CN203808485U - Attached scaffold operation platform structure - Google Patents
Attached scaffold operation platform structure Download PDFInfo
- Publication number
- CN203808485U CN203808485U CN201420053761.9U CN201420053761U CN203808485U CN 203808485 U CN203808485 U CN 203808485U CN 201420053761 U CN201420053761 U CN 201420053761U CN 203808485 U CN203808485 U CN 203808485U
- Authority
- CN
- China
- Prior art keywords
- suspension rod
- wire rope
- wall
- boom
- steel wire
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Movable Scaffolding (AREA)
Abstract
The utility model relates to a building construction tool structure, in particular to an attached scaffold operation platform structure. An attached scaffold operation platform is formed by a wall body and a platform device attached to the wall body. The platform device is composed of a boom beam, a boom and a steel wire rope. The boom beam is fixed on the wall body horizontally through a bolt, one end of the boom is connected with the boom beam in a rotating mode, the other end of the boom is directly and fixedly connected with the wall body through a bolt, one end of the steel wire rope is connected with the boom beam through a steel wire rope, and the other end of the steel wire rope is connected with the wall body through an embedded part and the steel wire rope. The operation platform structure has the advantages of being reasonable in design, low in construction cost, good in construction safety, not prone to fall and the like.
Description
Technical field
The utility model relates to a kind of building operations tool construction, especially relates to a kind of attaching scaffold operating platform structure.
Background technology
Attaching scaffold is in the building main structure construction stage, template and scaffold composition integral platform, Integral lifting carries out main structure construction, after main structure construction finishes, scaffold separates with integral platform, form external scaffolding or integral electric attached scaffold, the decoration of exterior wall that successively declines construction.Attaching scaffold platform can self climbing, reduce the vertical transport amount of construction, attaching scaffold self can be with construction requirement lifting, template, reinforcing bar, concrete operation major part are carried out on operating platform, although reduced labour intensity, but along with construction material is stacked on scaffold, make scaffold bear gravity and strengthen, have influence on the safety of construction.
Summary of the invention
The utility model is mainly that construction cost is higher for the existing complex structure of prior art, and working security is poor, the technical problem of easily falling etc., provides a kind of simple in structure, and construction cost is lower, working security is better, the scaffold operating platform that is difficult for falling.
Above-mentioned technical problem of the present utility model is mainly solved by following technical proposals: scaffold operating platform is made up of body of wall and the stage apparatus being attached on body of wall, stage apparatus is made up of suspension rod beam, suspension rod, wire rope, suspension rod beam is horizontally fixed on body of wall by bolt, one end of suspension rod and suspension rod beam are rotationally connected, the other end of suspension rod is directly fixedly connected with by bolt with body of wall, one end of wire rope is connected with rope cramp with suspension rod beam, and the other end of wire rope is connected with rope cramp by built-in fitting with body of wall.
As preferably, adjusting bolt is installed in the middle part of suspension rod.The length of adjusting bolt adjustable suspension rod, by the length adjustment of suspension rod, adjusts the angle between suspension rod beam and body of wall, to reach maximum weighted effect.Again by additional wire rope, reach the object of dual fail-safe simultaneously.
Therefore, the utlity model has design more reasonable, construction cost is lower, and working security is better, and the feature such as be difficult for falling.
Brief description of the drawings
Accompanying drawing 1 is overall structure schematic diagram of the present utility model.
Detailed description of the invention
Below by embodiment, and by reference to the accompanying drawings, the technical solution of the utility model is described in further detail.
Embodiment 1: attaching scaffold operating platform is made up of body of wall and the stage apparatus being attached on body of wall, stage apparatus is made up of suspension rod beam 1, suspension rod 2, wire rope 5, suspension rod beam 1 is horizontally fixed on body of wall 3 by bolt, one end of suspension rod 2 and suspension rod beam 1 are rotationally connected, the other end of suspension rod 2 is directly fixedly connected with by bolt with body of wall 3, one end of wire rope 5 is connected with suspension rod beam 1 use rope cramp, and wire rope 5 other ends are connected with rope cramp by built-in fitting with body of wall 3.Suspension rod 2 middle parts are provided with adjusting bolt 4 (as shown in Figure 1).
Claims (2)
1. an attaching scaffold operating platform structure, formed by body of wall and the stage apparatus being attached on body of wall, it is characterized in that described stage apparatus is by suspension rod beam (1), suspension rod (2), wire rope (5) composition, suspension rod beam (1) is horizontally fixed on body of wall (3) by bolt, one end of suspension rod (2) and suspension rod beam (1) are rotationally connected, the other end of suspension rod (2) is directly fixedly connected with by bolt with body of wall (3), one end of wire rope (5) is connected with rope cramp with suspension rod beam (1), wire rope (5) other end is connected with rope cramp by built-in fitting with body of wall (3).
2. attaching scaffold operating platform structure according to claim 1, is characterized in that described suspension rod (2) middle part is provided with adjusting bolt (4).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420053761.9U CN203808485U (en) | 2014-01-27 | 2014-01-27 | Attached scaffold operation platform structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420053761.9U CN203808485U (en) | 2014-01-27 | 2014-01-27 | Attached scaffold operation platform structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203808485U true CN203808485U (en) | 2014-09-03 |
Family
ID=51447262
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420053761.9U Expired - Fee Related CN203808485U (en) | 2014-01-27 | 2014-01-27 | Attached scaffold operation platform structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203808485U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107091008A (en) * | 2017-06-05 | 2017-08-25 | 国家电网公司 | A kind of adhesion type is from lifting pole |
-
2014
- 2014-01-27 CN CN201420053761.9U patent/CN203808485U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107091008A (en) * | 2017-06-05 | 2017-08-25 | 国家电网公司 | A kind of adhesion type is from lifting pole |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104420640B (en) | Abnormity chimney construction platform | |
CN204876508U (en) | Portable height -adjustable scaffold | |
CN202023404U (en) | Multifunctional pole erecting device | |
CN205063057U (en) | Plugging device for small-sized hole | |
CN204370786U (en) | A kind of anti-collision body model sheetinstallat hanging basket | |
CN203808485U (en) | Attached scaffold operation platform structure | |
CN203593556U (en) | High safety tower crane | |
CN203654790U (en) | 3m safety net-picking type steel support | |
CN204040515U (en) | Cat ladder | |
CN203475797U (en) | Special-shaped chimney construction platform | |
CN204738548U (en) | Design safe plain net of encorbelmenting | |
CN204676865U (en) | A kind of building scaffold | |
CN204139567U (en) | Aerial work platform | |
CN205134921U (en) | Building outer wall concrete constructional column hangs construction platform | |
CN105525755A (en) | Steel bar planting hole drilling mechanical hand | |
CN204266607U (en) | A kind of high-voltage line protective frame | |
CN204400568U (en) | Become span hanging basket suspension mechanism | |
CN204018797U (en) | New type electric impact drill extending bracket device | |
CN204198326U (en) | I.e. hanging balance of well pumping unit control apparatus | |
CN206705575U (en) | A kind of building tower crane with safety hanging cradle | |
CN205604078U (en) | Web stirrup installation positioner | |
CN204919374U (en) | Machine is maintained to cable -stay bridge | |
CN204163367U (en) | Cat ladder frame operating platform | |
CN204510768U (en) | A kind of without support operation frame | |
CN105569326A (en) | Handling frame without support and exterior wall construction method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140903 Termination date: 20170127 |