CN203950557U - Fused mass gaseous-waste holdup system in heap after nuclear power plant accident - Google Patents

Fused mass gaseous-waste holdup system in heap after nuclear power plant accident Download PDF

Info

Publication number
CN203950557U
CN203950557U CN201420268437.9U CN201420268437U CN203950557U CN 203950557 U CN203950557 U CN 203950557U CN 201420268437 U CN201420268437 U CN 201420268437U CN 203950557 U CN203950557 U CN 203950557U
Authority
CN
China
Prior art keywords
reactor
ivr
working medium
fused mass
nuclear power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201420268437.9U
Other languages
Chinese (zh)
Inventor
王辉
郭强
陈巧艳
刘建平
韩晓峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Nuclear Power Engineering Co Ltd
Original Assignee
China Nuclear Power Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Nuclear Power Engineering Co Ltd filed Critical China Nuclear Power Engineering Co Ltd
Priority to CN201420268437.9U priority Critical patent/CN203950557U/en
Application granted granted Critical
Publication of CN203950557U publication Critical patent/CN203950557U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin
    • Y02E30/30Nuclear fission reactors

Landscapes

  • Structure Of Emergency Protection For Nuclear Reactors (AREA)

Abstract

The utility model belongs to reactor designing technique, is specifically related to pile interior fused mass gaseous-waste holdup system after a kind of nuclear power plant accident.Its structure comprises the pressure vessel being placed in reactor pit, outside reactor pit, be provided with the high-order container of IVR working medium higher than the position of pressure vessel, the high-order container of IVR working medium is connected with reactor pit by injecting pipeline, in space between reactor pit inner pressure vessel and reactor pit exterior wall, be provided with heat interchanger, described heat interchanger is connected by the built-in material-changing water tank of circulation line and reactor.The IVR working medium that system adopts is gallium.The utility model can effectively be avoided the appearance of pressure vessel outer wall boiling crisis, thereby guarantees that pressure vessel outer wall can be by reactor core fused mass burn through.

Description

Fused mass gaseous-waste holdup system in heap after nuclear power plant accident
Technical field
The utility model belongs to reactor designing technique, is specifically related to pile interior fused mass gaseous-waste holdup system after a kind of nuclear power plant accident.
Background technology
After Fukushima, Japan nuclear accident, effectively eliminating extensive radioactivity release becomes the important safety target of nuclear power station design.Fused mass delay technology is the important mitigation strategy of nuclear power station for major accident, can effectively eliminate radioactivity release, maintains the integrality of secure border.Generation Ⅲ nuclear power station has generally adopted fused mass to be detained measure at present.
AP1000 adopts the gentle measure of separating major accident of non-active prevention, mainly comprise melting reactor core gaseous-waste holdup system (IVR) is set, in the time there is reactor core thawing accident, heap chamber flood system is by the space between water piii reactor pressure vessel outer wall and reactor pit heat insulation layer, drop into the reactor core fused mass of container low head from external refrigeration, ensure that low head is not fused, make reactor core fused mass can remain on pressure vessel inside, avoid reacting of fused mass and water and containment concrete floor, prevented the generation of out-pile vapour explosion and base plate burn through.But during major accident, pressure vessel low head wall heat flux density is very large, once there is boiling crisis in container outer wall face, likely burn through pressure vessel of fused mass, now IVR system will lose efficacy.Therefore, need badly fused mass gaseous-waste holdup system in heap is provided after a kind of novel nuclear power plant accident of avoiding existing IVR technical failure.
Utility model content
The purpose of this utility model is the defect for prior art, provides after a kind of nuclear power plant accident that can avoid existing IVR technical failure fused mass gaseous-waste holdup system in heap, to improve the security in nuclear power plant accident situation.
The technical solution of the utility model is as follows: fused mass gaseous-waste holdup system in heap after a kind of nuclear power plant accident, comprise the pressure vessel being placed in reactor pit, outside reactor pit, be provided with the high-order container of IVR working medium higher than the position of pressure vessel, the high-order container of IVR working medium is connected with reactor pit by injecting pipeline, in space between reactor pit inner pressure vessel and reactor pit exterior wall, be provided with heat interchanger, described heat interchanger is connected by the built-in material-changing water tank of circulation line and reactor.
Further, fused mass gaseous-waste holdup system in heap after nuclear power plant accident as above, wherein, described circulation line comprises the exchanger heat pipeline section and the heat interchanger cold leg that are connected with the built-in material-changing water tank of reactor respectively, and the opening absolute altitude that described exchanger heat pipeline section stretches into the built-in material-changing water tank of reactor stretches into the opening absolute altitude of the built-in material-changing water tank of reactor higher than described heat interchanger cold leg.
Further, on the injection pipeline of the high-order container of described IVR working medium and heat interchanger cold leg, be respectively equipped with valve.
Further, fused mass gaseous-waste holdup system in heap after nuclear power plant accident as above, wherein, in the high-order container of described IVR working medium, IVR working medium adopts gallium.
Further, fused mass gaseous-waste holdup system in heap after nuclear power plant accident as above, wherein, in the high-order container of described IVR working medium, the loading amount of IVR working medium should be able to be flooded whole reactor pit in the state of accident.
The beneficial effects of the utility model are as follows: the utility model proposes and use gallium to replace the water of conventional I VR system as the heat eliminating medium of direct cooling pressure container; because the boiling point of gallium is far above water; thermal conductivity is high; stable chemical nature simultaneously; therefore can effectively avoid the appearance of pressure vessel outer wall boiling crisis, thereby guarantee that pressure vessel outer wall can be by reactor core fused mass burn through.Meanwhile, the heat exchanger system of the utility model design can effectively utilize the natural convection of water to reduce the temperature of IVR working medium in reactor pit, and the heat of IVR working medium is exported in built-in material-changing water tank.The utility model can effectively be avoided IVR technical failure, improves the security of nuclear power station.
Brief description of the drawings
Fig. 1 is the structural representation of fused mass gaseous-waste holdup system in the utility model heap;
Fig. 2 moves schematic diagram under the accident condition of fused mass gaseous-waste holdup system in the utility model heap.
Embodiment
Below in conjunction with drawings and Examples, the utility model is described in detail.
As shown in Figure 1, after the nuclear power plant accident that the utility model provides, in heap, fused mass gaseous-waste holdup system is made up of pressure vessel 1, reactor pit exterior wall 2, the high-order container 4 of IVR working medium, IVR working medium injection pipeline 5, IVR working medium injection pipeline valve 6, the built-in material-changing water tank 7 of reactor, heat interchanger 9, exchanger heat pipeline section 8, heat interchanger cold leg 10, heat interchanger cold leg valve 11.Wherein, between pressure vessel 1 outer wall and reactor pit exterior wall 2, form reactor pit 3 spaces; The high-order container 4 of IVR working medium arranges that absolute altitude is higher than pressure vessel 1 and reactor pit 3, IVR working medium-gallium is equipped with in inside, this working medium has that boiling point is very high, thermal conductivity is good, stable chemical nature and normal temperature (30 DEG C) lower be the feature such as liquid, its loading amount should ensure to be enough to flood under accident condition reactor pit 3; IVR working medium is injected pipeline 5 one end and is connected with the high-order container 4 of IVR working medium, and an end opening extend into reactor pit 3; IVR working medium is injected pipeline valve 6 and is positioned on IVR working medium injection pipeline 5, under nuclear power station normal operating condition, closes, and under accident condition, opens.The built-in material-changing water tank 7 of reactor is equipped with water, and the loading amount of water should be enough to flood exchanger heat pipeline section 8 and stretch into the opening of built-in material-changing water tank 7; The opening absolute altitude that exchanger heat pipeline section 8 stretches into built-in material-changing water tank 7 stretches into the opening absolute altitude of built-in material-changing water tank 7 higher than heat interchanger cold leg 10; Heat interchanger cold leg valve 11 is positioned on heat interchanger cold leg 10, under nuclear power station normal operating condition, closes, and under accident condition, opens.
Under nuclear power plant accident state, the operation schematic diagram of native system as shown in Figure 2.In the time that nuclear power station has an accident, IVR working medium is injected valve 6 and chilled(cooling) water return (CWR) valve 11 is opened; Under Action of Gravity Field, the IVR working medium in the high-order container 4 of IVR working medium is injected pipeline 5 by IVR working medium and is injected into reactor pit 3; Heat interchanger 9 forms flowloop by exchanger heat pipeline section 8 and heat interchanger cold leg 10 with the built-in material-changing water tank 7 of reactor; Reactor core fused mass in pressure vessel 1 is delivered to the IVR working medium in reactor pit 3 by pressure vessel 1 outer wall by heat.IVR working medium in reactor pit 3 heats the heat interchanger 9 being immersed in wherein, after the pipe side cooling medium of heat interchanger 9 is heated, flow into the built-in material-changing water tank 7 of reactor by heat pipe section 8, the water that in the built-in material-changing water tank 7 of reactor, relative temperature is lower, by the pipe side of heat interchanger cold leg 10 inflow heat exchangers 9 of heat interchanger 9, forms the closed circuit of a water.This system the most at last heat of the interior reactor core fused mass of pressure vessel 1 exports in the built-in material-changing water tank 7 of reactor.
Obviously, those skilled in the art can carry out various changes and modification and not depart from spirit and scope of the present utility model the utility model.Like this, if to these amendments of the present utility model with within modification belongs to the scope of the utility model claim and equivalent technology thereof, the utility model is also intended to comprise these changes and modification interior.

Claims (5)

1. the interior fused mass gaseous-waste holdup system of heap after a nuclear power plant accident, comprise the pressure vessel (1) being placed in reactor pit (3), it is characterized in that: outside reactor pit, be provided with the high-order container of IVR working medium (4) higher than the position of pressure vessel (1), the high-order container of IVR working medium (4) is connected with reactor pit (3) by injecting pipeline (5), in space between reactor pit inner pressure vessel (1) and reactor pit exterior wall (2), be provided with heat interchanger (9), described heat interchanger (9) is connected by the built-in material-changing water tank of circulation line and reactor (7).
2. the interior fused mass gaseous-waste holdup system of heap after nuclear power plant accident as claimed in claim 1, it is characterized in that: described circulation line comprises the exchanger heat pipeline section (8) and the heat interchanger cold leg (10) that are connected with the built-in material-changing water tank of reactor (7) respectively, the opening absolute altitude that described exchanger heat pipeline section (8) stretches into the built-in material-changing water tank of reactor (7) stretches into the opening absolute altitude of the built-in material-changing water tank of reactor (7) higher than described heat interchanger cold leg (10).
3. fused mass gaseous-waste holdup system in heap after nuclear power plant accident as claimed in claim 2, is characterized in that: on the injection pipeline (5) of the high-order container of described IVR working medium (4) and heat interchanger cold leg (10), be respectively equipped with valve (6,11).
4. the interior fused mass gaseous-waste holdup system of heap after the nuclear power plant accident as described in any one in claim 1-3, is characterized in that: the IVR working medium in the described high-order container of IVR working medium (4) adopts gallium.
5. the interior fused mass gaseous-waste holdup system of heap after the nuclear power plant accident as described in any one in claim 1-3, is characterized in that: the loading amount of the described interior IVR working medium of the high-order container (4) of IVR working medium should be able to be flooded whole reactor pit in the state of accident.
CN201420268437.9U 2014-05-23 2014-05-23 Fused mass gaseous-waste holdup system in heap after nuclear power plant accident Withdrawn - After Issue CN203950557U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420268437.9U CN203950557U (en) 2014-05-23 2014-05-23 Fused mass gaseous-waste holdup system in heap after nuclear power plant accident

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420268437.9U CN203950557U (en) 2014-05-23 2014-05-23 Fused mass gaseous-waste holdup system in heap after nuclear power plant accident

Publications (1)

Publication Number Publication Date
CN203950557U true CN203950557U (en) 2014-11-19

Family

ID=51892580

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420268437.9U Withdrawn - After Issue CN203950557U (en) 2014-05-23 2014-05-23 Fused mass gaseous-waste holdup system in heap after nuclear power plant accident

Country Status (1)

Country Link
CN (1) CN203950557U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104021824A (en) * 2014-05-23 2014-09-03 中国核电工程有限公司 In-pile melts retention system after nuclear power station accident
CN106816185A (en) * 2015-11-27 2017-06-09 国核华清(北京)核电技术研发中心有限公司 Peace for nuclear power station notes container

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104021824A (en) * 2014-05-23 2014-09-03 中国核电工程有限公司 In-pile melts retention system after nuclear power station accident
CN106816185A (en) * 2015-11-27 2017-06-09 国核华清(北京)核电技术研发中心有限公司 Peace for nuclear power station notes container
CN106816185B (en) * 2015-11-27 2018-11-27 国核华清(北京)核电技术研发中心有限公司 Peace for nuclear power station infuses container

Similar Documents

Publication Publication Date Title
CN104021824A (en) In-pile melts retention system after nuclear power station accident
CN105810257B (en) A kind of passive nuclear power station pressure release condensation heat exchange system
CN201689688U (en) System for cooling reactor core, filling water in reactor cavity and guiding out heat of containment
CN102163469B (en) Nuclear power station non-active engineering safety system
CN206210405U (en) Nuclear reactor safety system
CN202855316U (en) Containment cooling system for PWR (pressurized water reactor) nuclear power plant
CN104361914A (en) Passive safe cooling system
CN106328223B (en) A kind of novel passive containment energy management system
CN105047235A (en) Melt in-pile retention passive cooling system in nuclear reactor severe accident state
CN104103325B (en) Heat derivation system for long-term passive containment
CN105047236A (en) Passive cooling system for retention of melts in serious accident state of reactor
CN204242601U (en) Non-passive safety cooling system
CN202615805U (en) Non-dynamic safety case cooling system
CN102623072A (en) Compound accident residual heat removal system for accelerator-driven sub-critical reactor
CN202549316U (en) Non-active safe shell cooling system with combination of water logging and air cooling
CN203366760U (en) Reactor cavity water-injection system of nuclear power station
CN103413581A (en) Passive containment cooling system
CN102194533A (en) Reactor safety system
CN202332312U (en) Emergency protection device for preventing reactor pressure vessel from being melted through by utilizing passive heat exchange
CN103928069A (en) Containment built-in spent fuel pool
CN102820067B (en) Natural circulation heat exchanger for discharging waste heat of supercritical water reactor
CN203950555U (en) There is after the nuclear power plant accident of heat conduction reactor pit exterior wall fused mass gaseous-waste holdup system in heap
CN203950557U (en) Fused mass gaseous-waste holdup system in heap after nuclear power plant accident
CN203839055U (en) Passive containment external cooling system
CN104134474B (en) passive cooling system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20141119

Effective date of abandoning: 20170503