CN203756173U - Delay filling original roadway coal-pillar-free gob-side entrydriving system - Google Patents
Delay filling original roadway coal-pillar-free gob-side entrydriving system Download PDFInfo
- Publication number
- CN203756173U CN203756173U CN201420079205.9U CN201420079205U CN203756173U CN 203756173 U CN203756173 U CN 203756173U CN 201420079205 U CN201420079205 U CN 201420079205U CN 203756173 U CN203756173 U CN 203756173U
- Authority
- CN
- China
- Prior art keywords
- filling
- section
- tunnel
- upper curtate
- haulageway
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000003245 coal Substances 0.000 claims abstract description 23
- 238000005086 pumping Methods 0.000 claims description 12
- 230000003245 working effect Effects 0.000 claims description 2
- 238000009412 basement excavation Methods 0.000 claims 1
- 230000000694 effects Effects 0.000 abstract description 6
- 239000000463 material Substances 0.000 abstract description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract description 2
- 238000005065 mining Methods 0.000 abstract 1
- 238000011017 operating method Methods 0.000 abstract 1
- 230000005641 tunneling Effects 0.000 abstract 1
- 239000011435 rock Substances 0.000 description 5
- 238000000605 extraction Methods 0.000 description 4
- 239000000945 filler Substances 0.000 description 4
- 210000003141 lower extremity Anatomy 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 238000002955 isolation Methods 0.000 description 2
- 239000006210 lotion Substances 0.000 description 2
- 238000007796 conventional method Methods 0.000 description 1
- 238000005429 filling process Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
The utility model discloses a delay filling original roadway coal-pillar-free gob-side entrydriving system which comprises a filling system, an upper-section haulageway and a lower-section air return roadway. The operating method comprises the following steps: filling paste or paste-like material or gangue or high-water material in the haulageway behind an upper-section working face by the filling system according to the geological conditions of different coal seam roofs and coal seam floors; tunneling the lower-section air return roadway along the lower edge of the upper-section haulageway filled body after the upper section haulageway is completely filled and reaches a certain strength and an overlying layer on the upper-section haulageway is stable; and finally, replacing the coal pillars by utilizing the upper-section haulageway filled body so as to achieve an effect of isolating an upper-section goaf and bearing a part of weight of the overlying layer. Therefore, the aim of safe, economic and high-efficiency roadway mining is reached.
Description
Technical field
The utility model relates to the former tunnel of a kind of delay filling without coal column gob side entry driving system.
Background technology
The cut coal conventional method of resource of China is reserved coal pillar between upper and lower section, the goaf with reserved coal column isolation upper curtate, prevent goaf coal nature, leak, gas overflowing etc. this give birth to the generation of disaster.For improving coal recovery rate, China often adopts gob side entry retaining and gob side entry driving technology to reclaim to greatest extent coal column.Edge air gallery technology difficult point is in goaf, to build artificial wall, and stays not easy care of impact that the tunnel of establishing adopted rear mine pressure.Gob side entry driving technical disadvantages is to stay the fender of establishing certain width to isolate upper curtate goaf, to greatest extent reclaiming coal resource.Be badly in need of a kind of can realization without coal column for this reason and excavate the tunnel method for digging that tunnel can reduce again road maintenance rate, realize the efficient back production of safe coal.
Utility model content
The object of the utility model embodiment is to propose the former tunnel of a kind of delay filling without coal column gob side entry driving system, according to different roofs and the geological conditions of seat earth, by filling system, utilize lotion or like lotion or spoil or high-water material, the haulage drift at upper curtate work plane rear is carried out to filling, until the filling of upper curtate haulage drift complete reach and some strength and upper curtate haulage drift overlying rock reach stable after, the driving that carries out lower curtate return aircourse along upper curtate haulage drift obturation, reaches the object that safety economy efficiently excavates tunnel.To achieve these goals, the utility model adopts following technical scheme: the former tunnel of a kind of delay filling, without coal column gob side entry driving system, comprising: filling system, comprises filling pumping plant, filling pipeline, filling template; Upper curtate haulage drift, comprises hydraulic prop, protects lane equipment; Lower curtate return aircourse, comprises heading equipment and support apparatus; Hydraulic prop Ji Hu lane equipment is withdrawn in time work plane rear upper curtate haulage drift after upper curtate working face extraction, for tunnel filling ready; The filler of filling pumping plant pumping carries out filling by filling pipeline and filling template to upper curtate haulage drift; Heading equipment until the filling of upper curtate haulage drift complete and reach some strength and tunnel overlying rock reach stable after, along upper curtate haulage drift obturation lower limb, carry out the driving of lower curtate return aircourse, and utilize in time support apparatus to carry out the supporting of lower curtate return aircourse.
Preferably, described hydraulic prop Ji Hu lane equipment is withdrawn in time work plane rear upper curtate haulage drift after upper curtate working face extraction, for tunnel filling ready.
Preferably, the filler of described filling pumping plant pumping carries out filling by filling pipeline and filling template to upper curtate haulage drift.
Preferably, described heading equipment until the filling of upper curtate haulage drift complete and reach some strength and tunnel overlying rock reach stable after, along upper curtate haulage drift obturation lower limb, carry out the driving of lower curtate return aircourse, and utilize in time support apparatus to carry out the supporting of lower curtate return aircourse.
Establish or tunnel lower curtate tailgate and compare with existing staying, the utlity model has following advantage: the former tunnel of delay filling that the utility model is addressed is without coal column gob side entry driving method, specifically there are filling system, upper curtate haulage drift, lower curtate return aircourse, by filling system and upper curtate haulage drift preparation, filling operation and lower curtate stope drift active workings excavate, support work on time and space rationally, realize the former tunnel of delay filling without coal column gob side entry driving.First-selected hydraulic prop Ji Hu lane equipment is withdrawn in time work plane rear upper curtate haulage drift after upper curtate working face extraction, for tunnel filling ready.Then the filler of filling pumping plant pumping carries out filling by filling pipeline and filling template to upper curtate haulage drift.Last heading equipment until the filling of upper curtate haulage drift complete and reach some strength and tunnel overlying rock reach stable after, along upper curtate haulage drift obturation lower limb, carry out the driving of lower curtate return aircourse, and utilize in time support apparatus to carry out the supporting of lower curtate return aircourse, finally utilize the filling of upper curtate haulage drift to replace coal column to play the effect that part overburden weight is born in isolation goaf simultaneously, reach the object of safety economy high efficiente callback coal resources.
Accompanying drawing explanation
Fig. 1 is the former tunnel of filling process floor map in the utility model embodiment.
Fig. 2 is the final planar effect picture in the former tunnel of filling in the utility model embodiment.
Fig. 3 is gob side entry driving process floor map in the utility model embodiment.
Fig. 4 is the final planar effect picture of gob side entry driving in the utility model embodiment.
Fig. 5 is gob side entry driving final section design sketch in the former tunnel of delay filling in the utility model embodiment.
The specific embodiment
Shown in Fig. 1, hydraulic prop (4) Ji Hu lane equipment (5) is withdrawn in time work plane rear upper curtate haulage drift after upper curtate working face extraction, for tunnel filling ready, the filler of filling pumping plant (1) pumping carries out filling by filling pipeline (2) and filling template (3) to upper curtate haulage drift, and final effect as shown in Figure 2.
Shown in Fig. 3, described heading equipment (6) in the filling of upper curtate haulage drift complete and reach some strength and tunnel overlying rock reach stable after, along upper curtate haulage drift obturation lower limb, carry out the driving of lower curtate return aircourse, and utilizing in time support apparatus (7) to carry out the supporting of lower curtate return aircourse, final effect is as shown in Figure 4, Figure 5.
Claims (1)
1. the tunnel filling of non chain pillar entryprotection and a gob side entry driving system, is characterized in that: the tunnel filling of described non chain pillar entryprotection and gob side entry driving system comprise
Filling body, comprise filling pumping plant (1), filling pipeline (2), filling template (3), described filling body is placed in upper curtate work plane the place ahead stope drift active workings, when filling upper curtate haulage drift described in filling pumping plant (1) by filling pipeline (2), be connected with filling template (3);
Supporting boring mechanism, comprise hydraulic prop (4), protect lane equipment (5), heading equipment (6), support apparatus (7), described hydraulic prop (4), protect lane equipment (5) and be placed in not pack portion cooperatively interacting of upper curtate haulage drift, described heading equipment (6) is placed in lower curtate without coal column return aircourse foremost, and described support apparatus (7) is placed in the lower curtate at described heading equipment (6) rear without coal column return aircourse.
2. the tunnel filling of non chain pillar entryprotection according to claim 1 and gob side entry driving system, it is characterized in that: described hydraulic prop (4) Yu Hu lane equipment (5) is placed in not pack portion of upper curtate haulage drift, with the passing of upper curtate work plane, progressively withdraws upper curtate haulage drift.
3. the tunnel filling of non chain pillar entryprotection according to claim 1 and gob side entry driving system, it is characterized in that: described filling pumping plant (1) is connected with filling template (3) by filling pipeline (2), and filling pipeline (2), filling template (3) be placed in the upper curtate haulage drift of hydraulic prop (4) Yu Hu lane equipment (5) institute supporting together, with the passing of upper curtate work plane, progressively move forward.
4. the tunnel filling of non chain pillar entryprotection according to claim 1 and gob side entry driving system, it is characterized in that: described heading equipment (6) is placed in lower curtate without coal column return aircourse foremost, support apparatus (7) is placed in the tunnel of heading equipment (6) excavation, with the motion of heading equipment (6), advances.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420079205.9U CN203756173U (en) | 2014-02-25 | 2014-02-25 | Delay filling original roadway coal-pillar-free gob-side entrydriving system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420079205.9U CN203756173U (en) | 2014-02-25 | 2014-02-25 | Delay filling original roadway coal-pillar-free gob-side entrydriving system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203756173U true CN203756173U (en) | 2014-08-06 |
Family
ID=51251460
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420079205.9U Expired - Fee Related CN203756173U (en) | 2014-02-25 | 2014-02-25 | Delay filling original roadway coal-pillar-free gob-side entrydriving system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203756173U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104100271A (en) * | 2014-06-28 | 2014-10-15 | 山东科技大学 | Side-supporting roadway forming method by pre-digging guide cavern and filling with artificial side wall for secondary use |
CN110424966A (en) * | 2019-07-25 | 2019-11-08 | 中国矿业大学 | A kind of pumping of ultrahigh water material filling working face spoil stays lane without pillar mining method |
CN113464140A (en) * | 2021-08-18 | 2021-10-01 | 山东新巨龙能源有限责任公司 | Coal mine bed-jig roadway coal-pillar-free mining method |
CN114263494A (en) * | 2021-11-10 | 2022-04-01 | 中国矿业大学(北京) | End filling maintenance lower roadway roof stable structure and filling method thereof |
-
2014
- 2014-02-25 CN CN201420079205.9U patent/CN203756173U/en not_active Expired - Fee Related
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104100271A (en) * | 2014-06-28 | 2014-10-15 | 山东科技大学 | Side-supporting roadway forming method by pre-digging guide cavern and filling with artificial side wall for secondary use |
CN104100271B (en) * | 2014-06-28 | 2016-07-20 | 山东科技大学 | Pre-pick is led cave filling artificial side secondary multiplexing roadside support and is become lane method |
CN110424966A (en) * | 2019-07-25 | 2019-11-08 | 中国矿业大学 | A kind of pumping of ultrahigh water material filling working face spoil stays lane without pillar mining method |
CN113464140A (en) * | 2021-08-18 | 2021-10-01 | 山东新巨龙能源有限责任公司 | Coal mine bed-jig roadway coal-pillar-free mining method |
CN113464140B (en) * | 2021-08-18 | 2023-09-22 | 山东新巨龙能源有限责任公司 | Coal mine forming roadway coal pillar-free mining method by using coal mine tire membrane |
CN114263494A (en) * | 2021-11-10 | 2022-04-01 | 中国矿业大学(北京) | End filling maintenance lower roadway roof stable structure and filling method thereof |
CN114263494B (en) * | 2021-11-10 | 2022-09-06 | 中国矿业大学(北京) | End filling maintenance lower roadway roof stabilizing structure and filling method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103742148B (en) | The soft coal-mining method covering the descending waste filling of supporting of a kind of half-edge coal seam | |
CN102493838A (en) | Method for fully mechanized continuously-filling coal mining of steeply pitching coal seam | |
CN104775819B (en) | Deep inclined coal seam mining roadway mine pressure control mining method | |
CN104018837B (en) | A kind of interval filling gob-side entry retaining method processing planted agent's spoil | |
CN110424966B (en) | Ultrahigh water material filling working face gangue pumping entry retaining non-coal pillar mining method | |
CN103161480A (en) | Method for actively supporting lane side filling gob-side entry retaining | |
CN103306714B (en) | Gas control method for drilling hole and hole three-purpose in close-range coal seam group bottom drainage roadway | |
CN102996131A (en) | Solid-filling coal mining method with two pre-excavating tunnels for advancing | |
CN104100271B (en) | Pre-pick is led cave filling artificial side secondary multiplexing roadside support and is become lane method | |
CN203756173U (en) | Delay filling original roadway coal-pillar-free gob-side entrydriving system | |
CN103953345B (en) | A kind of small section entry retaining along gob side exploitation method | |
CN103939135B (en) | A kind of fully-mechanized mining working removes frame passage rapid constructing method | |
CN104088643A (en) | High-dipping extremely-close-distance coal seam top coal caving mining method | |
CN101749020A (en) | Forward coal mining by filling method | |
CN103775085A (en) | Flexible shield support excavation integrated supporting coal-pillar-free mining method of steep medium-thickness coal seam | |
CN105003299A (en) | Flexible filling bag for gob-side entry retaining and its application method | |
CN105134212B (en) | A kind of method that three soft high seam tunnel ensures the rate of extraction along top driving longwall top coal caving | |
CN103993881A (en) | Long-wall roadway type cemented filling mining method | |
CN103075153B (en) | Drilling type coal mining machine for open air | |
CN104405392B (en) | Three soft high seam tunnel jackings are kept on file anchor rete cord active support longwall top coal caving method | |
CN109630112A (en) | A kind of N00 mining codes for cutting top filling | |
CN103953346A (en) | Non-chain-pillar exploitation method | |
CN204299617U (en) | One is anti-breaks type gob side entry retaining filling air bag | |
CN102011610B (en) | Supporting method of no-pillar mining mode for medium-thick coal seams | |
CN113153295A (en) | Mining method for extremely thick hard coal |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140806 Termination date: 20160225 |