CN203684373U - Equipment for improving urban waterlogging prevention standard and controlling water pollution - Google Patents

Equipment for improving urban waterlogging prevention standard and controlling water pollution Download PDF

Info

Publication number
CN203684373U
CN203684373U CN201320726992.7U CN201320726992U CN203684373U CN 203684373 U CN203684373 U CN 203684373U CN 201320726992 U CN201320726992 U CN 201320726992U CN 203684373 U CN203684373 U CN 203684373U
Authority
CN
China
Prior art keywords
tunnel
main body
urban
pump group
drainage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320726992.7U
Other languages
Chinese (zh)
Inventor
隋军
汪传新
牛樱
陈贻龙
王广华
周建华
李文涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Municipal Engineering Design & Research Institute
Guangzhou Municipal Engineering Design & Research Institute Co Ltd
Original Assignee
Guangzhou Municipal Engineering Design & Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Municipal Engineering Design & Research Institute Co Ltd filed Critical Guangzhou Municipal Engineering Design & Research Institute Co Ltd
Priority to CN201320726992.7U priority Critical patent/CN203684373U/en
Application granted granted Critical
Publication of CN203684373U publication Critical patent/CN203684373U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model provides equipment for improving urban waterlogging prevention standard and controlling water pollution. According to the equipment provided by the utility model, a deep tunnel system is arranged at a position at least 30m under the ground in a main channel direction in a watershed, a plurality of connecting silos are distributed above a main tunnel, the lower end of each connecting silo is communicated with the main tunnel, the upper end of each connecting silo is connected with an urban superficial pollutant intercepting pipeline through a control valve; a drainage pump station is arranged beside the main tunnel, an urban downstream waterway and the urban sewage drainage way; a drain pump group communicates the main tunnel and the urban sewage drainage way through a pipeline; a floodwater drainage pump group communicates the main tunnel with the urban downstream waterway through a pipeline; by utilizing time-spatial distribution of rainfall and scheduling the deep tunnel system, the main tunnel is used as a floodwater drawoff channel to improve the waterlogging prevention standard of the watershed when the rainfall is heavy and is used as a confluence sewage storage pond to play a role in controlling the water pollution when the rainfall is small. According to the equipment provided by the utility model, the drainage main tunnel is constructed in an underground deep space, and thus house removal caused by ground facility construction is avoided, and the investment is reduced.

Description

Improve city prevention waterlogging standard and control the equipment that water pollutes
Technical field
The utility model relates to the method for city waterlogging control and water pollution control, particularly relates to a kind of equipment that can improve prevention waterlogging standard, can effectively control again water pollution.
Background technology
Along with the expansion in city and the increasing of construction density, hardened ground rate is more and more high, original reservoir, massif, lake, fish pond are occupied gradually, it is more and more narrow that section is gushed in river, earth's surface water storage, draining and the natural purifying ability in city weaken greatly, add that urban heat land effect causes extreme weather to take place frequently, townsfolk's the security of the lives and property in city water logging and waterlogging serious threat, and waterlogging problem has become a urban water difficult problem.
The high population density and urban construction density strengthen rapidly city surface source pollution load, between flush period, surface flow just rain pollute and the pollution load of overflow (CSO) in combined system area day by day serious, be one of important sources of urban water-body pollution.
The standard of widening river course, building large-scale discharge conduit and can improve Urban Waterlogging, newly-increased build city just rain and combined sewage storage pond be effective water pollution control method, but all can relate to a large amount of housing demolitions and underground utilities migration, invest huge.The complexity of building dense and underground utilities is crowded to be made to improve urban sewerage and drainage standard and improve and cut a dirty system and become abnormal difficult by building shallow-layer subsoil drain.
Utility model content
Main purpose of the present utility model is to provide and a kind ofly not only can have improved city prevention waterlogging standard but also can effectively control the equipment that water pollutes, it can overcome the shortcoming that needs a large amount of housing demolitions in existing Drainage System Construction on the one hand, overcomes on the other hand the shortcoming of existing drainage function singleness.
The utility model object is achieved through the following technical solutions:
A kind of equipment that improves city prevention waterlogging standard and control water pollution, comprise and set up city deep layer tunnel system, deep layer tunnel system comprises main body tunnel, connect vertical shaft and drainage pumping plant, drainage pumping plant is provided with drain pump group and the pump group of drainning off floodwaters, main body tunnel is horizontally placed on urban ground 30m at least below, multiple connection vertical shafts are distributed in main body tunnel upper, the lower end that connects vertical shaft is connected logical with main body tunnel, the upper end that connects vertical shaft is connected with city shallow-layer wastewater interception pipe by control valve, drainage pumping plant is located at by nearly main body tunnel and city underwater and urban sewage water channel, drain pump group is communicated with main body tunnel by pipeline with urban sewage water channel, the pump group of drainning off floodwaters is communicated with main body tunnel by pipeline with city underwater.
Concrete operation method of the present utility model is as follows:
At amount of precipitation hour, open and connect vertical shaft control valve, the combined sewage that exceedes shallow-layer wastewater interception pipe ability enters main body tunnel by connection vertical shaft and regulates and stores, open after the rain drain pump group, the combined sewage in the main body tunnel of regulating and storing is transported to downstream Wastewater Treatment Plant by city underwater and processes.
At amount of precipitation greatly when having exceeded the water drainage standard of basin main stem, open simultaneously and connect vertical shaft control valve and the pump group of drainning off floodwaters, flood enters main body tunnel and is discharged to underwater by the pump group of drainning off floodwaters by connecting vertical shaft from shallow-layer wastewater interception pipe, and main body tunnel is as flood diversion passage.
Compared with prior art, the utlity model has substantive distinguishing features and progress:
Underground deep layer tunnel is used for drainage works by the utility model, on the one hand, utilize the Variation Features of amount of precipitation size, and by the management and running to deep layer tunnel, make tunnel drain off floodwaters and improve prevention waterlogging standard as flood diversion passage when amount of precipitation is large, when amount of precipitation is little, as combined sewage storage pond, controls water and pollute, make a tunnel facility utilize the time difference of rainfall to distribute and have two kinds of functions concurrently, avoided overlapping investment.On the other hand, by outlet tunnel construction, in underground deep layer space, except connecting vertical shaft, to occupy less use extraterrestrial, there is no other ground installations, avoided housing demolition.In basin, existing shallow-layer river course drains off floodwaters too lately, and while there is waterlogging risk, the utility model is using tunnel as the flood diversion passage in basin, effectively prevents that waterlogging from occurring, and can effectively improve the prevention waterlogging standard in basin.
Brief description of the drawings
Fig. 1 is structural scheme of mechanism of the present utility model.
Detailed description of the invention
Below in conjunction with example calculation, the utility model is described in further detail.
Embodiment 1
Basin, Guangzhou, 12.47 square kilometres of basin perimeters, 4.51 kilometers of basin main stems, 2.62 kilometers of upstreams are covered as closed conduit, and 1.89 kilometers, downstream is bright gushing, and enters the Zhujiang River from north orientation Nanhui.In basin, be drainage system system, in basin, combined sewer along the line imports main stem, and rainy season is by combined sewer and main stem water drainage; Main stem is provided with wastewater interception pipe along the line, is provided with and cuts dirty facility in combined sewer outlet.As calculated: existing main stem water conservancy prevention waterlogging standard is 11 years chances, combined sewer municipal drainage standard along the line is 3 years chances, and in basin, arterial drainage pipeline is 0.5 ~ 1 year one chance, and main stem wastewater interception pipe interception ratio along the line is 1.0.5 main interflow canal case year overflow number of times along the line are respectively 68 times, 32 times, 22 times, 37 times, 43 times, approximately 220 tons of COD/ of pollution load of overflow.
With reference to figure 1, adopting the utility model from north orientation south below ground 30m, 1 internal diameter to be set in downstream river course direction is the deep layer main body tunnel 2 of 5.3 meters, along 2 tops, main body tunnel, all the people present is set and connects vertical shaft 3, the lower end that connects vertical shaft 3 is connected logical with main body tunnel 2, the upper end that connects vertical shaft 3 is connected with city shallow-layer wastewater interception pipe 1 by control valve 11, the maximum inbound traffics that all the people present connects vertical shaft 3 are respectively 31m3/s, 4.8 m3/s, 4.8 m3/s, 23 m3/s, and the tunnel system ability of regulating and storing is 6.3 ten thousand steres.
Main body tunnel 2 proximal ends arrange a pumping plant 5, pumping plant 5 is provided with draining shaft 4, the drain pump group 7 being communicated with main body tunnel 2 and the pump group 6 of drainning off floodwaters, drain pump group 7 is communicated with main body tunnel 2 by the emptying pipe 71 being installed in draining shaft 4, the nearly urban sewage water channel of delivery port 8 tops of drain pump group 7, drain pump group 7 abilities are 0.89 m3/s; The pump group 6 of drainning off floodwaters is communicated with main body tunnel 2 by the pipeline 61 that drains off floodwaters being installed in draining shaft 4, downstream river course 9 tops, the nearly city of delivery port of the pump group 6 of drainning off floodwaters, and the pump group of drainning off floodwaters 6 abilities are 48 m3/s.
At amount of precipitation hour, open the control valve 11 connecting on vertical shaft 3, the combined sewage that exceedes shallow-layer wastewater interception pipe 1 ability enters the main body tunnel 2 in deep layer tunnel and regulates and stores by connecting vertical shaft 3, open after the rain drain pump group 7, the combined sewage in the main body tunnel 2 of regulating and storing is transported to downstream Wastewater Treatment Plant by urban sewage water channel 8 and processes.
At amount of precipitation greatly when having exceeded the water drainage standard of basin main stem, open the control valve 11 connecting on vertical shaft 3 and the pump group 6 of drainning off floodwaters simultaneously, flood enters the main body tunnel 2 in deep layer tunnel from shallow-layer wastewater interception pipe 1 by connection vertical shaft 3 and the pump group 6 of being drained off floodwaters is discharged to underwater 9, and main body tunnel 2 is as flood diversion passage.
As calculated: prevention waterlogging standard in main stem basin is brought up to 40 years chances, combined sewer municipal drainage standard along the line is 10 years chances, and in basin, arterial drainage pipeline is 5 years chances; According to 2006 ~ 2012 the rainfall data of totally 7 years calculate, 5 main interflow canal case year overflow number of times along the line significantly reduce, and are respectively 9 times, 6 times, 4 times, 3 times, 7 times, cut down pollution load of overflow 70%, reduce approximately 154 tons of COD/ of pollution load of overflow thing.
Embodiment 2
The present embodiment is another design scheme of embodiment 1, adopting the utility model from north orientation south below ground 30m, 1 internal diameter to be set in downstream river course direction is the deep layer main body tunnel 2 of 7.7 meters, all the people present is set along the line and connects vertical shaft 3, the maximum inbound traffics that all the people present connects vertical shaft 3 are respectively 41 m3/s, 5.2 m3/s, 5.3 m3/s, 26 m3/s, and the tunnel system ability of regulating and storing is 10.6 ten thousand steres.
Main body tunnel 2 proximal ends arrange a pumping plant 5, pumping plant 5 is provided with draining shaft 4, the drain pump group 7 being communicated with main body tunnel 2 and the pump group 6 of drainning off floodwaters, drain pump group 7 is communicated with main body tunnel 2 by the emptying pipe 71 being installed in draining shaft 4, the nearly urban sewage water channel of delivery port 8 tops of drain pump group 7, drain pump group 7 abilities are 1.7 m3/s; The pump group 6 of drainning off floodwaters is communicated with main body tunnel 2 by the pipeline 61 that drains off floodwaters being installed in draining shaft 4, downstream river course 9 tops, the nearly city of delivery port of the pump group 6 of drainning off floodwaters, the pump group of drainning off floodwaters 6 ability 55 m3/s.
At amount of precipitation hour, open the control valve 11 connecting on vertical shaft 3, the combined sewage that exceedes shallow-layer wastewater interception pipe 1 ability enters the main body tunnel 2 in deep layer tunnel and regulates and stores by connecting vertical shaft 3, open after the rain drain pump group 7, the combined sewage in the main body tunnel 2 of regulating and storing is transported to downstream Wastewater Treatment Plant by urban sewage water channel 8 and processes.
At amount of precipitation greatly when having exceeded the water drainage standard of basin main stem, open the control valve 11 connecting on vertical shaft 3 and the pump group 6 of drainning off floodwaters simultaneously, flood enters the main body tunnel 2 in deep layer tunnel from shallow-layer wastewater interception pipe 1 by connection vertical shaft 3 and the pump group 6 of being drained off floodwaters is discharged to underwater 9, and main body tunnel 2 is as flood diversion passage.
As calculated: prevention waterlogging standard in main stem basin is brought up to 50 years chances, combined sewer municipal drainage standard along the line is 20 years chances, and in basin, arterial drainage pipeline is 10 years chances; According to 2006 ~ 2012 the rainfall data of totally 7 years calculate, 5 main interflow canal case year overflow number of times along the line significantly reduce, and are respectively 7 times, 5 times, 3 times, 2 times, 6 times, cut down pollution load of overflow 89%, reduce approximately 195 tons of COD/ of pollution load of overflow thing.
Embodiment 3
The present embodiment is another design scheme of embodiment 2, adopting the utility model from north orientation south below ground 30m, 1 internal diameter to be set in downstream river course direction is the deep layer main body tunnel of 7.7 meters, all the people present is set along the line and connects vertical shaft 3, the maximum inbound traffics that all the people present connects vertical shaft 3 are respectively 23 m3/s, 4.8 m3/s, 4.8 m3/s, 23 m3/s, the tunnel system ability of regulating and storing is 10.6 ten thousand steres, drain pump group ability 1.7 m3/s, the pump group of drainning off floodwaters ability 48 m3/s.
At amount of precipitation hour, open the control valve 11 connecting on vertical shaft 3, the combined sewage that exceedes shallow-layer wastewater interception pipe 1 ability enters the main body tunnel 2 in deep layer tunnel and regulates and stores by connecting vertical shaft 3, open after the rain drain pump group 7, the combined sewage in the main body tunnel 2 of regulating and storing is transported to downstream Wastewater Treatment Plant by urban sewage water channel 8 and processes.
At amount of precipitation greatly when having exceeded the water drainage standard of basin main stem, open the control valve 11 connecting on vertical shaft 3 and the pump group 6 of drainning off floodwaters simultaneously, flood enters the main body tunnel 2 in deep layer tunnel from shallow-layer wastewater interception pipe 1 by connection vertical shaft 3 and the pump group 6 of being drained off floodwaters is discharged to underwater 9, and main body tunnel 2 is as flood diversion passage.
As calculated: prevention waterlogging standard in main stem basin is brought up to 40 years chances, combined sewer municipal drainage standard along the line is 10 years chances, and in basin, arterial drainage pipeline is 5 years chances; According to 2006 ~ 2012 the rainfall data of totally 7 years calculate, 5 main interflow canal case year overflow number of times along the line significantly reduce, and are respectively 7 times, 5 times, 3 times, 2 times, 6 times, cut down pollution load of overflow 86%, reduce approximately 189 tons of COD/ of pollution load of overflow thing.
Above are only several detailed description of the invention of the present utility model, because water drainage ability difference, basin internal drainage facility difference are gushed in drainage area difference, river, the waterlogging risk existing and pollution problem are also different, in basin, building condition element is also the calculating that affects deep layer tunnel, therefore under the prerequisite without prejudice to the utility model essence and claims scope, can suitably adjust parameters more of the present utility model, to adapt to concrete situation.But design concept of the present utility model is not limited to this, allly utilize this design to carry out the change of unsubstantiality to the utility model, all should belong to the behavior of invading the utility model protection domain.

Claims (1)

1. improve city prevention waterlogging standard and control the equipment that water pollutes, it is characterized in that:
Set up city deep layer tunnel system, deep layer tunnel system comprises main body tunnel, connect vertical shaft and drainage pumping plant, drainage pumping plant is provided with drain pump group and the pump group of drainning off floodwaters, main body tunnel is horizontally placed on urban ground 30m at least below, multiple connection vertical shafts are distributed in main body tunnel upper, the lower end that connects vertical shaft is connected logical with main body tunnel, the upper end that connects vertical shaft is connected with city shallow-layer wastewater interception pipe by control valve, drainage pumping plant is located at by nearly main body tunnel and city underwater and urban sewage water channel, drain pump group is communicated with main body tunnel by pipeline with urban sewage water channel, the pump group of drainning off floodwaters is communicated with main body tunnel by pipeline with city underwater.
CN201320726992.7U 2013-11-18 2013-11-18 Equipment for improving urban waterlogging prevention standard and controlling water pollution Expired - Lifetime CN203684373U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320726992.7U CN203684373U (en) 2013-11-18 2013-11-18 Equipment for improving urban waterlogging prevention standard and controlling water pollution

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320726992.7U CN203684373U (en) 2013-11-18 2013-11-18 Equipment for improving urban waterlogging prevention standard and controlling water pollution

Publications (1)

Publication Number Publication Date
CN203684373U true CN203684373U (en) 2014-07-02

Family

ID=51006296

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320726992.7U Expired - Lifetime CN203684373U (en) 2013-11-18 2013-11-18 Equipment for improving urban waterlogging prevention standard and controlling water pollution

Country Status (1)

Country Link
CN (1) CN203684373U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103669547A (en) * 2013-11-18 2014-03-26 广州市市政工程设计研究院 Method and equipment for raising urban water-logging prevention standard and controlling water pollution
CN105178425A (en) * 2015-09-22 2015-12-23 余姚市人民政府凤山街道办事处 Flood-drainage, water-supplementing and water-changing pump station junction design for cities and towns
CN109505287A (en) * 2019-01-11 2019-03-22 吉林大学 One kind being suitable for Mountainous Area in North China karez formula underground and catchments water delivery water storage gallery
CN110056069A (en) * 2019-04-27 2019-07-26 励土峰 A kind of high pressure flood control sewer drainage system
CN112081212A (en) * 2020-08-11 2020-12-15 宁波水表(集团)股份有限公司 System for preventing and treating urban waterlogging by using underground well
CN114934583A (en) * 2022-06-24 2022-08-23 张云逢 Deep flood regulation and storage well beside underground building

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103669547A (en) * 2013-11-18 2014-03-26 广州市市政工程设计研究院 Method and equipment for raising urban water-logging prevention standard and controlling water pollution
CN105178425A (en) * 2015-09-22 2015-12-23 余姚市人民政府凤山街道办事处 Flood-drainage, water-supplementing and water-changing pump station junction design for cities and towns
CN105178425B (en) * 2015-09-22 2017-03-15 余姚市人民政府凤山街道办事处 Cities and towns water drainage, moisturizing, water-change pump station hinge
CN109505287A (en) * 2019-01-11 2019-03-22 吉林大学 One kind being suitable for Mountainous Area in North China karez formula underground and catchments water delivery water storage gallery
CN109505287B (en) * 2019-01-11 2024-03-12 吉林大学 Underground water collecting, transporting and storing gallery suitable for campaigns in North China mountain area
CN110056069A (en) * 2019-04-27 2019-07-26 励土峰 A kind of high pressure flood control sewer drainage system
CN112081212A (en) * 2020-08-11 2020-12-15 宁波水表(集团)股份有限公司 System for preventing and treating urban waterlogging by using underground well
CN114934583A (en) * 2022-06-24 2022-08-23 张云逢 Deep flood regulation and storage well beside underground building

Similar Documents

Publication Publication Date Title
CN203684373U (en) Equipment for improving urban waterlogging prevention standard and controlling water pollution
CN203188340U (en) Urban drainage system under closure-type comprehensive drainage system
CN103088896B (en) Ecological road shock resistance rainwater utilization system
CN104358302A (en) Treatment method for initial rainwater of separate system
CN103669547A (en) Method and equipment for raising urban water-logging prevention standard and controlling water pollution
CN202416277U (en) Nitrogen and phosphorus intercepting submerged dam for ecological ditch
CN102351376A (en) Riverbank multiple pond wetland waste sewage treatment method and device
CN105951969B (en) A kind of water storage flood drainage system and storage discharge method
CN203080677U (en) Ecological road anti-shocking rainwater utilizing system
CN102976546A (en) Bypass offline river purifying method and purifying system
CN103015517A (en) Intelligently controlled type concave urban rainwater park capable of resisting shocks
CN209686564U (en) A kind of small sponge urban ecology rainwater storage cell system
CN105178425B (en) Cities and towns water drainage, moisturizing, water-change pump station hinge
CN201972229U (en) Residential rainwater comprehensive utilization system device
CN102966165B (en) System for eliminating and reducing urban inland inundation by utilizing adsorption layer of green area and inland inundation eliminating and reducing method
CN108625453A (en) Skyscraper sponge City complex system
CN109958099B (en) Urban river channel rain and flood resource regulation and control system
CN203174745U (en) Vertical rainwater zoned drainage system
CN202730707U (en) Initial-stage rainwater intercepting and shunting as well as later-stage rainwater separating system for flood drainage river channel
CN205012440U (en) Effectively compensate city rainwater pipeline system of groundwater
CN202157297U (en) Gate control type urban rain and flood regulation, control and utilization system
CN207243686U (en) A kind of overpass rain processing system
CN201896357U (en) Automatic sewage purification and drainage device
CN210133988U (en) Urban road rainwater modularization intelligence utilizes system
CN208056238U (en) A kind of ring-type drainage pipeline networks

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 510060 East seat, No. 348 East Ring Road, Guangzhou, Guangdong, Yuexiu District

Patentee after: GUANGZHOU MUNICIPAL ENGINEERING DESIGN & RESEARCH INSTITUTE Co.,Ltd.

Address before: 510060 East seat, No. 348 East Ring Road, Guangzhou, Guangdong, Yuexiu District

Patentee before: GUANGZHOU MUNICIPAL ENGINEERING DESIGN & Research Institute

CP01 Change in the name or title of a patent holder
CP03 Change of name, title or address

Address after: 510060 East seat, No. 348 East Ring Road, Guangzhou, Guangdong, Yuexiu District

Patentee after: GUANGZHOU MUNICIPAL ENGINEERING DESIGN & Research Institute

Address before: 510070 East staircase, No. 348 East Ring Road, Guangzhou, Guangdong

Patentee before: GUANGZHOU MUNICIPAL ENG DESIGN & Research Institute

CP03 Change of name, title or address
CX01 Expiry of patent term

Granted publication date: 20140702

CX01 Expiry of patent term