CN203794770U - Electrode cooler of bottom plugging type electrode melting furnace - Google Patents

Electrode cooler of bottom plugging type electrode melting furnace Download PDF

Info

Publication number
CN203794770U
CN203794770U CN201420174284.1U CN201420174284U CN203794770U CN 203794770 U CN203794770 U CN 203794770U CN 201420174284 U CN201420174284 U CN 201420174284U CN 203794770 U CN203794770 U CN 203794770U
Authority
CN
China
Prior art keywords
water
electrode
electrical conductor
inlet pipe
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420174284.1U
Other languages
Chinese (zh)
Inventor
毛会曾
郎海林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FUSHUN KESHENG XIASHI MICROCRYSTALLINE MATERIALS EQUIPMENT MANUFACTURING Co Ltd
Original Assignee
FUSHUN KESHENG XIASHI MICROCRYSTALLINE MATERIALS EQUIPMENT MANUFACTURING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FUSHUN KESHENG XIASHI MICROCRYSTALLINE MATERIALS EQUIPMENT MANUFACTURING Co Ltd filed Critical FUSHUN KESHENG XIASHI MICROCRYSTALLINE MATERIALS EQUIPMENT MANUFACTURING Co Ltd
Priority to CN201420174284.1U priority Critical patent/CN203794770U/en
Application granted granted Critical
Publication of CN203794770U publication Critical patent/CN203794770U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Vertical, Hearth, Or Arc Furnaces (AREA)

Abstract

The utility model discloses an electrode cooler of a bottom plugging type electrode melting furnace. The electrode cooler comprises an electrode, a connecting board, an electric conductor, a cylinder body and a water inlet pipe, wherein the electrode is connected with the electric conductor through the connecting board. According to the electrode cooler, the cylinder structure is adopted, the portion where the electrode is connected with the electric conductor and a cooling medium supply and drainage mechanism are both placed in the cylinder body, the upper end of the cylinder body and the lower end of the cylinder body are sealed through the connecting board and a lower end board, and the cooling medium is water; an annular water sprayer is arranged around the electric conductor in the cylinder body, a water collecting board is arranged under the annular water sprayer, a water drainage pipe and an air guiding pipe are arranged on the water collecting board and the lower end board respectively, a through hole is formed in the center of the electric conductor, the upper end of the through hole is connected to a water outlet in the outer surface of the lateral wall of the electric conductor, a water inlet pipe I is connected with the annular water sprayer, and a water inlet pipe II is connected with a center through hole in the lower end of the electric conductor. Compared with a traditional electrode cooler, the electrode cooler has the advantages of being advanced, reliable, safe, stable and economical, and therefore the bottom plugging type electrode melting furnace can be used safely for a long time. Extending application of the bottom plugging type electrode melting furnace to other industries and fields is realized. The bottom plugging type electrode melting furnace is made to become a novel device in the new generation of environmentally friendly energy filed.

Description

Formula electrode melting stove cooling of electrode device is inserted at the end
one, technical field
The utility model relate to the end insert formula electrode melting stove (all-electric melting or local electric smelting) electrode in ultrahigh-temperature working order (more than 1600 ℃ temperature) to the electrical conductor warm cooling protection that weighs; monomer equipment and the long-acting cooling technology of system equipment of many production technique and production safety problem, especially the ultrahigh-temperature resistance heat heated partses such as associated electrical conductor resistance value, electrode thermal power, melt current density, electric smelter production efficiency, the device service time limit, quality product and electrical conductor workpiece charging operation.
two, background technology
Aerobic naked flame burning is heat power engineering and the mode that human society is continued to use for a long time, and along with the high speed development of modern industry, deficiency and the drawback of traditional thermal technology's mode manifest, and in production efficiency, in environmental safety key link, forms and has a strong impact on.Be subject to driving and the scientific and technical innovation effect of modern science, first electrode melting method is applied and promotes at glass industry.Glass industry, other non-metallic material and metal material field novel preparation technology and equipment technology have been become at present.
Electrode melting technology application electrode resistance self-heating high-temp principle completes the melting of melt, utilize under non-metal material high temperature molten state, there is semi-conductor and conductor performance and metallic substance under molten state, resistance value increases characteristic, and the conduction that realizes melted material has a resistance heat and melts production.Modern electric smelter, adopt low-voltage and high-current Technology and three-phase alternating current single-phase electrode circulation technology, not only electrode work produces ultrahigh-temperature state, also makes melt when liquid state, increase current density, produce high-temperature electric thermal resistance, there is higher burn-off rate and production efficiency.Especially electric smelting work is without helping oxygen.Be subject to electromagnetic field constraint effect and non-metallic material melting viscous effect, be melted material volatilization and greatly reduce, improved greatly environmental protection grade and environmental index.Become modern fusing thermal technology's important technology of preparing.
Electrode is the core workpiece in electric smelter equipment.Electrode materials not only will have higher high-temperature capability, will have good perveance simultaneously, the resistance stabilization performance under the condition of high temperature, superpower corrosion resistance nature.The electric smelter that whole world glass industry and nonmetal fusing are equipped at present, first-selected molybdenum and molybdenum base alloy are as electrode.Because molybdenum and molybdenum base alloy possess outside above-mentioned performance, also there is good electric current output density under the fusing point (2630 ℃) of superelevation and high temperature.
But the fatal shortcoming that molybdenum electrode exists is low-temperature oxidation decomposes, and molybdenum, in 370 ~ 600 ℃ of temperature, is oxidized to molybdic oxide, is powder state material.Cause fracture and the hole of electrode, cause strength degradation and conductivity to reduce.Affected by this, be especially subject to the constraint of existing cooling technology, up to the present, the standard of electrode electric melting furnace, is difficult to change decades.It is main continuing to use top-insertion type electrode always, and side-plug-in electrode standard is auxiliary equipment standard.Major cause be electrode after damage, can change and cooling technology is difficult to guarantee.
The invention of electrode melting stove is the history of existing decades so far, and the thermodynamic material of electric smelter, builds peace standard, electrical control, and fusing system is very ripe and reliable.But be subject to the equipment standard of electrode implantation mode regulation, have at present larger production capacity and benefit difference.Exist equipment to extend the application huge energy and environmental protection effect, formula electrode melting stove and accessory is inserted at the end has outstanding equipment excellent properties and conglomerate, multi-field extension application advantage simultaneously.Through scientific research with facts have proved, electric smelter electrode standard (electrode implantation mode) is to the productive rate usefulness of electric smelter, watt consumption, equipment cost, quality product, and productivity effect has obvious difference.Formula electrode melting stove is inserted at the end has outstanding advantage than top-insertion type and the slotting formula electrode melting stove and accessory of Side.From social demand and environmental protection requirement actual state at present and from now on; anaerobic melting and oxygen deprivation cracking technology of preparing, become modern society and processed important technology trend and the equipment approach that harmful slag thing and flying dust thing after refuse, high moisture danger compound and burn processing are abandoned in noxious industry.Therefore the distinctive equipment standard of formula electrode melting stove and steric requirements are inserted in the end, and multiple types thermal technology's combination condition has inter-trade and application extension and growth requirement field.
The greatest problem that formula electrode melting stove exists is inserted at the end, is that electrode is changed.The electric smelter of larger production capacity (more than being generally vitreous state material 100 ton per days) electrode does not allow to change within the overhaul phase, and therefore, insert formula electrode melting stove and is restricted at the end of current larger production capacity.Be difficult to promotion and application.
The performance of formula electrode melting stove excellence and real situation are inserted in the end, and key is the replacing of electrode, and key problem is cooling technology and the equipment technology of electrode.Because molybdenum electrode has good corrosion-and high-temp-resistant performance.Under non-low-temperature oxidation condition, there is permanent working life.But cooling equipment and technology can not be guaranteed, adopt existing cooling of electrode mode and equipment technology, be difficult to realize the use safety of inserting formula electrode melting stove in the end.
Formula electrode melting stove cooling technology basic structure is inserted at the existing domestic and international end and technical characterictic mainly contains two kinds of modes:
A kind of is that tubular type spill-over method is cooling.Be that electrode and electrical conductor connecting portion are placed in the metal cylinder of sealing, water coolant in overflow status, solves being heated of electrical conductor and resistance change with this at cylindrical shell.This mode requires into drainage speed very fast, produces a large amount of heat energy loss, and overall power consumption is larger.Once meet, add melting materials capable larger, while reducing electrode temperature, or power supply system interruption, in electrode inactivity situation, easily cause electrode low-temperature oxidation.Electrode is attenuated or decompose hole, when serious, fracture has an accident.
Another kind is that cylindrical shell ponding method is cooling.Adopt cylindrical shell sealing electrical conductor to be connected with electrode.Water inlet pipe is placed in electrical conductor one side, water shoot is placed in certain altitude in cylindrical shell, form the water surface of certain altitude, to penetrate the junction of spray and spoil over electrode and electrical conductor on water inlet pipe, but because electrical conductor is placed in cylindrical shell center, water inlet pipe side is sprayed and intercepted by electrical conductor, forms covering of the fan angle, cannot be cooling to whole bonding surfaces, cooling by cylindrical shell ponding.This mode cooler construction is simple, but electrode high temperature heat by conduction part is cannot balance cooling, cause water coolant to touch surface temperature lower, fan-shaped angle face cannot touch water and excess Temperature, produce larger resistance value, under the liquid conduction state of melt, once liquid object touches cylindrical shell position in stove, form conductive effect.Cause cylindrical shell fusing, have vaporization in cylindrical shell simultaneously, interior pressure increases, and water inlet is obstructed, and makes water cooler fusing or explosion failure.
Also there are both at home and abroad the research and the experiment report that utilize other heat-eliminating medium, but because of the limitation of preparation technology and technology, the case that there is no application at present and move.
The cooling technology of formula electrode is inserted at the end, is to insert the concentrated assembly place that formula electrode melting stove goes wrong in production practice at the bottom of many cases till now.Also be to insert formula electrode melting stove equipment the end to use the Key technique problem facing.
three, summary of the invention
The purpose of this utility model is to provide the slotting formula electrode melting stove cooling of electrode device in a kind of end, various job failures and production run safety problem that the slotting formula electrode low-temperature oxidation in the solution end, temperature imbalance cause, thus the prolonged use bottleneck of safety of inserting formula electrode melting stove in the end solved.
The technical solution adopted in the utility model is: insert formula electrode melting stove cooling of electrode device and comprises electrode, web plate, electrical conductor, cylindrical shell and water inlet pipe at the end, electrode is connected by web plate with electrical conductor, the utility model water cooler adopts cylindrical shell appearance structure, electrode and electrical conductor connecting portion, heat-eliminating medium Gei Pai mechanism are all inserted in cylindrical shell, cylindrical shell upper and lower end adopts web plate and bottom plate sealing, and heat-eliminating medium is pure water; In cylindrical shell, around electrical conductor, annular water-jet is set, annular water-jet bottom is provided with water collection sheet, has respectively water shoot and airway at water collection sheet with above bottom plate; There is through hole at electrical conductor center, and through hole upper end connects the posticum that leads to sidewall appearance, and water inlet pipe I connects annular water-jet, and water inlet pipe II connects electrical conductor lower end central through hole.
General large-scale electric smelter (more than 100 ton per days) consists of 20 ~ 50 electrodes, and the core workpiece of equipment is to insert formula electrode the end, requires the electrode operation of working reliably.Cooling of electrode is the core technology place of electrode work.Core of the present utility model is to solve electrode and the electrical conductor temperature under the condition of high temperature and dispose.Adopt pure water as heat-eliminating medium, fully taking into account electrode power, heating status, electric trend, under the conditions such as control variation, science is selected and is made material and technique, structure and the working mechanism of science design water cooler, adopt advanced mechanism and structure, sets up complete cooling system and equipment.Various job failures and production run safety problem that the slotting formula electrode low-temperature oxidation in the solution end, temperature imbalance cause.The slotting formula electrode melting stove and accessory in the end is had and stablize lasting use state, become traditional industries and emerging industry New Equipments.
Insert the cooling technology of formula electrode and mainly realize following several respects function at the end:
1, guarantee that electrode is all the time in the critical above temperature working order of low-temperature oxidation (more than 600 ℃ temperature working order).
2, electrical conductor, with structure in balanced state of temperature, guarantees the stability of electric trend and conduction resistance.
3, by thermal conduction trend and heated part, set up the distribution mode of heat-eliminating medium, touch area density, cooling gradient, working mechanism.
4, according to all kinds of work condition states and ANOMALOUS VARIATIONS, set up the supply mode of heat-eliminating medium, pressure index, controls standard, pure standard, the integral frameworks such as the row's of giving structure.
5,, according to electrode power and smelting furnace temperature index, determine the working capacity of water cooler, the standard of materials of various workpiece, manufacturing process.
6, fully take into account chiller belt electricity condition, in mode of connection, in the links such as installation position, evade electromagnetic induction and leak electricity safe variety of issue.
At the bottom of the utility model, insert formula electrode melting stove cooling of electrode device, than traditional electrode water cooler, there is the advance of structure, the reliability of outer combined system, the security of electrode, the stability of conduction, the saving of power consumption.Make the end insert the safe handling of formula electrode melting furnace superintendent phase.
Adopting the 360 annular water-jets of degree and the three subgradient types of cooling is unique textures of this technology, catchmenting of different sites is cooling with electrical conductor mesopore, the cooling work mechanism of composition science, solved the water cooler different sites electrical conductor temperature imbalance that difference produces that is heated, the temperature that the mode that injection covers simultaneously can balancedly solve cooling breadth is consistent, guarantees that electrode is effectively worked in safety temperature all the time.This water cooler arranges air guide and the gas barrier at two positions simultaneously, has solved the pressure for water generates vaporization heat after cutting off the water supply and has discharged, and guarantees the water supply security of standard pressure.In electric smelter initial heating process, can utilize airway to carry out the air cooling of different flow.Prevent the damage of 600 ℃ of above temperature water coolings to water cooler, do not change coupling device.Make cooling of electrode there is several different methods and sort use, guarantee the safety of water cooler.
The several functions of water cooler body and outer combined system, has guaranteed the safe operation of trouble-free service and the electric smelter of electrode.Because cooling system has good temperature homeostasis function, guaranteed electrical installation index, electric smelter power, production capacity are stablized, the fatigue strength of cooler metal material is greatly improved simultaneously, extended working life, reduce manufacturing cost, compare with traditional electrical smelting furnace chiller system, investment reduces more than 30%, power consumption reduces more than 30%, production capacity efficiency (comparing with power) improves more than 40%, has given prominence to the end and has inserted formula electrode melting stove excellent properties, has solved the bottleneck of the slotting formula electrode equipment in the restriction end.
This technology has solved the use safety of the slotting formula electrode in the end, the more important thing is that having solved the end inserts formula electrode melting stove to the extension application in other industry and field.Because this technology is not subject to the constraint of electrode power, can be applied in the electric smelting equipment of more high-power and production capacity.At environmental protection at present and in the future, energy field, have a wide range of applications space.
Electric smelter can be realized anaerobic hot conditions.Anaerobic Pintsch process is the effective means of eliminating any organic nuisance.Organic matter is cracked into low molecular state under high temperature anaerobic state, forms the combustiblematerials of simple substance class or low molecular state, has solved macromole oxypolymer hazardous property after burning.During due to electrofuse thing liquid state, there is electroconductibility, produce strong magnetic field effect, electronics is had bound, in addition molten glass state attribute, the viscosity with reinforced cooling, can a large amount of bonding materials, through melting process, metallics are become to nucleus particle, nonmetallic substance becomes vitreous state parcel, effectively solves the environmental issue of melt.And melt is become to type material, and as devitrified glass etc., with this, carry out municipal sludge, pharmaceutical factory waste residue, harmful flying dust and danger compound waste residue are processed, and have excellent performance and effect.To make the end insert formula electrode melting stove independently or be combined with other combustion system, become the New Equipments in eco-friendly power source of new generation field.
four, accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the structural representation of web plate;
Fig. 3 is the structural representation of water collection sheet;
Fig. 4 is the structural representation of bottom plate;
Fig. 5 is the structural representation that annular water-jet connects water inlet pipe I;
Fig. 6 is the vertical view of annular water-jet;
Fig. 7 is the structural representation of electrical conductor;
Fig. 8 is the structural representation that cooling of electrode device inserts electric smelter;
Fig. 9 is the structural representation of the utility model waterworks.
five, embodiment
Insert formula electrode melting stove cooling of electrode device and comprise electrode 1 at the end, web plate 2, electrical conductor 11, cylindrical shell 9 and water inlet pipe 15, electrode 1 is connected by web plate 2 with electrical conductor 11, water cooler adopts cylindrical shell appearance structure, by electrode 1 and electrical conductor 11 connecting portions, heat-eliminating medium Gei Pai mechanism, other various work structuring are all inserted in cylindrical shell 9, on cylindrical shell 9, lower end adopts web plate 2 and bottom plate 10 sealings, weld airtight, and difference fixed electorde, electrical conductor, intake-discharge pipe, the workpiece such as steam discharge pipe, independently insert fixedly electric smelter body of wall, each station workpiece connects with relative workpiece.Electrode is vertical concentric with design for electrical conductors, is placed in cylindrical shell medullary ray, and cylindrical shell has a certain proportion of bulk, and the conduction trend that both favourable electrode and electrical conductor are good, is also beneficial to other structural arrangement.Heat-eliminating medium adopts pure water.In cylindrical shell 9, around electrical conductor 11, annular water-jet 3 is set, annular water-jet 3 bottoms are provided with water collection sheet 4, have respectively water shoot and airway at water collection sheet 4 with above bottom plate 11; There is through hole at electrical conductor 11 centers, and through hole upper end connects the posticum 12 that leads to sidewall appearance, and water inlet pipe I 14 connects annular water-jet 3, and water inlet pipe II 15 connects electrical conductor 11 lower end central through holes.
Water cooler upper end web plate 2, in electrode and the high heat of electric smelter place, adopts special high temperature alloy.Web plate 2 adopts cone shape, upper and lower center drilling, and fixed electorde 1 and electrical conductor 11, make electrode 1 web plate vertical with electrical conductor 11 2 centers, web plate 2 lower ends and airtight connection of cylindrical shell 9 upper ends respectively.Web plate 2 is to have certain thickness cone shape, in effective fixed electorde 1 and electrical conductor 11, reduces tactile face and the heating surface area of conducting liquid in stove, and can guarantee the cooling range of decrease of annular shunting injection, makes electrode in safe work state.Web plate 2 upper end centre hole screw thread fixed electordes 1, lower end centre hole screw thread is electrical conductor 11 fixedly, and welding reinforcement is fixing, and web plate 2 lower end certain sizes are connected with cylindrical shell 9, and weld airtight.
Annular water-jet 3 is provided with a plurality of spout holes above, and spout hole is divided into outer spout hole 16,18, three kinds of spout holes of interior spout hole 17 and vertical spout hole to web plate 2 formation covering of the fans injections by three angles, completes water coolant and is uniformly distributed.According to leaving water temperature(LWT), adjust injection flow, effectively control the temperature of electrical conductor and web plate, implement once cooling.Annular water-jet 3, and welds and is confined to one workpiece with water inlet pipe I 14 for to manufacture with footpath seamless tube with water inlet pipe I 14.
Water collection sheet 4 is annular plates, its periphery is connected with cylindrical shell 9 is airtight, there is tapping hole 13 at center, gapped between tapping hole 13 and electrical conductor 11, on water collection sheet 4, tap into respectively water pipe I 14, water shoot I 5 and airway I 6, water inlet pipe I 14 is connected to annular water-jet 3 through water collection sheet 4, and tapping hole 13 is derived and sprayed 1/3 of cooling water inventory, all the other water coolants form certain altitude, by the water shoot I 5 arranging on water collection sheet 4, import cylindrical shell bottom.As sprayed after cutting off the water supply, produce bog, by airway I on water collection sheet 46, discharged.Two kinds of water guide modes are cooling to electrical conductor and cylindrical shell upper part enforcement secondary respectively.Water shoot I 5 is higher than water collection sheet 4 certain altitudes, and airway I 6 is higher than water shoot I 5 certain altitudes.When water coolant reaches after water shoot I 5 height, by water shoot I 5, discharged.The gas importing is discharged by airway I 6.Respectively to electrical conductor, cylindrical shell implement three times cooling.
Bottom plate 10 is annular plate, its periphery is connected with cylindrical shell 9 is airtight, between centre hole and electrical conductor 11, be closely connected, on bottom plate 10, tap into respectively water pipe I 14, water shoot II 7 and airway II 8, water inlet pipe I 14 is connected to annular water-jet 3 through bottom plate 10 and water collection sheet 4, and water shoot II 7 is higher than bottom plate 10 certain altitudes, and airway II 8 is higher than water shoot II 7 certain altitudes.
Electrical conductor 11 adopts the right cylinder with intermediate throughholes, and bottom connects water inlet pipe II 15, has the posticum 12 being communicated with central through hole on electrical conductor 11 tops near web plate 2 places.Outside electrical conductor 11 lower ends, certain altitude is made standard thread and is connected and fixed circuit, and other exposes workpiece and is shaped with screw thread and is connected and fixed respectively corresponding pipeline.
Water cooler is except design preset clearance, and all full weld is airtight.All material, except electrode, all adopts corrosion-and high-temp-resistant stainless steel material to manufacture.
Other workpiece of water cooler, according to operating mode position and influence factor, adopts respectively material and the structure of various performances, makes it in reliable and stable use.Adopt advanced technologies processing and manufacturing.
Water cooler is realized effectively work, and except noumenon function, outer set assembly system is also important support.
Water cooler working conditions is that water coolant is supplied with and temperature-stable, for evading the fault of dynamo-electric operation, water coolant is supplied with and is adopted large capacity elevated tank, sets hydraulic pressure standard, adopt artesian pressure to supply water completely, prevent the accident that machinery supplies water, water coolant adopts annular spray, and hole is less, therefore adopt pure water treatment facility, for preventing cooling water outflow, all adopt the closed circuit standard of plumbing, stop exotic water saving.Backwater adopts interchanger to process and reclaims the energy, and stable temperature of cooling water.Various states according to occurring, arrange respectively cooling water pipeline flow director, cutout alarm device, and draining water temperature device, realizes reliable adjustment and early warning.Water level automatic water-supply equipment is set in elevated tank, adopts double loop standard, guarantee quantitative water supply.Water cooler is inserted from electric smelter bottom, and vertical with smelting furnace baseplane fixing, web plate 2 is a little less than furnace hearth liquid level, and electrode 1 is arranged in furnace hearth liquid level, and bottom plate 10 is fixed in body of heater with upper part; Electrical conductor 11, water shoot I 5, water shoot II 7, airway I 6, airway II 8, water inlet pipe I 14, water inlet pipe II 15 are all exposed to outside body of heater.
Water coolant is after pure water apparatus processing and add related agents and import water reservoir 19, by submersible pump 20, through water-line 21, send into elevated tank 22, elevated tank 22 connects water trap 24 through water supply line 23, supplying water in 24 1 groups of electrodes of each water trap (three electrodes of AC three-phase), six roads, connects respectively the suction culvert of water cooler; Elevated tank 22 is connected to several water traps 24, connects other group electrode; Return piping 28 is connected with water reservoir 19, and water shoot, the airway of water cooler are connected with return water pipe respectively, and water coolant reaches standard temperature through interchanger and returns into water reservoir after discharging, and waterworks recycles, periodic replacement.The employing one of supplying water is opened one and is prepared formula and the assurance of emergent self-supply power source.
Water reservoir 19 sealing and dustproofs, water coolant adopts closed-circuit system.
Elevated tank 22 arranges water level early warning and automatic water supply device, and suction culvert, discharge pipe line all arrange cutting-out alarm 25, flow director 26 and temperature indicator 27.
Working mechanism.Unloading phase when in electrode and stove, temperature reaches set condition, adopt temperature in air-cooled reduction water cooler, then implement water quench.
Water coolant is opened and is supplied water by water inlet pipe 1, through annular water-jet, sprays web plate end face, implements once cooling.
By water collection sheet ponding height, through water shoot 1 and tapping hole, discharged respectively that secondary is carried out in electrical conductor and water cooler top is cooling.
The water coolant aggregation being imported by water collection sheet more than bottom plate height, by water shoot 2, discharged, carry out three times cooling.
Three times cooling is subject to thermal gradient and position to complete cooling effect with the different state of temperature of water coolant to difference respectively, makes each workpiece temperature of water cooler inner chamber balanced, guarantees electrical installation index.
Electrical conductor centre hole water inlet pipe adopts micro-water inlet system, the conductor core temperature that leadout electrode heat by conduction brings, thus effectively guaranteeing the temperature equalisation of conductor, conduction is stable.

Claims (10)

1. insert formula electrode melting stove cooling of electrode device at the bottom of one kind, comprise electrode (1), web plate (2), electrical conductor (11), cylindrical shell (9) and water inlet pipe (15), electrode (1) is connected by web plate (2) with electrical conductor (11), it is characterized in that: water cooler adopts cylindrical shell appearance structure, electrode (1) is all inserted in cylindrical shell (9) with electrical conductor (11) connecting portion, heat-eliminating medium Gei Pai mechanism, cylindrical shell (9) upper and lower end adopts web plate (2) and bottom plate (10) sealing, and heat-eliminating medium adopts pure water; In cylindrical shell (9), around electrical conductor (11), annular water-jet (3) is set, annular water-jet (3) bottom is provided with water collection sheet (4), at water collection sheet (4) with above bottom plate (11), has respectively water shoot and airway; There is through hole at electrical conductor (11) center, and through hole upper end connects the posticum (12) that leads to sidewall appearance, and water inlet pipe I (14) connects annular ejection hydrophone (3), and water inlet pipe II (15) connects electrical conductor (11) lower end central through hole.
2. formula electrode melting stove cooling of electrode device is inserted at the end according to claim 1, it is characterized in that: web plate (2) adopts cone shape, upper and lower center drilling, difference fixed electorde (1) and electrical conductor (11), make electrode (1) and the vertical web plate of electrical conductor (11) (2) center, web plate (2) lower end and cylindrical shell (9) airtight connection of upper end.
3. formula electrode melting stove cooling of electrode device is inserted at the end according to claim 1, it is characterized in that: annular water-jet (3) is provided with a plurality of spout holes above, spout hole is divided into outer spout hole (16), interior spout hole (17) and vertical spout hole (18) by three angles, and three kinds of spout holes form covering of the fan to web plate (2) and spray.
4. formula electrode melting stove cooling of electrode device is inserted at the end according to claim 1, it is characterized in that: water collection sheet (4) is annular plate, its periphery and airtight connection of cylindrical shell (9), there is tapping hole (13) at center, gapped between tapping hole (13) and electrical conductor (11), on water collection sheet (4), tap into respectively water pipe I (14), water shoot I (5) and airway I (6), water inlet pipe I (14) is connected to annular water-jet (3) through water collection sheet (4), water shoot I (5) is higher than water collection sheet (4), and airway I (6) is higher than water shoot I (5).
5. formula electrode melting stove cooling of electrode device is inserted at the end according to claim 1, it is characterized in that: bottom plate (10) is annular plate, its periphery and airtight connection of cylindrical shell (9), between centre hole and electrical conductor (11), be closely connected, on bottom plate (10), tap into respectively water pipe I (14), water shoot II (7) and airway II (8), water inlet pipe I (14) is connected to annular water-jet (3) through bottom plate (10) and water collection sheet (4), water shoot II (7) is higher than bottom plate (10), and airway II (8) is higher than water shoot II (7).
6. formula electrode melting stove cooling of electrode device is inserted at the end according to claim 1, it is characterized in that: electrical conductor (11) adopts the right cylinder with intermediate throughholes, bottom connects water inlet pipe II (15), locates the posticum (12) being communicated with central through hole on electrical conductor (11) top near web plate (2).
7. formula electrode melting stove cooling of electrode device is inserted at the end according to claim 1, it is characterized in that: water cooler is inserted from electric smelter bottom, vertical with smelting furnace baseplane fixing, web plate (2) is lower than furnace hearth liquid level, electrode (1) is arranged in furnace hearth liquid level, and bottom plate (10) is fixed in body of heater with upper part; Electrical conductor (11), water shoot I (5), water shoot II (7), airway I (6), airway II (8), water inlet pipe I (14), water inlet pipe II (15) are all exposed to outside body of heater.
8. formula electrode melting stove cooling of electrode device is inserted at the end according to claim 1, it is characterized in that: water coolant imports water reservoir (19) after pure water apparatus processing, by submersible pump (20), through water-line (21), send into elevated tank (22), through water supply line, (23 connect water trap (24) to elevated tank (22), supplying water in (24) one groups of electrodes of each water trap six roads, connects respectively the suction culvert of water cooler; Elevated tank (22) is connected to several water traps (24), connects other group electrode; Return piping (28) is connected with water reservoir (19), and water shoot, the airway of water cooler are connected with return water pipe respectively, and water coolant reaches standard temperature through interchanger and returns into water reservoir after discharging, and waterworks recycles, periodic replacement.
9. formula electrode melting stove cooling of electrode device is inserted at the end according to claim 8, it is characterized in that: water reservoir (19) sealing and dustproof, water coolant adopts closed-circuit system.
10. formula electrode melting stove cooling of electrode device is inserted at the end according to claim 8, it is characterized in that: elevated tank (22) arranges water level early warning and automatic water supply device, suction culvert, discharge pipe line all arrange cutting-out alarm (25), flow director (26) and temperature indicator (27).
CN201420174284.1U 2014-04-11 2014-04-11 Electrode cooler of bottom plugging type electrode melting furnace Expired - Fee Related CN203794770U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420174284.1U CN203794770U (en) 2014-04-11 2014-04-11 Electrode cooler of bottom plugging type electrode melting furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420174284.1U CN203794770U (en) 2014-04-11 2014-04-11 Electrode cooler of bottom plugging type electrode melting furnace

Publications (1)

Publication Number Publication Date
CN203794770U true CN203794770U (en) 2014-08-27

Family

ID=51377003

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420174284.1U Expired - Fee Related CN203794770U (en) 2014-04-11 2014-04-11 Electrode cooler of bottom plugging type electrode melting furnace

Country Status (1)

Country Link
CN (1) CN203794770U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103922562A (en) * 2014-04-11 2014-07-16 抚顺科盛霞石微晶材料设备制造有限公司 Electrode cooler for bottom-plug electrode melting furnace
CN109244977A (en) * 2018-08-10 2019-01-18 芜湖易测自动化设备有限公司 A kind of power supply line's protective device of automation equipment

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103922562A (en) * 2014-04-11 2014-07-16 抚顺科盛霞石微晶材料设备制造有限公司 Electrode cooler for bottom-plug electrode melting furnace
CN109244977A (en) * 2018-08-10 2019-01-18 芜湖易测自动化设备有限公司 A kind of power supply line's protective device of automation equipment

Similar Documents

Publication Publication Date Title
CN103922562B (en) Formula electrode melting stove cooling of electrode device is inserted at the end
CN203794770U (en) Electrode cooler of bottom plugging type electrode melting furnace
CN201688691U (en) Water cooling-free intermediate frequency furnace of inductor
CN202168232U (en) Electromagnetic induction heating device for heating metal workpiece
CN203657484U (en) Novel electric arc furnace water-cooling furnace cover
CN105140607A (en) Water-cooled microwave waveguide suitable for high-power microwave heating equipment
CN201885564U (en) Triple alloy smelting furnace with double molten channels for pressurizing and stirring liquid level
CN206905532U (en) A kind of safety-type melting furnace
CN202792915U (en) Furnace cover of electric-arc furnace for smelting titanium slags
CN204905403U (en) Water -cooled microwave waveguide suitable for high -power microwave heating equipment
CN106903409A (en) A kind of excellent Portable electric welder of radiating effect
CN206430573U (en) Many extruded anisotropic graphite electrode lay-out ferro-alloy furnace power transmission smelting systems of three-phase
CN202658265U (en) Crystal growing furnace
CN207713837U (en) A kind of carbon cathode blocks preheating device
CN102291863B (en) Electromagnetic induction heating device for heating metal workpiece
CN206430572U (en) Many extruding large-size graphite electrode layout furnace of calcium carbide power transmission smelting systems of three-phase
CN2189611Y (en) Electrolyte self-circulation type oxygen-hydrogen generator
CN205043117U (en) Hot chamber machine sandwich heating crucible
CN205946304U (en) Plasma cathode electrode and plasma gas generator
CN204760561U (en) Copper bar for water cooled cable
CN201081553Y (en) Power-saving short network system for refining furnace
CN206408276U (en) Zinc distillation furnace
CN204705918U (en) Energy-efficient omnipotent inverter
CN204574787U (en) A kind of safe heat insulation type intermediate frequency furnace
CN216688346U (en) Automatic liquid level control system for magnesium electrolytic cell

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140827

Termination date: 20170411