CN203669468U CN201420002120.0U CN201420002120U CN203669468U CN 203669468 U CN203669468 U CN 203669468U CN 201420002120 U CN201420002120 U CN 201420002120U CN 203669468 U CN203669468 U CN 203669468U
Authority
CN
China
Prior art keywords
buried
floor
floor stand
stand column
welded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420002120.0U
Other languages
Chinese (zh)
Inventor
崔海旗
方斌
邓亚宏
章海波
杨威
宋青春
蔡春良
邓从蓉
王旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Construction Engineering Co Ltd of China Construction Third Engineering Division
Original Assignee
Second Construction Engineering Co Ltd of China Construction Third Engineering Division
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Construction Engineering Co Ltd of China Construction Third Engineering Division filed Critical Second Construction Engineering Co Ltd of China Construction Third Engineering Division
Priority to CN201420002120.0U priority Critical patent/CN203669468U/en
Application granted granted Critical
Publication of CN203669468U publication Critical patent/CN203669468U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model relates to a structure for fixing a floor-stand vertical column. The structure comprises a plurality of steel-bar pre-buried claws, a pre-buried steel plate, and the floor-stand vertical column. The structure is characterized in that one end of each steel-bar pre-buried claw is welded at the bottom of the pre-buried steel plate, and the other end of each steel-bar pre-buried claw is welded with an embedded steel bar in a concrete buttress; and the floor-stand vertical column is welded at the upper part of the pre-buried steel plate. A threaded steel bar is bent and welded under the pre-buried steel plate. The leveling operation of a pre-buried piece is achieved through the welding of the embedded steel bar in the concrete buttress with a threaded pre-buried claw of the pre-buried piece. And then the floor-stand vertical column is connected with the pre-buried steel plate. Four reinforcing wing plates are added in four directions, so as to increase the strength. The structure provided by the utility model solves a problem of the complexity of the leveling operation of the pre-buried piece at a rooting point of a floor stand, improves the connection intensity of the floor-stand vertical column with the pre-buried piece, improves the on-site construction progress, and improves the safety of the floor stand.

Description

Floor stand column fixed structure
Technical field
The utility model relates to a kind of floor stand column fixed structure, is applied in the making and installation process of construction work electromechanical pipeline floor stand, plays the effect of more easily adjusting built-in fitting planeness and reinforced support column and built-in fitting bonding strength.
Background technology
In the making and installation process of construction work electromechanical pipeline floor stand; often can occur, due to the support phenomenon that a built-in fitting planeness not carries out after-treatment of taking root, also can occur because bracket upright post and the spot welding place unbalance stress of taking root cause support to occur quality problems simultaneously.Therefore good embedded part structure and bracket upright post and a built-in fitting type of attachment, can make floor stand that more efficient and safety are installed.
Summary of the invention
The utility model is technology, the quality problems that overcome above-mentioned existence, and a kind of new floor stand column fixed structure is provided, and the utility model is applicable to making and the installation of all kinds of floor stands.
The technical solution of the utility model is:
Floor stand column fixed structure, comprise the pre-buried pawl of some reinforcing bars, pre-embedded steel slab, floor stand column, it is characterized in that: one end of the every pre-buried pawl of reinforcing bar is welded on the bottom of pre-embedded steel slab, bar planting welding in the other end and the concrete buttress of the every pre-buried pawl of reinforcing bar, by the bar planting in concrete buttress, pre-embedded steel slab is carried out to levelling work, after take root a concrete buttress or relevant civil engineering work complete, floor stand column is welded on the top of pre-embedded steel slab.
The utility model also comprises some reinforcement wing plates, and some reinforcement wing plates are divided equally at floor stand column periphery and are welded on floor stand column and pre-embedded steel slab, to increase the stability of floor stand column
The pre-buried pawl of described reinforcing bar is the pre-buried pawl of indented bars.The pre-buried pawl of described indented bars is that indented bars carries out Bending Processing and forms.
The pre-buried pawl of described indented bars and reinforcement wing plate are three or four, and are uniformly distributed.
Before making built-in fitting, need to be according to built-in fitting size, the indented bars of selecting quantity, specification to meet the demands, the pre-buried pawl of indented bars must not be less than three.In the time that floor stand column is connected with pre-embedded steel slab, advanced spot welding, after the verticality of guaranteeing floor stand column can meet the demands, then adds reinforcement wing plate, strengthens the distribution of wing plate and wants evenly, to guarantee stress equalization.
The utility model has solved a floor stand complicated degree for built-in fitting levelling work of taking root, and has strengthened the bonding strength between bracket upright post and built-in fitting simultaneously, has also increased the safety of floor stand in improving site operation progress.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Detailed description of the invention
Structure accompanying drawing is further described the utility model.
As shown in Figure 1, the utility model comprises four pre-buried pawls 1 of indented bars, pre-embedded steel slab 2, strengthen wing plate 3 for four, floor stand column 4, it is characterized in that: four pre-buried pawls 1 of reinforcing bar are uniformly distributed, one end of the every pre-buried pawl 1 of reinforcing bar is welded on the bottom of pre-embedded steel slab 2, bar planting welding in the other end and the concrete buttress of the every pre-buried pawl 1 of reinforcing bar, by the bar planting in concrete buttress, pre-embedded steel slab 2 is carried out to levelling work, after take root a concrete buttress or relevant civil engineering work complete, floor stand column 4 is welded on the top of pre-embedded steel slab 2, four strengthen wing plate 3 divide equally floor stand column 4 peripheries and be welded on floor stand column 4 and pre-embedded steel slab 2 on, to increase the stability of floor stand column 4, the pre-buried pawl of described indented bars is that indented bars carries out Bending Processing and forms.
Work progress of the present utility model is:
Indented bars is carried out to Bending Processing and is welded under pre-embedded steel slab, the levelling work of built-in fitting is carried out in pre-buried pawl 1 welding of indented bars by the bar planting in concrete buttress and built-in fitting, after take root a concrete buttress or relevant civil engineering work complete, again floor stand column 4 is connected with pre-embedded steel slab 2, and add and strengthen wing plate 3 at four direction, reinforcement wing plate 3 carries out full weld with floor stand column 4, pre-embedded steel slab 2 junctions and is connected, to gain in strength.
Before making built-in fitting, need to be according to built-in fitting size, the indented bars of selecting quantity, specification to meet the demands, the pre-buried pawl 1 of indented bars must not be less than three.In the time that floor stand column 4 is connected with pre-embedded steel slab 2, advanced spot welding, after the verticality of guaranteeing floor stand column 4 can meet the demands, then adds reinforcement wing plate 3, strengthens the distribution of wing plate 3 and wants evenly, to guarantee stress equalization.

Claims (5)

1. floor stand column fixed structure, comprise the pre-buried pawl of some reinforcing bars, pre-embedded steel slab, floor stand column, it is characterized in that: one end of the every pre-buried pawl of reinforcing bar is welded on the bottom of pre-embedded steel slab, bar planting welding in the other end and the concrete buttress of the every pre-buried pawl of reinforcing bar, floor stand column is welded on the top of pre-embedded steel slab.
2. floor stand column fixed structure according to claim 1, is characterized in that: also comprise some reinforcement wing plates, some reinforcement wing plates are divided equally at floor stand column periphery and are welded on floor stand column and pre-embedded steel slab.
3. floor stand column fixed structure according to claim 1, is characterized in that: the pre-buried pawl of described reinforcing bar is the pre-buried pawl of indented bars.
4. floor stand column fixed structure according to claim 3, is characterized in that: the pre-buried pawl of described indented bars is that indented bars carries out Bending Processing and forms.
5. according to the floor stand column fixed structure one of claim 1-4 Suo Shu, it is characterized in that: the pre-buried pawl of described indented bars and reinforcement wing plate are three or four, and are uniformly distributed.
CN201420002120.0U 2014-01-02 2014-01-02 Structure for fixing floor-stand vertical column Expired - Lifetime CN203669468U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420002120.0U CN203669468U (en) 2014-01-02 2014-01-02 Structure for fixing floor-stand vertical column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420002120.0U CN203669468U (en) 2014-01-02 2014-01-02 Structure for fixing floor-stand vertical column

Publications (1)

Publication Number Publication Date
CN203669468U true CN203669468U (en) 2014-06-25

Family

ID=50965783

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420002120.0U Expired - Lifetime CN203669468U (en) 2014-01-02 2014-01-02 Structure for fixing floor-stand vertical column

Country Status (1)

Country Link
CN (1) CN203669468U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103726707A (en) * 2014-01-02 2014-04-16 中建三局第二建设工程有限责任公司 Floor stand vertical column fixing structure
CN108005349A (en) * 2017-11-30 2018-05-08 中建六局第三建筑工程有限公司 Leveling method for super large ultra-flat terrace built-in fitting
CN109612449A (en) * 2018-11-26 2019-04-12 中国二冶集团有限公司 A kind of measurement control stake
CN115288372A (en) * 2022-08-19 2022-11-04 中交第四公路工程局有限公司 Sound insulation and vibration reduction overhead stone roof structure and construction method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103726707A (en) * 2014-01-02 2014-04-16 中建三局第二建设工程有限责任公司 Floor stand vertical column fixing structure
CN108005349A (en) * 2017-11-30 2018-05-08 中建六局第三建筑工程有限公司 Leveling method for super large ultra-flat terrace built-in fitting
CN109612449A (en) * 2018-11-26 2019-04-12 中国二冶集团有限公司 A kind of measurement control stake
CN115288372A (en) * 2022-08-19 2022-11-04 中交第四公路工程局有限公司 Sound insulation and vibration reduction overhead stone roof structure and construction method

Similar Documents

Publication Publication Date Title
CN103882813B (en) For calf support platform and the building method thereof of bridge pier and straining beam synchronous construction
CN203669468U (en) Structure for fixing floor-stand vertical column
CN103866697B (en) A kind of bridge pier and straining beam calf support method for synchronously constructing
CN204298825U (en) Foundation ditch builds elephant trunk supporting and regulating device
CN105040968A (en) Device and method for supporting inclined high, large, empty and thin-walled reinforced concrete wall form
CN202937005U (en) Cast-in-situ concrete beam lateral template reinforcement device
CN202117074U (en) Foundation bed steel structure for positioning and mounting base of tower crane
CN202227590U (en) Column rib locator for reinforced concrete column
CN203834926U (en) Formwork erecting structure for bare concrete basement exterior wall
CN105317052A (en) Tower crane foundation bolt fixing method
CN104233961B (en) A kind of supporting shelf bracket of No. 0 block of cantilever bridge
CN103726707A (en) Floor stand vertical column fixing structure
CN203891462U (en) Form erecting device for fair-faced concrete independent columns
CN206408951U (en) A kind of architectural industrialization project conversion layer position level ladder muscle
CN209585576U (en) Overhanging scaffold
CN205259618U (en) Cast -in -place floor gauge control device of concrete
CN102926537A (en) Method and device for fixing root of external wall formwork
CN202031309U (en) Suspending operation platform for structural concrete constructions
CN103195079B (en) Installing type template, installing type template group and complete installing type plate device
CN103882868A (en) Single-side formwork erecting structure for enclosing purlin in cast-in-pace pile enclosing protection and constructing method
CN205224420U (en) Anticorrosive industry factory building precast concrete stand
CN203782716U (en) Unilateral template support structure of circuit purlin in cast-in-place pile support
CN204875544U (en) T type roof beam pterygoid lamina reinforcing bar fetal membrane
CN204530479U (en) The interim counter-force bracing or strutting arrangement of a kind of bridge jacking
CN204185062U (en) U-shaped guide rail bracket of elevator

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20140625