CN203738374U - Automatic assembling device for PTC heating core of heater - Google Patents

Automatic assembling device for PTC heating core of heater Download PDF

Info

Publication number
CN203738374U
CN203738374U CN201420137621.XU CN201420137621U CN203738374U CN 203738374 U CN203738374 U CN 203738374U CN 201420137621 U CN201420137621 U CN 201420137621U CN 203738374 U CN203738374 U CN 203738374U
Authority
CN
China
Prior art keywords
band
plate
insulation film
ptc element
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201420137621.XU
Other languages
Chinese (zh)
Inventor
黄明峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHANGSHU LEESHR HEATING TECHNOLOGY Co Ltd
Original Assignee
CHANGSHU LEESHR HEATING TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHANGSHU LEESHR HEATING TECHNOLOGY Co Ltd filed Critical CHANGSHU LEESHR HEATING TECHNOLOGY Co Ltd
Priority to CN201420137621.XU priority Critical patent/CN203738374U/en
Application granted granted Critical
Publication of CN203738374U publication Critical patent/CN203738374U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Landscapes

  • Resistance Heating (AREA)

Abstract

The utility model provides an automatic assembling device for a PTC heating core of a heater, and belongs to the technical field of automatic machinery. The automatic assembling device for the PTC heating core of the heater comprises an insulating-film-tape conveying workbench, a PTC element conveying workbench, an insulating-film-tape traction mechanism, an insulating-film-tape conveying mechanism, a conveyor belt mechanism, an electrode plate supply mechanism, a film tape and electrode plate transfer mechanism, a PTC element supply mechanism and a PTC element transfer mechanism, wherein the insulating-film-tape traction mechanism is arranged on the insulating-film-tape conveying workbench, the insulating-film-tape conveying mechanism is arranged on the insulating-film-tape conveying workbench, the conveyor belt mechanism is supported by a floor, the electrode plate supply mechanism is arranged on the rear side of a workbench machine frame, the film tape and electrode plate transfer mechanism is arranged on the workbench machine frame, the PTC element supply mechanism is arranged on the upper portion of the PTC element conveying workbench, and the PTC element transfer mechanism is arranged on the rear side of the conveyor belt mechanism. Human input is reduced, so that precious labor resources are saved; assembling efficiency is improved, so that the requirement for industrial scale-up production of the heater is satisfied. Working intensity of workers is relieved, quality is guaranteed, insulating film tapes, electrode plates and surface electrode layers of PTC elements cannot get dirty or damaged.

Description

The PTC heat generating core automatic assembling apparatus of heater
Technical field
The utility model belongs to automated machine technical field, is specifically related to a kind of PTC heat generating core automatic assembling apparatus of heater.
Background technology
Aforesaid heater is ptc heater, and PTC is English abbreviation (English: Positive Temperature Coefficient), Chinese is positive temperature coefficient.Heater mainly consists of following two parts: one is heater, and this heater also claims radiator; Two is PTC heat generating core.Uper side surface and radiating aluminium sheet downside surface and that be corrugated structure that heater comprises aluminum pipe and is positioned at the length direction of aluminum pipe.PTC heat generating core is contained in the tube chamber of aluminum pipe of heater, comprise plural number piece neat arrangement and each is combined with the PTC element (every PTC element of mentioning all refers to " PTC ceramic thermal resistance or claim ceramic PTC thermistor ") of electrode layer herein and is arranged on each piece of electrode slice PTC elements on either side and electrode layer electrical contact (also claiming electrical connection bar) in vacuum sputtering mode or with other similar fashion in both side surface, at least one end of electrode slice leans out the tube chamber of aforementioned aluminum pipe and is electrically connected by circuit and external power source controller.Under the control of power-supply controller of electric, for example, while switching on to electrode slice, PTC element heating also transfers heat to the aluminum pipe of heater, by aluminum pipe, heat is distributed by radiating aluminium sheet.
The heater of said structure form is widely used in air-conditioning or similarly installs, and be no lack of and be seen in disclosed Chinese patent literature, as CN2640002Y(PTC heater assembly), CN2753090Y(combined type PTC heater), heat-conducting aluminium pipe and the PTC heater of a CN201499328U(PTC heater), heating supporting seat and the ptc heater of a CN201515508U(ptc heater) and CN2392334Y(PTC heating element), etc.
Although above-mentioned patent is to the appellation of heater difference to some extent, practical structures forms by aforesaid heater and two parts of PTC heat generating core.In the manufacture process of heater, conventionally first by the PTC heat generating core that has completed assembling by being placed under insulation film (as Kapton or polyester film etc.) package status in the tube chamber of aluminum pipe of heater, then radiating aluminium sheet is fixed to cementation or appropriate roll compacting mode on the upper and lower side surface of length direction of aluminum pipe.
The work of prior art assembling PTC heat generating core is conventionally by completing by hand, concrete process is: first on workbench, lay insulation film (also claims insulation film band, as follows), by one piece of electrode slice, (also claim electrical connection bar again, as follows) be positioned on insulation film, then PTC element is placed on aforesaid one piece of electrode slice with neat ordered state, then on the top of PTC element, place again one piece of electrode slice, thereby make two pieces of electrode slices lay respectively at the upper of PTC element, below, finally insulation film is amounted to, by insulation film by PTC element and two pieces of electrode slices in whole package status, when PTC heat generating core is received in aluminum pipe, by insulation film, played the insulation buffer action between PTC heat generating core and aluminum pipe tube wall.
Above-mentionedly by handwork assembling PTC heat generating core, there is following technical problem: one, because the packaging efficiency of hand assembled is low, thereby production firm need to be equipped with numerous assemblers, thereby not only causes the waste of work resource, and cost improves; Its two, owing to being hand assembled, thereby directly affect the production efficiency of heater; Its three, the large and tense situation in height of workman's labour intensity; Its four, because the quality of hand assembled is subject to the impact of workman's experience difference, sense of responsibility difference and emotional change degree, thereby quality control difficulty is larger; Its five, due in hand assembled process, workman's finger directly contacts with parts, thereby has the anxiety undermine parts, for example, have the anxiety of the electrode layer that undermines PTC element surface.
The shortcoming existing for above-mentioned hand assembled PTC heat generating core, is necessary to be improved, and the applicant has done useful design for this reason, has formed the technical scheme of PTC heat generating core of assembling for people with machine described below.
Summary of the invention
Task of the present utility model is to provide a kind of and contributes to significantly to reduce human input and use and save valuable human resources, be conducive to significantly improve packaging efficiency and use the industrial amplification production requirement that meets heater, be of value to the comfortable assembling operation environment of structure and use the operation intensity that significantly alleviates workman, there is the PTC heat generating core automatic assembling apparatus of being convenient to control group packing quality and using the heater of the electrode layer of avoiding flaw product to use with there being the finger of being good at preventing operator directly to contact with PTC element stopping undermining PTC element surface.
Task of the present utility model completes like this, a kind of PTC heat generating core automatic assembling apparatus of heater, comprise an insulation film band conveying workbench and a PTC element conveying workbench, top at insulation film band conveying workbench is fixed with the front side of a worktable frame with airborne, and the rear side of worktable frame is supported on terrace in the position of the rear side of the length direction corresponding to insulation film band conveying workbench, PTC element conveying workbench is arranged on the left end of insulation film band conveying workbench at the state corresponding with insulation film band conveying workbench; One insulation film band haulage gear, this insulation film band haulage gear is arranged on the top of described insulation film band conveying workbench, and is positioned at the left end of insulation film band conveying workbench; One for being delivered to insulation film band the insulation film band conveying mechanism of described insulation film band haulage gear, this insulation film band conveying mechanism is arranged on the top of described insulation film band conveying workbench at the state corresponding with insulation film band haulage gear, and is positioned at the right-hand member of insulation film band conveying workbench; One conveyer belt mechanism and an electrode slice feed mechanism, this conveyer belt mechanism is bearing on the terrace of field of employment, and simultaneously corresponding to the rear side of length direction of described insulation film band conveying workbench and the rear side of the length direction of PTC element conveying workbench, electrode slice feed mechanism is arranged on the rear side of described worktable frame; One for be transferred to the insulation film band being obtained by described insulation film band haulage gear described conveyer belt mechanism and the electrode slice of being supplied with by described electrode slice feed mechanism be transferred to film strip and the electrode slice transfer device on the insulation film band on conveyer belt mechanism simultaneously, this film strip and electrode slice transfer device are arranged on described worktable frame, and the while is corresponding to the top of conveyer belt mechanism and electrode slice feed mechanism; YiPTC component feeding mechanism, GaiPTC component feeding mechanism is arranged on described PTC element conveying workbench, and is positioned at the top of PTC element conveying workbench; One for extracting and be transferred to the PTC element transfer device on the electrode slice of being transported to by described conveyer belt mechanism by the PTC element of being supplied with by described PTC component feeding mechanism, this PTC element transfer device is arranged on the rear side of described conveyer belt mechanism, and with airborne, is stretched over the back side top of the top of conveyer belt mechanism and the length direction of PTC element conveying workbench simultaneously.
In a specific embodiment of the present utility model, described insulation film band haulage gear comprises a pair of insulation film band guiding carrier, a pair of traction guide rod seat, traction electric machine, traction driving wheel, traction driven pulley, Traction Drive band, traction screw, pull nut and cylinder folder, a pair of insulation film band guiding carrier is fixed on the left end on the top of described insulation film band conveying workbench with parallel state, and the below corresponding to described worktable frame, each formation of the side facing each other at this pair of insulation film band guiding carrier has an insulation film belt edge guide channel, a pair of traction guide rod seat is fixed on insulation film band conveying workbench with the state corresponding to each other, and one of them the traction guide rod seat in this pair of traction guide rod seat is corresponding to the left end of a pair of insulation film band guiding carrier, and another traction guide rod seat in a pair of traction guide rod seat is corresponding to the right-hand member of a pair of insulation film band guiding carrier, traction electric machine is fixed on the left end end of insulation film band conveying workbench by traction electric machine holder, and this traction electric machine is the motor with rotating function, the traction electric machine axle of traction driving wheel and traction electric machine is fixed, traction driven pulley is fixed on the left end of traction screw, one end of Traction Drive band is nested with on traction driving wheel, the other end is nested with on traction driven pulley, the left end of traction screw and right-hand member are bearing on a pair of traction guide rod seat rotationally, and the left end of this traction screw leans out a traction guide rod seat of the left end in a pair of traction guide rod seat, the middle part of pull nut coordinates with traction screw transmission, and the two ends of pull nut are slidably matched with pull nut guide rod respectively, and the left end of pull nut guide rod and right-hand member are fixed with a pair of traction guide rod seat respectively, cylinder is folded in pull nut, wherein: described traction screw is corresponding between described a pair of insulation film band guiding carrier, described insulation film band conveying mechanism is corresponding with the right-hand member of a pair of insulation film band guiding carrier.
In another specific embodiment of the present utility model, described insulation film band conveying mechanism comprises and send tape holder, send band platform, carrier band device, upper tape guide roller, lower tape guide roller, belt-guiding device, belt pressing device, cut belting and send band platform regulating action cylinder, send the left end of tape holder to be fixed on the right-hand member of described insulation film band conveying workbench, and send the right-hand member of tape holder to lean out insulation film band conveying workbench with horizontal boom state, send band platform to be slidably arranged in a pair of sending on band platform rail, and a pair of sending is fixed on insulation film band conveying workbench with parallel state with platform rail, described in being fixed on, carrier band device send the right-hand member of tape holder, upper tape guide roller is bearing in the top of a pair of upper conduction band roller seat rotationally, and the bottom of a pair of upper conduction band roller seat is fixed on insulation film band conveying workbench, lower tape guide roller is bearing on lower conduction band roller seat rotationally with horizontal boom state, and lower conduction band roller seat is fixed on the middle part of sending tape holder, belt-guiding device, belt pressing device and cut belting and be all arranged on described sending on band platform, wherein: belt pressing device is at belt-guiding device and cut between belting, belt-guiding device is between belt pressing device and upper tape guide roller, and cut belting between described insulation film band haulage gear and belt pressing device, send band platform regulating action cylinder to be arranged on insulation film band conveying workbench, this send with platform regulating action cylinder send with platform regulating action cylinder post with described in send the middle position with the right side of platform to be connected.
In another specific embodiment of the present utility model, described carrier band device comprises carrier band disk-drive motor, carrier band dish reduction box and carrier band dish, carrier band disk-drive motor coordinates with the transmission of carrier band dish reduction box, and described in being fixed on together with carrier band disk-drive motor by carrier band dish reduction box, send the right-hand member of tape holder, carrier band dish coordinates with the carrier band dish reduction box final stage power output shaft of carrier band dish reduction box, described belt-guiding device comprises first, the second conduction band plate holder, conduction band plate, conduction band briquetting and conduction band press strip, first, described in being fixed on parallel state, the second conduction band plate holder send on band platform, and between described belt pressing device and upper tape guide roller, the top of one side of conduction band plate and the first conduction band plate holder is fixed, the top of opposite side and the second conduction band plate holder is fixed, this conduction band plate towards on a side be fixed with a conduction band briquetting matching seat and a conduction band press strip matching seat, conduction band briquetting and conduction band briquetting matching seat are fixed, and between this conduction band briquetting and conduction band briquetting matching seat, form and have a briquetting conduction band groove passing through for confession insulation film band, conduction band press strip and conduction band press strip matching seat are fixed, and between this conduction band press strip and conduction band press strip matching seat, form and have a same press strip conduction band groove for passing through for insulation film band, described belt pressing device comprises belt hold roller frame, belt delivering roller motor, belt delivering roller reduction box, belt hold roller, belt delivering roller, pressure zone roller seat and pressure zone roller seat regulating action cylinder, belt hold roller frame is the shape of portal frame, described in being fixed on, send with between the left side on platform and corresponding to the described conduction band plate of cutting belting and belt-guiding device, belt delivering roller motor coordinates with the transmission of belt delivering roller reduction box and by belt delivering roller reduction box, together with belt delivering roller motor, is fixed on the front side of belt hold roller frame, belt hold roller is arranged on rotationally on pressure zone roller seat above corresponding to belt delivering roller, at the two ends of this pressure zone roller seat, be respectively fixed with a pressure zone roller seat guide rod, pressure zone roller seat guide rod coordinates with the top slide of belt hold roller frame, belt delivering roller is bearing in rotationally on belt hold roller frame below corresponding to belt hold roller, and the belt delivering roller axle of this belt delivering roller and the belt delivering roller speed reduction box shaft of belt delivering roller reduction box are in transmission connection, pressure zone roller seat regulating action cylinder is fixed on the middle position at the top of belt hold roller frame, the pressure zone roller seat regulating action cylinder post of this pressure zone roller seat regulating action cylinder towards under, and be connected with the middle position of the length direction of described pressure zone roller seat, the described belting of cutting comprises and cuts band knife rest, cuts band cutter and cut band cutter acting cylinder, cut the shape that is portal frame with knife rest, described in being fixed on, send on band platform, and between described insulation film band haulage gear and the belt hold roller frame of belt pressing device, cut with cutter acting cylinder and be fixed on the middle position of cutting with the top of knife rest, and this cut with cutter acting cylinder cut band cutter acting cylinder post towards under, cut with the middle part of the length direction of cutter with cut band cutter acting cylinder post and be connected, this cut with cutting of cutter be with cutter blade towards under.
In another specific embodiment of the present utility model, described conveyer belt mechanism comprises housiung separator left support frame, housiung separator right support frame, the first housiung separator, the second housiung separator, left conveyer belt roller, right conveyer belt roller, conveyer belt, driven roller drive motors, conveyer belt main drive roll and a pair of conveyer belt tightening roller, housiung separator left support frame is supported on terrace in the position of the left end of the rear side of the length direction corresponding to described PTC element conveying workbench, housiung separator right support frame is fixedly connected with the side of described worktable frame towards described insulation film band conveying workbench, and this housiung separator right support frame is corresponding with housiung separator left support frame, first, the second rack beam is parallel, and the left end of this first housiung separator and the second housiung separator is all fixed with the top of housiung separator left support frame, and right-hand member is all fixed with the top of housiung separator right support frame, and the left end of the first housiung separator and the second housiung separator is corresponding between the rear side of the length direction of described PTC element conveying workbench and described PTC element transfer device, and right-hand member is corresponding between described insulation film band conveying workbench and described electrode slice feed mechanism, on the first housiung separator, be fixed with a spindle nose fixed head, and on the second housiung separator and in the position corresponding to spindle nose fixed head, be fixed with a motor fixing plate, left conveyer belt roller is bearing between the first housiung separator and the second housiung separator rotationally, and be positioned at the left end of the first housiung separator and the second housiung separator, right conveyer belt roller is bearing in rotationally between the first housiung separator and the second housiung separator and is positioned at the right-hand member of the first housiung separator and the second housiung separator, driven roller drive motors is fixed on motor fixing plate back to a side of spindle nose fixed head with horizontally-arranged state, conveyer belt main drive roll has a conveyer belt drive roller shaft, this conveyer belt drive roller shaft is connected towards one end of motor fixing plate and the driven roller drive motors through-drive of driven roller drive motors, and conveyer belt drive roller shaft is bearing on spindle nose fixed head rotationally towards one end of spindle nose fixed head, a pair of conveyer belt tightening roller respectively has a conveyer belt tensioner roll shaft, conveyer belt tensioner roll shaft is fixed towards one end and the motor fixing plate of motor fixing plate, and conveyer belt tensioner roll shaft is fixed towards one end and the spindle nose fixed head of spindle nose fixed head, described conveyer belt main drive roll is corresponding to the below between a pair of conveyer belt tightening roller, the left end of conveyer belt is nested with on left conveyer belt roller, middle part is nested with on conveyer belt main drive roll, and the right-hand member of conveyer belt is nested with on right conveyer belt roller, described a pair of conveyer belt tightening roller and conveyer belt are back to a side contacts of conveyer belt main drive roll, the described film strip and the electrode slice transfer device that are arranged on described worktable frame are moving with alternating state between two stations at conveyer belt and described electrode slice feed mechanism with alternating state action and while between two stations of described insulation film band haulage gear and described conveyer belt, described PTC element transfer device moves with alternating state between two stations of described PTC component feeding mechanism and conveyer belt.
Of the present utility model, also have in a specific embodiment, described electrode slice feed mechanism comprises the electrode slice groove of getting the raw materials ready, electrode slice pushing plate, pushing plate nut, pushing plate nut-screw, pushing plate nut-screw motor, in the middle of a pair of, separate guide block and nut-screw support strip, the get the raw materials ready worktable frame of groove and described insulation film band conveying workbench of electrode slice is fixed, and corresponding with the rear side of the described housiung separator right support frame of described conveyer belt mechanism, the get the raw materials ready length direction of groove of this electrode slice forms the groove vallecular cavity of getting the raw materials ready, right-hand member and the top of this groove vallecular cavity of getting the raw materials ready are not sealed, the get the raw materials ready trough floor of getting the raw materials ready of groove of pushing plate nut-screw motor and electrode slice is fixed back to a side of the groove vallecular cavity of getting the raw materials ready, and be positioned at the middle position of the length direction of the trough floor of getting the raw materials ready, pushing plate nut-screw is positioned at the get the raw materials ready groove vallecular cavity of getting the raw materials ready of groove of electrode slice, the upper end of this pushing plate nut-screw is bearing in the middle position of the length direction of nut-screw support strip rotationally, and lower end is connected with pushing plate nut-screw motor-driven in the position of screw rod resigning hole at position placed in the middle corresponding to being located at the length direction of the trough floor of getting the raw materials ready, pushing plate nut is provided on pushing plate nut-screw, by pushing plate nut-screw clockwise or rotate counterclockwise and displacement up or down, electrode slice pushing plate is positioned at the groove vallecular cavity of getting the raw materials ready, the middle part of the length direction of this electrode slice pushing plate and pushing plate nut are fixed, and respectively offer a middle guide block resigning hole of separating at left end and the right-hand member of electrode slice pushing plate, one of them middle separation guide block in the middle of a pair of in separation guide block is plugged on the middle of left end of electrode slice pushing plate and separates in guide block resigning hole, and its bottom supporting is got the raw materials ready in trough floor described, another middle separation guide block in the middle of a pair of in separation guide block is plugged on the middle of right-hand member of electrode slice pushing plate and separates in guide block resigning hole, and its bottom is bearing in equally gets the raw materials ready in trough floor, by separating guide block in the middle of a pair of, the groove vallecular cavity of getting the raw materials ready is separated into two chambers independent of each other at length direction, the two ends of nut-screw support strip are fixed with a pair of middle top of separating guide block respectively, described pushing plate nut-screw motor is the motor with rotating function.
More of the present utility model and in a specific embodiment, described film strip and electrode slice transfer device comprise the left guide rod of displacement plate, the right guide rod of displacement plate, displacement plate, displacement plate screw drive motor, displacement plate drive screw, inhale band acting cylinder, insulation film band suction nozzle plate, electrode slice extracts acting cylinder and electrode slice extracts suction nozzle plate, one end of the left guide rod of displacement plate and the other end are separately fixed on the left guide rod seat of displacement plate, and the left guide rod seat of displacement plate is fixed on the top in the left side of described worktable frame, one end of the right guide rod of displacement plate and the other end are separately fixed on the right guide rod seat of displacement plate, and the right guide rod seat of displacement plate is fixed on the top on the right side of worktable frame, the left end of displacement plate and be fixed with the left sliding seat of a pair of displacement plate towards a upper side, the left sliding seat of this pair of displacement plate is respectively slidably arranged on the left guide rod of displacement plate by left sliding seat guide pin bushing, the right-hand member of displacement plate and be fixed with the right sliding seat of a pair of displacement plate towards a upper side, the right sliding seat of this pair of displacement plate is respectively slidably arranged on the right guide rod of displacement plate by right sliding seat guide pin bushing, displacement plate screw drive motor is the motor with rotating function, this displacement plate screw drive motor is fixed on displacement plate screw drive motor cabinet in the middle position of the rear side corresponding to displacement plate length direction, and this displacement plate screw drive motor cabinet is fixed on the top of described worktable frame, one end of displacement plate drive screw is bearing on drive screw front support seat rotationally, middle part is equipped with a displacement plate drive screw nut, this displacement plate drive screw nut and described displacement plate are fixed towards a upper side, the other end of displacement plate drive screw is bearing on drive screw rear branching holder rotationally, and leaning out this drive screw rear branching holder is connected with the displacement plate screw drive electric machine shaft driving of displacement plate screw drive motor, described drive screw front support seat and drive screw rear branching holder are fixed on the top of worktable frame with the state corresponding to each other, suction is fixed at middle position and the displacement plate of the front side of the length direction corresponding to displacement plate with acting cylinder, and this suction with the suction band acting cylinder post of acting cylinder towards under, the middle position of the length direction of insulation film band suction nozzle plate is fixed with suction band acting cylinder post, Ge Yi interval, both sides state at the length direction of insulation film band suction nozzle plate is provided with one group of insulation film band suction nozzle, electrode slice extracts acting cylinder and fixes at middle position and the displacement plate of the rear side of the length direction corresponding to displacement plate, and the electrode slice that this electrode slice extracts acting cylinder extract acting cylinder post towards under, electrode slice extracts middle position and the electrode slice extraction acting cylinder post of the length direction of suction nozzle plate and fixes, Ge Yi interval, the both sides state that extracts the length direction of suction nozzle plate at electrode slice is provided with one group of electrode slice suction nozzle, wherein: the lower end that is respectively fixed with an insulation film band suction nozzle plate guide post at the two ends of described insulation film band suction nozzle plate, the upper end of this insulation film band suction nozzle plate guide post is slidably matched by suction nozzle plate guide post guide pin bushing and the displacement plate being arranged on displacement plate, the two ends of extracting suction nozzle plate at described electrode slice are respectively fixed with the lower end that an electrode slice extracts suction nozzle plate guide post, the top that this electrode slice extracts suction nozzle plate guide post is slidably matched by suction nozzle plate guide post fairlead and the displacement plate being arranged on displacement plate.
In of the present utility model and then a specific embodiment, described PTC component feeding mechanism comprises the PTC element casket holder of getting the raw materials ready, scraping wings acting cylinder, scraping wings, PTC component shaping arrangement board, positioning pedestal, PTC component shaping motor, PTC component shaping screw rod, PTC component shaping piece nut and PTC element casket, the PTC element casket holder of getting the raw materials ready is fixed on described PTC element conveying workbench, and the left end from the length direction of PTC element conveying workbench extends to right-hand member, at the get the raw materials ready length direction of casket holder of this PTC element, with interval state, form and to have the PTC element casket of getting the raw materials ready to insert chamber, and PTC element is got the raw materials ready and is formed and have scraping wings slot between the bottom of casket holder and the table top of described PTC element conveying workbench, the quantity of scraping wings acting cylinder is a pair of, this scraping wings acting cylinder is fixed on the front side of the length direction of PTC element conveying workbench with horizontal boom state, and the scraping wings acting cylinder post of this scraping wings acting cylinder is towards scraping wings, at scraping wings, towards the length direction of a side of scraping wings acting cylinder post, be fixed with a scraping wings holder, on this scraping wings holder and in the position corresponding to scraping wings acting cylinder post, be fixed with a cylinder post Connection Block, this cylinder post Connection Block is connected with the end of scraping wings acting cylinder post, scraping wings coordinates with the plug of described scraping wings slot towards the get the raw materials ready side of length direction of casket holder of PTC element, PTC component shaping arrangement board is corresponding to the get the raw materials ready rear side of length direction of casket holder of PTC element, right-hand member at PTC component shaping arrangement board is extended with a PTC element gear pin, and at the left end of PTC component shaping arrangement board and each end, be respectively connected with one end of a shaping arrangement board return spring, and the other end of shaping arrangement board return spring is fixed on PTC element conveying workbench by return spring seat, at PTC component shaping arrangement board towards a side of the length direction of positioning pedestal the one end with interval stateful connection limited location bar, and the other end of gag lever post is slidably matched with the gag lever post hole that is opened in positioning pedestal, and on gag lever post, be arranged with gag lever post spring, one end of gag lever post spring is bearing in PTC component shaping arrangement board towards a side of positioning pedestal, and the other end of gag lever post spring is bearing in positioning pedestal towards a side of PTC component shaping arrangement board, and towards the length direction of a side of PTC component shaping arrangement board, with interval state, be fixed with spacing raming at this positioning pedestal, PTC component shaping motor is the motor with rotating function, this PTC component shaping motor is fixed on the below of the left end end of PTC element conveying workbench, PTC component shaping screw rod by shaping screw bolt seat be bearing in rotationally PTC element conveying workbench towards under a side, and corresponding with the PTC component shaping piece slot to make way being opened on PTC element conveying workbench, PTC component shaping piece nut coordinates with PTC component shaping screw drive, on this PTC component shaping piece nut and in the position corresponding to described PTC component shaping piece slot to make way, form and have a PTC component shaping piece, this PTC component shaping piece upwards leans out PTC component shaping piece slot to make way, the quantity of PTC element casket and the described PTC element quantity that casket inserts chamber of getting the raw materials ready equates and is plugged on PTC element to get the raw materials ready on the slotting chamber of casket, short transverse at this PTC element casket forms the PTC element reserve chamber that is useful on deposit PTC element, the bottom of PTC element reserve chamber and the PTC element casket of getting the raw materials ready is inserted chamber and is communicated, described PTC element transfer device is positioned at the second housiung separator of described conveyer belt mechanism back to the left end of a side of described the first housiung separator.
Of the present utility model again more and in a specific embodiment, described PTC element transfer device comprises the support that soars, the left guide rod of movable plate, the right guide rod of movable plate, movable plate, screw drive motor, screw rod, PTC element extracts plate acting cylinder and PTC element extracts plate, the support that soars is being used state lower support on the terrace of field of employment, and the second housiung separator of the bottom of this support that soars and described conveyer belt mechanism is fixedly connected with back to the left end of a side of described the first housiung separator, and the top of the support that soars corresponds to the top of described conveyer belt with horizontal boom state, and be connected with described PTC element casket, the two ends of the left guide rod of movable plate are separately fixed on the left guide rod seat of movable plate, and the left guide rod seat of movable plate is fixed on the top in the left side of the support that soars, the two ends of the right guide rod of movable plate are separately fixed on the right guide rod seat of movable plate, and the right guide rod seat of movable plate is fixed on the top on the right side of the support that soars, the left end of movable plate is fixed with the left guide pin bushing seat of a movable plate, the left guide pin bushing seat of this movable plate is slidably matched by left guide pin bushing and the left guide rod of movable plate, the right-hand member of movable plate is fixed with the right guide pin bushing seat of a movable plate, the right guide pin bushing seat of this movable plate is slidably matched by right guide pin bushing and the right guide rod of movable plate, screw drive motor is the motor with rotating function, and this screw drive motor is fixed by the top of screw drive motor fixing seat and launching cradle, one end of screw rod is bearing on screw bolt seat rotationally, and the other end of screw rod is connected with screw drive motor-driven, on screw rod, be equipped with a bolt and nut, the middle position of the length direction of this bolt and nut and movable plate is fixed, PTC element extracts plate acting cylinder and is fixed on movable plate, and be positioned at the below of middle position of the length direction of movable plate, the acting cylinder post that this PTC element extracts plate acting cylinder towards under, the middle position that PTC element extracts the length direction of plate is fixedly connected with acting cylinder post, and be respectively fixed with an extraction plate guide rod at the two ends of PTC element extraction plate, extracting plate guide rod is slidably matched by extracting plate guide rod fairlead and movable plate, PTC element extract plate length direction and towards under a side with interval state, be provided with PTC element and extract mouth.
In again of the present utility model and then a specific embodiment, at the top of the described support that soars and be respectively provided with a movable plate position signal acquisition device in the position of the one end corresponding to screw rod and the other end, and be fixed with a movable plate position signal acquisition device on described bolt and nut, trigger part, it is corresponding with movable plate position signal acquisition device and match that this movable plate position signal acquisition device triggers part, the length direction that extracts plate at described PTC element offers a PTC element extraction mouth adjustment tank, described PTC element extracts mouth and is arranged on PTC element extraction plate in the position of extracting mouth adjustment tank corresponding to PTC element.
The technical scheme that the utility model provides is owing to insulation film band being flowed to insulation film band haulage gear by insulation film band conveying mechanism in the mode of automation, and insulation film band is transferred to conveyer belt mechanism and electrode slice self-electrode sheet feed mechanism is transferred on the insulation film band being positioned on conveyer belt mechanism by film strip and electrode slice transfer device, and then the PTC element of YouPTC component feeding mechanism being supplied with by PTC element transfer device extracts and is released on electrode slice, thereby can significantly reduce human input and save valuable human resources and improve packaging efficiency and meet the industrial amplification production requirement of heater, because the operating environment of automatic assembling PTC heat generating core is desirable, thereby can significantly alleviate workman's operation intensity, because the assembling of PTC heat generating core is not affected by human factors, thereby can ensure quality, due in the process at automatic assembling PTC heat generating core without manually grabbing and pinch insulation film band, electrode slice and PTC element by workman, thereby can be not dirty and or undermine the surface electrode layer of insulation film band, electrode slice and PTC element.
Accompanying drawing explanation
Fig. 1 is embodiment schematic diagram of the present utility model.
Fig. 2 is insulation film band haulage gear, insulation film band conveying mechanism and the film strip shown in Fig. 1 and the detailed structure view of electrode slice transfer device.
Fig. 3 is the detailed structure view of the conveyer belt mechanism shown in Fig. 1 and electrode slice feed mechanism.
Fig. 4 is the side view of the film strip shown in Fig. 3 and electrode slice transfer device.
Fig. 5 is the detailed structure view of the PTC component feeding mechanism shown in Fig. 1 and PTC element transfer device.
Fig. 6 a to Fig. 6 d utilizes Standard shown in Fig. 1 to become the schematic flow sheet of PTC heat generating core.
The specific embodiment
For the auditor that the makes Patent Office especially public can be expressly understood technical spirit of the present utility model and beneficial effect more, applicant elaborates the mode with embodiment below, but to the description of embodiment, be not all the restriction to the utility model scheme, any according to the utility model design, done only for pro forma but not substantial equivalent transformation all should be considered as the technical solution of the utility model category.
Every relating in the following description, under, left, right, before, after, upper end, lower end, left end, right-hand member, front end, rear end, upside, downside, left side, right side, the concept of the directionality of front side and rear side and so on (or claim directionality) is all for the residing location status of figure being described, its object is to help the public's understanding, and make technology contents of the present utility model more clear, thereby can not be understood as being particularly limited technical characterictic of the present utility model, more can not be understood as the unique restriction to technology contents of the present utility model.In addition " the PTC element " mentioned below, refers to " PTC ceramic thermal resistance (claiming again ceramic PTC thermistor) "; " PTC heat generating core " refers to " PTC ceramic thermal resistance heat generating core (claiming again ceramic PTC thermistor heat generating core) ", the structure of this PTC ceramic thermal resistance heat generating core belongs to known technology, for example can be referring to the 0020th section, the description of Chinese patent Granted publication CN201499328U.
Refer to Fig. 1, provided insulation film band conveying workbench 1 frame-like and that be cuboid and and be equally PTC element conveying workbench 7 frame-like and that be equally cuboid.As shown in Figure 1, top at insulation film band conveying workbench 1 is fixed with the front side of a worktable frame 11 with airborne, and the rear side of worktable frame 11 is supported on the terrace of field of employment in the position of the rear side of the length direction corresponding to insulation film band conveying workbench 1.PTC element conveying workbench 7 is arranged on the left end of insulation film band conveying workbench 1 at the state corresponding with insulation film band conveying workbench 1.If the PTC element conveying workbench 7 that is positioned at the left end of insulation film band conveying workbench 1 is designed to integrative-structure with insulation film band conveying workbench 1, should be considered as form so and immaterial variation and still belong to the disclosed technology contents category of the utility model.
Provided an insulation film band haulage gear 2, this insulation film band haulage gear 2 is arranged on the top of aforementioned dielectric film strip conveying workbench 1, and be positioned at insulation film band conveying workbench 1 towards one end of PTC element conveying workbench 7, be positioned at the left end of insulation film band conveying workbench 1.
Provided one for insulation film band is delivered to aforementioned dielectric film strip haulage gear 2 to caught the insulation film band conveying mechanism 3 of getting and drawing by insulation film band haulage gear 2, this insulation film band conveying mechanism 3 is arranged on the right-hand member of aforementioned dielectric film strip conveying workbench 1 at the state corresponding with insulation film band haulage gear 2.
A conveyer belt mechanism 4 and an electrode slice feed mechanism 5 have been provided, conveyer belt mechanism 4 is bearing on the terrace of field of employment, and this conveyer belt mechanism 4 is simultaneously corresponding to the rear side of length direction of insulation film band conveying workbench 1 and the rear side of the length direction of PTC element conveying workbench 7, electrode slice feed mechanism 5 is arranged on the rear side of aforementioned worktable frame 11, corresponding to the rear side of conveyer belt mechanism 4.
Having provided an insulation film band 201 for the structural system as PTC heat generating core 20 obtained by aforementioned dielectric film strip haulage gear 2 is transferred to aforementioned conveyer belt mechanism 4 and the PTC heat generating core 20(Fig. 6 d that belongs to being supplied with by aforementioned electric pole piece feed mechanism 5 is shown simultaneously) electrode slice 202(Fig. 3 and Fig. 6 a of structural system show) be transferred to film strip and electrode slice transfer device 6 on the insulation film band 201 being positioned on conveyer belt mechanism 4, this film strip and electrode slice transfer device 6 are arranged on aforementioned worktable frame 11, and corresponding to the top of conveyer belt mechanism 4 and electrode slice feed mechanism 5.
YiPTC component feeding mechanism 8 and a PTC element transfer device 9 have been provided, PTC component feeding mechanism 8 is arranged on aforementioned PTC element conveying workbench 7, and be positioned at the top of PTC element conveying workbench 7, the function of PTC element transfer device 9 is by PTC element 203(Fig. 1 of the structural system that belongs to PTC heat generating core 20 of YouPTC component feeding mechanism 8 supplies, Fig. 5 and Fig. 6 a to 6d show) extract and shift again and be released on the electrode slice 202 of being transported to by conveyer belt mechanism 4, this PTC element transfer device 9 is arranged on the rear side of aforementioned conveyer belt mechanism 4, corresponding to the rear side of conveyer belt mechanism 4, and the while is stretched over the top of the rear side of the top of conveyer belt mechanism 4 and the length direction of PTC element conveying workbench 7 with airborne.
Refer to Fig. 2, above mentioned insulation film band haulage gear 2 comprises a pair of insulation film band guiding carrier 21, a pair of traction guide rod seat 22, traction electric machine 23, one traction driving wheel 24, one traction driven pulley 25, one Traction Drive band 26, one traction screw 27, one pull nut 28 and cylinder folder 29, a pair of insulation film band guiding carrier 21 is fixed on the top of aforementioned dielectric film strip conveying workbench 1 with parallel state, and be positioned at the top of the left end of insulation film band conveying workbench 1, below corresponding to aforementioned worktable frame 11, due to the side facing each other of the length direction of this pair of insulation film band guiding carrier 21, each forms an insulation film belt edge guide channel 211, thereby the shape of cross section of this pair of insulation film belt edge guide channel 211 is in T shape substantially, the edge of the length direction of this insulation film band 201 is by insulation film belt edge guide channel 211 supports.A pair of traction guide rod seat 22 is respectively fixed on insulation film band conveying workbench 1 with traction guide rod seat hold-down screw 221 with the state facing each other with the state corresponding to each other, and one of them the traction guide rod seat in this pair of traction guide rod seat 22 is corresponding to the left end of a pair of insulation film band guiding carrier 21, and another traction guide rod seat in a pair of traction guide rod seat 22 is corresponding to the right-hand member of a pair of insulation film band guiding carrier 21.The traction electric machine 23 with rotating function is fixed on the left end end of insulation film band conveying workbench 1 by traction electric machine holder 231, more particularly, traction electric machine 23 is fixed on traction electric machine holder 231, and traction electric machine holder 231 is fixed on the left end end of insulation film band conveying workbench 1 by traction electric machine holder screw 2311.Traction driving wheel 24 is fixed with the traction electric machine axle of traction electric machine 23, and traction driven pulley 25 is fixed on the left end of traction screw 27, and one end of Traction Drive band 26 is nested with on traction driving wheel 24, and the other end is nested with on traction driven pulley 25.The left end of traction screw 27 is bearing on a pair of traction guide rod seat 22 rotationally, and the left end of this traction screw 27 leans out a traction guide rod seat of the left end in a pair of traction guide rod seat 22 and uses for aforesaid traction driven pulley 25 fixing.The middle part of pull nut 28 coordinates with traction screw 27 transmissions, and the two ends of pull nut 28 are slidably matched by pull nut guide pin bushing 282 and pull nut guide rod 281 respectively, and the left end of pull nut guide rod 281 and right-hand member are fixing with a pair of traction guide rod seat 22 respectively.Hence one can see that, and aforesaid pull nut guide rod 281 has a pair of, with parallel state, is fixed between a pair of traction guide rod seat 22.Cylinder folder 29 is located in pull nut 28, moving left and right and do corresponding movement by pull nut 28 on traction screw 27.Because cylinder folder 29 belongs to known technology, for example adopt by Changshu City, Jiangsu Province, China pull together that pneumatic element Co., Ltd produces and before the application proposes the model in market sale be XL-A7 type jaw cylinder.The position of above mentioned insulation film band conveying mechanism 3 on edge film strip conveying workbench 1 be positioned at the right-hand member corresponding to a pair of insulation film band guiding carrier 21.
In the present embodiment, aforesaid traction driving wheel 24 and traction driven pulley 25 are all preferably selected with synchronous pulley, and correspondingly, aforesaid Traction Drive band 26 is Timing Belt.
Preferably, under use state, at the two ends of aforesaid a pair of insulation film band guiding carrier 21, be respectively provided with a bolt and nut signal picker 212, in the present embodiment, this bolt and nut signal picker 212 is optoelectronic switch, but also can use travel switch, microswitch, position approach switch, tongue tube or hall sensing element, when moving and move to the position of matching corresponding with bolt and nut signal picker 212 on traction screw 27, pull nut 28 by bolt and nut signal picker 212, signal feedback is given to the electric controller 12 of the front side right-hand member that is arranged on edge film strip conveying workbench 1, by electric controller 12, send signal to traction electric machine 23, traction electric machine 23 is quit work or reverse operation, cylinder folder 29 is clamped insulation film band 201 or is discharged (also will describe in detail below).
Please continue to refer to Fig. 2, above mentioned insulation film band conveying mechanism 3 comprises and send tape holder 31, send band platform 32, carrier band device 33, upper tape guide roller 34, lower tape guide roller 35, belt-guiding device 36, belt pressing device 37, cuts belting 38 and send band platform regulating action cylinder 39, send the left end of tape holder 31 to use the front side of sending tape holder hold-down screw 311 to be fixed on the right-hand member of aforementioned dielectric film strip conveying workbench 1, and send the right-hand member of tape holder 31 with horizontal boom state, to lean out the right-hand member end face of insulation film band conveying workbench 1.Send band platform 32 by its back side (towards under the surface of a side) send band platform rail groove 322 to be slidably arranged in a pair of sending to be with on platform rail 321, and this pair of sending with platform rail 321 is fixed on insulation film band conveying workbench 1 with parallel state.Preferably, the aforesaid band platform rail groove 322 that send is swallow tail shaped slot, and aforesaidly a pair ofly send the shape of cross section with platform rail 321 to be swallow-tail form.Carrier band device 33 is arranged on the right-hand member that send tape holder 31.Upper tape guide roller 34 is bearing in the top of a pair of upper conduction band roller seat 341 rotationally by conduction band roll shaft 342 on it, and the bottom of a pair of upper conduction band roller seat 341 upper conduction band roller seat hold-down screw 3411 of each employing is fixed on insulation film band conveying workbench 1.Lower tape guide roller 35 is bearing on lower conduction band roller seat 351 with horizontal boom state rotationally by its lower conduction band roll shaft 352, and lower conduction band roller seat 351 is fixed on the middle part of the length direction that send tape holder 31 by lower conduction band roller seat hold-down screw 3511.Belt-guiding device 36, belt pressing device 37 and cut belting 38 be all arranged on send band platform 32 on, signal from Fig. 2: belt pressing device 37 is at belt-guiding device 36 and cut between belting 38, belt-guiding device 36, between belt pressing device 37 and upper tape guide roller 34, and is cut belting 38 between the right-hand member and belt pressing device 37 of a pair of insulation film band guiding carrier 21 of aforementioned dielectric film strip haulage gear 2.Specifically, cut belting 38, belt pressing device 37 and belt-guiding device 36 and sending setting from left to right successively on band platform 32.Send band platform regulating action cylinder 39 to be arranged on insulation film band conveying workbench 1, middle position with the right side of platform 32 is corresponding with sending, and this send with sending with platform regulating action cylinder post 391 of platform regulating action cylinder 39 and is connected with sending the middle position with the right side of platform 32.
The aforesaid band platform regulating action cylinder 39 that send is selected in the present embodiment with cylinder, be connected as air pump or air compressor, and air pump or air compressor is controlled by aforesaid electric controller 12 by source of the gas pipeline and aerogenesis apparatus.In order to control sending with platform 32 regulating degree to the left or to the right, thereby on insulation film band conveying workbench 1 and corresponding to sending position with the rear side of platform 32 to be fixed with one first seat 13 and 1 second seat 14 of raming of raming, at first seat 13 of raming, towards second seat 14 the side of raming, be equipped with one first screw 131 of raming, second, ram seat 14 towards the first ram seat side of 13 and be equipped with one second screw 141 of raming corresponding to the first position of raming a screw 131, and sending with the rear side of platform 32 and corresponding to first, second ram seat 13, position between 14 is fixed with a stop screw seat 323, when stop screw seat 323 and first is ramed a screw 131 while contacting, send band platform 32 can not be again to left dislocation, and ram a screw 141 while contacting when stop screw seat 323 and second, send the displacement to the right again of band platform 32, thereby making to send with platform regulating action cylinder 39 is sending the circumscription regulating to the left or to the right with platform 32 first, second screw 131 of raming, between 141.
In addition, applicant it should be noted that; If use the aforesaid band platform regulating action cylinder 39 that send instead oil cylinder, should be considered as so equivalence and substitute and still belong to the disclosed technology contents category of the utility model.
Still referring to Fig. 2, aforesaid carrier band device 33 preferably but not the structure being definitely limited to is as follows: comprise a carrier band disk-drive motor 331, a carrier band dish reduction box 332 and a carrier band dish 333, carrier band disk-drive motor 331 coordinates with 332 transmissions of carrier band dish reduction box, and by carrier band dish reduction box 332, together with carrier band disk-drive motor 331, be fixed on carrier band dish deceleration block 3321, and carrier band dish deceleration block 3321 is fixed by screws in the aforementioned right-hand member that send tape holder 31.Carrier band dish 333 can be changed, and coordinates with the carrier band dish reduction box final stage power output shaft of carrier band dish reduction box 332.Aforesaid carrier band disk-drive motor 331 is connected with electric controller 12 electrical controls by circuit.
When 331 work of carrier band disk-drive motor, through carrier band dish reduction box 332, slow down, carrier band dish reduction box final stage power output shaft by carrier band dish reduction box 332 drives carrier band dish 333, by the rotation of carrier band dish 333, the insulation film band 201 around answering on it is exited, and the insulation film band 201 exiting is extracted by aforesaid insulation film band haulage gear 2 by way of lower tape guide roller 35, upper tape guide roller 34, belt-guiding device 36, belt pressing device 37 with after cutting belting 38 successively.
Above mentioned belt-guiding device 36 preferably but not the structure being definitely limited to is as follows: comprise first, second conduction band plate holder 361,362, conduction band plate 363, conduction band briquetting 364 and conduction band press strip 365, first, second conduction band plate holder 361,362 with parallel state respectively use screw and the aforesaid band platform 32 that send fixing, and between corresponding to belt pressing device 37 and upper tape guide roller 34.One side of conduction band plate 363 is that the left side of the location status shown in Fig. 2 and the top of the first conduction band plate holder 361 are fixed, opposite side is that the right side of location status shown in Fig. 2 and the top of the second conduction band plate holder 362 are fixed, conduction band plate 363 towards on the surface of a side be fixed with a conduction band briquetting matching seat 3631 and a conduction band press strip matching seat 3632, conduction band briquetting matching seat 3631 is positioned at the left end of conduction band plate 363, and conduction band press strip matching seat 3632 is positioned at the right-hand member of conduction band plate 363.Conduction band briquetting 364 use conduction band briquetting hold-down screws and conduction band briquetting matching seat 3631 are fixing, and between these conduction band briquetting 364 bottoms and conduction band briquetting matching seat 3631, maintain gap, by this gap, be configured to the briquetting conduction band groove 3641 for passing through for insulation film band 201.Conduction band press strip 365 use conduction band press strip hold-down screws and conduction band press strip matching seat 3632 are fixing, and between the bottom of this conduction band press strip 365 and conduction band press strip matching seat 3632, maintain gap, by this gap, be configured to the press strip conduction band groove 3651 for passing through for insulation film band 201.Aforesaid briquetting conduction band groove 3641 and press strip conduction band groove 3651 correspond to each other.
Above mentioned belt pressing device 37 preferably but not the structure being definitely limited to is as follows: comprise belt hold roller frame 371, belt delivering roller motor 372, belt delivering roller reduction box 373, belt hold roller 374, belt delivering roller 375, pressure zone roller seat 376 and pressure zone roller seat regulating action cylinder 377, belt hold roller frame 371 is just as the shape of portal frame, be substantially n shape, the bottom of this belt hold roller frame 371 adopts belt hold roller frame hold-down screw and the aforesaid band platform 32 that send to fix, and cuts between belting 38 and the conduction band plate 363 of belt-guiding device 36 corresponding to aforementioned.Belt delivering roller motor 372 is connected with aforementioned controller 12 electrical controls by circuit, and coordinates with 373 transmissions of belt delivering roller reduction box, by this belt delivering roller reduction box 373, together with belt delivering roller motor 372, is fixed on belt hold roller frame 371 towards a front side.Belt hold roller 374 is arranged on pressure zone roller seat 376 rotationally in the position corresponding to above belt delivering roller 375, at these pressure zone roller seat 376 two ends, be respectively fixed with the lower end of a pressure zone roller seat guide rod 3761(pressure zone roller seat 3761), and pressure zone roller seat guide rod 3761 coordinates (because pressure zone roller seat guide rod guide pin bushing 37611 is arranged on the top of belt hold roller frame 371) by pressure zone action roller seat guide rod guide pin bushing 37611 with the top slide of belt hold roller frame 371.Belt delivering roller 375 is bearing in rotationally on belt hold roller frame 371 below corresponding to belt hold roller 374, and the belt delivering roller axle of this belt delivering roller 375 and the belt hold roller speed reduction box shaft 3731 of aforementioned belt hold roller reduction box 373 are in transmission connection.Pressure zone roller seat regulating action cylinder 377 is fixed on the middle position at the top of belt hold roller frame 371, the pressure zone roller seat regulating action cylinder post 3771 of this pressure zone roller seat regulating action cylinder 377 towards under, and through being connected with the middle position of the length direction of aforementioned pressure zone roller seat 376 behind the top of belt hold roller frame 371.For the more specific detail of pressure zone roller seat regulating action cylinder 377 as to the aforementioned description of sending with platform regulating action cylinder 39.
When stretching outside cylinder body, pressure zone roller seat regulating action cylinder post 3771 just drive pressure zone roller seat 376 descending, by pressure zone roller seat 376, drive pressure zone action roller 374 DL synchronizations, to be able to insulation film band 201 to transport to and cut belting 38 under the cooperation of belt hold roller 374 and belt delivering roller 375.
Aforesaidly cut belting 38 preferably but not the structure being definitely limited to is as follows: comprise and cut band knife rest 381, cut band cutter 382 and cut band cutter acting cylinder 383, cut the shape that is portal frame with knife rest 381, be that shape is similar to aforesaid pressure zone action roller frame 371, and be fixed on and send on band platform 32, between a pair of insulation film band guiding carrier 21 and belt hold roller frame 371 of insulation film band haulage gear 2, cut with cutter acting cylinder 383 and be fixed on the middle position of cutting with the top of knife rest 381, and this cut with cutter acting cylinder 383, cut band cutter acting cylinder post 3831(Fig. 1 signal) towards under.The middle part of cutting with the length direction of cutter 382 is fixedly connected with cutting band cutter acting cylinder post 3831, this cut with cutter 382 cut band cutter blade towards under.Same to sending the description with platform regulating action cylinder 39 for the more detailed explanation of cutting with cutter acting cylinder 383.When cutting band cutter acting cylinder post 3831 and stretch outside cylinder body, by its drive, cut band cutter 382 descending, insulation film band 201 is cut off, vice versa.
Under the work of insulation film band conveying mechanism 3, the insulation film band 201 exiting from carrier band dish 33 by way of lower tape guide roller 35, upper tape guide roller 34, press strip conduction band groove 3651, briquetting conduction band groove 3641, belt hold roller 374 and between sending with action roller 375 and cut the region that enters insulation film haulage gear 2 with the below of cutter 382, enters the right-hand member of a pair of insulation film band guiding carrier 21 successively.Now, the position of the pull nut 28 of insulation film haulage gear 2 on traction screw 27 is positioned at the right-hand member of traction screw 27, so under the work of cylinder folder 29, by cylinder folder 29, by being insinuated into the end of cutting with the insulation film band 201 on insulation film belt edge guide channels 211 cutter 832 left sides and that be positioned at a pair of insulation film band guiding carrier 21, clamped, traction electric machine 23 work, traction electric machine axle by traction electric machine 23 drives traction driving wheel 24, through Traction Drive band 26, drive traction driven pulley 25, by traction driven pulley 25, drive traction screw 27, by traction screw 27, drive pull nut 28 right-to-left on traction screw 27 to move, because cylinder folder 29 is located in pull nut 28, therefore in the process moving at pull nut 28 right-to-lefts, cylinder folder 29 in insulation film band 201 being clamped to state also right-to-left moves, insulation film band 201 is placed on a pair of insulation film band guiding carrier 21 in traction state lower berth.When pull nut 28 corresponds to the bolt and nut signal picker 212 of the left end that is positioned at insulation film band guiding carrier 21, by this bolt and nut signal picker 212 by signal feedback to electric controller 12, by electric controller 12, to signal, give traction electric machine 23, cylinder folder 29 and cut band cutter acting cylinder 383, traction electric machine 23 break-ofves, cylinder folder 29 discharges the insulation film band of clamping 201, makes to cut band cutter and is about to insulation film band 201 for 382 times and cuts off (severing) simultaneously by cutting with the work of cutter acting cylinder 383.To the insulation film 201 being positioned on a pair of insulation film band guiding carrier 21 is extracted and is transferred on the conveyer belt mechanism 4 that is about to below describe in detail by the film strip that also will describe in detail below and electrode slice transfer device 6.
Refer to Fig. 3, above mentioned conveyer belt mechanism 4 preferably but not the structure being definitely limited to is as follows: comprise housiung separator left support frame 41a, housiung separator right support frame 41b, the first housiung separator 42, the second housiung separator 43, left conveyer belt roller 44, right conveyer belt roller 45, conveyer belt 46, driven roller drive motors 47, conveyer belt main drive roll 48 and a pair of conveyer belt tightening roller 49, housiung separator left support frame 41a is supported in the position of the left end of the rear side of the length direction corresponding to aforementioned PTC element conveying workbench 7 on the terrace of field of employment (Fig. 1 signal), housiung separator right support frame 41b is fixedly connected with the side of aforementioned worktable frame 11 towards insulation film band conveying workbench 1, and this housiung separator right support frame 41b is corresponding with housiung separator left support frame 41a.First, second rack beam 42,43 keeps parallel at length direction each other, the left end of this first housiung separator 42 and the second housiung separator 43 is all fixed with the top of housiung separator left support frame 41a, and right-hand member is all fixed with the top of housiung separator right support frame 41b, and the left end of the first housiung separator 42 and the second housiung separator 43 is corresponding to the rear side of the length direction of PTC element conveying workbench 7 and by between Fig. 1 and the PTC element transfer device 9 of Fig. 5 signal, and right-hand member is corresponding between insulation film band conveying workbench 1 and electrode slice feed mechanism 5.That is to say that conveyer belt mechanism 4 extends to the right-hand member of insulation film band conveying workbench 1 in the position of the rear side corresponding to PTC element conveying workbench 7 and insulation film band conveying workbench 1 from the left end of PTC element conveying workbench 7.As shown in Figure 1, on the first housiung separator 42, be fixed with a spindle nose fixed head 421, and on the second housiung separator 43 and in the position corresponding to spindle nose fixed head 421, be fixed with a motor fixing plate 431.Left conveyer belt roller 44 is bearing between the first housiung separator 42 and the second housiung separator 43 rotationally, and is positioned at the left end of the first housiung separator 42 and the second housiung separator 43.Specifically: the left end at the first housiung separator 42 is fixed with one first left conveyer belt roller axle bed 422 by the first left conveyer belt roller axle bed hold-down screw 4221, and at the left end of the second housiung separator 43 and be fixed with one second conveyer belt roller axle bed 432 in the position corresponding to the first left conveyer belt roller axle bed 422.Aforesaid left conveyer belt roller 44 is bearing on the first left conveyer belt roller axle bed 422 and the second left conveyer belt roller axle bed 432 rotationally by the two ends of its left conveyer belt roll shaft 441.Right conveyer belt roller 45 is bearing between the first housiung separator 42 and the second housiung separator 43 rotationally, and is positioned at the right-hand member of the first housiung separator 42 and the second housiung separator 43.Specifically: the right-hand member at the first housiung separator 42 is fixed with one first right conveyer belt roller axle bed 423 by the first right conveyer belt roller axle bed hold-down screw 4231, and at the right-hand member of the second housiung separator 43 and be fixed with one second right conveyer belt roller axle bed 433 in the position corresponding to the first right conveyer belt roller axle bed 423.Aforesaid right conveyer belt roller 45 is bearing on the first right conveyer belt roller axle bed 423 and the second right conveyer belt roller axle bed 433 rotationally by the two ends of its right conveyer belt roll shaft 451.Driven roller drive motors 47 is fixed on aforementioned motor fixed head 431 back to a side of spindle nose fixed head 421 with level with horizontally-arranged state, conveyer belt main drive roll 48 has a conveyer belt drive roller shaft 481, this conveyer belt drive roller shaft 481 is bearing on the spindle nose fixed head bearing block 4211 being arranged on spindle nose fixed head 421 rotationally towards one end of spindle nose fixed head 421, and conveyer belt drive roller shaft 481 is bearing in rotationally towards one end of motor fixing plate 431 on motor fixing plate 431 and with the driven roller drive motors through-drive of driven roller drive motors 47 and is connected.A pair of conveyer belt tightening roller 49 respectively has a conveyer belt tensioner roll shaft 491, conveyer belt tensioner roll shaft 491 one end towards spindle nose fixed head 421 are being fixed corresponding to the position and the spindle nose fixed head 421 that are opened in the spindle nose adjustment tank 4212 on spindle nose fixed head 421, and limit nut 4911 restrictions (spindle nose limits nut 4911 and screws on the spindle nose of conveyer belt tensioner roll shaft 491) by spindle nose; Conveyer belt tensioner roll shaft 491 is being fixed with motor fixing plate 431 corresponding to the position that is opened in spindle nose on motor fixing plate 431 and adjusts slotted eye 4311 towards one end of motor fixing plate 431, and by spindle nose, limits nut equally and limit.Aforesaid conveyer belt main drive roll 48 is corresponding to the below between a pair of conveyer belt tightening roller 49, one end of conveyer belt 46 is that left end is nested with on left conveyer belt roller 44, middle part is nested with on conveyer belt main drive roll 48, and the other end of conveyer belt 46 to be right-hand member be nested with on right conveyer belt roller 45.Before a pair of conveyer belt tightening roller 49 and conveyer belt 46 back to a side of conveyer belt main drive roll 48 with conveyer belt 46 side contacts outward.
As preferred scheme, one conveyer belt supporting plate 461 is set in the position corresponding to aforementioned conveyer belt 46, by 4612 pairs of conveyer belt 46 supports of this conveyer belt supporting plate (i.e. holder is protected), one side of the length direction of this conveyer belt supporting plate 461 and aforementioned the first housiung separator 42 are fixing, and the opposite side of length direction and aforementioned the second housiung separator 43 are fixing, particularly, the both sides of the length direction of conveyer belt supporting plate 461 are plugged on respectively in the conveyer belt supporting plate slot on first, second housiung separator 42,43.
The film strip of having mentioned above and electrode slice transfer device 6 move with alternating state between aforesaid insulation film band haulage gear 2 and two stations of conveyer belt 46, and between two stations of conveyer belt 46 and electrode slice feed mechanism 5, with alternating state, move simultaneously, so that by be positioned on a pair of insulation film band guiding carrier 21 and by cutting the insulation film band 201 cutting off with cutter 832, extracts and is discharged into conveyer belt 46, the electrode slice 202 by 5 supplies of electrode slice feed mechanism is extracted and is discharged into simultaneously the top of the insulation film band 201 being positioned on conveyer belt 46.Between aforesaid PTC element transfer device 9 PTC component feeding mechanisms 8 and two stations of conveyer belt 46 with alternating state action so that the PTC element 203 that YouPTC component feeding mechanism 8 is supplied with extract and when corresponding to the station of conveyer belt 46, the PTC element 203 of extraction be discharged into be positioned on conveyer belt 46 and be stacked on the electrode slice 202 on insulation film band 201.
Aforesaid driven roller drive motors 47 is connected with electric controller 12 electrical controls by circuit, when this driven roller drive motors 47 work, by its driving conveying belt main drive roll 48, by these conveyer belt main drive roll 48 driving conveying belt 46(belts) around left conveyer belt roller 44 and right conveyer belt roller 45 again and again and have the rhythm and pace of moving things and move.
Please continue referring to Fig. 3, above mentioned electrode slice feed mechanism 5 preferably but not the structure being definitely limited to is as follows: comprise the electrode slice groove 51 of getting the raw materials ready, electrode slice pushing plate 52, pushing plate nut 53, pushing plate nut-screw 54, pushing plate nut-screw motor 55, in the middle of a pair of, separate guide block 56 and nut-screw support strip 57, get the raw materials ready groove 51 of electrode slice adopts the groove hold-down screw 513 of getting the raw materials ready fixing with the groove fixing screw hole 111 of getting the raw materials ready on worktable frame 11, and corresponding with the rear side of the housiung separator right support frame 41b of aforementioned conveyer belt mechanism 4, more precisely the side back to the first housiung separator 42 corresponding to the second housiung separator 43.As shown in Figure 3, the get the raw materials ready length direction of groove 51 of electrode slice forms the groove vallecular cavity 511 of getting the raw materials ready, and this get the raw materials ready right-hand member of groove vallecular cavity 511 and top of length direction are uncovered, do not seal.Pushing plate nut-screw motor 55 is for having the motor of rotating function, and be connected with electric controller 12 electrical controls by Fig. 1 and Fig. 2 signal by circuit, the get the raw materials ready trough floor 512(that gets the raw materials ready of groove 51 of this pushing plate nut-screw motor 55 and electrode slice is the base plate of the groove vallecular cavity 511 of getting the raw materials ready) back to a side of the groove vallecular cavity 511 of getting the raw materials ready, fix, and be positioned at the middle position of the length direction of the trough floor 512 of getting the raw materials ready, be connected with electric controller 12 electrical controls.Pushing plate nut-screw 54 is positioned at the get the raw materials ready groove vallecular cavity 511 of getting the raw materials ready of plate 51 of electrode slice, the upper end of this pushing plate nut-screw 54 is bearing in the middle position of the length direction of nut-screw support strip 57 rotationally by screw shaft bearing 541, and lower end is in transmission connection at position and the pushing plate nut-screw motor 55 of screw rod resigning hole 5121 at position placed in the middle corresponding to being opened in the length direction of the trough floor 512 of getting the raw materials ready.Pushing plate nut 53 is provided on pushing plate nut-screw 54, by pushing plate nut-screw 54 clockwise or rotate counterclockwise and do displacement up or down.Electrode slice pushing plate 52 is positioned at the groove vallecular cavity 511 of getting the raw materials ready, the middle part of the length direction of this electrode slice pushing plate 52 (middle position) is fixed towards a upper side with pushing plate nut 53, and respectively offering a middle guide block resigning hole 521 of separating at left end and the right-hand member of electrode slice pushing plate 52, this centre is separated guide block resigning hole 521 and also be can be described as the middle guide plate slot to make way of separating.In the middle of separating one of them in guide block 56 in the middle of a pair of, separate middle the separation in guide block resigning hole 521 that guide block 56 is plugged on the left end of electrode slice pushing plate 52, and its bottom supporting is in the trough floor 512 of getting the raw materials ready, another middle separation guide block 56 in the middle of a pair of in separation guide block 56 is plugged on the middle of right-hand member of electrode slice pushing plate 52 and separates in guide block resigning hole 521, and its bottom is bearing in equally gets the raw materials ready in trough floor 512, hence one can see that, by separating guide block 56 in the middle of a pair of, the groove vallecular cavity 511 of getting the raw materials ready is separated into two chambers independent of each other at length direction, the width of this chamber preferably adapts with the width of electrode slice 202, in each chamber, store the electrode slice 202 of illustrating in figure.Each fixes the end, two ends of nut-screw support strip 57 with support strip screw 571 and aforesaid a pair of middle top of separating guide block 56.
Preferably, in the both sides of the length direction of aforesaid electrode slice push pedal 52, each is fixed an electrode slice and shelves seat 522, and aforesaid electrode slice 202 is shelved on electrode slice and shelves on seat 522.
And then preferably, at the right-hand member of electrode slice pushing plate 52, being provided with the signal picker 523 of getting the raw materials ready, this signal picker 523 of getting the raw materials ready is preferably used optoelectronic switch.Because the aforesaid groove vallecular cavity 511 of getting the raw materials ready is divided into two independently chambers by separating guide block 56 in the middle of a pair of, the signal picker 523 of therefore getting the raw materials ready has two, and is connected with electric controller 12 electrical controls by signal line 5231.When the quantity of the electrode slice 202 on electrode slice pushing plate 52 is reduced to the degree being able to by signal picker 523 perception of getting the raw materials ready, while using up, by its by signal feedback to electric controller 12, and send alarm signal, to urge online assignment personnel to supplement electrode slice 202 to the groove vallecular cavity 511 of getting the raw materials ready, electrode slice 202 is placed in to the electrode slice that is positioned at the groove vallecular cavity 511 of getting the raw materials ready with neat stacked state and shelves on seat 522, electrode slice pushing plate 52 now has been returned to the bottom of the groove vallecular cavity 511 of getting the raw materials ready under the reverse operation of pushing plate nut-screw motor 55.
Aforesaid pushing plate nut-screw motor 55 every actions once, pushing plate nut-screw 54 just rotates a certain angle, make pushing plate nut 53 drive electrode slice pushing plate 52 to distance of top offset, this distance is the degree of the thickness of one piece of electrode slice 202 just, make electrode slice 202 in the get the raw materials ready notch place on top of length direction of groove 51 of electrode slice, to extracted by the film strip that is about to describe and electrode slice transfer device 6 below.When electrode slice 202 is tending towards using up, the top of electrode slice pushing plate 52 now in the groove vallecular cavity 511 of getting the raw materials ready, so pushing plate nut-screw motor 55 reverse operations, make pushing plate nut 53 in 54 up-downgoings of pushing plate nut-screw, drive electrode slice pushing plate 52 to come downwards to the bottom of the groove vallecular cavity 511 of getting the raw materials ready.
Please see Fig. 2 by emphasis, above mentioned film strip and electrode slice transfer device 6 preferably but not the structure being definitely limited to is as follows: comprise the left guide rod 61 of displacement plate, the right guide rod 62 of displacement plate, displacement plate 63, displacement plate screw drive motor 64, displacement plate drive screw 65, inhale band acting cylinder 66, insulation film band suction nozzle plate 67, electrode slice extracts acting cylinder 68 and electrode slice extracts suction nozzle plate 69, the rear end that the front end of the instant shown position state in one end of the left guide rod 61 of displacement plate and the other end are shown position state is separately fixed on the left guide rod seat 611 of displacement plate, and the left guide rod seat 611 of displacement plate is fixed on the top in the left side of described worktable frame 11.One end of the right guide rod 62 of displacement plate is that the front end of shown position state and rear end that the other end is shown position state are separately fixed on the right guide rod seat 621 of displacement plate, and the right guide rod seat 621 of displacement plate is fixed on the top on the right side of worktable frame 11.The left end of displacement plate 63 and towards on a side be fixed with the left sliding seat 631 of a pair of displacement plate, the left sliding seat 631 of this pair of displacement plate is respectively slidably arranged on the left guide rod 61 of displacement plate by left sliding seat guide pin bushing 6311, the right-hand member of displacement plate 63 and be fixed with the right sliding seat 632 of a pair of displacement plate towards a upper side, the right sliding seat 632 of this pair of displacement plate is respectively slidably arranged on the right guide rod 62 of displacement plate by right sliding seat guide pin bushing 6321.Displacement plate screw drive motor 64 is for having the motor of rotating function, and be connected with electric controller 12 electrical controls by circuit, the middle position of these displacement plate screw drive motor 64 rear sides at the length direction corresponding to displacement plate 63 is fixed on displacement plate screw drive motor cabinet 641, and this displacement plate screw drive motor cabinet 641 is fixed on the top of described worktable frame 11.One end of displacement plate drive screw 65 illustrates front end and is bearing in rotationally on drive screw front support seat 651, middle part is equipped with a displacement plate drive screw nut 652, this displacement plate drive screw nut 652 is fixed towards a upper side with described displacement plate 63, the other end of displacement plate drive screw 65 is that illustrated rear end is bearing on drive screw rear branching holder 653 rotationally, and leaning out this drive screw rear branching holder 653 is in transmission connection with the displacement plate screw drive motor shaft 642 of displacement plate screw drive motor 64, aforesaid drive screw front support seat 651 and drive screw rear branching holder 653 are fixed on the top of worktable frame 11 with the state corresponding to each other.Suction is with acting cylinder holder 662 with displacement plate 63 fixing in the middle position of the front side of the length direction corresponding to displacement plate 63 by suction with acting cylinder 66, and this suction with the suction band acting cylinder post 661 of acting cylinder 66 towards under, the middle position of the length direction of insulation film band suction nozzle plate 67 is with to be positioned at the suction band acting cylinder post fixed head 6611 of inhaling with acting cylinder post 661 ends fixing, Ge Yi interval, both sides state at the length direction of insulation film band suction nozzle plate 67 is provided with one group of insulation film band suction nozzle 671, electrode slice extracts acting cylinder 68 and shows by being equivalent to the electrode slice extraction plate acting cylinder holder 682(Fig. 4 inhaling with acting cylinder holder 662 in the middle position of the rear side of the length direction corresponding to displacement plate 63) fixing with displacement plate 63, and the electrode slice that this electrode slice extracts acting cylinder 68 extract acting cylinder post 681 towards under.It is fixing that electrode slice extracts the middle position of length direction and the cylinder post fixed head 6811 of electrode slice extraction acting cylinder post 681 ends of suction nozzle plate 69, Ge Yi interval, the both sides state that extracts the length direction of suction nozzle plate 69 at electrode slice is provided with one group of electrode slice suction nozzle 691, wherein: the lower end that is respectively fixed with an insulation film band suction nozzle plate guide post 672 at the two ends of aforementioned dielectric film strip suction nozzle plate 67, the upper end of this insulation film band suction nozzle plate guide post 672 is slidably matched with displacement plate 63 by the suction nozzle plate guide post guide pin bushing 6721 being arranged on displacement plate 63, the two ends of extracting suction nozzle plate 69 at aforementioned electric pole piece are respectively fixed with the lower end that an electrode slice extracts suction nozzle plate guide post 692, the top that this electrode slice extracts suction nozzle plate guide post 692 is slidably matched with displacement plate 63 by the suction nozzle plate guide post fairlead 6921 being arranged on displacement plate 63.
The detailed content of extracting acting cylinder 68 about aforesaid suction with acting cylinder 66 and electrode slice is as to the aforesaid description of sending with platform regulating action cylinder 39.
Preferably, at Ge Yi interval, the both sides state of the length direction of aforementioned dielectric film strip suction nozzle plate 67, offer insulation film band suction nozzle adjustment tank 673 is installed, aforesaid insulation film band suction nozzle 671 is fixed on insulation film band suction nozzle plate 67 in the position that adjustment tank 673 is installed corresponding to insulation film band suction nozzle.The both sides of extracting the length direction of suction nozzle plate 69 at aforesaid electrode slice offer electrode slice suction nozzle with interval state equally adjustment tank 693 are installed, and aforesaid electrode slice suction nozzle 691 is fixed on electrode slice in the position that adjustment tank 693 is installed corresponding to electrode slice suction nozzle and extracts on suction nozzle plate 69.
In the present embodiment, the quantity that the insulation film band suction nozzle of offering due to the both sides of the length direction at insulation film band suction nozzle plate 67 is installed adjustment tank 673 respectively has four, thereby the quantity of insulation film band suction nozzle 671 has eight, but obviously can not limit with the variation of this quantity technology contents of the present utility model, aforesaid electrode slice suction nozzle is installed adjustment tank 693 and the same example of electrode slice suction nozzle 691.According to professional general knowledge, insulation film band suction nozzle 671 and electrode slice suction nozzle 691 by pipeline with depression generator as vavuum pump or similar equipment connection, and depression generator is controlled by electric controller 12.
Refer to Fig. 4 and in conjunction with Fig. 3, when displacement plate screw drive motor 64 is worked clockwise, by it, drive displacement plate drive screw 65 to do corresponding rotation, by the rotation of displacement plate drive screw 65, drive 652 displacements forward of displacement plate drive screw nut, by displacement plate drive screw nut 652, drive displacement plate 63, displacement plate 63 is following respectively the left guide rod 61 of displacement plate and the displacement forward of the right guide rod 62 of displacement plate by the left sliding seat 631 of a pair of displacement plate and the right sliding seat 632 of a pair of displacement plate.That said here refers to forward towards the station displacement of a pair of insulation film band guiding carrier 21 of aforementioned dielectric film strip haulage gear 2.Owing to inhaling band acting cylinder 66 and electrode slice, extract acting cylinder 68 and be separately fixed on displacement plate 63, therefore at displacement plate 63, drive in displacement forward and inhale band acting cylinder 66 and electrode slice extracts synchronously displacement forward of acting cylinder 68.Because being connected in, inhales with the suction of acting cylinder 66 with the suction of the end of acting cylinder post 661 with being connected in the electrode slice that electrode slice extracts acting cylinder 68 and extracting on the cylinder post fixed head 6811 of acting cylinder post 681 ends on acting cylinder post fixed head 6611 and because electrode slice extracts suction nozzle plate 69 insulation film band suction nozzle plate 67 again, thereby drive insulation film band suction nozzle plate 67 to front side displacement by inhaling band acting cylinder 66, by electrode slice, extract acting cylinder 68 simultaneously and drive electrode slice to extract suction nozzle plate 69 to front side displacement.When insulation film band suction nozzle plate 67 corresponds to the top between aforesaid a pair of insulation film band guiding carrier 21, electrode slice now extracts the top that suction nozzle plate 69 corresponds to conveyer belt 46 just, and now on conveyer belt 46, there is insulation film band 201, and on a pair of insulation film band guiding carrier 21, there is too the insulation film band 201 of being cut with cutter 832 cut-outs.Under this state, under the instruction of electric controller 12, inhale band acting cylinder 66 and electrode slice and extract acting cylinder 68 work, inhale band acting cylinder post 661 stretches out outside cylinder body, make insulation film band suction nozzle plate 67 descending, the state that insulation film band suction nozzle 671 is tending towards contacting in the insulation film band 201 with being positioned on a pair of insulation film band guiding carrier 21, now insulation film band suction nozzle 671 is in negative pressure state, thereby insulation film band 201 is held, meanwhile, owing to having held electrode slice 202(on electrode slice suction nozzle 691, two pieces of electrode slices 202 have been held), thereby at electrode slice, extract under the work of acting cylinder 681, electrode slice extracts acting cylinder post 681 and stretches out outside cylinder body, make electrode slice extract suction nozzle plate 69 descending, in held two pieces of electrode slices 201 of state by two row's electrode slice suction nozzles 691, be tending towards the state contacting with the insulation film band 201 being positioned on conveyer belt 46, and when electrode slice suction nozzle 691 loses negative pressure and two pieces of electrode slices 202 are released on the insulation film band 201 being positioned on conveyer belt 4, this state is illustrated by Fig. 6 a, and by conveyer belt 46, be sent to the station of PTC element conveying workbench 7.After aforesaid action completes, displacement plate screw drive motor 64 reverse operations, i.e. work counterclockwise, by aforementioned contrary course of action, until make insulation film band suction nozzle plate 67 correspond to conveyer belt 46, electrode slice now extracts suction nozzle plate 69 corresponding to the get the raw materials ready top of the groove vallecular cavity 511 of getting the raw materials ready of groove 51 of the electrode slice of aforementioned electric pole piece feed mechanism 5.When insulation film band suction nozzle 67 is released on conveyer belt 46 by the insulation film band 201 previously having held, electrode slice suction nozzle 691 is drawn two pieces of electrode slices 202 from electrode slice feed mechanism 5 just.So repeat aforementioned activities.
Refer to Fig. 5, aforesaid PTC component feeding mechanism 8 comprises the PTC element casket holder 81 of getting the raw materials ready, scraping wings acting cylinder 82, scraping wings 83, PTC component shaping arrangement board 84, positioning pedestal 85, PTC component shaping motor 86, PTC component shaping screw rod 87, PTC component shaping piece nut 88 and PTC element casket 89, the PTC element casket holder 81 of getting the raw materials ready is fixed on aforementioned PTC element conveying workbench 7, and the left end from the length direction of PTC element conveying workbench 7 extends to right-hand member, at the get the raw materials ready length direction of casket holder 81 of this PTC element, with interval state, form and to have the PTC element casket of getting the raw materials ready to insert chamber 811, and PTC element is got the raw materials ready and is formed and have scraping wings slot 812 between the bottom of casket holder 81 and the table top of PTC element conveying workbench 7.The quantity of scraping wings acting cylinder 82 is a pair of, this scraping wings acting cylinder 82 is by acting cylinder holder 822 and adopt hold-down screw 8221 with horizontal boom state, to be fixed on the front side of the length direction of PTC element conveying workbench 7, and the scraping wings acting cylinder post 821 of this scraping wings acting cylinder 82 is towards scraping wings 83, at scraping wings 83, towards the length direction of a side of scraping wings acting cylinder post 821, be fixed with a scraping wings holder 831, on this scraping wings holder 831 and in the position corresponding to scraping wings acting cylinder post 821, be fixed with the L-shaped cylinder post Connection Block 8311 of a shape, this cylinder post Connection Block 8311 is connected with the end of scraping wings acting cylinder post 821, scraping wings 83 coordinates with 812 plugs of aforementioned scraping wings slot towards the get the raw materials ready side of length direction of casket holder 81 of PTC element.PTC component shaping arrangement board 84 is corresponding to the get the raw materials ready rear side of length direction of casket holder 81 of PTC element, right-hand member at PTC component shaping arrangement board 84 is extended with a PTC element gear pin 841, and at the left end of PTC component shaping arrangement board 84 and each end, be respectively connected with one end of a shaping arrangement board return spring 842, and the other end of shaping arrangement board return spring 842 is fixed on PTC element conveying workbench 7 by return spring seat 8421, at PTC component shaping arrangement board 84 towards the length direction of a side of positioning pedestal 85 one end with interval stateful connection limited location bar 843, and the other end of gag lever post 843 is slidably matched with the gag lever post hole 851 that is opened in positioning pedestal 85, and on gag lever post 843, be arranged with gag lever post spring 8431, one end of gag lever post spring 8431 is bearing in PTC component shaping arrangement board 84 towards a side of positioning pedestal 85, and the other end of gag lever post spring 8431 is bearing in positioning pedestal 85 towards a side of PTC component shaping arrangement board 84, and with interval state, be fixed with and spacingly ram 852 towards the length direction of a side of PTC component shaping arrangement board 84 at this positioning pedestal 85.PTC component shaping motor 86 is for having the motor of rotating function, this PTC component shaping motor 86 is fixed on the below of the left end end of PTC element conveying workbench 7, PTC component shaping screw rod 87 by shaping screw bolt seat 871 be bearing in rotationally PTC element conveying workbench 7 towards under a side, and corresponding with the PTC component shaping piece slot to make way 71 being opened on PTC element conveying workbench 7.PTC component shaping piece nut 88 coordinates with 87 transmissions of PTC component shaping screw rod, on this PTC component shaping piece nut 88 and in the position corresponding to PTC component shaping piece slot to make way 71, form and have a PTC component shaping piece 881, this PTC component shaping piece 881 upwards leans out PTC component shaping piece slot to make way 71, the quantity of PTC element casket 89 and the PTC element quantity that casket inserts chamber 811 of getting the raw materials ready equates and is plugged on PTC element to get the raw materials ready on the slotting chamber 811 of casket, in the short transverse of this PTC element casket 89, form the PTC element reserve chamber 891(that is useful on deposit PTC element 203 and there is shown three PTC element reserve chamber 891), the bottom of PTC element reserve chamber 891 and the PTC element casket of getting the raw materials ready is inserted chamber 811 and is communicated.Aforesaid PTC element transfer device 9 moves with alternating state between two stations of PTC element conveying workbench 7 and conveyer belt 46, and GaiPTC element travel mechanism 9 is positioned at the first housiung separator 43 of aforementioned conveyer belt mechanism 4 back to the left end of a side of described the first housiung separator 42.Preferably, the middle part of aforementioned PTC element casket 89 short transverses is fixing with the support 91 that soars by PTC element casket fixing feet 892, and the lower end of the short transverse of PTC element casket 89 is fixing by fixing feet 893 and the aforementioned PTC element casket holder 81 of getting the raw materials ready.
The detailed content of aforesaid scraping wings acting cylinder 82 is as the description to material conveying platform regulating action cylinder 39, and aforesaid PTC component shaping motor 86 is connected with electric controller 12 electrical controls by circuit.
Applicant it should be noted that: according to the specifications vary of the PTC heat generating core 20 of being illustrated by Fig. 6 d, the quantity of the PTC element casket 89 of enabling can be done corresponding variation, to control the quantity of the PTC element 203 of being drawn by PTC element casket 89.In addition, although show two-phase scraping wings acting cylinder 82 in Fig. 5, if yet be reduced to one and connect in the position placed in the middle of the length direction of scraping wings holder 831, form should be considered as so and the variation of immaterial equivalence, and then the disclosed technical connotation category of the utility model should be considered as not departing from.
When 82 work of scraping wings acting cylinder, for example, when scraping wings acting cylinder post 821 stretches out outside cylinder body, just by scraping wings acting cylinder post 821, drive scraping wings holder 831, because scraping wings 83 is fixing with scraping wings holder 831, it is the front side that scraping wings holder 831 is fixed on the length direction of scraping wings 83, thereby by scraping wings holder 831 drive scraping wings 83 at the position corresponding to scraping wings slot 812 towards the direction displacement of PTC component shaping arrangement board 84, PTC element reserve chamber 891 by PTC element casket 89 is introduced into the PTC element casket of getting the raw materials ready and inserts PTC element 203(in chamber 811, to be positioned at the PTC element 203 of the foot of PTC element reserve chamber 891) front side of passing the length direction of PTC component shaping arrangement board 84.In this process, the situation that PTC component shaping arrangement board 84 occurs to positioning pedestal 85 direction displacements, degree of displacement is with till suffering spacing 852 stop of raming, and at PTC component shaping arrangement board 84 during to positioning pedestal 85 direction displacement, 8431 compressions of gag lever post spring, and shaping arrangement board return spring 842 extends.PTC element 202 is passed to the front side of PTC component shaping arrangement board 84 having completed, after having completed PTC element 202 being passed and got the raw materials ready between casket holder 81 and PTC component shaping arrangement board 84 to PTC element, aforesaid scraping wings acting cylinder 82 reverse operations, scraping wings acting cylinder post 821 bounces back in cylinder body, makes the holding state of scraping wings 83 in next action.
For make to be positioned at PTC component shaping arrangement board 84 length direction front side PTC element 203 against each other together, with one piece of neat arrangement of mode by a piece, eliminate the gap between adjacent PTC element 203, therefore by 86 work of PTC component shaping motor, by this PTC component shaping motor 86, drive 87 rotations of PTC component shaping screw rod, by PTC component shaping screw rod 87, drive 88 displacements from left to right of PTC component shaping piece nut.Because PTC component shaping piece 881 is formed on PTC component shaping piece nut 88, therefore this PTC component shaping piece 881 in the position corresponding to PTC component shaping piece slot to make way 71 with 88 displacements from left to right of PTC component shaping piece nut, the previous PTC element 203 of the front side in length direction loose condition (of surface) and that be positioned at PTC component shaping arrangement board 84 be take to PTC element gear pin 841 to be driven to the right as benchmark, make PTC element 203 with neat state (the gap disappearance between adjacent PTC element 203) between PTC component shaping piece 881 and PTC element gear pin 841, specifically by Fig. 5, illustrated.After having completed the shaping of PTC element 203, PTC component shaping motor 86 reverse operations, make 87 reverse rotations of PTC component shaping screw rod, PTC component shaping piece nut 88 is oppositely displacement (to left dislocation) on PTC component shaping screw rod 87, return to initial holding state, to tackle the shaping to PTC element 203 next time.
Please continue to refer to Fig. 5, the PTC element 203 of the state after shaping is extracted and is transferred to that be sent to by conveyer belt 46 and be arranged on one piece of electrode slice of front side of two pieces of electrode slices 202 on insulation film band 201 by PTC element transfer device 9, be the state shown in Fig. 6 b, the one piece of electrode slice that is arranged in the rear side of two pieces of electrode slices 202 on insulation film band 201 is stacked and placed on and is covered on PTC element 203 when the length direction of insulation film band 201 is rolled over to exhibition by follow-up operation hand-manipulated, is the state shown in Fig. 6 c and 6d.
Above mentioned PTC element transfer device 9 preferably but not the structure being definitely limited to is as follows: comprise the support 91 that soars, the left guide rod 92 of movable plate, the right guide rod 93 of movable plate, movable plate 94, screw drive motor 95, screw rod 96, PTC element extracts plate acting cylinder 97 and PTC element extracts plate 98, the support 91 that soars is being used state lower support on the terrace of field of employment, and the second housiung separator 43 of the bottom of this support 91 that soars and aforementioned conveyer belt mechanism 4 is fixedly connected with back to the left end of a side of the first housiung separator 42, and the top of the support 91 that soars corresponds to the top of aforementioned conveyer belt 46 with horizontal boom state, and be connected with described PTC element casket 89, that is to say that PTC element casket 89 is fixing with the support 91 that soars by PTC element casket fixing feet 892.The two ends of the left guide rod 92 of movable plate are separately fixed on the left guide rod seat 921 of movable plate, and the left guide rod seat 921 of movable plate is fixed on the top in the left side of the support 91 that soars, the two ends of the right guide rod 93 of movable plate are separately fixed on the right guide rod seat 931 of movable plate, and the right guide rod seat 931 of movable plate is fixed on the top on the right side of the support 91 that soars, the left end of movable plate 94 is fixed with the left guide pin bushing seat 941 of a movable plate, the left guide pin bushing seat 941 of this movable plate is slidably matched with the left guide rod 92 of movable plate by left guide pin bushing 9411, the right-hand member of movable plate 94 is fixed with the right guide pin bushing seat 942 of a movable plate, the right guide pin bushing seat 942 of this movable plate is slidably matched with the right guide rod 93 of movable plate by right guide pin bushing 9421.Screw drive motor 95, for having the motor of rotating function, is connected with aforesaid electric controller 12 electrical controls, and this screw drive motor 95 is fixed by screw drive motor fixing seat 951 and the top of launching cradle 91.One end of screw rod 96 is that the front end of state shown in Fig. 5 is bearing on screw bolt seat 961 rotationally, and rear end and screw drive motor 95 that the other end of screw rod 96 is state shown in Fig. 5 are in transmission connection.On screw rod 96, be equipped with a bolt and nut 962, this bolt and nut 962 is fixed with the middle position of the length direction of movable plate 94.PTC element extracts plate acting cylinder 97 and is fixed on movable plate 94 with cantilever position by extracting plate acting cylinder seat 972, and is positioned at the below of middle position of the length direction of movable plate 94, the acting cylinder post 971 that this PTC element extracts plate acting cylinder 97 towards under.The middle position of length direction and the acting cylinder post fixed head 9711 of acting cylinder post 971 ends that PTC element extracts plate 98 are fixedly connected with, and be respectively fixed with an extraction plate guide rod 981 at the two ends of PTC element extraction plate 98, extracting plate guide rod 981 is slidably matched with movable plate 94 by extracting plate guide rod fairlead 9811, PTC element extract plate 98 length direction and towards under a side with interval state, be provided with PTC element and extract mouth 982, adjacent PTC extracts between mouth 982 and is communicated with by extracting mouth air intake duct 9821, extracting mouth air intake duct 9821 and negative pressure device is connected as vavuum pump or other similarly install pipeline, and vavuum pump or other similar device are connected with electric controller 12 electrical controls.The more specific detail of extracting plate acting cylinder 97 about aforesaid PTC element is as to the aforementioned description of sending with platform regulating action cylinder 39.
In Fig. 5, also illustrated for by the first housiung separator 42 of aforementioned conveyer belt mechanism 4 by the fixing situation of reinforcement connector 424 and PTC element conveying workbench 7.
Preferably, at the top of the aforesaid support 91 that soars and in the one end corresponding to screw rod 96, the position of (diagram front end) and the other end (diagram rear end) is respectively provided with a movable plate position signal acquisition device 911, and be fixed with a movable plate position signal acquisition device being connected with 12 electrical controls of aforementioned electric airgun controller on aforementioned bolt and nut 962, trigger part 9621, it is corresponding with movable plate position signal acquisition device 911 and match that this movable plate position signal acquisition device triggers part 9621, the length direction that extracts plate 98 at front described PTC element offers a PTC element and extracts mouth adjustment tank 983, aforesaid PTC element extracts mouth 982 and is arranged on PTC element extraction plate 98 in the position of extracting mouth adjustment tank 983 corresponding to PTC element.
And then preferably, aforesaid movable plate position signal acquisition device 911 adopts optoelectronic switch, but also can use travel switch, microswitch, position approach switch, tongue tube, hall sensing element or other similar device.
When will be by that supply with by aforementioned PTC component feeding mechanism 8 and when the PTC of shaping ordered state element 203 is transferred on aforementioned two pieces of electrode slices 202 of being illustrated by Fig. 5, first by screw drive motor 95 work clockwise (forward), screw rod 96 is turned clockwise, by the dextrorotation of screw rod 96, transfer to drive bolt and nut 962 displacement forward on screw rod 96, towards the direction displacement of the front side of the length direction of aforementioned PTC component shaping arrangement board 84, because bolt and nut 962 is fixing with movable plate 94, therefore by bolt and nut 962, drive movable plate 94 simultaneous displacements, because extracting plate acting cylinder 97, fixes with movable plate 94 by PTC element again, therefore by movable plate 94, drive PTC element to extract 97 simultaneous displacements of plate acting cylinder, also because extracting plate 98, PTC element is fixedly connected with the acting cylinder post fixed head 9711 that PTC element extracts acting cylinder post 971 ends of plate acting cylinder 97, thereby by PTC element, extract plate acting cylinder 97 drive PTC elements and extract plate 98 simultaneous displacements.When movable plate position signal acquisition device on bolt and nut 962 triggers part 9621 and corresponds to the degree of a movable plate position signal acquisition device 911 of the front side that is arranged in aforementioned two movable plate position signal acquisition devices 911, PTC element extracts the top that plate 98 is got the raw materials ready between casket holder 81 and PTC component shaping arrangement board 84 corresponding to aforesaid PTC element just, corresponding to the top of the PTC element 203 in shaping ordered state, now by movable plate position signal acquisition device 911 by signal feedback to electric controller 12, by electric controller 12, send instruction to screw drive motor 95, screw drive motor 95 is quit work, PTC element extracts 97 work of plate acting cylinder simultaneously, acting cylinder post 971 stretches outside cylinder body, make PTC element extract plate 98 descending, PTC element extracts the state (but have micro-vast spacing) of mouth 982 in being tending towards contacting with PTC element 203, now, under the suction function that extracts mouth air intake duct 9821 (under getter action) by PTC element, extract mouth 982 PTC element 203 held.PTC element extracts plate acting cylinder 97 reverse operations, and acting cylinder post 971 bounces back in cylinder body, by acting cylinder post 971, PTC element is extracted to plate 98 and mentions (making PTC element extract plate 98 up).Follow aforesaid screw drive motor 95 work counterclockwise (reversion), screw rod 96 is also rotated counterclockwise, when movable plate position signal acquisition device with aforementioned opposite direction process on bolt and nut 962 triggers the corresponding degree of a movable plate position signal acquisition device 911 of the rear side in part 9621 and aforesaid two movable plate position signal acquisition devices 911, PTC element extracts plate 98 and just turns back to the top corresponding to conveyer belt 46, still in extracted mouth 982 by PTC element, extract the PTC element 203 of state corresponding to the top of one piece of electrode slice 202 of the front side in aforementioned two pieces of electrode slices 202, now by movable plate position signal acquisition device 911, send instruction to screw drive motor 95, screw drive motor 95 is quit work, PTC element extracts plate acting cylinder 97 task more simultaneously, acting cylinder post 971 stretches out outside cylinder body, make PTC element extract plate 98 descending.Now under the positive pressure of extracting mouth air intake duct 9821, make the PTC element previously having been held by PTC element extraction mouth 982 be discharged on one piece of electrode slice 202 of the front side in two pieces of electrode slices 202 being illustrated by Fig. 5.Then by the conveyer belt 46 of conveyer belt mechanism 4, transport to the handwork workbench 30 that is positioned at PTC element conveying workbench 7 left ends of being illustrated by Fig. 1, by online assignment personnel by the 201 folding exhibitions of insulation film band, make one piece of electrode slice 202 of two pieces of rear sides in electrode slice 202 be folded into the top of the PTC element 203 on the one piece of electrode slice 202 that is positioned at front side, until be the state of Fig. 6 d.
Please then see Fig. 5, as preferred scheme, between described first housiung separator 42 of aforementioned conveyer belt mechanism 4 and the second housiung separator 43 and at the position (also can claim the position that has a common boundary) that borders on of the right-hand member of the left end corresponding to described insulation film band conveying workbench 1 and PTC element conveying workbench 7, be provided with a glue-spraying mechanism 10, this glue-spraying mechanism 10 is corresponding to the top of described conveyer belt 46.
In addition, applicant it should be noted that: at the top of aforementioned worktable frame 11 and a pair of signal picker that is equivalent to aforementioned movable plate position signal acquisition device 911 is set in the position corresponding to movable plate drive screw 65, one of them signal picker in this pair of signal picker is corresponding to the front side of aforementioned displacements plate drive screw nut 652, and another signal picker in a pair of signal picker is corresponding to the rear side of displacement plate drive screw nut 652, and on displacement plate drive screw nut 652, arrange one and be equivalent to the signal picker haptic element that aforementioned movable plate position signal acquisition device triggers part 9621, to realize with coordinating of signal picker the forward and reverse of movable plate screw drive motor 64 controlled by signal picker haptic element, specifically can be referring to applicant's description to PTC element transfer device 9 in the above, because the operating principle of displacement plate screw drive motor 64 and the operating principle of screw drive motor 95 are identical, thereby applicant repeats no more.
Aforesaid glue-spraying mechanism 10 preferably but not the structure being definitely limited to is as follows: comprise a binder spray support 101 and a pair of binder spray 102, binder spray support 101 is the structure of portal frame, the front side lower part of this binder spray support 101 and aforementioned the first housiung separator 42 are fixing, then side lower part and aforementioned the second housiung separator 43 are fixing, and the side (left side of shown position) at this binder spray support 101 is provided with a pair of the first glue spraying signal picker 1011, and opposite side (right side of face shown position) is provided with a pair of the second glue spraying signal picker 1012, this is a pair of first years old, the second glue spraying signal picker 1011, 1012 are connected with aforesaid electric controller 12 electrical controls by circuit, a pair of binder spray 102 is located at the middle part of binder spray support 101, between a pair of the first glue spraying signal picker 1011 and a pair of the second glue spraying signal picker 1012, this a pair of binder spray 102 is connected with electric controller 12 electrical controls.
The function of aforementioned glue-spraying mechanism 10 is to spray adhesive to two pieces of electrode slices 202 that are positioned on insulation film band 201 simultaneously, so that on one piece of electrode slice 202 of the front side in two pieces of electrode slices 202 that PTC element 203 adhered to reliably illustrated by Fig. 5, make again one piece of electrode slice 201 of two pieces of rear sides in electrode slice 202 be incorporated into reliably the top of (adhering to) PTC element 203.
Conveyer belt 46 carry be placed with two pieces of electrode slices 202 insulation film band 201 when the station of aforementioned dielectric film strip conveying workbench 1 is advanced to the station of PTC element conveying workbench 7, when by the first glue spraying signal picker 1011 and the second glue spraying signal picker 1012 equal sensing electrode sheet 202, by signal feedback to electric controller 12, by electric controller 12, send instruction to a pair of binder spray 102, due to a pair of binder spray 102 respectively with two pieces of electrode slices 202 corresponding (corresponding to the top of electrode slice 202), thereby by a pair of binder spray 102 simultaneously to two pieces of electrode slice 202 glue sprayings, when electrode slice 202 is advanced left and is gone from the first glue spraying signal picker 1011, by its by signal feedback to electric controller 12, by electric controller 12, to instruction, give a pair of binder spray 102, make a pair of binder spray 102 stop glue spraying.So make the surface conjunction of electrode slice 202 of being delivered to the station place of PTC element conveying workbench 7 by conveyer belt 46 have adhesive.
Refer to Fig. 6 a to Fig. 6 d and in conjunction with Fig. 1 to Fig. 5, applicant sketches the process of the utility model assembling PTC heat generating core 20.Fig. 6 a illustrated to belong to the PTC heat generating core 20 of being illustrated by Fig. 6 d structural system insulation film band 201 and with the state of walking abreast, be positioned at two pieces of electrode slices 202 on insulation film band 201.Wherein: insulation film band 201 flows to insulation film band haulage gear 2 by insulation film band conveying mechanism 3, and by film strip and electrode slice transfer device 6, be transferred on the conveyer belt 46 of conveyer belt mechanism 4, and electrode slice 202 is released on insulation film band 201 after extracting by 5 supplies of electrode slice feed mechanism and by film strip and electrode slice transfer device 6, due to this process by applicant to insulation film band haulage gear 2, insulation film band conveying mechanism 3, conveyer belt mechanism 4, during the description of electrode slice feed mechanism 5 and film strip and electrode slice transfer device 6, be described in detail, thereby no longer repeat to set forth.
Fig. 6 b has illustrated discharge on the one piece of electrode slice 202 that is positioned at front side in two pieces of electrode slices 202 to have the PTC element 203 of the structural system that belongs to PTC heat generating core 20.Under the motion of conveyer belt 46, the insulation film band 201 shown in Fig. 6 a is carried together with the station of electrode slice 202 towards the PTC element conveying workbench 7 on it, and at electrode slice 202 jet surface adhesive by 10 pairs of electrode slices 202 of glue-spraying mechanism during by way of glue-spraying mechanism 10 place, after arriving the station of PTC element conveying workbench 7, the PTC element 203 YouPTC component feeding mechanism 8 shapings being completed by PTC element transfer device 9 extracts and is released on one piece of electrode slice 202 of two pieces of front sides in electrode slice 202, because this process is explained in detail when the description of DuiPTC component feeding mechanism 8 and PTC element transfer device 9 by applicant, thereby repeat no more.
Fig. 6 c has illustrated by conveyer belt 46 the insulation film band 201 of Fig. 6 b state, two pieces of electrode slices 202 and be stacked and placed in two pieces of electrode slices 202 the wherein one piece PTC element 203 on (front side one piece) electrode slice 202 be delivered to the left end that is positioned at PTC element conveying workbench 7 handwork workbench 30 station and at the station place of this handwork workbench 30 by online assignment personnel by the folding state of the rear side of insulation film band 201, under this state, make uper side surface and the downside surface of PTC element 203 by electrode slice 202, realize electrical connection respectively, and then, station place at this handwork platform 30 is amounted to the insulation film band 201 of redundancy by online assignment personnel, by insulation film band 201, electrode slice 202 and PTC element 203 are fully wrapped up and formed by the PTC heat generating core 20 shown in Fig. 6 d.At subsequent processing, by workman, PTC heat generating core 20 is packed in the tube chamber of aluminum pipe of structural system of the heater that belongs to heater.
Applicant uses having taked under secrecy provision, the utility model have been carried out to simulation, result is: the efficiency of assembling of the PTC heat generating core automatic assembling apparatus of the utility model heater is equivalent to ten above personnel hand-manipulated, adopts the PTC heat generating core automatic assembling apparatus of a set of the utility model heater can save ten above assemblers.
In sum, the technical scheme that the utility model provides has overcome the shortcoming in prior art, has successfully completed invention task, has embodied objectively the technique effect in the superincumbent technique effect of applicant hurdle.

Claims (10)

1. a kind of PTC heat generating core automatic assembling apparatus of heater, it is characterized in that comprising an insulation film band conveying workbench (1) and a PTC element conveying workbench (7), top at insulation film band conveying workbench (1) is fixed with the front side of a worktable frame (11) with airborne, and the rear side of worktable frame (11) is supported on terrace in the position of the rear side of the length direction corresponding to insulation film band conveying workbench (1), PTC element conveying workbench (7) is arranged on the left end of insulation film band conveying workbench (1) at the state corresponding with insulation film band conveying workbench (1), one insulation film band haulage gear (2), this insulation film band haulage gear (2) is arranged on the top of described insulation film band conveying workbench (1), and is positioned at the left end of insulation film band conveying workbench (1), one for being delivered to insulation film band the insulation film band conveying mechanism (3) of described insulation film band haulage gear (2), this insulation film band conveying mechanism (3) is arranged on the top of described insulation film band conveying workbench (1) at the state corresponding with insulation film band haulage gear (2), and is positioned at the right-hand member of insulation film band conveying workbench (1), one conveyer belt mechanism (4) and an electrode slice feed mechanism (5), this conveyer belt mechanism (4) is bearing on the terrace of field of employment, and simultaneously corresponding to the rear side of length direction of described insulation film band conveying workbench (1) and the rear side of the length direction of PTC element conveying workbench (7), electrode slice feed mechanism (5) is arranged on the rear side of described worktable frame (11), one for be transferred to the insulation film band being obtained by described insulation film band haulage gear (2) described conveyer belt mechanism (4) and the electrode slice of being supplied with by described electrode slice feed mechanism (5) be transferred to film strip and the electrode slice transfer device (6) on the insulation film band on conveyer belt mechanism (4) simultaneously, it is upper that this film strip and electrode slice transfer device (6) are arranged on described worktable frame (11), and the while is corresponding to the top of conveyer belt mechanism (4) and electrode slice feed mechanism (5), YiPTC component feeding mechanism (8), it is upper that GaiPTC component feeding mechanism (8) is arranged on described PTC element conveying workbench (7), and be positioned at the top of PTC element conveying workbench (7), one for extracting and be transferred to the PTC element transfer device (9) on the electrode slice of being transported to by described conveyer belt mechanism (4) by the PTC element of being supplied with by described PTC component feeding mechanism (8), this PTC element transfer device (9) is arranged on the rear side of described conveyer belt mechanism (4), and with airborne, is stretched over the back side top of the top of conveyer belt mechanism (4) and the length direction of PTC element conveying workbench (7) simultaneously.
2. the PTC heat generating core automatic assembling apparatus of heater according to claim 1, it is characterized in that described insulation film band haulage gear (2) comprises a pair of insulation film band guiding carrier (21), a pair of traction guide rod seat (22), traction electric machine (23), traction driving wheel (24), traction driven pulley (25), Traction Drive band (26), traction screw (27), pull nut (28) and cylinder folder (29), a pair of insulation film band guiding carrier (21) is fixed on the left end on the top of described insulation film band conveying workbench (1) with parallel state, and the below corresponding to described worktable frame (11), each formation of the side facing each other at this pair of insulation film band guiding carrier (21) has an insulation film belt edge guide channel (211), a pair of traction guide rod seat (22) is fixed on insulation film band conveying workbench (1) with the state corresponding to each other, and one of them the traction guide rod seat in this pair of traction guide rod seat (22) is corresponding to the left end of a pair of insulation film band guiding carrier (21), and another traction guide rod seat in a pair of traction guide rod seat (22) is corresponding to the right-hand member of a pair of insulation film band guiding carrier (21), traction electric machine (23) is fixed on the left end end of insulation film band conveying workbench (1) by traction electric machine holder (231), and this traction electric machine (23) is for having the motor of rotating function, traction driving wheel (24) is fixed with the traction electric machine axle of traction electric machine (23), traction driven pulley (25) is fixed on the left end of traction screw (27), one end of Traction Drive band (26) is nested with on traction driving wheel (24), the other end is nested with on traction driven pulley (25), the left end of traction screw (27) and right-hand member are bearing on a pair of traction guide rod seat (22) rotationally, and the left end of this traction screw (27) leans out a traction guide rod seat of the left end in a pair of traction guide rod seat (22), the middle part of pull nut (28) coordinates with traction screw (27) transmission, and the two ends of pull nut (28) are slidably matched with pull nut guide rod (281) respectively, and the left end of pull nut guide rod (281) and right-hand member are fixing with a pair of traction guide rod seat (22) respectively, cylinder folder (29) is located in pull nut (28), wherein: described traction screw (27) is corresponding between described a pair of insulation film band guiding carrier (21), described insulation film band conveying mechanism (3) is corresponding with the right-hand member of a pair of insulation film band guiding carrier (21).
3. the PTC heat generating core automatic assembling apparatus of heater according to claim 1 and 2, it is characterized in that described insulation film band conveying mechanism (3) comprises send tape holder (31), send band platform (32), carrier band device (33), upper tape guide roller (34), lower tape guide roller (35), belt-guiding device (36), belt pressing device (37), cut belting (38) and send band platform regulating action cylinder (39), send the left end of tape holder (31) to be fixed on the right-hand member of described insulation film band conveying workbench (1), and send the right-hand member of tape holder (31) to lean out insulation film band conveying workbench (1) with horizontal boom state, send band platform (32) to be slidably arranged in a pair of sending on band platform rail (321), and a pair of band platform rail (321) that send is fixed on insulation film band conveying workbench (1) with parallel state, described in being fixed on, carrier band device (33) send the right-hand member of tape holder (31), upper tape guide roller (34) is bearing in the top of a pair of upper conduction band roller seat (341) rotationally, and the bottom of a pair of upper conduction band roller seat (341) is fixed on insulation film band conveying workbench (1), lower tape guide roller (35) is bearing on lower conduction band roller seat (351) rotationally with horizontal boom state, and lower conduction band roller seat (351) is fixed on the middle part of sending tape holder (31), belt-guiding device (36), belt pressing device (37) and cut belting (38) and be all arranged on described sending on band platform (32), wherein: belt pressing device (37) is positioned at belt-guiding device (36) and cuts between belting (38), belt-guiding device (36) is positioned between belt pressing device (37) and upper tape guide roller (34), and cut belting (38), be positioned between described insulation film band haulage gear (2) and belt pressing device (37), send band platform regulating action cylinder (39) to be arranged on insulation film band conveying workbench (1), this send band platform regulating action cylinder (39) send band platform regulating action cylinder post (391) with described in send the middle position on the right side of being with platform (32) to be connected.
4. the PTC heat generating core automatic assembling apparatus of heater according to claim 3, it is characterized in that described carrier band device (33) comprises carrier band disk-drive motor (331), carrier band dish reduction box (332) and carrier band dish (333), carrier band disk-drive motor (331) coordinates with carrier band dish reduction box (332) transmission, and described in being fixed on together with carrier band disk-drive motor (331) by carrier band dish reduction box (332), send the right-hand member of tape holder (31), carrier band dish (333) coordinates with the carrier band dish reduction box final stage power output shaft of carrier band dish reduction box (332), described belt-guiding device (36) comprises first, the second conduction band plate holder (361, 362), conduction band plate (363), conduction band briquetting (364) and conduction band press strip (365), first, the second conduction band plate holder (361, 362) send described in being fixed on parallel state on band platform (32), and between described belt pressing device (37) and upper tape guide roller (34), the top of one side of conduction band plate (363) and the first conduction band plate holder (361) is fixed, the top of opposite side and the second conduction band plate holder (362) is fixed, at this conduction band plate (363), towards a upper side, be fixed with a conduction band briquetting matching seat (3631) and a conduction band press strip matching seat (3632), conduction band briquetting (364) is fixing with conduction band briquetting matching seat (3631), and between this conduction band briquetting (364) and conduction band briquetting matching seat (3631), form and have a briquetting conduction band groove (3641) passing through for confession insulation film band, conduction band press strip (365) is fixing with conduction band press strip matching seat (3632), and between this conduction band press strip (365) and conduction band press strip matching seat (3632), form and have a same press strip conduction band groove (3651) for passing through for insulation film band, described belt pressing device (37) comprises belt hold roller frame (371), belt delivering roller motor (372), belt delivering roller reduction box (373), belt hold roller (374), belt delivering roller (375), pressure zone roller seat (376) and pressure zone roller seat regulating action cylinder (377), belt hold roller frame (371) is the shape of portal frame, described in being fixed on, send between the upper and left side corresponding to the described conduction band plate (363) of cutting belting (38) and belt-guiding device (36) of band platform (32), belt delivering roller motor (372) coordinates with belt delivering roller reduction box (373) transmission and by belt delivering roller reduction box (373), together with belt delivering roller motor (372), is fixed on the front side of belt hold roller frame (371), belt hold roller (374) is arranged on pressure zone roller seat (376) rotationally in the top corresponding to belt delivering roller (375), at the two ends of this pressure zone roller seat (376), be respectively fixed with a pressure zone roller seat guide rod (3761), pressure zone roller seat guide rod (3761) coordinates with the top slide of belt hold roller frame (371), belt delivering roller (375) is bearing on belt hold roller frame (371) rotationally in the below corresponding to belt hold roller (374), and the belt delivering roller speed reduction box shaft (3731) of the belt delivering roller axle of this belt delivering roller (375) and belt delivering roller reduction box (373) is in transmission connection, pressure zone roller seat regulating action cylinder (377) is fixed on the middle position at the top of belt hold roller frame (371), the pressure zone roller seat regulating action cylinder post (3771) of this pressure zone roller seat regulating action cylinder (377) towards under, and be connected with the middle position of the length direction of described pressure zone roller seat (376), the described belting (38) of cutting comprises and cuts band knife rest (381), cut band cutter (382) and cut band cutter acting cylinder (383), cut and be with knife rest (381) to be the shape of portal frame, described in being fixed on, send on band platform (32), and between described insulation film band haulage gear (2) and the belt hold roller frame (371) of belt pressing device (37), cut band cutter acting cylinder (383) and be fixed on the middle position of cutting the top of being with knife rest (381), and this cut band cutter acting cylinder (383) cut band cutter acting cylinder post (3831) towards under, cutting the middle part of the length direction of band cutter (382) is with cutter acting cylinder post (3831) to be connected with cutting, this cut band cutter (382) cut band cutter blade towards under.
5. the PTC heat generating core automatic assembling apparatus of heater according to claim 1, it is characterized in that described conveyer belt mechanism (4) comprises housiung separator left support frame (41a), housiung separator right support frame (41b), the first housiung separator (42), the second housiung separator (43), left conveyer belt roller (44), right conveyer belt roller (45), conveyer belt (46), driven roller drive motors (47), conveyer belt main drive roll (48) and a pair of conveyer belt tightening roller (49), housiung separator left support frame (41a) is supported on terrace in the position of the left end of the rear side of the length direction corresponding to described PTC element conveying workbench (7), housiung separator right support frame (41b) is fixedly connected with the side of described worktable frame (11) towards described insulation film band conveying workbench (1), and this housiung separator right support frame (41b) is corresponding with housiung separator left support frame (41a), first, the second rack beam (42, 43) parallel, and the left end of this first housiung separator (42) and the second housiung separator (43) is all fixed with the top of housiung separator left support frame (41a), and right-hand member is all fixed with the top of housiung separator right support frame (41b), and the left end of the first housiung separator (42) and the second housiung separator (43) is corresponding between the rear side of the length direction of described PTC element conveying workbench (7) and described PTC element transfer device (9), and right-hand member is corresponding between described insulation film band conveying workbench (1) and described electrode slice feed mechanism (5), on the first housiung separator (42), be fixed with a spindle nose fixed head (421), and go up and be fixed with in the position corresponding to spindle nose fixed head (421) motor fixing plate (431) at the second housiung separator (43), left conveyer belt roller (44) is bearing between the first housiung separator (42) and the second housiung separator (43) rotationally, and be positioned at the left end of the first housiung separator (42) and the second housiung separator (43), right conveyer belt roller (45) is bearing in rotationally between the first housiung separator (42) and the second housiung separator (43) and is positioned at the right-hand member of the first housiung separator (42) and the second housiung separator (43), driven roller drive motors (47) is fixed on motor fixing plate (431) back to a side of spindle nose fixed head (421) with horizontally-arranged state, conveyer belt main drive roll (48) has a conveyer belt drive roller shaft (481), this conveyer belt drive roller shaft (481) is connected towards one end of motor fixing plate (431) and the driven roller drive motors through-drive of driven roller drive motors (47), and conveyer belt drive roller shaft (481) is bearing on spindle nose fixed head (421) rotationally towards one end of spindle nose fixed head (421), a pair of conveyer belt tightening roller (49) respectively has a conveyer belt tensioner roll shaft (491), conveyer belt tensioner roll shaft (491) is fixing towards one end and the motor fixing plate (431) of motor fixing plate (431), and conveyer belt tensioner roll shaft (491) is fixing towards one end and the spindle nose fixed head (421) of spindle nose fixed head (421), described conveyer belt main drive roll (48) is corresponding to the below between a pair of conveyer belt tightening roller (49), the left end of conveyer belt (46) is nested with on left conveyer belt roller (44), middle part is nested with on conveyer belt main drive roll (48), and the right-hand member of conveyer belt (46) is nested with on right conveyer belt roller (45), described a pair of conveyer belt tightening roller (49) and the side contacts of conveyer belt (46) back to conveyer belt main drive roll (48), the described film strip and the electrode slice transfer device (6) that are arranged on described worktable frame (11) are moving with alternating state between conveyer belt (46) and two stations of described electrode slice feed mechanism (5) with alternating state action and while between described insulation film band haulage gear (2) and two stations of described conveyer belt (46), described PTC element transfer device (9) moves with alternating state between described PTC component feeding mechanism (8) and two stations of conveyer belt (46).
6. the PTC heat generating core automatic assembling apparatus of heater according to claim 5, it is characterized in that described electrode slice feed mechanism (5) comprises the electrode slice groove (51) of getting the raw materials ready, electrode slice pushing plate (52), pushing plate nut (53), pushing plate nut-screw (54), pushing plate nut-screw motor (55), in the middle of a pair of, separate guide block (56) and nut-screw support strip (57), the get the raw materials ready worktable frame (11) of groove (51) and described insulation film band conveying workbench (1) of electrode slice is fixing, and corresponding with the rear side of the described housiung separator right support frame (41b) of described conveyer belt mechanism (4), the get the raw materials ready length direction of groove (51) of this electrode slice forms the groove vallecular cavity (511) of getting the raw materials ready, this right-hand member and top of getting the raw materials ready groove vallecular cavity (511) is not sealed, the get the raw materials ready trough floor of getting the raw materials ready (512) of groove (51) of pushing plate nut-screw motor (55) and electrode slice is fixed back to a side of the groove vallecular cavity (511) of getting the raw materials ready, and be positioned at the middle position of the length direction of the trough floor of getting the raw materials ready (512), pushing plate nut-screw (54) is positioned at the get the raw materials ready groove vallecular cavity (511) of getting the raw materials ready of groove (51) of electrode slice, the upper end of this pushing plate nut-screw (54) is bearing in the middle position of the length direction of nut-screw support strip (57) rotationally, and lower end is in transmission connection at position and the pushing plate nut-screw motor (55) of screw rod resigning hole (5121) at position placed in the middle corresponding to being located at the length direction of the trough floor of getting the raw materials ready (512), pushing plate nut (53) is provided on pushing plate nut-screw (54), by pushing plate nut-screw (54) clockwise or rotate counterclockwise and displacement up or down, electrode slice pushing plate (52) is positioned at the groove vallecular cavity (511) of getting the raw materials ready, the middle part of the length direction of this electrode slice pushing plate (52) and pushing plate nut (53) are fixing, and respectively offer a middle guide block resigning hole (521) of separating at left end and the right-hand member of electrode slice pushing plate (52), one of them middle separation guide block in the middle of a pair of in separation guide block (56) is plugged on the middle of left end of electrode slice pushing plate (52) and separates in guide block resigning hole (521), and its bottom supporting is in the described trough floor of getting the raw materials ready (512), another middle separation guide block in the middle of a pair of in separation guide block (56) is plugged on the middle of right-hand member of electrode slice pushing plate (52) and separates in guide block resigning hole (521), and its bottom is bearing in the trough floor of getting the raw materials ready (512) equally, by separating guide block (56) in the middle of a pair of, the groove vallecular cavity (511) of getting the raw materials ready is separated into two chambers independent of each other at length direction, the two ends of nut-screw support strip (57) are fixed with a pair of middle top of separating guide block (56) respectively, described pushing plate nut-screw motor (55) is for having the motor of rotating function.
7. the PTC heat generating core automatic assembling apparatus of heater according to claim 1 or 5, it is characterized in that described film strip and electrode slice transfer device (6) comprise the left guide rod of displacement plate (61), the right guide rod of displacement plate (62), displacement plate (63), displacement plate screw drive motor (64), displacement plate drive screw (65), inhale band acting cylinder (66), insulation film band suction nozzle plate (67), electrode slice extracts acting cylinder (68) and electrode slice extracts suction nozzle plate (69), one end of the left guide rod of displacement plate (61) and the other end are separately fixed on the left guide rod seat of displacement plate (611), and the left guide rod seat of displacement plate (611) is fixed on the top in the left side of described worktable frame (11), one end of the right guide rod of displacement plate (62) and the other end are separately fixed on the right guide rod seat of displacement plate (621), and the right guide rod seat of displacement plate (621) is fixed on the top on the right side of worktable frame (11), the left end of displacement plate (63) and be fixed with the left sliding seat of a pair of displacement plate (631) towards a upper side, the left sliding seat of this pair of displacement plate (631) is respectively slidably arranged on the left guide rod of displacement plate (61) by left sliding seat guide pin bushing (6311), the right-hand member of displacement plate (63) and be fixed with the right sliding seat of a pair of displacement plate (632) towards a upper side, the right sliding seat of this pair of displacement plate (632) is respectively slidably arranged on the right guide rod of displacement plate (62) by right sliding seat guide pin bushing (6321), displacement plate screw drive motor (64) is for having the motor of rotating function, this displacement plate screw drive motor (64) is fixed on displacement plate screw drive motor cabinet (641) in the middle position of the rear side corresponding to displacement plate (63) length direction, and this displacement plate screw drive motor cabinet (641) is fixed on the top of described worktable frame (11), one end of displacement plate drive screw (65) is bearing on drive screw front support seat (651) rotationally, middle part is equipped with a displacement plate drive screw nut (652), this displacement plate drive screw nut (652) is fixed towards a upper side with described displacement plate (63), the other end of displacement plate drive screw (65) is bearing on drive screw rear branching holder (653) rotationally, and leaning out this drive screw rear branching holder (653) is in transmission connection with the displacement plate screw drive motor shaft (642) of displacement plate screw drive motor (64), described drive screw front support seat (651) and drive screw rear branching holder (653) are fixed on the top of worktable frame (11) with the state corresponding to each other, inhale band acting cylinder (66) fixing at middle position and the displacement plate (63) of the front side of the length direction corresponding to displacement plate (63), and this suction band acting cylinder post (661) of inhaling band acting cylinder (66) towards under, the middle position of the length direction of insulation film band suction nozzle plate (67) is fixing with suction band acting cylinder post (661), Ge Yi interval, both sides state at the length direction of insulation film band suction nozzle plate (67) is provided with one group of insulation film band suction nozzle (671), it is fixing at middle position and the displacement plate (63) of the rear side of the length direction corresponding to displacement plate (63) that electrode slice extracts acting cylinder (68), and the electrode slice that this electrode slice extracts acting cylinder (68) extract acting cylinder post (681) towards under, electrode slice extracts middle position and the electrode slice extraction acting cylinder post (681) of the length direction of suction nozzle plate (69) and fixes, Ge Yi interval, the both sides state that extracts the length direction of suction nozzle plate (69) at electrode slice is provided with one group of electrode slice suction nozzle (691), wherein: the lower end that is respectively fixed with an insulation film band suction nozzle plate guide post (672) at the two ends of described insulation film band suction nozzle plate (67), the upper end of this insulation film band suction nozzle plate guide post (672) is slidably matched with displacement plate (63) by the suction nozzle plate guide post guide pin bushing (6721) being arranged on displacement plate (63), the two ends of extracting suction nozzle plate (69) at described electrode slice are respectively fixed with the lower end that an electrode slice extracts suction nozzle plate guide post (692), the top that this electrode slice extracts suction nozzle plate guide post (692) is slidably matched with displacement plate (63) by the suction nozzle plate guide post fairlead (6921) being arranged on displacement plate (63).
8. the PTC heat generating core automatic assembling apparatus of heater according to claim 5, it is characterized in that described PTC component feeding mechanism (8) comprises the PTC element casket holder (81) of getting the raw materials ready, scraping wings acting cylinder (82), scraping wings (83), PTC component shaping arrangement board (84), positioning pedestal (85), PTC component shaping motor (86), PTC component shaping screw rod (87), PTC component shaping piece nut (88) and PTC element casket (89), the PTC element casket holder (81) of getting the raw materials ready is fixed on described PTC element conveying workbench (7), and the left end from the length direction of PTC element conveying workbench (7) extends to right-hand member, this PTC element get the raw materials ready casket holder (81) length direction with interval state form have PTC element get the raw materials ready casket insert chamber (811), and PTC element is got the raw materials ready and is formed and have scraping wings slot (812) between the bottom of casket holder (81) and the table top of described PTC element conveying workbench (7), the quantity of scraping wings acting cylinder (82) is a pair of, this scraping wings acting cylinder (82) is fixed on the front side of the length direction of PTC element conveying workbench (7) with horizontal boom state, and the scraping wings acting cylinder post (821) of this scraping wings acting cylinder (82) is towards scraping wings (83), be fixed with a scraping wings holder (831) at scraping wings (83) towards the length direction of a side of scraping wings acting cylinder post (821), go up and be fixed with a cylinder post Connection Block (8311) corresponding to the position of scraping wings acting cylinder post (821) at this scraping wings holder (831), this cylinder post Connection Block (8311) is connected with the end of scraping wings acting cylinder post (821), scraping wings (83) coordinates towards a get the raw materials ready side and described scraping wings slot (812) plug of length direction of casket holder (81) of PTC element, PTC component shaping arrangement board (84) is corresponding to the get the raw materials ready rear side of length direction of casket holder (81) of PTC element, be extended with a PTC element gear pin (841) at the right-hand member of PTC component shaping arrangement board (84), and be respectively connected with one end of a shaping arrangement board return spring (842) at the left end of PTC component shaping arrangement board (84) and each end, and the other end of shaping arrangement board return spring (842) is fixed on PTC element conveying workbench (7) by return spring seat (8421), at PTC component shaping arrangement board (84) towards a side of the length direction of positioning pedestal (85) one end with interval stateful connection limited location bar (843), and the other end of gag lever post (843) is slidably matched with the gag lever post hole (851) that is opened in positioning pedestal (85), and on gag lever post (843), be arranged with gag lever post spring (8431), one end of gag lever post spring (8431) is bearing in the side of PTC component shaping arrangement board (84) towards positioning pedestal (85)And the other end of gag lever post spring (8431) is bearing in the side of positioning pedestal (85) towards PTC component shaping arrangement board (84), and be fixed with spacing ram (852) towards the length direction of a side of PTC component shaping arrangement board (84) with interval state at this positioning pedestal (85), PTC component shaping motor (86) is for having the motor of rotating function, this PTC component shaping motor (86) is fixed on the below of the left end end of PTC element conveying workbench (7), PTC component shaping screw rod (87) by shaping screw bolt seat (871) be bearing in rotationally PTC element conveying workbench (7) towards under a side, and with to be opened in PTC component shaping piece slot to make way (71) on PTC element conveying workbench (7) corresponding, PTC component shaping piece nut (88) coordinates with PTC component shaping screw rod (87) transmission, above and in the position corresponding to described PTC component shaping piece slot to make way (71) form and have a PTC component shaping piece (881) at this PTC component shaping piece nut (88), this PTC component shaping piece (881) upwards leans out PTC component shaping piece slot to make way (71), the quantity of PTC element casket (89) and the described PTC element quantity that casket inserts chamber (811) of getting the raw materials ready equates and is plugged on PTC element to get the raw materials ready on the slotting chamber (811) of casket, form the PTC element reserve chamber (891) that is useful on deposit PTC element in the short transverse of this PTC element casket (89), the bottom of PTC element reserve chamber (891) and the PTC element casket of getting the raw materials ready is inserted chamber (811) and is communicated, described PTC element transfer device (9) is positioned at second housiung separator (43) of described conveyer belt mechanism (4) back to the left end of a side of described the first housiung separator (42).
9. the PTC heat generating core automatic assembling apparatus of heater according to claim 8, it is characterized in that described PTC element transfer device (9) comprises the support that soars (91), the left guide rod of movable plate (92), the right guide rod of movable plate (93), movable plate (94), screw drive motor (95), screw rod (96), PTC element extracts plate acting cylinder (97) and PTC element extracts plate (98), the support (91) that soars is being used state lower support on the terrace of field of employment, and second housiung separator (43) of the bottom of this support that soars (91) and described conveyer belt mechanism (4) is fixedly connected with back to the left end of a side of described the first housiung separator (42), and the top of the support that soars (91) corresponds to the top of described conveyer belt (46) with horizontal boom state, and be connected with described PTC element casket (89), the two ends of the left guide rod of movable plate (92) are separately fixed on the left guide rod seat of movable plate (921), and the left guide rod seat of movable plate (921) is fixed on the top in the left side of the support that soars (91), the two ends of the right guide rod of movable plate (93) are separately fixed on the right guide rod seat of movable plate (931), and the right guide rod seat of movable plate (931) is fixed on the top on the right side of the support that soars (91), the left end of movable plate (94) is fixed with a left guide pin bushing seat of movable plate (941), the left guide pin bushing seat of this movable plate (941) is slidably matched by left guide pin bushing (9411) and the left guide rod of movable plate (92), the right-hand member of movable plate (94) is fixed with a right guide pin bushing seat of movable plate (942), the right guide pin bushing seat of this movable plate (942) is slidably matched by right guide pin bushing (9421) and the right guide rod of movable plate (93), screw drive motor (95) is for having the motor of rotating function, and this screw drive motor (95) is fixed by screw drive motor fixing seat (951) and the top of launching cradle (91), one end of screw rod (96) is bearing on screw bolt seat (961) rotationally, and the other end of screw rod (96) and screw drive motor (95) are in transmission connection, on screw rod (96), be equipped with a bolt and nut (962), this bolt and nut (962) is fixed with the middle position of the length direction of movable plate (94), PTC element extracts plate acting cylinder (97) and is fixed on movable plate (94), and be positioned at the below of middle position of the length direction of movable plate (94), the acting cylinder post (971) that this PTC element extracts plate acting cylinder (97) towards under, the middle position that PTC element extracts the length direction of plate (98) is fixedly connected with acting cylinder post (971), and be respectively fixed with an extraction plate guide rod (981) at the two ends of PTC element extraction plate (98), extracting plate guide rod (981) is slidably matched with movable plate (94) by extracting plate guide rod fairlead (9811), PTC element extract plate (98) length direction and towards under a side with interval state, be provided with PTC element and extract mouth (982).
10. the PTC heat generating core automatic assembling apparatus of heater according to claim 9, it is characterized in that at the top of the described support that soars (91) and in the position of the one end corresponding to screw rod (96) and the other end, be respectively provided with a movable plate position signal acquisition device (911), and be fixed with a movable plate position signal acquisition device on described bolt and nut (962), trigger part (9621), it is corresponding with movable plate position signal acquisition device (911) and match that this movable plate position signal acquisition device triggers part (9621), the length direction that extracts plate (98) at described PTC element offers a PTC element extraction mouth adjustment tank (983), described PTC element extracts mouth (982) and is arranged on PTC element extraction plate (98) in the position of extracting mouth adjustment tank (983) corresponding to PTC element.
CN201420137621.XU 2014-03-25 2014-03-25 Automatic assembling device for PTC heating core of heater Withdrawn - After Issue CN203738374U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420137621.XU CN203738374U (en) 2014-03-25 2014-03-25 Automatic assembling device for PTC heating core of heater

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420137621.XU CN203738374U (en) 2014-03-25 2014-03-25 Automatic assembling device for PTC heating core of heater

Publications (1)

Publication Number Publication Date
CN203738374U true CN203738374U (en) 2014-07-30

Family

ID=51338237

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420137621.XU Withdrawn - After Issue CN203738374U (en) 2014-03-25 2014-03-25 Automatic assembling device for PTC heating core of heater

Country Status (1)

Country Link
CN (1) CN203738374U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103878585A (en) * 2014-03-25 2014-06-25 常熟市林芝电热器件有限公司 Automatic assembly device of heater PTC heating core
CN106514209A (en) * 2016-12-02 2017-03-22 芜湖市泰能电热器具有限公司 Electric heating wire mounting equipment
CN109760991A (en) * 2018-11-05 2019-05-17 江苏壹度科技股份有限公司 A kind of electrode slice automatic sheet-feeding machine that feeding is stable

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103878585A (en) * 2014-03-25 2014-06-25 常熟市林芝电热器件有限公司 Automatic assembly device of heater PTC heating core
CN103878585B (en) * 2014-03-25 2016-04-06 常熟市林芝电热器件有限公司 The PTC heat generating core automatic assembling apparatus of heater
CN106514209A (en) * 2016-12-02 2017-03-22 芜湖市泰能电热器具有限公司 Electric heating wire mounting equipment
CN106514209B (en) * 2016-12-02 2018-07-10 芜湖市泰能电热器具有限公司 A kind of electric heating wire installs equipment
CN109760991A (en) * 2018-11-05 2019-05-17 江苏壹度科技股份有限公司 A kind of electrode slice automatic sheet-feeding machine that feeding is stable
CN109760991B (en) * 2018-11-05 2024-05-24 江苏壹度科技股份有限公司 Automatic electrode slice feeding machine with stable feeding

Similar Documents

Publication Publication Date Title
CN103878584B (en) The PTC heat generating core Automated assembly device of heater
CN103878585B (en) The PTC heat generating core automatic assembling apparatus of heater
CN203779095U (en) Automatic assembly device for PTC heating core of heater
CN204078909U (en) A kind of bagged-spring bar cuts off propelling unit
CN203738374U (en) Automatic assembling device for PTC heating core of heater
CN104526764B (en) The die-cut all-in-one with base material adhesive tape and protecting pad pasting and cutting method
CN103879828B (en) The insulation film band hitch structure of PTC heat generating core automatic assembling apparatus
CN103934657B (en) The PTC element extraction mechanism structure of PTC heat generating core automatic assembling machine
CN103878583B (en) The PTC component feeding mechanism of PTC heat generating core automatic assembling machine
CN103878586B (en) The electrode slice feed mechanism of PTC heat generating core automatic assembling machine
CN106853880A (en) Four banding wet towel package machines
CN203185389U (en) Light absorption piece cutting machine
CN203779064U (en) Structure of PTC (positive temperature coefficient) element collecting mechanism of automatic assembly machine for PTC heating cores
CN203973196U (en) A kind of bagged-spring bar shut-off mechanism
CN203781468U (en) Insulating film strip traction structure of automatic assembly device for PTC heating cores
CN103878559B (en) The PTC heat generating core automatic assembling apparatus of heater send band structure
CN203738342U (en) Tape conveying structure for automatic assembling device for PTC heating core of heater
CN203788484U (en) Film belt and electrode sheet transfer mechanism structure of automatic PTC heating core assembly machine
CN203779094U (en) Structure of PTC (positive temperature coefficient) element feeding mechanism of automatic assembly machine for PTC heating cores
US2877120A (en) Method of interleaving sheets of material between slices of food and apparatus therefor
CN103945574B (en) The film strip of PTC heat generating core automatic assembling machine and electrode slice transfer device structure
CN106005539A (en) Medical glove lining paper packing folder
CN203779093U (en) Electrode plate feeding mechanism for automatic assembly machine for PTC heating cores
CN205240727U (en) Sorting unit is carried to crisp box of egg
CN103112026A (en) Light-absorbing-piece cutting machine

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20140730

Effective date of abandoning: 20160406

C25 Abandonment of patent right or utility model to avoid double patenting