CN203701415U - Manufacturing equipment for steel mesh frame wall body - Google Patents

Manufacturing equipment for steel mesh frame wall body Download PDF

Info

Publication number
CN203701415U
CN203701415U CN201420061362.7U CN201420061362U CN203701415U CN 203701415 U CN203701415 U CN 203701415U CN 201420061362 U CN201420061362 U CN 201420061362U CN 203701415 U CN203701415 U CN 203701415U
Authority
CN
China
Prior art keywords
portal frame
fixed
wall body
portal
welder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420061362.7U
Other languages
Chinese (zh)
Inventor
孟庆海
杨春龙
董春艳
李国红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
QINHUANGDAO LIYUAN MACHINERY ENGINEERING Co Ltd
Original Assignee
QINHUANGDAO LIYUAN MACHINERY ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by QINHUANGDAO LIYUAN MACHINERY ENGINEERING Co Ltd filed Critical QINHUANGDAO LIYUAN MACHINERY ENGINEERING Co Ltd
Priority to CN201420061362.7U priority Critical patent/CN203701415U/en
Application granted granted Critical
Publication of CN203701415U publication Critical patent/CN203701415U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Wire Processing (AREA)

Abstract

The utility model discloses manufacturing equipment for a steel mesh frame wall body. According to the manufacturing equipment for the steel mesh frame wall body, third sliding rails are arranged on the front cross beam and the rear cross beam of a bracket, two portal frame sliding seats are parallelly arranged on each third sliding rail, lower portal frames are fixed to the upper ends of the portal frame sliding seats through upright posts, upper portal frames are fixed to the upper ends of the lower portal frames through first screw rods, and two second sliding rails and a second screw rod are arranged on each of the lower portal frames and upper portal frames; a connecting rib plug device is fixed to the sliding rails on each upper portal frame through an angular adjustment device, an upper welding device is fixed beside the connecting rib plug device on the sliding rails on each upper portal frame, and a lower welding device is fixed to the sliding rails on each lower portal frame; a third screw rod is arranged between the left cross beam and the right cross beam of the bracket, the portal frame sliding seats are mounted on the third screw rod in a sleeving manner, wall body fixing framed are arranged in the bracket, and a steel mesh frame wall body is fixed to the wall body fixing bracket; stepping motors are arranged at the end parts of the first screw rods, the second screw rod and the third screw rod, so that the steel mesh bracket wall body manufactured by the equipment has high strength and good quality.

Description

The manufacturing equipment of steel wire mesh frame wall body
Technical field
The utility model relates to a kind of manufacturing equipment of steel wire mesh frame wall body, belongs to steel wire mesh frame wall body manufacturing equipment technical field.
Background technology
Steel wire mesh frame wall body is a kind of New Building Materials that are used for substituting common brick body of wall and hollow brick wall, has advantages of that good permeability, volume stability, good heat insulating, quality are light, easy installation and removal, is widely used at present in the construction work in house.The intermediate layer of steel wire mesh frame wall body is provided with foam heat-insulating board, both sides at foam heat-insulating board are provided with steel screen layer, for the intensity that increases steel wire mesh frame wall body need to be welded with through foam heat-insulating board some dowels in the time manufacturing steel wire mesh frame wall body the steel screen layer of both sides.In prior art, manufacture above-mentioned steel wire mesh frame wall body and can only adopt manual production or semi-automatic machinery production, inefficiency, supply falls short of demand, at present, the published patent No. is that 200920255116.4 " a kind of manufacturing equipment of steel wire mesh frame wall body " is although can full-automaticly produce, but, the stroke of the dowel docking device on this equipment is uncontrollable, still the phenomenon that there will be stroke or owed stroke in insertion process, affect the quality of whole body of wall, in addition, the grafting muscle device and the welder that form the manufacturing equipment of above-mentioned steel wire mesh frame wall body are all fixed, by mobile wall, dowel pegged graft and weld, like this, very easily cause gauze wire cloth and middle foam heat-insulating board to produce relative displacement, thereby affect the quality of body of wall.
Utility model content
The purpose of this utility model is the manufacturing equipment for a kind of steel wire mesh frame wall body is provided, because the dowel plug assembly and the welder that form this equipment are arranged on portal frame, the holder of portal frame can move on the crossbeam of support, and all mobile devices adopt stepper motor to drive, upper gauze wire cloth, foam heat-insulating board, lower gauze wire cloth is fixed in wall mounts, can guarantee like this stability of body of wall, avoid upper gauze wire cloth, foam heat-insulating board, between lower gauze wire cloth, produce relative displacement, cause dowel to peg graft inhomogeneous, and affect the quality of steel wire mesh frame wall body, can arbitrarily adjust distance owing to forming between the upper portal frame of this equipment and lower portal frame, therefore, this equipment is applicable to the manufacture of any thickness steel wire mesh frame wall body, the manufacturing equipment of this steel wire mesh frame wall body is simple in structure, reasonable in design, and operating efficiency is high, and the grafting stroke of dowel device is stable, the phenomenon that there will not be stroke or owed stroke, and the steel wire mesh frame wall body intensity producing is high, and quality is good.
In order to achieve the above object, the utility model is realized by following technological means.
A kind of manufacturing equipment of steel wire mesh frame wall body, it comprises support, slide rail, portal frame, wall mounts, screw mandrel, stepper motor, angular adjustment apparatus, dowel plug assembly, welder part, it is characterized in that: before support, on rear cross beam, be provided with the 3rd slide rail, on the 3rd slide rail, be arranged with two portal frame slides in parallel, be provided with two root posts at the two ends of two portal frame slides, the upper end of portal frame slide is fixed with lower portal frame by column, the two ends of lower portal frame are provided with two the first screw mandrels, the upper end of every the first screw mandrel is provided with the first stepper motor, the upper end of lower portal frame is fixed with upper portal frame by the first screw mandrel, on lower portal frame and upper portal frame, be provided with two the second slide rails and second leading screw, be provided with the second stepper motor in the end of the second leading screw, on slide rail on upper portal frame, be fixed with dowel plug assembly by angular adjustment apparatus, the fixing corresponding setting of dowel plug assembly on two described upper portal frames, on slide rail on upper portal frame, the side of dowel plug assembly is fixed with welder, the corresponding setting of upper welder of being fixed on two described upper portal frames, on slide rail on lower portal frame, be fixed with lower welder, the corresponding setting of lower welder of being fixed on two described lower portal frames, described lower welder is identical with the structure of upper welder, between the left and right crossbeam of support, be provided with the 3rd leading screw, the end of the 3rd leading screw is provided with the 3rd stepper motor, and described portal frame slide is sleeved on the 3rd leading screw, is provided with wall mounts in support, is fixed with steel wire mesh frame wall body in wall mounts.
The utility model mainly has following beneficial effect:
1, because the dowel plug assembly and the welder that form this equipment are arranged on portal frame, the holder of portal frame can move on the crossbeam of support, and all mobile devices adopt stepper motor to drive, upper gauze wire cloth, foam heat-insulating board, lower gauze wire cloth are fixed in wall mounts, can guarantee like this stability of body of wall, avoid producing relative displacement between upper gauze wire cloth, foam heat-insulating board, lower gauze wire cloth, cause dowel to peg graft inhomogeneous, and affect the quality of steel wire mesh frame wall body.
2, form between the upper portal frame of this equipment and lower portal frame and can arbitrarily adjust distance, therefore, this equipment is applicable to the manufacture of any thickness steel wire mesh frame wall body.
3, the manufacturing equipment of this steel wire mesh frame wall body is simple in structure, reasonable in design, and operating efficiency is high, and the grafting stroke of dowel device is stable, the phenomenon that there will not be stroke or owed stroke, and the steel wire mesh frame wall body intensity producing is high, and quality is good.
Accompanying drawing explanation
Accompanying drawing is the perspective view of the manufacturing equipment of the utility model steel wire mesh frame wall body.
As shown in the figure, in figure, various piece is represented by following Arabic numerals:
Support, 2. portal frame slide, 3. column, 4. descend portal frame, 5. wall mounts, 6. the first screw mandrel, 7. go up portal frame, 8. the first stepper motor, 9. the second stepper motor, 10. welder, 13. second slide rails, 14. second leading screws, 15. the 3rd stepper motors, 16. the 3rd leading screws, 17. the 3rd slide rails on angular adjustment apparatus, 11. dowel plug assemblys, 12..
Below in conjunction with embodiment and Figure of description, the utility model is described in further detail:
The specific embodiment
Embodiment
As shown in the figure, a kind of manufacturing equipment of steel wire mesh frame wall body, it comprises support 1, slide rail, portal frame, wall mounts 5, screw mandrel, stepper motor, angular adjustment apparatus 10, dowel plug assembly 11, welder part, before support 1, on rear cross beam, be provided with the 3rd slide rail 17, on the 3rd slide rail 17, be arranged with two portal frame slides 2 in parallel, be provided with two root posts 3 at the two ends of two portal frame slides 2, the upper end of portal frame slide 2 is fixed with lower portal frame 4 by column 3, the two ends of lower portal frame 4 are provided with two the first screw mandrels 6, the upper end of every the first screw mandrel 6 is provided with the first stepper motor 8, the upper end of lower portal frame 4 is fixed with upper portal frame 7 by the first screw mandrel 6, on lower portal frame 4 and upper portal frame 7, be provided with two the second slide rails 13 and second leading screw 14, be provided with the second stepper motor 9 in the end of the second leading screw 14, on slide rail on upper portal frame 7, be fixed with dowel plug assembly 11 by angular adjustment apparatus 10, the fixing corresponding setting of dowel plug assembly 11 on two described upper portal frames 7, on slide rail on upper portal frame 7, the side of dowel plug assembly 11 is fixed with welder 12, the corresponding setting of upper welder 12 of being fixed on two described upper portal frames 7, on slide rail on lower portal frame 4, be fixed with lower welder, the corresponding setting of lower welder of being fixed on two described lower portal frames 4, described lower welder is identical with the structure of upper welder 12, between the left and right crossbeam of support 1, be provided with the 3rd leading screw 16, the end of the 3rd leading screw 16 is provided with the 3rd stepper motor 15, described portal frame slide 2 is sleeved on the 3rd leading screw 16, is provided with wall mounts 5 in support 1, in wall mounts 5, is fixed with steel wire mesh frame wall body.
As shown in the figure, in the time utilizing the said equipment to manufacture steel wire mesh frame wall body, first by upper gauze wire cloth, insulation foam plate, lower gauze wire cloth is fixed in wall mounts 5 successively, by two portal frame slides 2 and dowel plug assembly 11, upper welder 12, the lower welder home position at zero point of all playbacking, so latter two starts dowel plug assembly 11, after dowel plug assembly 11 has been pegged graft, dowel plug assembly 11 and upper welder 12 are under the drive of the second stepper motor 9, the mobile distance of setting, making welder 12 move to dowel plug assembly 11 places welds, simultaneously, lower welder welds the lower end of dowel, after having welded, the second stepper motor 9 starts again, dowel plug assembly, welder are moved to next position, repeat above-mentioned work, in the time reaching the edge of body of wall, the 3rd stepper motor 15 starts, two portal frame slides 2 are moved to setpoint distance and repeat above-mentioned work, can produce so complete steel wire mesh frame wall body.

Claims (1)

1. the manufacturing equipment of a steel wire mesh frame wall body, it comprises support (1), slide rail, portal frame, wall mounts (5), screw mandrel, stepper motor, angular adjustment apparatus (10), dowel plug assembly (11), welder part, it is characterized in that: before support (1), on rear cross beam, be provided with the 3rd slide rail (17), on the 3rd slide rail (17), be arranged with two portal frame slides (2) in parallel, be provided with two root posts (3) at the two ends of two portal frame slides (2), the upper end of portal frame slide (2) is fixed with lower portal frame (4) by column (3), the two ends of lower portal frame (4) are provided with two the first screw mandrels (6), the upper end of every the first screw mandrel (6) is provided with the first stepper motor (8), the upper end of lower portal frame (4) is fixed with upper portal frame (7) by the first screw mandrel (6), on lower portal frame (4) and upper portal frame (7), be provided with two the second slide rails (13) and second leading screw (14), be provided with the second stepper motor (9) in the end of the second leading screw (14), on slide rail on upper portal frame (7), be fixed with dowel plug assembly (11) by angular adjustment apparatus (10), the fixing corresponding setting of dowel plug assembly (11) on two described upper portal frames (7), on slide rail on upper portal frame (7), the side of dowel plug assembly (11) is fixed with upper welder (12), the corresponding setting of upper welder (12) of being fixed on two described upper portal frames (7), on slide rail on lower portal frame (4), be fixed with lower welder, the corresponding setting of lower welder of being fixed on described two lower portal frames (4), described lower welder is identical with the structure of upper welder (12), between the left and right crossbeam of support (1), be provided with the 3rd leading screw (16), the end of the 3rd leading screw (16) is provided with the 3rd stepper motor (15), described portal frame slide (2) is sleeved on the 3rd leading screw (16), in support (1), be provided with wall mounts (5), wall mounts is fixed with steel wire mesh frame wall body on (5).
CN201420061362.7U 2014-01-29 2014-01-29 Manufacturing equipment for steel mesh frame wall body Expired - Fee Related CN203701415U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420061362.7U CN203701415U (en) 2014-01-29 2014-01-29 Manufacturing equipment for steel mesh frame wall body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420061362.7U CN203701415U (en) 2014-01-29 2014-01-29 Manufacturing equipment for steel mesh frame wall body

Publications (1)

Publication Number Publication Date
CN203701415U true CN203701415U (en) 2014-07-09

Family

ID=51051871

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420061362.7U Expired - Fee Related CN203701415U (en) 2014-01-29 2014-01-29 Manufacturing equipment for steel mesh frame wall body

Country Status (1)

Country Link
CN (1) CN203701415U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104164943A (en) * 2014-09-10 2014-11-26 万保金 Efficient, green and heat-preservation wall molding equipment
CN107552690A (en) * 2017-09-13 2018-01-09 河北森阳建筑设备科技有限公司 The joint bar device angle station of rack welding machine

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104164943A (en) * 2014-09-10 2014-11-26 万保金 Efficient, green and heat-preservation wall molding equipment
CN107552690A (en) * 2017-09-13 2018-01-09 河北森阳建筑设备科技有限公司 The joint bar device angle station of rack welding machine

Similar Documents

Publication Publication Date Title
CN203679545U (en) Automatic welding machine for numerical control radiator
CN103864318B (en) Vertical hollow glass production line numerical control big or small slice glass closes sheet locating device
CN203701415U (en) Manufacturing equipment for steel mesh frame wall body
CN103331540B (en) Clamping tool for welding rectangular guardrail tubes and suspension loops of medical bed
CN203863203U (en) Base for welding and correction of steel structure
CN203610813U (en) Automatic welding device for solar junction box
CN104014913A (en) Dual-purpose seat for welding and correcting steel structure
CN208696666U (en) A kind of rack spot welding device
CN201120522Y (en) Automatic ear handle jointing machine for jointing branch ear on metal container
CN202639721U (en) Automatic welding machine for vertical post of metal furniture
CN204524489U (en) A kind of mobile device of selective spraying machine
CN218461143U (en) Novel automatic submerged arc welding fixture for corrugated steel web curve
CN107553026A (en) A kind of double-pendulum arms simulate human weld's device
CN209256198U (en) The apparatus for welding and positioning of hollow frame
CN111002280A (en) Curtain unit plate processing and assembling platform
CN203738986U (en) Improved flue duct vibration casting machine
CN207414612U (en) The continuous bonding machine of steel plate wall side pipe
CN108406188A (en) A kind of sewing machine base holder special welding machine
CN102085594B (en) Automatic netting four-taper-sleeve welding machine and automatic welding method thereof
CN201614690U (en) Manufacture equipment for steel wire mesh frame wall body
CN203726139U (en) Net rack plate welding device
CN103817531A (en) Rack plate welding device
CN104552983B (en) Layer paving device and layer paving method for main girder glass fiber cloth used for wind power blade production
CN217514543U (en) Automatic stretching mechanical equipment for plastic pipes
CN203752296U (en) Absorption-type square-outside and circular-inside flue gas channel maker

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140709