CN203629734U - Steel structure stay cable force measuring tensioner - Google Patents

Steel structure stay cable force measuring tensioner Download PDF

Info

Publication number
CN203629734U
CN203629734U CN201320645274.7U CN201320645274U CN203629734U CN 203629734 U CN203629734 U CN 203629734U CN 201320645274 U CN201320645274 U CN 201320645274U CN 203629734 U CN203629734 U CN 203629734U
Authority
CN
China
Prior art keywords
strut
connecting rod
application
line
force lever
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320645274.7U
Other languages
Chinese (zh)
Inventor
蒋庆林
朱平安
刘根林
丁从云
张立刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU DONGGE STAINLESS STEEL WARE CO Ltd
Original Assignee
JIANGSU DONGGE STAINLESS STEEL WARE CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU DONGGE STAINLESS STEEL WARE CO Ltd filed Critical JIANGSU DONGGE STAINLESS STEEL WARE CO Ltd
Priority to CN201320645274.7U priority Critical patent/CN203629734U/en
Application granted granted Critical
Publication of CN203629734U publication Critical patent/CN203629734U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Force Measurement Appropriate To Specific Purposes (AREA)

Abstract

The utility model discloses a steel structure stay cable force measuring tensioner. The steel structure stay cable force measuring tensioner comprises an upper force application lever, a lower force application lever and a connection rod, wherein an upper end of the connection rod is hinged with a middle segment of the upper force application lever, a lower end of the connection rod is hinged with a middle segment of the lower force application lever, and a support rod, a weighing sensor and a jack are connected in series between the upper force application lever and a back end of the lower force application lever. A distance between a front end force application point of the upper force application lever and an upper hinge support point of the connection rod on the upper force application lever is a, a distance between the upper hinge support point of the connection rod on the upper force application lever and a hinge support point of the support rod at the back end of the upper force application lever is b, and a/b is 1/3 to 3. The steel structure stay cable force measuring tensioner is convenient for tension operation, is accurate and controllable for tension force application, can simultaneously carry out cable tension and a cable test to realize coordinative mounting construction of a stay cable steel structure and is widely applied to mounting construction of various types of the stay cable steel structure.

Description

Steel construction drag-line dynamometry tensioner
Technical field
The present invention relates to a kind of tensioning equipment of steel construction drag-line, relate in particular to the utensil that drag-line is carried out stretch-draw and dynamometry in drag-line steel construction.
Background technology
In steel structure system, band drag-line prestressed steel structure is to produce prestress by stretch-draw drag-line in inside configuration, and a kind of steel frame system taking flexible cable as main supporting member or auxiliary supporting member.Resist the effect of external load by the axial tension of drag-line with drag-line steel construction, can utilize the most fully steel strength, adjust its power performance, improve load-bearing capacity, rigidity and the stability of structure, therefore be with drag-line steel construction to be applicable to, in large span, heavy load and high-rise structure, more can meet building function requirement.More because band drag-line steel construction is convenient to architectural image, adapt to diversified planar graph and appearance profile, can freely meet the expression-form of various building functions and architectural appearance, in the agent structure of venue, conference and exhibition center, bridge, gymnasium and industrial premises and curtain wall supporting structure, there is application very widely, there is good structural behaviour and economy.
Cable-tension is not only the important evidence of assessment steel construction mechanical property, and be the precondition of guaranteeing steel construction safety in utilization and serviceable life, meet the cable-tension of Structural Design Requirement and play a part to do important to the stability of steel construction, globality and rigidity.The at present construction of cable-tension be mainly by be positioned at cable tension end have positive and reverse return to adjustment screw rod apply; There is the drag-line of large stretching force will provide stretching force by lifting jack for large-span steel or requirement, and by the foundation of adjusting screw(rod) complete design stretching force, while using lifting jack that stretching force is provided, must lifting jack supporting structure be set at the stretching end of drag-line, it is comparatively complicated that the stretch-draw of drag-line and operation all become.Although existing this structure can complete the stretch-draw of drag-line, cable tension power size in uncontrollable stretching process; Especially in the one-piece construction resemble roof system, drag-line not only wants each point to coordinate stretch-draw, and also will carry out substep stretch-draw according to designing requirement to same drag-line.Obvious existing method for stretching cannot be realized the requirement of tension operation and stretching force synchro control, is difficult to ensure globality and the stability of steel construction.
Because stretching force is the axial internal force of drag-line, the test of cable tension power is in the prior art all to calculate by indirect method.Application for a patent for invention " partial cable-stayed bridge drag-line steel strand wires tension test method (application number: 201010597084.3) " discloses a kind of method of testing of cable-tension, it is to calculate cable-tension by fundamental frequency and the bending stiffness of test drag-line, these indirect measurement methods are extrapolated its cable tension power by other parameters, test procedure complexity, test data is inaccurate, measuring accuracy is not high, can not accurately reflect the real axially internal force of drag-line, especially under drag-line Xiao Zhang state of tension, its error amount is larger, give steel construction stability, security all brings serious impact.
Existing cable tension equipment and tension test utensil, all independent and carry out respectively the stretch-draw of drag-line or test separately, they or only can carry out cable tension and adjustment, or only drag-line is carried out to the reckoning of tension force indirectly testing, can not synchronously reflect exactly the internal tension of steel structure drag-line, can not immediately adjust control to drag-line internal tension easily.These cable tension utensils are cable tension fitting operation inconvenience for individual pull-up structure, and stretching force is inaccurate; And for tension integral structures such as rope dome or stretching integral networks, due to the association between size and the stretching force of the tension sequence of each drag-line in this class formation, stretching force, all there is strict designing requirement, existing straining device had both been difficult to accurately control and regulate drag-line internal tension, the installation that cannot coordinate steel construction again, produces many harmful effects to one-piece construction then.Therefore the control of cable tension power and test seem very important in the practice of construction of steel construction.
Summary of the invention
For the existing above-mentioned deficiency of prior art, technical matters to be solved by this invention is a kind of steel construction drag-line dynamometry tensioner, and it is not only easy to operate, and the application of force is accurately controlled, and can synchronously carry out stretch-draw and the test of drag-line, to realize the coordination installation to steel construction.
In order to solve the problems of the technologies described above, steel construction drag-line dynamometry tensioner of the present invention, this dynamometry tensioner comprises application of force lever, lower application of force lever and connecting rod, and the upper end of connecting rod is hinged in the stage casing of application of force lever, and the lower end of connecting rod is hinged in the stage casing of lower application of force lever; Between application of force lever and the rear end of lower application of force lever, be connected with strut, LOAD CELLS and lifting jack on described.
Adopt after technique scheme, due to upper, lower application of force lever, the strut of connecting rod and series winding, LOAD CELLS and lifting jack, having formed can synchronous tension, the four-bar mechanism of dynamometry, when upper, when the front end of lower application of force lever is stuck in the lower end of anchor-hold point position and stretching end, lifting jack imposes stretching force by two application of force levers to drag-line, LOAD CELLS shows stretching force size simultaneously, in the time that stretching force reaches the prestress value that design prestress value or segmentation apply, can lock drag-line to complete the stretching construction of drag-line by the adjusting bolt of cable tension end.First can directly synchronously complete stretch-draw and the dynamometry of drag-line by blocking slotting operation due to this structure, in carrying out cable tension, carry out the test of stretching force, realize synchronously carrying out of cable tension and tensile test, reflected timely and accurately the actual stretch-draw situation of drag-line and the actual size of pretension; To requiring the repeatedly integral tension structure of stretch-draw of segmentation, also can determine that every drag-line, at stretch-draw amount and the stretching force in each stage, realized integrally-built synchronous coordination installation easily according to designing requirement.Also due in the present invention, LOAD CELLS is connected in series with in stretch-draw force measuring structure, LOAD CELLS is directly reflecting the stretching force of drag-line, and be not subject to the impact of the factor such as cable tension power and the drag-line natural frequency of vibration, dynamometry more directly, more accurate, greatly simplify test structure and method of testing, improved dynamometry precision, be convenient to cable tension power to regulate and control accurately.This direct force measuring method, not only makes cable tension power size accurately controlled, and no longer needs to be provided for specially the jack pad assembly of stretch-draw at the stretching end of drag-line, and it is more simple that stayed structure becomes, and cost of manufacture reduces.That the present invention also has advantages of is simple in structure, be convenient to make and use.
The preferred embodiment of the present invention, distance a on the front end point of application of described upper application of force lever and the connecting rod on it between hinged point, distance b on connecting rod on this on application of force lever between the hinged point of the strut of hinged point and upper application of force lever rear end, described a/b=1/(1/3 ~ 3).This preferred stretch-draw lever ratio, can carry out stretch-draw amount to it according to drag-line service condition and/or stretching force is rationally controlled and regulates.
Further embodiment of the present invention, described connecting rod comprises screw rod under screw rod on connecting rod, lever regulated screwed pipe and connecting rod, on connecting rod, under screw rod and connecting rod, screw rod is rotatably connected in respectively the two ends of lever regulated screwed pipe, and on this connecting rod, under screw rod and connecting rod, the screw thread on screw rod has contrary rotation direction.This structure is the length of regulating connecting rod easily, thereby adapt to the structural requirement of different drag-lines and drag-line end, and adaptability is stronger.
Further embodiment of the present invention, described upper application of force lever rear end is hinged with strut, lower application of force lever rear end is hinged with jack pad assembly, is provided with in series successively from top to bottom strut, LOAD CELLS and lifting jack between upper application of force lever rear end and lower application of force lever rear end.
Described strut comprises that screw rod on strut, strut regulate screw rod under screwed pipe and strut, and on strut, under screw rod and strut, screw rod is rotatably connected in respectively strut and regulates the two ends of screwed pipe, and on this strut, under screw rod and strut, the screw thread on screw rod has contrary rotation direction.In this embodiment, strut, LOAD CELLS and lifting jack layout are more reasonable, and can be by the coordination of connecting rod and strut length, and to adapt to the structural requirement of different drag-lines and stretching end thereof, usable range is wide, strong adaptability.
Further embodiment of the present invention, described LOAD CELLS is column weighting sensor or radial LOAD CELLS.Described LOAD CELLS is resistance-strain type, photo-electric or fluid pressure type LOAD CELLS.This arrangement works is reliable, and security is good, and value wide ranges, error is little, data are accurate.
The further embodiment of the present invention, described LOAD CELLS is electrically connected mutually with digital indicator.This structure reading is easy to use.
The further embodiment of the present invention, described lifting jack is mechanical jack or fluid pressure type lifting jack.Simple compact, the conveniently moving of this Structural Tectonics.
Brief description of the drawings
Below in conjunction with the drawings and specific embodiments, steel construction drag-line dynamometry tensioner of the present invention is described further.
Fig. 1 is the structural representation of a kind of embodiment of steel construction drag-line dynamometry tensioner of the present invention;
Fig. 2 is the main TV structure schematic diagram of upper application of force lever in Fig. 1 illustrated embodiment;
Fig. 3 is the plan structure schematic diagram of structure shown in Fig. 2;
Fig. 4 is the main TV structure schematic diagram of lower application of force lever in Fig. 1 illustrated embodiment;
Fig. 5 is the plan structure schematic diagram of structure shown in Fig. 4.
In figure, 1-upper application of force lever, 2-suspension ring, on 3-connecting rod, sell, key seat on 4-connecting rod, on 5-strut, sell, key seat on 6-strut, screw rod on 7-strut, 8-strut, 9-strut regulates screwed pipe, screw rod under 10-strut, 11-LOAD CELLS, 12-lifting jack, 13-jack pad assembly, 14-lifting jack seat pin, 15-lower application of force lever, key seat under 16-connecting rod, 17-connecting rod downside pin, 18-drag-line, 19-drag-line clamping head, screw rod under 20-connecting rod, 21-cable tension adjusting bolt, 22-connecting rod, 23-lever regulated screwed pipe, screw rod on 24-connecting rod, 25-anchor-hold head, 26-steel structure, 27-card contact, 28-fork-shaped mouth, 29-gear rope pin.
Embodiment
In the steel construction drag-line dynamometry tensioner shown in Fig. 1, the upper end of connecting rod 22 is by selling 3 middle section positions that are hinged in upper application of force lever 1 on key seat on connecting rod 5 and connecting rod, the lower end of connecting rod 22 is hinged in the middle section position of lower application of force lever 15 by key seat under connecting rod 16 and connecting rod downside pin 17.Connecting rod 22 comprises screw rod 20 under screw rod 24 on connecting rod, lever regulated screwed pipe 23 and connecting rod, on connecting rod, screw rod 24 is fixedly connected on connecting rod on key seat 4, under connecting rod, screw rod 20 is fixedly connected under connecting rod on key seat 16, on connecting rod, under screw rod 24 and connecting rod, the outer end of screw rod 20 is rotatably connected in respectively the two ends of lever regulated screwed pipe 23, on connecting rod, under screw rod 24 and connecting rod, the screw thread on screw rod 20 has contrary thread rotary orientation, so that pivot link regulates screwed pipe 23 to carry out the total length of regulating connecting rod 22.On upper application of force lever 1, be provided with suspension ring 2, for lifting and suspention dynamometry tensioner.
The upper end of strut 8 by strut, sell 5 and strut on key seat 6 be hinged in the rear end of upper application of force lever 1, the lower end bearing of strut 8 is connected in LOAD CELLS 11.Strut 8 comprises that screw rod 7 on strut, strut regulate screw rod 10 under screwed pipe 9 and strut, on strut, screw rod 7 is fixedly connected on strut on key seat 6, under strut, screw rod 10 supportings are connected in LOAD CELLS 11, on strut, under screw rod 7 and strut, the overhanging end of screw rod 10 is rotatably connected in respectively on strut adjusting screw(rod) pipe 9, and on strut, under screw rod 7 and strut, the thread segment on screw rod 10 has contrary thread rotary orientation.The rear end of lower application of force lever 15 is connected with jack pad assembly 13 by lifting jack seat pin 14, be connected with lifting jack 12 at jack pad assembly 13 upper supports, under lifting jack 12 and strut, between screw rod 10, be connected with LOAD CELLS 11, so be formed on the series arrangement that is disposed with strut 8, LOAD CELLS 11 and lifting jack 12 between application of force lever 1 and the rear end of lower application of force lever 15.LOAD CELLS 11 structures are radial LOAD CELLS, can be also column weighting sensors, and the type of this LOAD CELLS is resistance-strain type class.LOAD CELLS 11 is electrically connected mutually with digital indicator, thereby forms conventional digital display type or scheme explicit pull and push dynamometer structure.Lifting jack 12 is conventional Manual hydraulic lifting jack.
As shown in Figure 2 and Figure 3, upper application of force lever 1 adopts symmetrical plank frame, is added and is welded by sheet pack.Be provided with the card contact 27 that is arc surface at the front end of upper application of force lever 1, when use, by card contact 27, this tensioner be connected on the anchor point of drag-line 18, be respectively arranged with the hinged hole of connecting rod and the hinged hole of strut in position, stage casing and the rear end of upper application of force lever 1.The two sides of upper application of force lever 1 also arrange reinforcement gusset.
As shown in Figure 4, Figure 5, lower application of force lever 15 also adopts symmetrical plank frame, also adds and is welded with sheet pack.Be provided with fork-shaped mouth 28 at the front end of lower application of force lever 15, when use, these fork-shaped mouth 28 fork-joins, on tight 19 of the drag-line of drag-line 18 stretching ends, are respectively arranged with the hinged hole of connecting rod and the hinged hole 10 of jack pad assembly in position, stage casing and the rear end of lower application of force lever 15.The two sides of lower application of force lever 15 are also provided with reinforcement gusset.Be provided with the pin hole for the gear rope pin 29 of pegging graft at the front end of fork-shaped mouth 28, to prevent that dynamometry tensioner from tumbling or drag-line is deviate from from fork-shaped mouth.
As shown in Figure 1, strut 8, LOAD CELLS 11 and the lifting jack 12 of lower application of force lever 15, connecting rod 22 and mutual series winding form the four-bar mechanism of stretch-draw dynamometry.The lever ratio a/b of the driving and driven arm of force forming between front end, link supports point and the rear end of upper application of force lever 1 and lower application of force lever 15 is preferentially chosen in 1/(1/3 ~ 3) between, wherein a is the distance between the hinged point on the upper application of force lever 1 front end point of application (card contact 27) and the connecting rod 22 on it, and b is the distance of the hinged point of strut 8 of hinged point and upper application of force lever 1 rear end on the connecting rod 22 on upper application of force lever 1.
In this enforcement, drag-line 18 is anchored on steel structure 26 in the mode being hinged by drag-line clamping head 19, cable tension adjusting bolt 21 and anchor-hold head 25, stretch-draw adjusting bolt 21 is a double threaded screw, the thread rotary orientation at these double threaded screw two ends is contrary, the two ends of stretch-draw adjusting bolt 21 are connected with respectively drag-line clamping head 19 and anchor-hold head 25, and anchor-hold head 25 is hinged on steel structure 26.When use, connecting rod 22 and strut 8 are adjusted to corresponding length, make the card contact 27 on application of force lever 1 be connected to steel structure anchor point or be connected on anchor-hold head 25, fork-shaped mouth 28 forks of lower application of force lever 15 are inserted in the front end of drag-line clamping head 19, start hydraulic jack and push LOAD CELLS 11 and strut 8, the rear end of application of force lever 1 and lower application of force lever 15 is strutted mutually, and its front end closes and disturbs with stretch-draw drag-line 18, turn cable tension adjusting bolt 21 simultaneously, in the time that LOAD CELLS 11 shows that drag-line prestress reaches designing requirement, locking cable tension is adjusted bolt 21, finally shed dynamometry tensioner, complete stretch-draw and dynamometry to drag-line 18.
Another embodiment of the present invention, except strut 8, LOAD CELLS 11 and lifting jack 12 mutually the position relationship of series winding different, all the other are same as the previously described embodiments.In the present embodiment, between above-mentioned application of force lever 1 and lower application of force lever 15 rear ends, be connected with successively from the top down strut 8, lifting jack 12 and LOAD CELLS 11.Can also be to be connected with successively from top to bottom the series arrangement such as LOAD CELLS 11, lifting jack 12 and strut 8.As long as strut 8, lifting jack 12 and LOAD CELLS 11 are connected in series with on same line of force.
Above-mentionedly only enumerated preferred implementations more of the present invention, the present invention is not limited thereto, under the prerequisite without prejudice to ultimate principle of the present invention, can also make many improvement and conversion.As connecting rod and strut do not adopt adjustable elongated structure, and adopt the connecting-rods with constant lengh of regular length; LOAD CELLS can also adopt the conventional pressure sensor types such as photo-electric, fluid pressure type LOAD CELLS; Lifting jack can also be mechanical jack etc.These conversion all fall into protection scope of the present invention.

Claims (10)

1. a steel construction drag-line dynamometry tensioner, it is characterized in that: this dynamometry tensioner comprises application of force lever (1), lower application of force lever (15) and connecting rod (22), the upper end of connecting rod (22) is hinged in the stage casing of application of force lever (1), and the lower end of connecting rod (22) is hinged in the stage casing of lower application of force lever (15); Between application of force lever (1) and the rear end of lower application of force lever (15), be connected with strut (8), LOAD CELLS (11) and lifting jack (12) on described.
2. steel construction drag-line dynamometry tensioner according to claim 1, it is characterized in that: the distance a between the front end point of application of described upper application of force lever (1) and the upper hinged point of the connecting rod (22) on it, distance b between the upper hinged point of connecting rod (22) on this on application of force lever (1) and the hinged point of strut (8) of upper application of force lever (1) rear end, described a/b=1/(1/3 ~ 3).
3. steel construction drag-line dynamometry tensioner according to claim 1 and 2, is characterized in that: the front end of described upper application of force lever (1) is provided with and is anchored point (27), and the front end of lower application of force lever (15) is provided with and shape mouth (28).
4. steel construction drag-line dynamometry tensioner according to claim 1 and 2, it is characterized in that: described connecting rod (22) comprises screw rod (20) under screw rod on connecting rod (24), lever regulated screwed pipe (23) and connecting rod, under screw rod on connecting rod (24) and connecting rod, screw rod (20) is rotatably connected in respectively the two ends of lever regulated screwed pipe (23), and the screw thread under screw rod on this connecting rod (24) and connecting rod on screw rod (20) has contrary rotation direction.
5. steel construction drag-line dynamometry tensioner according to claim 1 and 2, it is characterized in that: described upper application of force lever (1) rear end is hinged with strut (8), lower application of force lever (15) rear end is hinged with jack pad assembly (13), between upper application of force lever (1) rear end and lower application of force lever (15) rear end, is provided with in series successively from top to bottom strut (8), LOAD CELLS (11) and lifting jack (12).
6. steel construction drag-line dynamometry tensioner according to claim 5, it is characterized in that: described strut (8) comprises that screw rod on strut (7), strut regulate screw rod (10) under screwed pipe (9) and strut, under screw rod on strut (7) and strut, screw rod (10) is rotatably connected in respectively the two ends of strut adjusting screwed pipe (9), and the screw thread under screw rod on this strut (7) and strut on screw rod (10) has contrary rotation direction.
7. steel construction drag-line dynamometry tensioner according to claim 5, is characterized in that: described LOAD CELLS (11) is column weighting sensor or radial LOAD CELLS.
8. steel construction drag-line dynamometry tensioner according to claim 7, is characterized in that: described LOAD CELLS (11) is resistance-strain type, photo-electric or fluid pressure type LOAD CELLS.
9. steel construction drag-line dynamometry tensioner according to claim 8, is characterized in that: described LOAD CELLS (11) is electrically connected mutually with digital indicator.
10. steel construction drag-line dynamometry tensioner according to claim 1, is characterized in that: described lifting jack (12) is mechanical jack or fluid pressure type lifting jack.
CN201320645274.7U 2013-10-21 2013-10-21 Steel structure stay cable force measuring tensioner Expired - Fee Related CN203629734U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320645274.7U CN203629734U (en) 2013-10-21 2013-10-21 Steel structure stay cable force measuring tensioner

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320645274.7U CN203629734U (en) 2013-10-21 2013-10-21 Steel structure stay cable force measuring tensioner

Publications (1)

Publication Number Publication Date
CN203629734U true CN203629734U (en) 2014-06-04

Family

ID=50816200

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320645274.7U Expired - Fee Related CN203629734U (en) 2013-10-21 2013-10-21 Steel structure stay cable force measuring tensioner

Country Status (1)

Country Link
CN (1) CN203629734U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103528743A (en) * 2013-10-21 2014-01-22 江苏东阁不锈钢制品有限公司 Force measurement tensioning device for steel structural stay rope
CN105241648A (en) * 2015-10-23 2016-01-13 长安大学 Loading device simulating loess tunnel lock foot anchor pipe end stress and use method thereof
CN109724740A (en) * 2019-01-12 2019-05-07 尚廷东 A kind of drag-line bridge cable force measurement device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103528743A (en) * 2013-10-21 2014-01-22 江苏东阁不锈钢制品有限公司 Force measurement tensioning device for steel structural stay rope
CN105241648A (en) * 2015-10-23 2016-01-13 长安大学 Loading device simulating loess tunnel lock foot anchor pipe end stress and use method thereof
CN109724740A (en) * 2019-01-12 2019-05-07 尚廷东 A kind of drag-line bridge cable force measurement device
CN109724740B (en) * 2019-01-12 2024-04-16 尚廷东 Cable force measuring device for inhaul cable bridge

Similar Documents

Publication Publication Date Title
CN201258494Y (en) Loading unit for single-pile vertical anti-pulling static load test
CN203629734U (en) Steel structure stay cable force measuring tensioner
CN106049709B (en) Connecting system of hybrid coupled shear wall and construction method
CN200996883Y (en) Rotary inertia measuring device by triple-wire twisting method
CN109342166A (en) Sampling die for rock mass discontinuity shearing test
CN103528743A (en) Force measurement tensioning device for steel structural stay rope
CN101525886B (en) Major diameter uplift pile loading test method and device thereof
CN101949170A (en) Member-insertion type aluminum-alloy truss structure with plate gussets
CN106769414A (en) Load and test specimen durability test device under environment coupled action
CN101230562A (en) External prestress strengthening method for prestressed concrete box-beam bridge
CN102494839A (en) Self-balancing large range torque calibrating device
CN100510668C (en) Prestressed cable tension tester
CN102922601A (en) Bridge prestress tensioning control and feedback method
CN101782474A (en) Method for testing property of sun shading product
CN204112229U (en) Post stretching precast beam tension stress control device
CN104900136B (en) A kind of experiment cable-stayed bridge and installation method
CN206132590U (en) Inside testing arrangement that slides that bonds of reinforced concrete
CN102433843B (en) Self-balancing arch rib vertical rotation and lift construction method
CN108894114A (en) A kind of pylon based on ultrasonic displacement sensor adjusts cable system automatically
CN201926464U (en) Single-tower cable-stayed bridge test model based on damage identification
CN111175068A (en) Device and method for typical damage simulation of cable-stayed bridge
CN115233561A (en) Single-side hoisting mid-span closure method for cable-stayed bridge
CN103115791A (en) Method and device for field performance detection of steel portal rigid-framed structures
CN207197707U (en) A kind of simple bending curved strain fiber-optic grating sensor
CN217359383U (en) Structural mechanical property testing device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140604

Termination date: 20191021

CF01 Termination of patent right due to non-payment of annual fee