CN203900806U - Power station boiler pipeline opening welding alignment clearance positioning device - Google Patents

Power station boiler pipeline opening welding alignment clearance positioning device Download PDF

Info

Publication number
CN203900806U
CN203900806U CN201420295740.8U CN201420295740U CN203900806U CN 203900806 U CN203900806 U CN 203900806U CN 201420295740 U CN201420295740 U CN 201420295740U CN 203900806 U CN203900806 U CN 203900806U
Authority
CN
China
Prior art keywords
pipe
die
fixed
alignment clearance
station boiler
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420295740.8U
Other languages
Chinese (zh)
Inventor
丁卫征
李开
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SEPCO1 Electric Power Construction Co Ltd
Original Assignee
SEPCO1 Electric Power Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SEPCO1 Electric Power Construction Co Ltd filed Critical SEPCO1 Electric Power Construction Co Ltd
Priority to CN201420295740.8U priority Critical patent/CN203900806U/en
Application granted granted Critical
Publication of CN203900806U publication Critical patent/CN203900806U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Butt Welding And Welding Of Specific Article (AREA)

Abstract

The utility model relates to a power station boiler pipeline opening welding alignment clearance positioning device which comprises a fixed die, a support vertically fixed to the fixed die, a sliding die capable of being fixed to the support in a vertical sliding mode through an adjusting device, and a plurality of arc plates installed in the fixed die and the sliding die respectively. The axes of the arc plates in the fixed die coincide with those of the arc plates in the sliding die, and a pipe I and a pipe II needing to be welded are clamped and fixed by the fixed die and the sliding die through the arc plates. The sliding die is provided with a clearance adjusting device for adjusting the alignment clearance of the pipe I and the pipe II. By means of the power station boiler pipeline opening welding alignment clearance positioning device, coaxial fast clamping can be rapidly conducted on the pipes, in addition, the alignment clearance can be conveniently adjusted, operation is simple, and working efficiency is improved.

Description

A kind of station boiler pipeline mouth of pipe welding alignment clearance positioner
Technical field
The utility model relates to positioning tool technical field, is specifically related to a kind of station boiler pipeline mouth of pipe welding alignment clearance positioner.
Background technology
At present in station boiler installing area, the adjustment counterpart work that the many uses of counterpart operation during small-bore loose pipe welding are docked the mouth of pipe to brank, although brank is carried out to the concentricity that counterpart can guarantee to dock the mouth of pipe but utilize, but be difficult to guarantee the alignment clearance between two mouths of pipe, if the too small problems of welded quality such as not weld penetration, undercut, pore that easily cause of the alignment clearance between two mouths of pipe, and buy higher to the expense of brank.
Summary of the invention
The utility model, in order to overcome the deficiency of above technology, provides a kind of structure to add station boiler pipeline mouth of pipe welding alignment clearance positioner single, that can guarantee alignment clearance.
The utility model overcomes the technical scheme that its technical problem adopts:
This station boiler pipeline mouth of pipe welding alignment clearance positioner, comprise fixed die, be vertically fixed on support on fixed die, by adjusting device, can move up and down the sliding die being fixed on support and be installed on respectively the some arcs in fixed die and sliding die, the axis of each arc in described fixed die and sliding die coincides, fixed die and sliding die fix the pipe I of two needs welding and pipe II by arc, are provided with for adjusting the gap adjusting device of pipe I and pipe II alignment clearance in described sliding die.
Above-mentioned adjusting device comprises the seat tube that is fixed on support, be arranged at screwed hole in seat tube, be vertically combined on the screw rod in seat tube screwed hole and be installed on the Connection Block in sliding die, and the lower end of described screw rod is rotated and is installed in Connection Block.
Above-mentioned gap adjusting device comprises the nut that is installed in sliding die, is combined on the bolt in nut, and the lower end of described bolt is provided with conical conehead.
For simple operation, the upper end of above-mentioned screw rod is laterally fixed with cross bar.
The beneficial effects of the utility model are: will need the pipe I of butt welding to be placed on the arc of fixed die with pipe II, by adjusting device, drive sliding die to move down afterwards, arc and the arc on fixed die finally realized in sliding die will be managed I and manage II clamping and fix, because the axis of each arc in fixed die and sliding die coincides, therefore fixing pipe I with manage II and can guarantee coaxial.The alignment clearance with pipe II by gap adjusting device adjustment pipe I, makes it adjust to the required satisfied rational position of welding afterwards, can carry out butt welding to pipe I and pipe II afterwards.Therefore by this station boiler pipeline mouth of pipe welding alignment clearance positioner, can meet fast pipe is carried out to coaxial quick-clamping, can conveniently adjust alignment clearance again, simple to operate, improved operating efficiency.
Accompanying drawing explanation
Fig. 1 is perspective view of the present utility model;
Fig. 2 is use state perspective view of the present utility model;
Fig. 3 is lash adjusting device structural representation of the present utility model;
In figure, 1. support 2. fixed die 3. sliding die 4. arc 5. Connection Block 6. screw rod 7. cross bar 8. nut 9. bolt 10. pipe I 11. are managed II 12. alignment clearance 13. conehead 14. seat tubes.
The specific embodiment
Below in conjunction with accompanying drawing 1, accompanying drawing 2,3 pairs of the utility model of accompanying drawing, be described further.
This station boiler pipeline mouth of pipe welding alignment clearance positioner, comprise fixed die 2, vertically be fixed on the support 1 on fixed die 2, by adjusting device can move up and down the sliding die 3 being fixed on support 1 and be installed on respectively fixed die 2 and sliding die 3 in some arcs 4, the axis of each arc 4 in described fixed die 2 and sliding die 3 coincides, fixed die 2 and sliding die 3 fix the pipe I 10 of two needs welding and pipe II 11 by arc 4, in described sliding die 3, be provided with for adjusting pipe I 10 and the gap adjusting device of managing II 11 alignment clearances 12.To need the pipe I 10 of butt welding to be placed on the arc 4 of fixed die 2 with pipe II 11, by adjusting device, drive sliding die 3 to move down afterwards, the arc 4 of finally realizing in sliding die 3 will be managed I 10 with the arc 4 on fixed die 2 and manage II 11 clampings and fix, because the axis of each arc 4 in fixed die 2 and sliding die 3 coincides, therefore fixing pipe I 10 with manage II 11 and can guarantee coaxial.The alignment clearance 12 with pipe II 11 by gap adjusting device adjustment pipe I 10, makes it adjust to the required satisfied rational position of welding afterwards, can carry out butt welding to pipe I 10 and pipe II 11 afterwards.Therefore by this station boiler pipeline mouth of pipe welding alignment clearance positioner, can meet fast pipe is carried out to coaxial quick-clamping, can conveniently adjust alignment clearance 12 again, simple to operate, improved operating efficiency.
Adjusting device can be for following structure it comprise the seat tube 14 that is fixed on support 1, be arranged at screwed hole in seat tube 14, be vertically combined on the screw rod 6 in seat tube 14 screwed holes and be installed on the Connection Block 5 in sliding die 3, the lower end of described screw rod 6 is rotated and is installed in Connection Block 5.By rotary screw 6, can make the relative seat tube 14 of screw rod 6 move up and down, thereby drive sliding die 3 to move down by Connection Block 5, final realization clamps fixing by pipe I 10 and pipe II 11.Simple in structure, convenient manufacture.
As shown in Figure 3, gap adjusting device can be for following structure it comprise the nut 8 that is installed in sliding die 3, be combined on the bolt 9 in nut 8, the lower end of described bolt 9 is provided with conical conehead 13.After the pipe I 10 of needs welding and pipe II 11 being clamped with sliding die 3 by fixed die 2, swivel bolt 9, makes the conehead 13 Inserting Tube I 10 of bolt 9 lower ends and alignment clearance 12 places between pipe II 11.Because conehead 13 is conical, therefore in the process that is inserted into alignment clearance 12, can gradually the width of alignment clearance 12 be increased, realized the object of progressively adjusting, convenient to operation.
The upper end of screw rod 6 can laterally be fixed with cross bar 7.By the light rotary screw 6 of cross bar 7, improved comfort.

Claims (4)

1. a station boiler pipeline mouth of pipe welds alignment clearance positioner, it is characterized in that: comprise fixed die (2), vertically be fixed on the support (1) on fixed die (2), by adjusting device can move up and down the sliding die (3) being fixed on support (1) and be installed on respectively fixed die (2) and sliding die (3) in some arcs (4), the axis of each arc (4) in described fixed die (2) and sliding die (3) coincides, fixed die (2) and sliding die (3) fix the pipe I (10) of two needs welding and pipe II (11) by arc (4), in described sliding die (3), be provided with for adjusting pipe I (10) and the gap adjusting device of managing II (11) alignment clearance (12).
2. the station boiler pipeline mouth of pipe according to claim 1 welds alignment clearance positioner, it is characterized in that: described adjusting device comprises the seat tube (14) that is fixed on support (1), be arranged at screwed hole in seat tube (14), be vertically combined on the screw rod (6) in seat tube (14) screwed hole and be installed on the Connection Block (5) in sliding die (3), the lower end of described screw rod (6) is rotated and is installed in Connection Block (5).
3. the station boiler pipeline mouth of pipe according to claim 1 and 2 welds alignment clearance positioner, it is characterized in that: described gap adjusting device comprises the nut (8) that is installed in sliding die (3), is combined on the bolt (9) in nut (8), and the lower end of described bolt (9) is provided with conical conehead (13).
4. station boiler pipeline mouth of pipe welding alignment clearance positioner according to claim 2, is characterized in that: the upper end of described screw rod (6) is laterally fixed with cross bar (7).
CN201420295740.8U 2014-06-05 2014-06-05 Power station boiler pipeline opening welding alignment clearance positioning device Expired - Lifetime CN203900806U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420295740.8U CN203900806U (en) 2014-06-05 2014-06-05 Power station boiler pipeline opening welding alignment clearance positioning device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420295740.8U CN203900806U (en) 2014-06-05 2014-06-05 Power station boiler pipeline opening welding alignment clearance positioning device

Publications (1)

Publication Number Publication Date
CN203900806U true CN203900806U (en) 2014-10-29

Family

ID=51775097

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420295740.8U Expired - Lifetime CN203900806U (en) 2014-06-05 2014-06-05 Power station boiler pipeline opening welding alignment clearance positioning device

Country Status (1)

Country Link
CN (1) CN203900806U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104014974A (en) * 2014-06-05 2014-09-03 山东电力建设第一工程公司 Joint gap locating device for welding pipeline openings of utility boiler
CN105666027A (en) * 2016-04-08 2016-06-15 株洲博雅实业有限公司 Modular welding-based and robot-based manufacturing method of cooling hydraulic blower
CN106984933A (en) * 2017-04-14 2017-07-28 绍兴电力设备有限公司 Weld tabs reference location device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104014974A (en) * 2014-06-05 2014-09-03 山东电力建设第一工程公司 Joint gap locating device for welding pipeline openings of utility boiler
CN105666027A (en) * 2016-04-08 2016-06-15 株洲博雅实业有限公司 Modular welding-based and robot-based manufacturing method of cooling hydraulic blower
CN106984933A (en) * 2017-04-14 2017-07-28 绍兴电力设备有限公司 Weld tabs reference location device

Similar Documents

Publication Publication Date Title
CN203936576U (en) hydraulic oil pipe automatic welding frock
CN104084736A (en) Welding clamp suitable for butt joint of circular welds
CN104014974A (en) Joint gap locating device for welding pipeline openings of utility boiler
CN202824925U (en) Multi-purpose adjustable combined pipe fitting pressing plate brazing clamp
CN104493556A (en) Fast pipe clamping device
CN203900806U (en) Power station boiler pipeline opening welding alignment clearance positioning device
CN204053289U (en) A kind of pipeline automatic welding connection device
CN204209355U (en) Tube welding mouth engaging tool
CN204565486U (en) A kind of isometrical steel-pipe welding special fixture
CN203448747U (en) Multifunctional cutting machine for tube intersection line
CN204277370U (en) A kind of fixture for pipeline butt
CN209998668U (en) pipe group correction connecting tool
CN208871151U (en) Pipeline assists docking facilities
CN104668877A (en) Inner supporting device for vertical tube-tube welding machine
CN203831007U (en) Plumber welded junction docking unit
CN204353816U (en) Pipe fitting fast fixture
CN204171581U (en) A kind of weld jig being applicable to circular weld docking
CN202367397U (en) Adjustable pipeline aligning device
CN204800195U (en) Welding jig of air conditioner water collector
CN204504641U (en) A kind of for the two laterally opened fixture holding clamping of pipe pipe docking welding
CN203956391U (en) Taper square tubes soldering frock
CN210677595U (en) Pipeline concentricity adjusting device and butt joint pipeline
CN204686349U (en) Pipeline Quick butt connector
CN209648000U (en) A kind of fixed device of butt welding of pipelines construction correction
KR20130120055A (en) Apparatus for welding branch pipe to maim pipe and method by using the same

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20141029