CN203741997U - Steel bar pre-burying and connecting structure of beam and construction column - Google Patents

Steel bar pre-burying and connecting structure of beam and construction column Download PDF

Info

Publication number
CN203741997U
CN203741997U CN201420094215.XU CN201420094215U CN203741997U CN 203741997 U CN203741997 U CN 203741997U CN 201420094215 U CN201420094215 U CN 201420094215U CN 203741997 U CN203741997 U CN 203741997U
Authority
CN
China
Prior art keywords
steel bar
connecting sleeve
constructional column
reinforcing steel
reinforcing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420094215.XU
Other languages
Chinese (zh)
Inventor
杨顺
沈红
史承志
杨金锋
张立新
王颖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING TIANHENG CONSTRUCTION Co Ltd
Original Assignee
BEIJING TIANHENG CONSTRUCTION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING TIANHENG CONSTRUCTION Co Ltd filed Critical BEIJING TIANHENG CONSTRUCTION Co Ltd
Priority to CN201420094215.XU priority Critical patent/CN203741997U/en
Application granted granted Critical
Publication of CN203741997U publication Critical patent/CN203741997U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

The utility model relates to a steel bar pre-burying and connecting structure of a beam and a construction column. A plurality of steel bar connecting sleeves are buried in the position, provided with the construction column, of a concrete building structure in advance, the construction column is a vertical concrete construction column, the steel bar connecting sleeves are arranged on the lower side of the building structure cross beam, the lower end faces of the steel bar connecting sleeves are flush with the bottom surface of the building structure cross beam, and steel bars perpendicularly arranged on the construction column are connected with the steel bar connecting sleeves. The steel bar pre-burying and connecting structure of the beam and the construction column has the advantages that the concrete building structure cross beam and the steel bars perpendicular to the construction column are connected through a steel bar mechanical connecting technology, construction is convenient, and connecting quality of the steel bars is good.

Description

A kind of beam and constructional column reinforcing bar is pre-buried and syndeton
Technical field
The utility model belongs to concrete building structures, relates in particular to the pre-buried and syndeton of a kind of beam and constructional column reinforcing bar.
Background technology
At the regulation position of masonry house body of wall, by constructional reinforcement, and the concrete column of making by the sequence of construction of placing of concrete post after first building a wall, be commonly referred to concrete constructional column, be called for short constructional column.In the time being constructional column configuration reinforcement, prior art conventionally adopts in bar planting hole, the bottom surface of concrete building structures crossbeam, and this technique needs work high above the ground, and the position boring success rate intensive at crossbeam bottom surface reinforcing bar is low, because of bar planting hole vertically downward, inject bar planting difficulty; Therefore, this construction technology difficulty is large, and quality is wayward.Another technique is to adopt pre-embedded steel slab to be welded to connect reinforcing bar, and this technique also exists the defect of constructional difficulties.
Summary of the invention
The purpose of this utility model is to propose a kind of beam and constructional column reinforcing bar is pre-buried and the technical scheme of syndeton, and convenient construction also improves construction quality.
To achieve these goals, the technical solution of the utility model is: the pre-buried and syndeton of a kind of beam and constructional column reinforcing bar; The pre-buried multiple reinforcing steel bar connecting sleeve tubes in position of constructional column are set at concrete building structures; Described constructional column is vertical concrete constructional column, and described reinforcing steel bar connecting sleeve tube is arranged on the downside of building structure crossbeam, and reinforcing steel bar connecting sleeve tube lower surface is concordant with the bottom surface of building structure crossbeam, and the reinforcing bar of constructional column arranged perpendicular is connected with reinforcing steel bar connecting sleeve tube.
Further, described reinforcing steel bar connecting sleeve tube is that internal diameter is established threaded straight thread connecting sleeve; The steel bar end of described constructional column arranged perpendicular is provided with the threaded connector being connected with reinforcing steel bar connecting sleeve tube.
Further, described multiple reinforcing steel bar connecting sleeve tubes connect by sleeve connecting reinforcement, form branch sleeve built-in fitting.
Further, reinforcing steel bar connecting sleeve tube and the welding of sleeve connecting reinforcement.
Further, pre-buried four the described reinforcing steel bar connecting sleeve tubes in position of constructional column are set at concrete building structures, the connecting line of described four reinforcing steel bar connecting sleeve tubes is rectangle, have four described sleeve connecting reinforcements to form rectangle frame and connect four reinforcing steel bar connecting sleeve tubes, every sleeve connecting reinforcement two ends are provided with lifting one's head of bending.
The beneficial effects of the utility model are: adopt the technology that reinforcing steel bar machinery connects to connect concrete building structures crossbeam reinforcing bar vertical with constructional column, and easy construction, reinforcing bar quality of connection is good.
Below in conjunction with drawings and Examples, the utility model is described in detail.
Brief description of the drawings
Fig. 1 is the utility model structure chart;
Fig. 2 is that the A of Fig. 1 is to view;
Fig. 3 is the utility model branch sleeve embedded part structure figure;
Fig. 4 is the schematic diagram that the utility model completes body of wall and constructional column.
Detailed description of the invention
Fig. 3 as shown in Figure 1, Figure 2, the pre-buried and syndeton of a kind of beam and constructional column reinforcing bar; The pre-buried multiple reinforcing steel bar connecting sleeve tubes 10 in position of constructional column are set at concrete building structures; Described constructional column is vertical concrete constructional column, described reinforcing steel bar connecting sleeve tube is arranged on the downside of building structure crossbeam 20, reinforcing steel bar connecting sleeve tube lower surface 11 is concordant with the bottom surface 21 of building structure crossbeam, and the reinforcing bar 30 of constructional column arranged perpendicular is connected with reinforcing steel bar connecting sleeve tube.
Described reinforcing steel bar connecting sleeve tube is that internal diameter is established threaded straight thread connecting sleeve; The steel bar end of described constructional column arranged perpendicular is provided with the threaded connector 31 being connected with reinforcing steel bar connecting sleeve tube.
Described multiple reinforcing steel bar connecting sleeve tube connects by sleeve connecting reinforcement 40, forms branch sleeve built-in fitting.
Described straight thread connecting sleeve can be with reference to Hebei province's provincial standard " building bar roll forming straight thread connecting sleeve " (DB13/T 1463-2011).
In concrete construction, started at present to promote the technology that reinforcing steel bar machinery connects, adopted pre-buried straight thread connecting sleeve to connect constructional column reinforcing bar and have easy construction, quality of connection is good, the advantage of technology maturation.The product of the existing standardization and seriation of straight thread connecting sleeve.
Embodiment mono-:
Fig. 3 as shown in Figure 1, Figure 2, pre-buried and the syndeton of above-mentioned a kind of beam and constructional column reinforcing bar, the sectional dimension of constructional column is 250mm × 220mm, pre-buried four the described reinforcing steel bar connecting sleeve tubes 10 in position of constructional column are set at concrete building structures, reinforcing steel bar connecting sleeve tube is that connection diameter is the straight thread connecting sleeve of the reinforcing bar of 14mm, straight thread connecting sleeve is standardized industrial products, can have production firm to provide; The connecting line of described four reinforcing steel bar connecting sleeve tubes is rectangle, the horizontal spacing L1=200mm of four reinforcing steel bar connecting sleeve tubes, the longitudinal pitch L2=180mm of four reinforcing steel bar connecting sleeve tubes, there are four described sleeve connecting reinforcements 40 to form rectangle frame and connect four reinforcing steel bar connecting sleeve tubes, what every sleeve connecting reinforcement two ends were provided with bending lifts one's head 41, has the upwards bending in 90 ° of lifting one's head of bending.
Reinforcing steel bar connecting sleeve tube and the welding of sleeve connecting reinforcement, form branch sleeve built-in fitting (as shown in Figure 3).
In the time of construction, first weld four reinforcing steel bar connecting sleeve tubes and four sleeve connecting reinforcements, be made into branch sleeve built-in fitting, in the time of the colligation of concrete main body structure reinforcing bars, described branch sleeve built-in fitting is arranged on to the basal surface position of building structure crossbeam 20, this position is the position that crossbeam is connected with constructional column.Before concreting, by the threaded interior hole shutoff of reinforcing steel bar connecting sleeve tube, prevent that threaded interior hole from being stopped up by cement.After concreting completes, the bottom surface 11 of four reinforcing steel bar connecting sleeve tubes is concordant with the bottom surface 21 of crossbeam.The reinforcing bar 30 that four diameters of constructional column arranged perpendicular are 14mm, the plug of removal reinforcing steel bar connecting sleeve tube threaded interior hole, is connected four reinforcing bars that process threaded connector 31 with reinforcing steel bar connecting sleeve tube; After puzzling building masonry wall 60, build concrete constructional column 50, as shown in Figure 4.

Claims (5)

1. a beam and constructional column reinforcing bar is pre-buried and syndeton; It is characterized in that, the pre-buried multiple reinforcing steel bar connecting sleeve tubes in position of constructional column are set at concrete building structures; Described constructional column is vertical concrete constructional column, and described reinforcing steel bar connecting sleeve tube is arranged on the downside of building structure crossbeam, and reinforcing steel bar connecting sleeve tube lower surface is concordant with the bottom surface of building structure crossbeam, and the reinforcing bar of constructional column arranged perpendicular is connected with reinforcing steel bar connecting sleeve tube.
2. the pre-buried and syndeton of a kind of beam according to claim 1 and constructional column reinforcing bar, is characterized in that, described reinforcing steel bar connecting sleeve tube is that internal diameter is established threaded straight thread connecting sleeve; The steel bar end of described constructional column arranged perpendicular is provided with the threaded connector being connected with reinforcing steel bar connecting sleeve tube.
3. the pre-buried and syndeton of a kind of beam according to claim 1 and constructional column reinforcing bar, is characterized in that, described multiple reinforcing steel bar connecting sleeve tubes connect by sleeve connecting reinforcement, forms branch sleeve built-in fitting.
4. the pre-buried and syndeton of a kind of beam according to claim 3 and constructional column reinforcing bar, is characterized in that, reinforcing steel bar connecting sleeve tube and the welding of sleeve connecting reinforcement.
5. according to a kind of beam described in claim 1 or 2 or 3 and constructional column reinforcing bar is pre-buried and syndeton, it is characterized in that, pre-buried four the described reinforcing steel bar connecting sleeve tubes in position of constructional column are set at concrete building structures, the connecting line of described four reinforcing steel bar connecting sleeve tubes is rectangle, have four described sleeve connecting reinforcements to form rectangle frame and connect four reinforcing steel bar connecting sleeve tubes, every sleeve connecting reinforcement two ends are provided with lifting one's head of bending.
CN201420094215.XU 2014-03-04 2014-03-04 Steel bar pre-burying and connecting structure of beam and construction column Expired - Fee Related CN203741997U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420094215.XU CN203741997U (en) 2014-03-04 2014-03-04 Steel bar pre-burying and connecting structure of beam and construction column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420094215.XU CN203741997U (en) 2014-03-04 2014-03-04 Steel bar pre-burying and connecting structure of beam and construction column

Publications (1)

Publication Number Publication Date
CN203741997U true CN203741997U (en) 2014-07-30

Family

ID=51341816

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420094215.XU Expired - Fee Related CN203741997U (en) 2014-03-04 2014-03-04 Steel bar pre-burying and connecting structure of beam and construction column

Country Status (1)

Country Link
CN (1) CN203741997U (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105040577A (en) * 2015-09-02 2015-11-11 江苏明福钢结构有限公司 Multi-element alloy co-penetrated bridge pre-embedded steel member
CN107299764A (en) * 2017-07-24 2017-10-27 中国十七冶集团有限公司 A kind of concrete apparatus and construction method for being conveniently constructed the positioning of post cage bar
CN109024912A (en) * 2018-08-02 2018-12-18 中国十七冶集团有限公司 It is a kind of to prevent constructional column embedded ribs from falling off and accurate pre-buried device and construction method
CN109914609A (en) * 2019-04-09 2019-06-21 河北易达钢筋连接技术有限公司 Clamp device and assembled built-in fitting
CN110094010A (en) * 2019-05-30 2019-08-06 湖南工学院 A kind of mixing wallboard of assembled architecture plate and preparation method thereof
CN110409710A (en) * 2019-08-14 2019-11-05 长沙远大住宅工业(江苏)有限公司 A kind of composite beam, composite beam and cast-in-place column connected node and its construction method
CN112282123A (en) * 2020-10-16 2021-01-29 合力建设有限公司 Masonry filler wall constructional column and construction method thereof
CN113718999A (en) * 2021-09-02 2021-11-30 上海建工七建集团有限公司 Construction device and method for external filler wall end constructional column without peripheral protection
CN114108841A (en) * 2021-11-12 2022-03-01 哈尔滨工业大学 3D printed concrete constructional column bottom vertical steel bar anchoring member and construction method
CN114704094A (en) * 2022-04-29 2022-07-05 山西三建集团有限公司 Method for presetting secondary structure constructional column bar planting holes in primary structure beam pouring system
CN116771119A (en) * 2023-08-22 2023-09-19 江苏省华建建设股份有限公司 Connection construction method for embedded straight thread sleeve assembly of tie bar of concrete constructional column

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105040577A (en) * 2015-09-02 2015-11-11 江苏明福钢结构有限公司 Multi-element alloy co-penetrated bridge pre-embedded steel member
CN107299764A (en) * 2017-07-24 2017-10-27 中国十七冶集团有限公司 A kind of concrete apparatus and construction method for being conveniently constructed the positioning of post cage bar
CN109024912A (en) * 2018-08-02 2018-12-18 中国十七冶集团有限公司 It is a kind of to prevent constructional column embedded ribs from falling off and accurate pre-buried device and construction method
CN109914609A (en) * 2019-04-09 2019-06-21 河北易达钢筋连接技术有限公司 Clamp device and assembled built-in fitting
CN110094010A (en) * 2019-05-30 2019-08-06 湖南工学院 A kind of mixing wallboard of assembled architecture plate and preparation method thereof
CN110409710A (en) * 2019-08-14 2019-11-05 长沙远大住宅工业(江苏)有限公司 A kind of composite beam, composite beam and cast-in-place column connected node and its construction method
CN112282123A (en) * 2020-10-16 2021-01-29 合力建设有限公司 Masonry filler wall constructional column and construction method thereof
CN113718999A (en) * 2021-09-02 2021-11-30 上海建工七建集团有限公司 Construction device and method for external filler wall end constructional column without peripheral protection
CN114108841A (en) * 2021-11-12 2022-03-01 哈尔滨工业大学 3D printed concrete constructional column bottom vertical steel bar anchoring member and construction method
CN114704094A (en) * 2022-04-29 2022-07-05 山西三建集团有限公司 Method for presetting secondary structure constructional column bar planting holes in primary structure beam pouring system
CN116771119A (en) * 2023-08-22 2023-09-19 江苏省华建建设股份有限公司 Connection construction method for embedded straight thread sleeve assembly of tie bar of concrete constructional column

Similar Documents

Publication Publication Date Title
CN203741997U (en) Steel bar pre-burying and connecting structure of beam and construction column
CN103726649B (en) A kind of method of making concrete circular column template
CN203834914U (en) Automatic lifting stacking platform
CN209163438U (en) A kind of drop plate tool formula hoisting die construction structure
CN202247938U (en) Wedge-shaped foundation bolt preformed hole core formwork device
CN202644989U (en) Form erecting cradle for outer wall outer cornice
CN203200774U (en) Improved device for fixing position of cup core template of column foundation with large volume and high cup rim
CN203654721U (en) Support frame
CN207469596U (en) A kind of beam column outer rim is exempted to tear concrete mold open
CN103122695A (en) Tool for controlling pouring thickness of concrete floor
CN102650158A (en) Connecting device used in casting of shear walls in upper and lower layers
CN202055509U (en) Upright rod installation structure of directly-inserted scaffold
CN206571135U (en) It is a kind of not influence the outer scaffold wall connector of construction
CN210163890U (en) Tubular pile joint connecting structure
CN203654297U (en) Cylinder reinforcing steel bar connecting structure in reverse building method
CN204311749U (en) Formwork system at the bottom of straight cutting dish pin falsework beam
CN204152199U (en) A kind of movable stencil sub-truss
CN109778806B (en) Construction method for integrally sliding and lifting pier wall with connecting beam
CN209053376U (en) A kind of porous brick external decoration wall cladding system
CN203008127U (en) Connecting node of steel bar of composite structure
CN202559746U (en) Continuing device for upper-lower-layer shear wall during pouring
CN201343793Y (en) Energy-saving sandwich composite wall steel tie
CN205077632U (en) Connection structure of a core section of thick bamboo and outside structure level reinforcing bar
CN211286558U (en) Pull rod type external scaffold external corner shaping tool structure
CN205224557U (en) Lift scaffold pole setting connection structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Yang Shun

Inventor after: Shen Hong

Inventor after: Shi Chengzhi

Inventor after: Yang Jinfeng

Inventor after: Zhang Lixin

Inventor after: Wang Ying

Inventor before: Yang Shun

Inventor before: Shen Hong

Inventor before: Shi Chengzhi

Inventor before: Yang Jinfeng

Inventor before: Zhang Lixin

Inventor before: Wang Ying

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140730

Termination date: 20210304

CF01 Termination of patent right due to non-payment of annual fee