CN203635011U - Waste gas dust removal system for petroleum proppant production workshop - Google Patents
Waste gas dust removal system for petroleum proppant production workshop Download PDFInfo
- Publication number
- CN203635011U CN203635011U CN201320819457.6U CN201320819457U CN203635011U CN 203635011 U CN203635011 U CN 203635011U CN 201320819457 U CN201320819457 U CN 201320819457U CN 203635011 U CN203635011 U CN 203635011U
- Authority
- CN
- China
- Prior art keywords
- waste gas
- pipe
- hopper
- exhaust pipe
- discharge pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 239000002912 waste gas Substances 0.000 title claims abstract description 39
- 239000000428 dust Substances 0.000 title claims abstract description 29
- 239000003208 petroleum Substances 0.000 title claims abstract description 15
- 238000004519 manufacturing process Methods 0.000 title abstract description 5
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 19
- 238000004062 sedimentation Methods 0.000 claims description 17
- 239000003795 chemical substances by application Substances 0.000 claims description 13
- 238000005507 spraying Methods 0.000 claims description 11
- 238000004891 communication Methods 0.000 claims description 3
- 230000008676 import Effects 0.000 claims description 3
- 231100000331 toxic Toxicity 0.000 claims description 2
- 230000002588 toxic effect Effects 0.000 claims description 2
- 238000004134 energy conservation Methods 0.000 abstract 1
- 239000002245 particle Substances 0.000 description 4
- 239000007921 spray Substances 0.000 description 4
- 239000007789 gas Substances 0.000 description 3
- 239000011435 rock Substances 0.000 description 3
- 238000009825 accumulation Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 239000000284 extract Substances 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 239000000779 smoke Substances 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 1
- 239000012530 fluid Substances 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000005065 mining Methods 0.000 description 1
- 230000035699 permeability Effects 0.000 description 1
- 239000003209 petroleum derivative Substances 0.000 description 1
Images
Landscapes
- Treating Waste Gases (AREA)
Abstract
The utility model relates to a waste gas dust removal system for a petroleum proppant production workshop. The waste gas dust removal system comprises a waste gas discharge pipe which is provided with a row of dust collectors; an outlet of the waste gas discharge pipe is connected with an upper jet type dust remover; each dust collector comprises a hopper arranged at the lower side of the waste gas discharge pipe; each hopper has a tapered structure which is larger at the upper part and smaller at the lower part; the top of each hopper is provided with an opening, and each hopper is communicated with the interior of the waste gas discharge pipe; waste gas is pushed forward along the flowing direction of the waste gas discharge pipe; the lower part of the inner wall of the waste gas discharge pipe is provided with a baffle arranged at the front sides of the hoppers; the height of the baffle is smaller than the radius of an inner circle of the waste gas discharge pipe; the lower end of each hopper is provided with a blanking pipe which is provided with a blanking valve; and the lower end of each blanking pipe is connected with a dust collecting bag. The waste gas dust removal system is reasonable in design and simple in structure; the dust in the waste gas can be removed and recycled, so that the environment is protected, energy conservation and emission reduction are realized, the production cost of an enterprise is saved, and the waste gas dust removal system is high in practicality and convenient to popularize and apply.
Description
Technical field
The utility model belongs to petroleum propping agent production technical field, relates in particular to a kind of waste gas dedusting system for petroleum propping agent workshop.
Background technology
Petroleum propping agent is again petroleum fracturing propping agent.In the time of petroleum gas deep mining, high clossing pressure deposits of low permeability is after frac treatment, Oil gas-containing rock layer is split, the passage that oil gas forms from crack, collect, now need fluid to inject rock basic unit, to exceed the pressure of formation fracture intensity, make pit shaft generation crack, rock stratum around, form a passage with high laminar flow ability, open for the crack that keeps forming after pressure break, oil gas product can smooth and easy passing through.
At present, the waste gas that petroleum propping agent workshop produces is generally all discharged in atmosphere, has caused so huge atmosphere pollution, and this disagrees with the energy-saving and emission-reduction policy that country advocates, and therefore needs badly and is improved.
Utility model content
The utility model, in order to solve weak point of the prior art, provides a kind of waste gas dedusting system for petroleum propping agent workshop that can collect dust in waste gas.
For solving the problems of the technologies described above, the utility model adopts following technical scheme: for the waste gas dedusting system of petroleum propping agent workshop, comprise exhaust pipe, described exhaust pipe is provided with row's dust collection, and the outlet of exhaust pipe is connected with upper-spraying type deduster; Described each dust collection includes the hopper that is located at exhaust pipe downside, hopper is up big and down small pyramidal structure, hopper open top and with exhaust pipe internal communication, flow direction taking waste gas along exhaust pipe is forward direction, toxic emission inside pipe wall bottom is provided with the baffle plate that is positioned at hopper front side, and the height of baffle plate is less than radius of a circle in exhaust pipe, and hopper lower end is provided with tremie pipe, tremie pipe is provided with baiting valve, and the lower end of tremie pipe is connected with dust bag.
Described upper-spraying type deduster comprises sedimentation basin and is located at the casing of sedimentation basin top, bottom half is uncovered, bottom half level is provided with sparge pipe, the outlet shutoff of sparge pipe, sparge pipe top is provided with row's hole for water spraying vertically, the import of sparge pipe is connected with the high-pressure hose extending in sedimentation basin, high-pressure hose is provided with suction pump, suction pump is driven by variable-frequency motor, the upper left sidepiece of casing is connected with the outlet of exhaust pipe, top, casing right side is provided with blast pipe, and casing top inner wall is by left-to-right interval and be arranged alternately platoon leader's deflection plate and short deflection plate.
Adopt technique scheme, the waste gas that petroleum propping agent workshop is discharged is outwards arranged by exhaust pipe, first stopping through baffle plate, heavier particle is fallen in hopper, in the time that the dust accumulation in hopper is more, open baiting valve, be discharged in dust bag and be recycled.Now in waste gas, also have some dust, waste gas is entered in casing by the left upper portion of casing, variable-frequency motor drives suction pump, the clear water that suction pump extracts sedimentation basin internal upper part upwards sprays by the hole for water spraying on sparge pipe, under the stopping of long deflection plate and short deflection plate, the flow velocity of waste gas slows down, air-flow fluctuates in casing more up and down, in waste gas, residual dust adheres to and gathers on water smoke, forming larger heavier particle falls in sedimentation basin, by the dedusting again of water spray, substantially clean air is discharged in atmosphere by blast pipe.Water circulation in sedimentation basin is used, and in the time that the water yield is less, just in sedimentation basin, is added into clear water, has so fully saved water consumption.The height of baffle plate is less than radius of a circle in exhaust pipe, the not too large like this flow velocity that affects waste gas.
The utility model is reasonable in design, simple in structure, the dust in waste gas is removed and recycled, protection of the environment, and energy-saving and emission-reduction, for enterprise has saved production cost, practical, easy to utilize.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Detailed description of the invention
As shown in Figure 1, the waste gas dedusting system for petroleum propping agent workshop of the present utility model, comprises exhaust pipe 1, and exhaust pipe 1 is provided with row's dust collection, and the outlet of exhaust pipe 1 is connected with upper-spraying type deduster.Each dust collection includes the hopper 6 that is located at exhaust pipe 1 downside, hopper 6 is up big and down small pyramidal structure, hopper 6 open tops and with exhaust pipe 1 internal communication, flow direction taking waste gas along exhaust pipe 1 is as forward direction, exhaust pipe 1 inwall bottom is provided with the baffle plate 7 that is positioned at hopper 6 front sides, and the height of baffle plate 7 is less than the interior radius of a circle of exhaust pipe 1, and hopper 6 lower ends are provided with tremie pipe 8, tremie pipe 8 is provided with baiting valve 9, and the lower end of tremie pipe 8 is connected with dust bag 10.
Upper-spraying type deduster comprises sedimentation basin 11 and is located at the casing 12 of sedimentation basin 11 tops, casing 12 bottoms are uncovered, casing 12 bottom levels are provided with sparge pipe 13, the outlet shutoff of sparge pipe 13, sparge pipe 13 tops are provided with row's hole for water spraying 14 vertically, the import of sparge pipe 13 is connected with the high-pressure hose 15 extending in sedimentation basin 11, high-pressure hose 15 is provided with suction pump 16, suction pump 16 is driven by variable-frequency motor 17, the upper left sidepiece of casing 12 is connected with the outlet of exhaust pipe 1, casing 12 tops, right side are provided with blast pipe 18, casing 12 top inner wall are by left-to-right interval and be arranged alternately platoon leader's deflection plate 19 and short deflection plate 20.
The utility model is in the time that work is used, the high-temp waste gas that petroleum propping agent workshop is discharged is outwards arranged by exhaust pipe 1, first stopping through baffle plate 7, heavier particle is fallen in hopper 6, in the time that the dust accumulation in hopper 6 is more, open baiting valve 9, be discharged in dust bag 10 and be recycled.Now in waste gas, also have some dust, waste gas is entered in casing 12 by the left upper portion of casing 12, variable-frequency motor 17 drives suction pump 16, the clear water that suction pump 16 extracts sedimentation basin 11 internal upper parts upwards sprays by the hole for water spraying 14 on sparge pipe 13, under the stopping of long deflection plate 19 and short deflection plate 20, the flow velocity of waste gas slows down, the air-flow interior fluctuation up and down of casing 12 again, in waste gas, residual dust adheres to and gathers on water smoke, forming larger heavier particle falls in sedimentation basin 11, by the dedusting again of water spray, substantially clean air is discharged in atmosphere by blast pipe 18.Water circulation in sedimentation basin 11 is used, and in the time that the water yield is less, just in sedimentation basin 11, is added into clear water, has so fully saved water consumption.The airflow direction that in figure, arrow points is waste gas.
Above-described embodiment is not done any pro forma restriction to shape of the present utility model, material, structure etc.; any simple modification, equivalent variations and modification that every foundation technical spirit of the present utility model is done above embodiment, all belong to the protection domain of technical solutions of the utility model.
Claims (2)
1. for the waste gas dedusting system of petroleum propping agent workshop, comprise exhaust pipe, it is characterized in that: described exhaust pipe is provided with row's dust collection, and the outlet of exhaust pipe is connected with upper-spraying type deduster; Described each dust collection includes the hopper that is located at exhaust pipe downside, hopper is up big and down small pyramidal structure, hopper open top and with exhaust pipe internal communication, flow direction taking waste gas along exhaust pipe is forward direction, toxic emission inside pipe wall bottom is provided with the baffle plate that is positioned at hopper front side, and the height of baffle plate is less than radius of a circle in exhaust pipe, and hopper lower end is provided with tremie pipe, tremie pipe is provided with baiting valve, and the lower end of tremie pipe is connected with dust bag.
2. the waste gas dedusting system for petroleum propping agent workshop according to claim 1, it is characterized in that: described upper-spraying type deduster comprises sedimentation basin and is located at the casing of sedimentation basin top, bottom half is uncovered, bottom half level is provided with sparge pipe, the outlet shutoff of sparge pipe, sparge pipe top is provided with row's hole for water spraying vertically, the import of sparge pipe is connected with the high-pressure hose extending in sedimentation basin, high-pressure hose is provided with suction pump, suction pump is driven by variable-frequency motor, the upper left sidepiece of casing is connected with the outlet of exhaust pipe, top, casing right side is provided with blast pipe, casing top inner wall is by left-to-right interval and be arranged alternately platoon leader's deflection plate and short deflection plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320819457.6U CN203635011U (en) | 2013-12-13 | 2013-12-13 | Waste gas dust removal system for petroleum proppant production workshop |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320819457.6U CN203635011U (en) | 2013-12-13 | 2013-12-13 | Waste gas dust removal system for petroleum proppant production workshop |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203635011U true CN203635011U (en) | 2014-06-11 |
Family
ID=50866295
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320819457.6U Expired - Lifetime CN203635011U (en) | 2013-12-13 | 2013-12-13 | Waste gas dust removal system for petroleum proppant production workshop |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203635011U (en) |
-
2013
- 2013-12-13 CN CN201320819457.6U patent/CN203635011U/en not_active Expired - Lifetime
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209378655U (en) | A kind of constructing tunnel dust-extraction unit | |
CN203642741U (en) | High temperature waste gas utilization and dedusting system for petroleum proppant production workshop | |
CN203391742U (en) | Water-saving non-pollution system for automatically cleaning automobile by using air | |
CN204952530U (en) | Modified fertilizer production dust removal water tank | |
CN201310373Y (en) | Coal gas purifier for safety protection system for drilling and spraying orifice | |
CN203412533U (en) | Wet dust removal system for coal-mine gas pumping-exhaust drill hole | |
CN202510069U (en) | Gas-liquid phase dedusting device for operation of downhole drilling machine of coal mine | |
CN206121354U (en) | Environment -friendly drill carriage dust collecting device | |
CN203764076U (en) | Efficient dust-filtering separator for mine | |
CN206578712U (en) | High-pressure water cuts the Water Cutting equipment of retracting device and its application | |
CN201078239Y (en) | Wind pressure water straining magnetizing dustfall apparatus | |
CN203635011U (en) | Waste gas dust removal system for petroleum proppant production workshop | |
CN207153377U (en) | A kind of cleaning dedusting filter for mullite powder workshop | |
CN203867606U (en) | Net-type foam film dust removing system used for underground coal mine | |
CN202909585U (en) | Novel sprinkling dust removal system | |
CN205779936U (en) | A kind of efficient dust-remove blower | |
CN205680755U (en) | A kind of recycling equipment of electrokinetic cell | |
CN210105912U (en) | Dust settling system for underground gas extraction drill hole orifice | |
CN207525062U (en) | For the purifier of wet scrubber | |
CN208564472U (en) | A kind of coal mine drilling magnetized foam cyclone system | |
CN204253092U (en) | Semi-enclosed negative-pressure guniting dust collector | |
CN203515647U (en) | Spraying device of dust removal blower | |
CN203441518U (en) | Mining wet-type multi-channel dust remover | |
CN204502625U (en) | A kind of rotary kiln hot exhaust gas dust-removing recovery device | |
CN202786164U (en) | Gas-sand separating device for natural gas well |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20140611 |
|
CX01 | Expiry of patent term |