CN203668938U - Post grouting side wall grouting and guniting annular valve structure - Google Patents

Post grouting side wall grouting and guniting annular valve structure Download PDF

Info

Publication number
CN203668938U
CN203668938U CN201320896169.0U CN201320896169U CN203668938U CN 203668938 U CN203668938 U CN 203668938U CN 201320896169 U CN201320896169 U CN 201320896169U CN 203668938 U CN203668938 U CN 203668938U
Authority
CN
China
Prior art keywords
grouting
annular valve
valve body
guniting
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320896169.0U
Other languages
Chinese (zh)
Inventor
刘建茂
房立兴
康宪泉
李银
闫洪文
魏海玲
高峰
田伟坡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Bochuan Geotechnical Engineering Co ltd
Tianjin Survey And Design Institute Group Co ltd
Original Assignee
TIANJIN BOCHUAN GEOTECHINCAL ENGINEERING Co Ltd
Tianjin Institute Of Geotechnical Investigation & Surveying
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN BOCHUAN GEOTECHINCAL ENGINEERING Co Ltd, Tianjin Institute Of Geotechnical Investigation & Surveying filed Critical TIANJIN BOCHUAN GEOTECHINCAL ENGINEERING Co Ltd
Priority to CN201320896169.0U priority Critical patent/CN203668938U/en
Application granted granted Critical
Publication of CN203668938U publication Critical patent/CN203668938U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Check Valves (AREA)

Abstract

The utility model discloses a post grouting side wall grouting and guniting annular valve structure which comprises a valve body communicated with the bottom end of each grouting pipe. The valve body is annular. The annular valve body is composed of a flexible pipe and is made of a PVC pipe with reinforcing bars or a PVC pipe with steel wires. The annular valve body is connected with tee joints with the number and the positions identical to those of the grouting pipes. An elbow is connected between each tee joint and the corresponding grouting pipe. Multiple guniting holes are evenly distributed in the outer wall of the annular valve body in the circumferential direction. Each guniting hole is provided with a sealing rubber ring. The annular valve can contract or expand and the post grouting side wall grouting and guniting annular valve structure has the advantages that manufacture and installation are simple and convenient, a steel reinforcement cage is easy to place, grouting valves are well attached to the hole walls, concrete is gunited evenly, the sealing performance is good, the grouting valves can be opened easily in the guniting process, and the effect is good in actual application.

Description

The rear mud jacking side wall grouting annular valve arrangement of whitewashing
Technical field
The utility model relates to a kind of parts of realizing castinplace pile post grouting process, relates in particular to a kind of valve body structure that is arranged on grout outlet.
Background technology
Castinplace pile Post Grouting Technique is to certain hour after bored pile piling, by the stake end, the stake side grouting valve injected water mud that are preset in the grouting pipe in pile body and be attached thereto, be that the stake end stake side soil body (comprising sediment and mud skin) is reinforced, thereby improve bearing capacity of single pile, reduce sedimentation.Can play the effect of two aspects: the one, reinforce pile bottom sediment and stake sidewall mud skin; The 2nd, the soil body at the bottom of stake and in stake side certain limit is played to reinforcement effect by infiltrating (coarse-grained soil), splitting (fine grained soils) and densification (unsaturation loose ground) slip casting, thereby strengthen pile side resistance and end resistance.At present, the basic technology of pile-end post-grouting and slip casting is comparatively ripe, and Grouting Pipe is fixed on reinforcing cage, and grout outlet adopts 30~50cm in one-way throttle valve pressure pile subsoil.Adopt one-way throttle valve to make grout outlet, carry out pile concrete while building slurries can not pour in valve, slip casting also can not reflux slurries, slip casting success rate reaches more than 97%, and pressure is relatively stable, slip casting effect is remarkable.
Rear mud jacking technique is widely used in diaphragm wall and bored pile now, can effectively play and reduce stake side mud skin and sediment of the hole bottom negative interaction, can promote pile side friction and bearing capacity of pile tip simultaneously, thereby reach raising pile capacity, reduce the effect of cost, rear mud jacking bored pile is as the improvement stake type of bored pile, be widely used at present in highrise building, rear mud jacking technique is mainly pile end grouting and stake side wall grouting and combining form thereof, the valve body that is arranged on grout outlet is the critical piece that is applied to rear mud jacking technique, and the slip casting of stake side is as the technique that further develops of post grouting process, its grouting valve structure also constantly grope improve in.
Utility model content
For above-mentioned prior art, the utility model provide a kind of after the mud jacking side wall grouting annular valve arrangement of whitewashing, possess that fabrication and installation are easy, reinforcing cage is easily laid, grouting valve and hole wall stickiness is good, whitewashing evenly, the advantage such as easily open in good airproof performance, whitewashing, can receive in actual applications good effect.
In order to solve the problems of the technologies described above, the mud jacking side wall grouting annular valve arrangement of whitewashing after the utility model one, comprise the valve body being communicated with Grouting Pipe bottom, described valve body is annular valve body, described annular valve body is formed by flexible pipe, connects the threeway consistent with Grouting Pipe quantity and position difference on described annular valve body, between described threeway and described Grouting Pipe, is connected with elbow, on the lateral wall of described annular valve body, be uniformly distributed circumferentially multiple gunniting holes, each gunniting hole is provided with sealing rubber ring.
The mud jacking side wall grouting annular valve arrangement of whitewashing after the utility model, wherein, described annular valve body adopts reinforcement pvc pipe to make or adopts steel wire pvc pipe to make.
Compared with prior art, the beneficial effects of the utility model are: the utility model annular plate valve is that flexible material is made, collapsible or spreading, possess that fabrication and installation are easy, reinforcing cage is easily laid, grouting valve and hole wall stickiness is good, whitewashing evenly, the advantage such as easily open in good airproof performance, whitewashing, can receive in actual applications good effect.
Accompanying drawing explanation
Fig. 1 is provided with the whitewash pile body schematic diagram of annular valve arrangement of mud jacking side wall grouting after the utility model;
Fig. 2 is the sectional drawing of annular valve body installment state shown in A-A position in Fig. 1;
Fig. 3 is the sectional drawing of annular valve body open configuration shown in A-A position in Fig. 1;
Fig. 4 is I portion structure enlarged drawing in Fig. 3.
In figure: 1-Grouting Pipe, 2-reinforcing bar, 3-annular valve body, 4-threeway, 5-elbow, 6-gunniting hole, 7-rubber seal.
The specific embodiment
Below in conjunction with the specific embodiment, the utility model is described in further detail.
The mud jacking side wall grouting annular valve arrangement of whitewashing after the utility model one, comprise the valve body being communicated with Grouting Pipe 1 bottom, described valve body is annular valve body 3, described annular valve body 3 is formed by flexible pipe, on described annular valve body 3, connect the threeway 4 consistent with Grouting Pipe 1 quantity and position difference, between described threeway 4 and described Grouting Pipe 1, be connected with elbow 5, be uniformly distributed circumferentially multiple gunniting holes 6 on the lateral wall of described annular valve body 3, each gunniting hole 6 is provided with sealing rubber ring 7.
The utility model annular plate valve is transformed from material and structure compared with traditional grouting valve.First, the material of annular valve body 3 adopts reinforcement pvc pipe or steel wire pvc pipe material, and fabrication and installation are very easy, and greatly cost-saving; Secondly, annular valve body 3 steel soft and Ji, in the installation course of installation annular plate valve and reinforcing cage (having reinforcing bar 2 to form), this annular valve body 3 is in contraction state, as shown in Figure 2, therefore, in reinforcing cage installation course, can not produce owing to causing grouting valve structural failure or reinforcing cage to lay difficult problem to scratching of stake hole, in filling concrete process, under the effect of filling concrete pressure, after this annular valve body 3 is fully expanded, fit tightly hole wall, as shown in Figure 3, greatly promoted slip casting effect; Again, it is on annular valve body 3, to be uniformly distributed gunniting hole 6 that the structure of stake sidewall sprinkler is changed into, and on gunniting hole 6, be provided with high-tension rubber seal 7, as shown in Figure 4, therefore in installation course, gunniting hole 6 is closed state, thereby guarantee the seal before slip casting, when slip casting, break through gunite after sealing by fluid pressure.
Although the utility model is described in conjunction with figure above; but the utility model is not limited to the above-mentioned specific embodiment; the above-mentioned specific embodiment is only schematic; rather than restrictive; those of ordinary skill in the art is under enlightenment of the present utility model; in the situation that not departing from the utility model aim, can also make a lot of distortion, within these all belong to protection of the present utility model.

Claims (3)

1. the mud jacking side wall grouting annular valve arrangement of whitewashing after a kind, comprise the valve body being communicated with Grouting Pipe (1) bottom, it is characterized in that, described valve body is annular valve body (3), described annular valve body (3) is formed by flexible pipe, the threeway (4) that the upper connection of described annular valve body (3) is consistent with Grouting Pipe (1) quantity and position difference, between described threeway (4) and described Grouting Pipe (1), be connected with elbow (5), multiple gunniting holes (6) on the lateral wall of described annular valve body (3), are uniformly distributed circumferentially, each gunniting hole (6) is provided with sealing rubber ring (7).
According to claim 1 after the mud jacking side wall grouting annular valve arrangement of whitewashing, it is characterized in that, described annular valve body (3) adopts reinforcement pvc pipe to make.
According to claim 1 after the mud jacking side wall grouting annular valve arrangement of whitewashing, it is characterized in that, described annular valve body (3) adopts steel wire pvc pipe to make.
CN201320896169.0U 2013-12-30 2013-12-30 Post grouting side wall grouting and guniting annular valve structure Expired - Lifetime CN203668938U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320896169.0U CN203668938U (en) 2013-12-30 2013-12-30 Post grouting side wall grouting and guniting annular valve structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320896169.0U CN203668938U (en) 2013-12-30 2013-12-30 Post grouting side wall grouting and guniting annular valve structure

Publications (1)

Publication Number Publication Date
CN203668938U true CN203668938U (en) 2014-06-25

Family

ID=50965254

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320896169.0U Expired - Lifetime CN203668938U (en) 2013-12-30 2013-12-30 Post grouting side wall grouting and guniting annular valve structure

Country Status (1)

Country Link
CN (1) CN203668938U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105926589A (en) * 2016-06-07 2016-09-07 中交第二航务工程局有限公司 Steel pipe pile applicable to coral reef geology and grouting method of steel pipe pile
CN107882020A (en) * 2017-11-24 2018-04-06 苏州枫石堂工程科技有限公司 A kind of Trees with Small Diameters pile construction method and cleaning grouting device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105926589A (en) * 2016-06-07 2016-09-07 中交第二航务工程局有限公司 Steel pipe pile applicable to coral reef geology and grouting method of steel pipe pile
CN105926589B (en) * 2016-06-07 2017-12-05 中交第二航务工程局有限公司 It is adapted to the steel-pipe pile and its grouting method of coral reef geology
CN107882020A (en) * 2017-11-24 2018-04-06 苏州枫石堂工程科技有限公司 A kind of Trees with Small Diameters pile construction method and cleaning grouting device

Similar Documents

Publication Publication Date Title
CN103741683B (en) A kind of pouch expands end rigid-flexible mechanical arm and construction method
CN102828509B (en) Joint grouting method from bottom and side of prestressed pipe pile
CN101761345A (en) Reinforcement device for tunnel top soil and construction method thereof
CN104389314A (en) Grouting reinforcement device and method for shallow clay
CN201883435U (en) Preburied pipe pile grouting device
CN103669346A (en) Sleeve valve pipe and application to landslide control
CN203639903U (en) Side friction enhancement type precast tube pile structure
CN204000838U (en) The anti-Flow Structure Around of diaphragm wall capsule-type
CN204959737U (en) Stake of drilling extrusion pressure -bearing type bag formula branch
CN105804083A (en) Grouting pipeline device, conical special-shaped pile and application method thereof
CN203668938U (en) Post grouting side wall grouting and guniting annular valve structure
CN206845195U (en) A kind of tunnel grouting device
CN101793027B (en) Core-grouted static pressure anchor rod pile
CN203270584U (en) One-way intercepting grouting head for grouting
CN203533005U (en) Prestressed steel-concrete composite pressure jacking pipe
CN210151660U (en) Embedded concrete antiskid tenon grout stone retaining wall
CN104452746A (en) Construction method for bored pile
CN204311454U (en) A kind of pile end concrete placing device for foundation construction
CN206521773U (en) Tapered end leak plugging structure after a kind of prestressed anchor cable stretching
CN203834469U (en) Bag bottom expansion rigid and flexible combined pile
CN204080796U (en) Injection forming Variable Section Steel pile tube expands crowded device
CN201635072U (en) Centrally grouted static-pressured anchor pile former
CN103270903B (en) Ecological planting device
CN105332716A (en) Adaptive lining structure capable of bearing simultaneous actions of high internal and external water
CN204570705U (en) Three-dimensional post jacking structure is held in a kind of artificial grouting layer method stake

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 300191 No. 428 Hongqi South Road, Tianjin, Nankai District

Patentee after: Tianjin survey and Design Institute Group Co.,Ltd.

Patentee after: TIANJIN BOCHUAN GEOTECHNICAL ENGINEERING CO.,LTD.

Address before: 300191 No. 428 Hongqi South Road, Tianjin, Nankai District

Patentee before: TIANJIN INSTITUTE OF GEOTECHNICAL INVESTIGATION & SURVEYING

Patentee before: TIANJIN BOCHUAN GEOTECHNICAL ENGINEERING Co.,Ltd.

CP01 Change in the name or title of a patent holder
CX01 Expiry of patent term

Granted publication date: 20140625

CX01 Expiry of patent term