CN203866821U - Lead hole implant cloth bag gravel grouting pile - Google Patents

Lead hole implant cloth bag gravel grouting pile Download PDF

Info

Publication number
CN203866821U
CN203866821U CN201420256926.2U CN201420256926U CN203866821U CN 203866821 U CN203866821 U CN 203866821U CN 201420256926 U CN201420256926 U CN 201420256926U CN 203866821 U CN203866821 U CN 203866821U
Authority
CN
China
Prior art keywords
pile
cloth bag
hole
stake
cover plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201420256926.2U
Other languages
Chinese (zh)
Inventor
王新泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Jiangrun Technology Co Ltd
Original Assignee
Hangzhou Jiangrun Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Jiangrun Technology Co Ltd filed Critical Hangzhou Jiangrun Technology Co Ltd
Priority to CN201420256926.2U priority Critical patent/CN203866821U/en
Application granted granted Critical
Publication of CN203866821U publication Critical patent/CN203866821U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a lead hole implant cloth bag gravel grouting pile, which is mainly constituted of a pre-formed pile picket, a stranded steel wire, a geotextile cloth bag, a pile-end slurry solid, a gravel slurry solid pile body and a cover plate, wherein the pre-formed pile picket is set on the bottom of the pile body; a pre-opened hole for passing by the grouting pile is set in the middle of the pre-formed pile picket; a hole for passing by the stranded steel wire is set at the edge of the pre-formed pile picket; the pile-end slurry solid is formed on the bottom of the pre-formed pile picket by pouring; the gravel slurry solid pile body is set on the upper portion of the pre-formed pile picket and the outer side thereof is provided with a geotextile cloth bag; and the cover plate is set above the gravel slurry solid pile body. The beneficial effects of the utility model are that the performance of the granular material is fully used; the problems of necking, bulging, hole collapsing and mud pollution of the pile body are overcome; the integrity of the structure and the bearing capacity are improved; the sedimentation of the pile body is reduced; the foundation bearing capacity is rapidly enhanced; and the pile formation quality is improved.

Description

The stake of cloth bag gravel slip-casting is implanted in a kind of hole of drawing
Technical field
The utility model relates to a kind of grouting pile, relates in particular a kind of hole of drawing and implants the stake of cloth bag gravel slip-casting, belongs to ground process field.
Background technology
Along with the development of railway and Highway Cause, the supporting capacity of bridge struction pile and settlement Control are had higher requirement.Yet the southeastern coastal areas belong to soft foundation mostly, easily produce differential settlement, so Soft Ground problem seems and becomes increasingly conspicuous.In engineering field, the engineering method close with this patent has three kinds at present, i.e. Bag Grouting Pile, gravel slip-casting stake, cloth bag discrete material post grouting pile.
Traditional cloth bag grouting pile construction technology (patent No.: ZL200710053179.7) first utilize boring machine in the design attitude boring of stake, then mounted cloth bag and Grouting Pipe are put in a hole, then injection slurry is pressed into from bottom to top step by step, finally cloth bag is strutted, in the soil body, form the pile body of cylindricality.This construction method often can run into the problems such as collapse hole or necking down, can cause cloth bag to place difficulty, cannot reach the problems such as design stake footpath.
Gravel slip-casting stake (number of patent application: 201310636953.2) work progress comprises and first uses rig pore-forming, in hole, place Grouting Pipe and pour into rubble in hole, then by Grouting Pipe, to injecting clear water in hole, carry out simple hole flushing, finally by Grouting Pipe, carry out slip casing by pressure, and then form the solid pile body of slurry.Gravel slip-casting stake can be given full play to its metathesis, improves the shear behavior of ground; Gravel slip-casting stake simultaneously has good water permeability, can bring into play its good drainage performance under upper load effect, accelerates soil solidifying, improves foundation strength, and the settling amount effect that reduces ground is remarkable; In addition, the material source of gravel slip-casting stake is abundant, and cost is low, has good economic benefit.But also there are many problems in traditional gravel slip-casting stake, in (1) stake top 2~3m, easily bloat destruction, thereby will cause pile body bearing capacity greatly to reduce when radial deformation is excessive, cause losing efficacy; (2) while passing the dead-soft soil layers such as mud when rubble, cannot effectively avoid the rubble pouring into clamp-on in soft soil layer to the external diffusion of stake footpath, cause gravel slip-casting pile body lack of homogeneity, affect bearing capacity and the globality of pile body.(3) mud having in work progress in soil layer remains in rubble, pollutes rubble, and affects the load-carrying properties of pile body.
Cloth bag discrete material post grouting pile (number of patent application: be 200820087682.4) to utilize lifting rope that geotechnological cloth bag is hung in steel immersed tube, wherein geotechnological cloth bag bottom is fixed on precast reinforced concrete pile point, with impact pile driving equipment or pile vibrosinking equipment, steel pipe and precast reinforced concrete pile point are sunk to a formation stake hole in soil layer, then in cloth bag, put into Grouting Pipe and pour into rubble, immersed tube is extracted on vibration limit, limit, finally carries out slip casing by pressure and forms needed grouting pile.This construction technology quality is wayward, the too fast stake shortea that easily causes of tube drawing, and owing to being Squeezing Soil Pile, and the stake of having poured into a mould is in advance vulnerable to soil compaction effect and produces inclined fracture and even misplace.In work progress, hammering meeting produces larger noise, and vibration can affect Adjacent Buildings, therefore be less compliant in urban district, uses.
Utility model content
The purpose of this utility model is to overcome deficiency of the prior art, provides a kind of load-carrying properties of structure good, efficiency of construction is high, effectively avoids the hole of drawing of necking down, bulging and mud contamination to implant the stake of cloth bag gravel slip-casting.
The stake of cloth bag gravel slip-casting is implanted in this hole of drawing, mainly by precast pile tip, steel strand, geotechnological cloth bag, stake end slurry solid, the solid pile body of rubble slurry, cover plate, formed, described precast pile tip is located at pile body bottom, described precast pile tip center is provided with the preformed hole passing for Grouting Pipe, and edge is provided with the hole passing for steel strand; Precast pile tip bottom is built and is formed stake end slurry solid; The solid pile body of rubble slurry is located at precast pile tip top, its arranged outside geotechnique cloth bag; Cover plate is located at the solid pile body of rubble slurry top.
As preferably: described precast pile tip adopts circular steel plate pile tip, cross steel plate pile top or string bag pile top, the marginal position of precast pile tip is evenly provided with 2~3 holes that pass for steel strand.
As preferably: described geotechnological cloth bag top 3~5m adopts carbon fiber cloth bag, geotechnological cloth bag bottom is by connector or be adhesively fixed and fix on precast pile tip.
As preferably: described geotechnological cloth bag outside is provided with hoop constraint body, and described hoop constraint body adopts geo-grid.
As preferably: described cover plate adopts reinforced concrete cover plate or gravel slip-casting to form, the reserved vertical hole that steel strand are passed in cover plate, cover plate top arranges the fixedly ground tackle of steel strand.
As preferably: the reserved embedded pvc pipe of vertical hole that steel strand are passed in described cover plate.
The beneficial effects of the utility model are:
(1) the utility model is used dry soil taking hole forming under suitable geological condition, and the setting of cloth bag simultaneously can avoid mud to clamp-on rubble, has avoided the pollution of mud, to solving the problems such as pile body necking down, bulging, has good effect;
(2) in work progress, the lateral force of top rubble is larger, utilizes the tensile property that carbon fiber cloth bag is good to retrain rubble, avoids rubble to clamp-on around in soil layer, to improving integrality and the pile quality of top pile body, has good effect;
(3) the hoop constraint body outside pile body can play constraint effect to pile body when slip casting, avoids rubble or mortar to clamp-on around in soil layer, has the effect of the globality that strengthens pile body;
(4) setting of steel strand, sinks pile top maintenance level gradually, has guaranteed that rubble can pour in cloth bag smoothly, meanwhile, in construction in later period, can apply prestressing force to steel strand, can greatly improve the load-carrying properties of pile body and the globality between cover plate and pile body.
(5) pile top sinks in bottom, a hole process, and pile top bottom can exist surface dust (mud), belongs to soft layer, and stake end slurry solid can be reinforced the soft layer of pile top bottom, reduces the sedimentation of pile body, strengthens the load-carrying properties of pile body.
(6) in work progress, the recycle and reuse of steel strand can reduce construction costs, has good economy.
(7) in work progress, in geotechnological cloth bag, pour into part rubble, allow pile top and rubble under deadweight condition, sink to gradually a bottom, hole, in sinking process, continuous supplementary irrigation rubble, has effectively avoided the generation of the bad phenomenon such as necking down, bulging.
In a word, feature of the present utility model is to give full play to the performance of discrete material, solves the problems such as pile body necking down, bulging, collapse hole, mud contamination, improves globality, the load-carrying properties of structure, reduce the sedimentation of pile body, accelerate to improve bearing capacity of foundation soil, improve pile quality.
Accompanying drawing explanation
Fig. 1 is that the utility model draws hole implantation cloth bag gravel slip-casting stake longitudinal sectional drawing;
Fig. 2 first draws hole to implant cloth bag gravel slip-casting pilework pile schematic diagram;
Fig. 3 first draws hole to implant the main construction process figure of cloth bag gravel slip-casting stake;
Description of reference numerals: stake hole 1, precast pile tip 2, reserved perforate 3, steel strand 4, pulley 5, Grouting Pipe 6, carbon fiber cloth bag 7, geotechnological cloth bag 8, hoop constraint body 9, rubble 10, stake end slurry solid 11, cover plate 12, ground tackle 13, pvc pipe 14, the solid pile body 15 of rubble slurry.
The specific embodiment
Below in conjunction with drawings and Examples, the utility model is described further.Although the utility model is described in connection with preferred embodiment, should know, do not represent that the utility model is limited in described embodiment.On the contrary, the utility model is by alternative, modified and the equivalent contained in the scope of the present utility model that can be included in attached claims restriction.
Enforcement of the present utility model is referring to figs. 1 through shown in Fig. 3, after the first pore-forming of the utility model, implant cloth bag gravel slip-casting pilework mainly by: precast pile tip 2, steel strand 4, carbon fiber cloth bag 7, geotechnological cloth bag 8, stake end slurry solid 11 and cover plate 12 form.
This example stake bore dia is 500mm, and precast pile tip 2 adopts circular steel plate pile tip, is located at cloth bag gravel slip-casting stake bottom, and the center of circular steel plate pile tip is provided with perforate, so that Grouting Pipe 6 is passed, circular steel plate pile tip 50mm is stretched out in Grouting Pipe end.During slip casting, grouting pressure is controlled at 0.3~0.7MPa, and wherein the cement of grouting adopts No. 42.5 Portland cements.Lapidation material particle diameter is 20~40mm.
Carbon fiber cloth bag 7 adopts woven carbon fiber cloth bag, and the length of cloth bag is 5m; Geotechnique's cloth bag 8 is selected roll type, unit area 250g/m 2, effective aperture 0.07~0.5mm, tearing resistance>=0.9kN, coefficient of permeability K=1 * 10 -2~1 * 10 -3cm/s, CBR bursting strength>=5.5kN.Wherein bi-material cloth bag diameter is 500mm, and cloth bag junction connects by stitching, the overlapping 200mm of suture; Cloth bag bottom is fixed on steel plate precast pile tip 2 by splicing.
Steel strand 4 are selected the steel strand of 15-7 φ 5 specifications, and the lower end of steel strand is by being welded and fixed steel plate precast pile tip 2, and upper end is wrapped on the pulley 4 of hole fastening devices.
Hoop constraint body 9 adopts geo-grid, is the cylindric of up/down perforation, by the geo-grid of sheet is rolled, rolls limit form with nylon rope colligation, and bottom is fixed on precast pile tip 2 together with geotechnological cloth bag by glueing joint.
In cover plate 12, embedded pvc pipe 14 diameters are 30mm.
Fig. 3 implants the main construction process figure of cloth bag gravel slip-casting stake after first pore-forming; As shown in Figure 3, above-mentioned construction method of drawing the stake of hole implantation cloth bag gravel slip-casting, comprises following construction sequence:
Before step 1, construction, prepare: according to design drawing, process construction plant, measure stake position, draw stake position outline line;
Step 2, rig are in place: pore-forming can adopt rotary drilling rig.After equipment is marched into the arena, according to assembling drawing, assemble;
Step 3, drilling and forming hole: in soil layer, utilize rotary drilling rig pore-forming to projected depth, adopt dry soil taking hole forming, can be to water filling retaining wall in hole during boring;
Step 4, put pile top: the precast pile tip 2 that is fixed with prestress wire 4, geotechnological cloth bag 8, hoop constraint body 9 is put into a hole 1 certain depth, Grouting Pipe 6 is inserted in pile top preformed hole 3, steel plate 50mm is given prominence in lower end, and wherein steel strand 4 have by being fixed on 5 pairs of whole precast pile tips 2 of pulley at hole the effect of lifting;
Step 5, fill with rubble: to the rubble 10 that pours into the thick cleaning of 1m in geotechnological cloth bag, allow precast pile tip 2 and rubble 10 under deadweight, sink to gradually the bottom in a hole 1, decline along with precast pile tip 2, constantly in cloth bag, pour into rubble 10, until reach projected depth, pour in the process of rubble 10 and make rubble vibratory compaction with vibrator;
Step 6, drainage trenching: dig a gutter aside, guarantee to get rid of in time the underground water overflowing in rubble 10;
Step 7, slip casing by pressure: while overflowing without underground water in rubble 10, with high pressure grouting pump, to precast pile tip 2 bottom slip castings, form a stake end slurry solid 11, then hoisting grouting pipe 6 progressively, toward slip casing by pressure in rubble 10, Grouting Pipe 6 hoisting velocities are controlled at 0.4~0.6m/min; When pile body top has slurries to overflow, aperture frost boiling proportion continues slip casting 30s after arriving and requiring;
Step 8, build cover plate: after the slip casting of pile body completes, then build the cover plate 12 on pile body top, cover plate 12 adopts reinforced concrete cover plates;
Step 9, apply prestressing force: when the solid pile body 15 of rubble slurry and cover plate 12 reach after design strength, steel strand are applied to prestressing force, and on the cover board portion arranges ground tackle 13, then according to requirement of engineering, carry out postorder construction.
In step 3, also can use mud off to get hole, now, in step 4, Grouting Pipe 6 extracts mud in sinking to gradually a hole 1 bottom process.

Claims (6)

1. one kind is drawn the stake of hole implantation cloth bag gravel slip-casting, it is characterized in that: mainly by precast pile tip (2), steel strand (4), geotechnological cloth bag (8), stake end slurry solid (11), the solid pile body (15) of rubble slurry, cover plate (12), formed, described precast pile tip (2) is located at pile body bottom, described precast pile tip (2) center is provided with the preformed hole (3) passing for Grouting Pipe (6), and edge is provided with the hole passing for steel strand (4); Precast pile tip (2) bottom is built and is formed stake end slurry solid (11); The solid pile body (15) of rubble slurry is located at precast pile tip (2) top, its arranged outside geotechnique cloth bag (8); Cover plate (12) is located at the solid pile body (15) of rubble slurry top.
2. the stake of cloth bag gravel slip-casting is implanted in the hole of drawing according to claim 1, it is characterized in that: described precast pile tip (2) adopts circular steel plate pile tip, cross steel plate pile top or string bag pile top, the marginal position of precast pile tip (2) is evenly provided with 2~3 holes that pass for steel strand (4).
3. the stake of cloth bag gravel slip-casting is implanted in the hole of drawing according to claim 1, it is characterized in that: described geotechnological cloth bag (8) top 3~5m adopts carbon fiber cloth bag (7), geotechnological cloth bag (8) bottom is by connector or be adhesively fixed and fix on precast pile tip (2).
4. the stake of cloth bag gravel slip-casting is implanted in the hole of drawing according to claim 1, it is characterized in that: described geotechnological cloth bag (8) outside is provided with hoop constraint body (9), and described hoop constraint body (9) adopts geo-grid.
5. the stake of cloth bag gravel slip-casting is implanted in the hole of drawing according to claim 1, it is characterized in that: described cover plate (12) adopts reinforced concrete cover plate or gravel slip-casting to form, the reserved vertical hole that steel strand (4) are passed in cover plate (12), cover plate (12) top arranges the fixedly ground tackle (13) of steel strand (4).
6. the stake of cloth bag gravel slip-casting is implanted in the hole of drawing according to claim 5, it is characterized in that: the reserved embedded pvc pipe of vertical hole (14) that steel strand (4) are passed in described cover plate (12).
CN201420256926.2U 2014-05-19 2014-05-19 Lead hole implant cloth bag gravel grouting pile Withdrawn - After Issue CN203866821U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420256926.2U CN203866821U (en) 2014-05-19 2014-05-19 Lead hole implant cloth bag gravel grouting pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420256926.2U CN203866821U (en) 2014-05-19 2014-05-19 Lead hole implant cloth bag gravel grouting pile

Publications (1)

Publication Number Publication Date
CN203866821U true CN203866821U (en) 2014-10-08

Family

ID=51647791

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420256926.2U Withdrawn - After Issue CN203866821U (en) 2014-05-19 2014-05-19 Lead hole implant cloth bag gravel grouting pile

Country Status (1)

Country Link
CN (1) CN203866821U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103993598A (en) * 2014-05-19 2014-08-20 杭州江润科技有限公司 Crashed stone grouting pile with lead holes implanted in cloth bag and construction method
CN105297713A (en) * 2015-10-15 2016-02-03 广东华隧建设股份有限公司 Indiffusible pile foundation construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103993598A (en) * 2014-05-19 2014-08-20 杭州江润科技有限公司 Crashed stone grouting pile with lead holes implanted in cloth bag and construction method
CN103993598B (en) * 2014-05-19 2015-10-07 杭州江润科技有限公司 One is drawn hole and is implanted cloth bag crushed stone grouting pile and construction method
CN105297713A (en) * 2015-10-15 2016-02-03 广东华隧建设股份有限公司 Indiffusible pile foundation construction method

Similar Documents

Publication Publication Date Title
CN103993598B (en) One is drawn hole and is implanted cloth bag crushed stone grouting pile and construction method
CN101532290B (en) Granule grouting pile of ripple plastic sleeve with hole for strengthening soft soil foundation and strengthening method
CN104131556B (en) The construction method of the mutual foundation drainage pile for prestressed pipe of a kind of soft or hard interlayer
CN108442365B (en) Anti-blocking reinforced permeable pile and construction method
CN105220714B (en) Built-in anchor cable fills core compound prestress pile tube float Structure construction method
CN103510510A (en) Reinforced long spiral drilling concrete grouting pile and construction method thereof
CN104005404A (en) Prestressed pipe pile coated with active material pile body and construction method
CN110528533A (en) A kind of microorganism solidification impacting steel tube for soil-nail and its construction method
CN106948340A (en) A kind of construction method of the Manual excavated pile structure of high polymer grouting protection
CN101718098B (en) Micro-pile combined dug composite foundation and construction method thereof
CN104762956B (en) Method for forming pile based on construction waste recycled aggregate
CN104294823B (en) A kind of construction method of pile for prestressed pipe anti-floating pile raft structure
CN102330436A (en) Composite retaining structure and composite retaining method for half geotechnical layer ultradeep round spiral flow tank
CN104196013B (en) A kind of composite Y shape stake and construction method thereof
CN207659986U (en) A kind of building or structures foundation stabilization underpin pier
CN203866821U (en) Lead hole implant cloth bag gravel grouting pile
CN204000859U (en) The mutual foundation drainage pile for prestressed pipe of a kind of soft or hard interlayer
CN202187340U (en) Socketed pile with concrete-filled steel tube core column
CN108842761A (en) Drilling guiding prefabricated pile post-grouting technology
CN108277800A (en) A kind of consolidation layer of sand concrete reinforced pipe section broken stone pile and its construction method
CN201411687Y (en) Corrugated plastic sleeve pipe granule grouting pile with hole
CN204174616U (en) Pile for prestressed pipe anti-floating pile raft structure
CN213625569U (en) Soil anchor rod for constructional engineering
CN210827460U (en) Drainage anchor nail for slope drainage reinforcement and drainage system
CN104929101B (en) Resistance to plucking prestress anchoraging broken stone pile and construction method that a kind of base expanding and base expanding multistage side is expanded

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20141008

Effective date of abandoning: 20151007

C25 Abandonment of patent right or utility model to avoid double patenting