CN203808265U - Blocking structure for small reserved opening members of floor - Google Patents

Blocking structure for small reserved opening members of floor Download PDF

Info

Publication number
CN203808265U
CN203808265U CN201420100991.6U CN201420100991U CN203808265U CN 203808265 U CN203808265 U CN 203808265U CN 201420100991 U CN201420100991 U CN 201420100991U CN 203808265 U CN203808265 U CN 203808265U
Authority
CN
China
Prior art keywords
floor
reserved opening
concrete prefabricated
blocking structure
small
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420100991.6U
Other languages
Chinese (zh)
Inventor
赵明凯
郝丹丹
李永楠
王兴达
杜凡镛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Engineering Division Co Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN201420100991.6U priority Critical patent/CN203808265U/en
Application granted granted Critical
Publication of CN203808265U publication Critical patent/CN203808265U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Floor Finish (AREA)

Abstract

The utility model discloses a blocking structure for small reserved opening members of floor. The blocking structure comprises an inverted-frustum-shaped concrete prefabricated member which is closely plugged in an inverted-frustum-shaped concrete reserved opening of the floor. The shape of the concrete prefabricated member is matched with that of the reserved opening of the floor. Gaps at joints between four sides of the top of the concrete prefabricated member and the floor structure are filled with mortar. The blocking structure has the advantages that secondary casting is omitted for opening blocking, form supporting is omitted, operation is simplified, construction period is shortened, and cost is reduced while work efficiency is improved greatly.

Description

The small-sized reserved opening member of a kind of floor plugging structure
Technical field
The utility model relates to plugging structure, and the utility model relates in particular to the small-sized reserved opening member of floor plugging structure.
Background technology
When Construction of High-rise, the vertical transmission of control axis is generally reserved small-sized hole by floor and is successively upwards carried out, due to the number of plies, the quantity of reserved opening is also considerable more at most, carry out floor sealing hole after use finishes time, the general mode of hanging mould secondary concreting that adopts is carried out, engineering quantity is huge, and construction period is longer.
Summary of the invention
The purpose of this utility model is to overcome the deficiency of prior art, provide a kind of simple to operate, save the duration, the small-sized reserved opening member of a kind of floor plugging structure that reduces costs and greatly increase work efficiency.
In order to achieve the above object, the technical solution adopted in the utility model is:
The small-sized reserved opening member of a kind of floor of the present utility model plugging structure, it comprises that jam-pack is at the inversion truncated rectangular pyramids shape concrete prefabricated element of being inverted in truncated rectangular pyramids shape floor slab preformed hole mouth, described concrete prefabricated element shape and floor slab preformed hole mouth-shaped match, and described concrete prefabricated element top surrounding and floor slab structure junction gap filling are wiped with mortar.
The beneficial effects of the utility model are: sealing hole is built without secondary, need not install template, simple to operate, save the duration, reduce costs, and greatly increase work efficiency.
Brief description of the drawings
Accompanying drawing is the structural representation of the small-sized reserved opening member of a kind of floor of the present utility model plugging structure.
Detailed description of the invention
The small-sized reserved opening member of a kind of floor of the present utility model plugging structure as shown in drawings, it comprises that jam-pack is at the inversion truncated rectangular pyramids shape concrete prefabricated element 2 of being inverted in truncated rectangular pyramids shape floor slab preformed hole mouth, described concrete prefabricated element 2 shapes and floor slab preformed hole mouth-shaped match, and described concrete prefabricated element 2 top surroundings and floor slab structure 3 junction gap fillings are wiped with mortar 1.
The construction method of this structure is:
1. when floor slab preformed hole mouth is constructed, inversion truncated rectangular pyramids groove face 4 shapes of " up big and down small " are all arranged at four sides, and corresponding concrete prefabricated element 2 is also prefabricated into the inversion truncated rectangular pyramids shape of " up big and down small ", size and reserved opening consistent size;
2. reserved opening uses and finishes while carrying out sealing hole, by prefabricated units 2 from top to bottom jam-pack in hole, and by prefabricated units 2 top surroundings and floor slab structure 3 gaps, junction employing filled with mortar floating 1.

Claims (1)

1. the small-sized reserved opening member of a floor plugging structure, it is characterized in that: it comprises that jam-pack is at the inversion truncated rectangular pyramids shape concrete prefabricated element of being inverted in truncated rectangular pyramids shape floor slab preformed hole mouth, described concrete prefabricated element shape and floor slab preformed hole mouth-shaped match, and described concrete prefabricated element top surrounding and floor slab structure junction gap filling are wiped with mortar.
CN201420100991.6U 2014-03-06 2014-03-06 Blocking structure for small reserved opening members of floor Expired - Fee Related CN203808265U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420100991.6U CN203808265U (en) 2014-03-06 2014-03-06 Blocking structure for small reserved opening members of floor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420100991.6U CN203808265U (en) 2014-03-06 2014-03-06 Blocking structure for small reserved opening members of floor

Publications (1)

Publication Number Publication Date
CN203808265U true CN203808265U (en) 2014-09-03

Family

ID=51447042

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420100991.6U Expired - Fee Related CN203808265U (en) 2014-03-06 2014-03-06 Blocking structure for small reserved opening members of floor

Country Status (1)

Country Link
CN (1) CN203808265U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104631824A (en) * 2014-12-28 2015-05-20 上海建工一建集团有限公司 Support-changing construction method of structural slabs at temporary division walls
CN106988436A (en) * 2017-03-28 2017-07-28 中国水利水电第十二工程局有限公司 A kind of method of reserving hole closure
CN107989205A (en) * 2018-01-10 2018-05-04 山西三建集团有限公司 The plugging system of toilet bath room floor sewer pipe preformed hole
CN108842933A (en) * 2018-08-27 2018-11-20 中建八局第建设有限公司 A kind of tower crane sealing hole method
CN110388055A (en) * 2019-08-02 2019-10-29 中铁建设集团有限公司 A kind of structure floor horizontal hole mouth modularization plugging construction method
CN113062164A (en) * 2021-03-05 2021-07-02 武汉理工大学 Double-layer composite full-prefabricated assembly type pavement and construction method
CN113700332A (en) * 2021-08-30 2021-11-26 中国二十二冶集团有限公司 Construction method for blocking pay-off measuring hole of building construction engineering floor slab

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104631824A (en) * 2014-12-28 2015-05-20 上海建工一建集团有限公司 Support-changing construction method of structural slabs at temporary division walls
CN106988436A (en) * 2017-03-28 2017-07-28 中国水利水电第十二工程局有限公司 A kind of method of reserving hole closure
CN106988436B (en) * 2017-03-28 2019-07-02 中国水利水电第十二工程局有限公司 A kind of method that reserving hole blocks
CN107989205A (en) * 2018-01-10 2018-05-04 山西三建集团有限公司 The plugging system of toilet bath room floor sewer pipe preformed hole
CN108842933A (en) * 2018-08-27 2018-11-20 中建八局第建设有限公司 A kind of tower crane sealing hole method
CN108842933B (en) * 2018-08-27 2023-08-08 中建八局第一建设有限公司 Tower crane opening blocking method
CN110388055A (en) * 2019-08-02 2019-10-29 中铁建设集团有限公司 A kind of structure floor horizontal hole mouth modularization plugging construction method
CN113062164A (en) * 2021-03-05 2021-07-02 武汉理工大学 Double-layer composite full-prefabricated assembly type pavement and construction method
CN113700332A (en) * 2021-08-30 2021-11-26 中国二十二冶集团有限公司 Construction method for blocking pay-off measuring hole of building construction engineering floor slab

Similar Documents

Publication Publication Date Title
CN203808265U (en) Blocking structure for small reserved opening members of floor
CN202596184U (en) Lifting node for assembly type large wallboard
CN206053110U (en) Wind resistance prefabricated panel and exterior wall
CN202744951U (en) Light anchorage structure
CN103132707A (en) Repairing method and structure for building wall crack
CN104110078B (en) Heat-preserving wall
CN204009336U (en) A kind of hard ball curtain
JP3191602U (en) Steel column structure
CN205046743U (en) Building block of wall crown wedge
CN204940364U (en) The proof mechanism of water that the concrete support capping beam falling low is suitable for reading
CN203924411U (en) Prefabricated assembled fire wall
CN202767229U (en) Hollow building coping structure
CN204326307U (en) The module wall that a kind of building construction uses
CN204199477U (en) Heat-preserving building wall
CN204059727U (en) A kind of high-strength heat preservation autoclaved aerated building block
CN202925566U (en) A prefabricated assembly-type reinforced concrete inspection well chamber
CN105729623A (en) Prefabricated concrete wallboard system
CN204647576U (en) Concrete floor pre-arranged hole mouth water sealing structure
CN204163272U (en) With the solid light wallboard of crossed beam trunking
CN203393900U (en) Light foam concrete hanging beam
CN202370107U (en) Repairing structure of building wall slit
CN202830949U (en) Novel box type base
CN202416850U (en) Simple box construction formwork
CN202577726U (en) Building wall body adjustment member
CN102662413A (en) Slurry level control method used in composite heat insulation wall material production

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140903

Termination date: 20190306

CF01 Termination of patent right due to non-payment of annual fee