CN203640227U - Mounting structure of floor construction waste collection passage - Google Patents

Mounting structure of floor construction waste collection passage Download PDF

Info

Publication number
CN203640227U
CN203640227U CN201320775856.7U CN201320775856U CN203640227U CN 203640227 U CN203640227 U CN 203640227U CN 201320775856 U CN201320775856 U CN 201320775856U CN 203640227 U CN203640227 U CN 203640227U
Authority
CN
China
Prior art keywords
floor
mounting structure
building
building waste
passage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320775856.7U
Other languages
Chinese (zh)
Inventor
冼二启
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FOSHAN NANHAI BAODA CONSTRUCTION MACHINERY EQUIPMENT CO LTD
Original Assignee
FOSHAN NANHAI BAODA CONSTRUCTION MACHINERY EQUIPMENT CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FOSHAN NANHAI BAODA CONSTRUCTION MACHINERY EQUIPMENT CO LTD filed Critical FOSHAN NANHAI BAODA CONSTRUCTION MACHINERY EQUIPMENT CO LTD
Priority to CN201320775856.7U priority Critical patent/CN203640227U/en
Application granted granted Critical
Publication of CN203640227U publication Critical patent/CN203640227U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Floor Finish (AREA)

Abstract

A mounting structure of a floor construction waste collection passage comprises a passage body and a truss used for fixing the passage body. The truss is assembled on a building floor. The mounting structure is characterized in that a gap is reversed between the inner side of one side, close to the building floor, of the passage body and a longitudinal tangent plane of the building floor to form an unimpeded operation space. The truss is detachably assembled on the building floor, the inner side of the passage body is provided with an entrance allowing construction waste to enter, and a dodge door is hinged above the entrance. The mounting structure has the advantages that the mounting structure is simple and firm in structure, low in manufacturing cost and convenient for mounting or demounting, construction waste is conveyed to ground under the action of own gravity through the vertical passage in floor-upon-floor connection by means of pipelines, so that electricity is not needed, and time and labor are saved. Surface treatment operations of building floors are effectively solved, the unimpeded space is formed, and safety and reliability are achieved. Therefore, the mounting structure is superior technically and economically.

Description

The mounting structure of floor building waste cleaning passage
[technical field]
The utility model is usually directed to a kind of mounting structure of floor building waste cleaning passage.
[background technology]
The construction business of China is in development fast, the process of urbanization is rised sheer from level ground high buildings and large mansions in blocks, the construction requirement of building also can be more and more higher, to fast, and energy-conserving and environment-protective, low cost future development, and the cleaning of the rubbish of existing each floor, be all with little trolley one car car be carried to after the bottom by construction elevator, then focus on, time-consuming, effort; And take again electric.In order to address this problem, some garbage shafts are there are, as Chinese utility model patent document (CN02238257.7) discloses a kind of suspended construction garbage channel, comprise several reverse frustoconic cylinders, the reverse frustoconic cylinder of several sidewall band garbage inlets and the steel chain being serially connected, this suspended construction garbage channel is provided with suspension arrangement, its one end is fixedly connected with the reverse frustoconic cylinder of reverse frustoconic cylinder or sidewall band garbage inlet, and the other end is fixedly connected with building.These two adjacent cylinder coincidence part position gap locations are provided with flexible seal device, the inwall of cylinder is longitudinally provided with uniform reinforcing rib, its outer wall is along the circumferential direction provided with several cyclic reinforcing rib, internal and external walls and inwall waling are longitudinally all stepped, this sidewall is provided with elastic packing check apron with the reverse frustoconic cylinder of garbage inlet in the barrel entrance of garbage inlet, and this garbage shaft top unit cylinder suitable for reading is provided with semiclosed shape rubbish and throws in safe enclosing.This structure installation and removal complicated operation, and in the time construction floor being carried out to the operation of surfacing (as criticized wall or surperficial patch block or whitewashing), garbage shaft is deposited obstruction with building the distance of building flooring, can not carry out smoothly aforesaid operations, need to split out garbage shaft and just can operate; Also having a kind of way is exactly the distant place that garbage shaft is arranged at flooring, can carry out empty avoiding, but mounting structure is stressed large, and safety is affected, and is also unfavorable for operation.
For above-mentioned situation, we have developed a kind of mounting structure of floor building waste cleaning passage.
[utility model content]
The purpose of this utility model technical problem to be solved is the mounting structure that a kind of floor building waste cleaning passage will be provided, and it possesses simple in structure, firm, low cost of manufacture, it is convenient to install or remove, the vertical channel joining layer by layer with pipe method, by building waste by himself gravity transfer to floor ground, therefore, do not need electricity consumption, and save time, laborsaving etc. advantage, solves the surface treatment operations of construction floor effectively, form expedite space, safe and reliable.Therefore, it all has superior performance in technical and economy.
The utility model will solve the technical scheme that its technical problem adopts: a kind of mounting structure of floor building waste cleaning passage, comprise passage body and the roof beam structure for fixing described passage body, described roof beam structure is assembled on building floor, it is characterized in that: described passage body exists gap near inner side edge and the longitudinal tangent plane of described building floor of described building floor one side, to form expedite operating space.
As further preferred version of the present utility model, described roof beam structure is removably assembled on described building floor, and described passage body inner side is provided with the entrance entering for building waste, the hinged dodge gate in described entrance top.
As further preferred version of the present utility model, described roof beam structure comprises two girders that be arranged in parallel, and described girder is provided with connection sole, and described connection sole is also fixed on described building floor by spiro connection structure.
As further preferred version of the present utility model, described gap is 50mm to 1000mm.
As further preferred version of the present utility model, described gap is 200mm.
As further preferred version of the present utility model, described girder is made up of rectangular steel pipe, described spiro connection structure comprises the adjusting seat that is fixedly arranged on building floor, is provided with adjusting bolt in adjusting seat, and described adjusting bolt screws tight fixing with the described sole that is connected by nut.
As further preferred version of the present utility model, described girder is provided with the operating mechanism for adjusting described gap length, described operating mechanism comprises the control stick being placed in described girder, be connected in the pressing plate of described control stick one end, the described control stick other end is provided with handgrip, is provided with thread segment near the control stick of described handgrip; Be located at the head plate at described girder two ends, on described head plate, be installed with adjusting nut, described thread segment rotates to realize stretching out or retracting of described pressing plate in described adjusting nut.
As further preferred version of the present utility model, be positioned at described entrance front and be provided with the plate of filling a vacancy, described in the plate of filling a vacancy be installed on described girder.
The utility model is compared produced beneficial effect with background technology:
Because the utility model has adopted above-mentioned technical scheme, due to the existence of this operating space, carry out building surface while operating to site operation, can be by means of operating space, can realize operation (as criticized wall or surperficial patch block or whitewashing) not interrupted, no longer need to remove passage body and just operate, and passage body can be relatively close to building floor, installation and removal is convenient, safe and reliable.
[brief description of the drawings]
Fig. 1 is that the mounting structure of floor building waste cleaning passage in the utility model embodiment launches schematic diagram;
Fig. 2 is the structural representation of the face of overlooking of Fig. 1;
Fig. 3 is the mounting structure schematic perspective view of floor building waste cleaning passage in the utility model embodiment;
Fig. 4 is the operating mechanism configuration diagram of floor building waste cleaning passage in the utility model embodiment.
[detailed description of the invention]
Describe embodiment of the present utility model below in detail, described embodiment example is shown in the drawings, and wherein same or similar label represents same or similar element or has the element of identical or similar functions from start to finish.Be exemplary below by embodiment is described with reference to the drawings, be intended to explain the utility model, and can not be interpreted as restriction of the present utility model.
In description of the present utility model, it should be noted that, for the noun of locality, if any term " " center ", " laterally ", " longitudinally ", " length ", " width ", " thickness ", " on ", D score, " front ", " afterwards ", " left side ", " right side ", " vertically ", " level ", " top ", " end ", " interior ", " outward ", " clockwise ", indicating positions such as " counterclockwise " and position relationship are based on orientation shown in the drawings or position relationship, only for the ease of narration the utility model and simplified characterization, instead of device or the element of instruction or hint indication must have specific orientation, with particular orientation structure and operation, can not be interpreted as limiting concrete protection domain of the present utility model.
In addition,, and can not be interpreted as instruction or hint relative importance or implicit indicate the quantity that technology thing is levied only for describing object if any term " first ", " second ".Thus, be limited with that " first ", " second " feature can be expressed or implicit one or more this feature that comprises, in the utility model is described, the implication of " multiple " is two or more, unless otherwise expressly limited specifically.
In the utility model, except as otherwise clearly specifying and limiting, should go to understand as broad sense if any terms such as term " assembling ", " being connected ", " connection ", " fixing ", for example, can be to be fixedly connected with, can be also to removably connect, or connect integratedly; Also can be mechanical connection, can be also electrical connection; Can be to be directly connected, can be to be also connected by intermediary, can be that two element internals are connected.For those of ordinary skills, can understand as the case may be the concrete meaning of above-mentioned term in the utility model.
In utility model, unless otherwise prescribed and limit, First Characteristic Second Characteristic it " on " or D score can comprise that the first and second features directly contact, also can comprise that the first and second features are not directly contacts but by the other feature contact between them.And, First Characteristic Second Characteristic " on ", " under " and " above " comprise the and levy directly over Second Characteristic and oblique upper, or be only to represent the height of First Characteristic level height higher than Second Characteristic.First Characteristic Second Characteristic " on ", " under " and " below " comprise First Characteristic under Second Characteristic or tiltedly, or only represent that First Characteristic level height is lower than Second Characteristic.
Below in conjunction with accompanying drawing, by detailed description of the invention of the present utility model is further described, make the technical solution of the utility model and beneficial effect thereof clearer, clear and definite.
Please refer to shown in accompanying drawing 1-4, its preferred embodiment providing for the utility model is a kind of mounting structure 100 of floor building waste cleaning passage, comprise passage body 110 and the roof beam structure 120 for fixing described passage body, described roof beam structure 120 is assembled on building floor 130, there is clearance D near the inner side edge 111 of described building floor 130 1 sides with the longitudinal tangent plane of described building floor in described passage body 110, to form expedite operating space 140.
Due to the existence of this operating space 140, carry out building surface while operating to site operation, can be by means of operating space 140, can realize operation (as criticized wall or surperficial patch block or whitewashing) not interrupted, no longer needing to remove passage body 110 just operates, and passage body 110 can be relatively close to building floor 130, installation and removal is convenient, safe and reliable.
In above-mentioned example, can root Ju difference need, can select separately or combine selection, be increased to the technical scheme in above-mentioned enforcement and produce technique effect in suitable mode, as follows:
Described roof beam structure 120 is removably assembled on described building floor 130.Can be specially: described roof beam structure 120 comprises two girders 121 and 122 that be arranged in parallel, be connected on the first crossbeam 123 of described girder, described girder 121 and 122 is provided with and is connected sole 124, and described connection sole 124 is also fixed on described building floor 130 by spiro connection structure 160.Dismountable like this mode, is convenient to change between different floors or different building site, can Reusability, and also durable in use.Effectively save the acquisition cost of the equipment of construction.Described passage body 110 inner sides are provided with the entrance 150 entering for building waste, the described entrance 150 hinged dodge gates 151 in top.When cleaning building waste, open dodge gate 151, clean out rear hinged dodge gate 151 and automatically close.
Described clearance D is 50mm to 1000mm.But can preferably adopt clearance D is 200mm.Like this, passage body 110 is near building floor 130, and than being easier to operate stationary conduit body 110, roof beam structure 120 stretches out the shorter of building floor 130, and moment is little, and therefore, that can further save roof beam structure 120 uses material cost, just can meet mechanics designing requirement.
Described girder 121 and 122 can be made up of rectangular steel pipe.Material highly versatile, cost is low, and stable mechanical property.Described spiro connection structure 160 comprises the adjusting seat 161 that is fixedly arranged on building floor, is provided with adjusting bolt 162 in adjusting seat 161, and described adjusting bolt 162 screws tight fixing with the described sole 124 that is connected by nut 163.Upper-lower position can be adjusted according to different installation requirements,
As shown in Figures 3 and 4, described girder 121 is for adjusting the operating mechanism 170 of operating space 140 sizes, described operating mechanism 170 comprises the control stick 171 being placed in described girder, be connected in the pressing plate 172 of described control stick 171 one end, described control stick 171 other ends are provided with handgrip 173, are provided with thread segment 174 near the control stick of described handgrip 173; Be located at the head plate 175 at described girder 121 two ends, on described head plate 175, be installed with adjusting nut 176, described thread segment 174 in the interior rotation of described adjusting nut 176 to realize stretching out or retracting of described pressing plate 172.Be positioned at described entrance 150 fronts and be provided with the plate 180 of filling a vacancy, described in the plate 180 of filling a vacancy be installed on described girder 121.
When use, only need manipulating handgrip 173, drive and rotate pressing plate 172, as adjusting nut 176, pressing plate will correspondingly be fixed. when dismounting, and only need be at in-house operation, unscrew adjusting nut 176,, rotating handgrip, pressing plate 172 is corresponding disengagement just, coordinate tower crane, take off the plate 121 of filling a vacancy, extract girder 121 out, just can be easily by garbage shaft complete removal.
Described passage body 130 can be made up of metal sheet roof covering.Material highly versatile, cost is low, lightweight, easily fixing.Add and can adopt the operation of bending technique finishing type man-hour.Process technology difficulty reduces, and yield rate is high, further cuts down manufacturing cost.
In the description of manual, the description of reference term " embodiment ", " preferably ", " example ", " further concrete example " or " some examples " etc. means specific features, structure, material or the feature in conjunction with this embodiment or example description, be contained at least one embodiment of the present utility model or example, not necessarily refer to identical embodiment or example for the schematic statement of above-mentioned term in this manual.And specific features, structure, material or the feature of description can be with suitable method combination in any one or more embodiment or example.
All can adopt " removably assembling " in manual and " being removably connected " connected mode of screw bolt and nut, or be not limited to aforesaid way, belong to the current techique that those of ordinary skill in the art can be known easily, concrete structure explanation or diagram or principle all can describe in detail, and those of ordinary skill in the art also can understand and apply conversion completely.
By the description of above-mentioned structure and principle; person of ordinary skill in the field is to be understood that; the utility model is not limited to above-mentioned detailed description of the invention; on the utility model basis, adopt the improvement of techniques well known and substitute and all drop on protection domain of the present utility model, should limit it by each claim.

Claims (8)

1. the mounting structure of a floor building waste cleaning passage, comprise passage body and the roof beam structure for fixing described passage body, described roof beam structure is assembled on building floor, it is characterized in that: described passage body exists gap near inner side edge and the longitudinal tangent plane of described building floor of described building floor one side, to form expedite operating space.
2. the mounting structure of floor building waste cleaning passage according to claim 1, it is characterized in that: described roof beam structure is removably assembled on described building floor, described passage body inner side is provided with the entrance entering for building waste, the hinged dodge gate in described entrance top.
3. the mounting structure of floor building waste cleaning passage according to claim 2, it is characterized in that: described roof beam structure comprises two girders that be arranged in parallel, described girder is provided with connection sole, and described connection sole is fixed on described building floor by spiro connection structure.
4. according to the mounting structure of the floor building waste cleaning passage described in claim 1-3 any one, it is characterized in that: described gap is 50mm to 1000mm.
5. the mounting structure of floor building waste cleaning passage according to claim 4, is characterized in that: described gap is 200mm.
6. the mounting structure of floor building waste cleaning passage according to claim 3, it is characterized in that: described girder is made up of rectangular steel pipe, described spiro connection structure comprises the adjusting seat that is fixedly arranged on building floor, be provided with adjusting bolt in adjusting seat, described adjusting bolt screws tight fixing with the described sole that is connected by nut.
7. the mounting structure of floor building waste cleaning passage according to claim 6, it is characterized in that: described girder is provided with the operating mechanism for adjusting described gap length, described operating mechanism comprises the control stick being placed in described girder, be connected in the pressing plate of described control stick one end, the described control stick other end is provided with handgrip, is provided with thread segment near the control stick of described handgrip; Be located at the head plate at described girder two ends, on described head plate, be installed with adjusting nut, described thread segment rotates to realize stretching out or retracting of described pressing plate in described adjusting nut.
8. the mounting structure of floor building waste according to claim 2 cleaning passage, is characterized in that: be positioned at described entrance front and be provided with the plate of filling a vacancy, described in the plate of filling a vacancy be installed on described girder.
CN201320775856.7U 2013-11-30 2013-11-30 Mounting structure of floor construction waste collection passage Expired - Fee Related CN203640227U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320775856.7U CN203640227U (en) 2013-11-30 2013-11-30 Mounting structure of floor construction waste collection passage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320775856.7U CN203640227U (en) 2013-11-30 2013-11-30 Mounting structure of floor construction waste collection passage

Publications (1)

Publication Number Publication Date
CN203640227U true CN203640227U (en) 2014-06-11

Family

ID=50871483

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320775856.7U Expired - Fee Related CN203640227U (en) 2013-11-30 2013-11-30 Mounting structure of floor construction waste collection passage

Country Status (1)

Country Link
CN (1) CN203640227U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105178567A (en) * 2014-08-28 2015-12-23 中建四局第三建筑工程有限公司 Waste treatment passage for high-rise building construction and construction method for waste treatment passage
CN114775954A (en) * 2022-05-06 2022-07-22 中建八局第一建设有限公司 High-efficient rubbish clearance system of super high-rise building thing

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105178567A (en) * 2014-08-28 2015-12-23 中建四局第三建筑工程有限公司 Waste treatment passage for high-rise building construction and construction method for waste treatment passage
CN105178567B (en) * 2014-08-28 2018-02-06 中建四局第三建筑工程有限公司 A kind of high-building construction refuse disposal shaft and construction method
CN114775954A (en) * 2022-05-06 2022-07-22 中建八局第一建设有限公司 High-efficient rubbish clearance system of super high-rise building thing
CN114775954B (en) * 2022-05-06 2023-08-11 中建八局第一建设有限公司 High-efficient rubbish clearance system of super high-rise building

Similar Documents

Publication Publication Date Title
CN107971311A (en) A kind of transport development barrel of cement cleaning plant
CN104525545A (en) Sealing cover for circular pond body of synchronous-rotation reverse hanging membrane structure
CN203640227U (en) Mounting structure of floor construction waste collection passage
CN201065634Y (en) Automatic plastering machine
CN207535712U (en) A kind of buried charging pile
CN103134293B (en) Production line used for drying coal slime
CN103302741B (en) Chassis is built in the rainproof movement of precast bridge concrete
CN205928685U (en) Clear storehouse scale removal robot of intelligence
CN103134289B (en) Production line used for drying coal slime
CN207553159U (en) A kind of environment-friendly sewage well well lid for facilitating installation
CN103148683B (en) Coal slurry-drying production line
CN208104965U (en) A kind of floor tile being laid with blind way road
CN203331220U (en) Rainproof moving pouring trolley for prefabricated bridge concrete
CN115853518A (en) Shield construction method using subway crossover arrangement
CN202611206U (en) Rail type millstone troweling machine
CN204134276U (en) A kind of skimmer device
CN204098224U (en) Detachable concrete prefabricated wall plate structure house
CN212045293U (en) Full precast wallboard concrete placement device
CN209308070U (en) A kind of sleiding form support frame
CN103134287B (en) Drying treatment system of slurry
CN208927686U (en) Band pushes away the mud scraper of mud device
CN103134290B (en) Production line used for drying coal slime
CN207332386U (en) One kind is easy to clean steel-structure factory building
CN208197103U (en) A kind of wallboard pouring molding mold
CN103134285B (en) Drying treatment system of slurry

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140611

Termination date: 20211130

CF01 Termination of patent right due to non-payment of annual fee