoring mark
CN204237470U (en) A kind of tower crane attachment telescopic strut
CN203795819U (en) Attached type lifting scaffold anti-inclination locking device
CN203924682U (en) A kind of cast wheel buckle scaffold
CN203129588U (en) Overall removing type template for cast-in-place concrete rail
CN205172633U (en) A cable suspension device for geomantic omen pipeline in pit
CN204475870U (en) Straight support girder prestressing force adjusting device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141126

Termination date: 20180718

CF01 Termination of patent right due to non-payment of annual fee