CN203626382U - Communication emergency tent support - Google Patents

Communication emergency tent support Download PDF

Info

Publication number
CN203626382U
CN203626382U CN201320848164.0U CN201320848164U CN203626382U CN 203626382 U CN203626382 U CN 203626382U CN 201320848164 U CN201320848164 U CN 201320848164U CN 203626382 U CN203626382 U CN 203626382U
Authority
CN
China
Prior art keywords
bracket
communication
lower transverse
beams
cant
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320848164.0U
Other languages
Chinese (zh)
Inventor
支东风
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHINA TELECOM CONSTRUCTION 4TH ENGINEERING Co Ltd
Original Assignee
CHINA TELECOM CONSTRUCTION 4TH ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHINA TELECOM CONSTRUCTION 4TH ENGINEERING Co Ltd filed Critical CHINA TELECOM CONSTRUCTION 4TH ENGINEERING Co Ltd
Priority to CN201320848164.0U priority Critical patent/CN203626382U/en
Application granted granted Critical
Publication of CN203626382U publication Critical patent/CN203626382U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Tents Or Canopies (AREA)

Abstract

The utility model discloses a communication emergency tent support which comprises an upper regular polygon bracket and a plurality of oblique beams. The upper regular polygon bracket is formed by assembling a plurality of upper cross beams, and the oblique beams are installed on a plurality of vertexes of the upper bracket respectively. The oblique beams are uniformly distributed on the lower portion of the upper bracket and are straight rods, wherein the upper ends of the straight rods are installed on the upper bracket, and the straight rods can rotate vertically. The lower portions of every two adjacent oblique beams are connected through one lower cross beam. A plurality of the lower cross beams form a lower regular polygon bracket located under the upper bracket. The lower cross beams are folded rods formed by assembling a plurality of connecting rods. The two ends of each lower cross beam are installed on every two oblique beams in a hinged mode. The lower end of each oblique beam is provided with one stand column. The stand columns are telescopic rods, wherein the upper ends of the telescopic rods are installed on the oblique beams and the telescopic rods can rotate vertically. The communication emergency tent support is simple in structure, reasonable in design, convenient to unfold and fold, high in anti-wind capacity, good in use effect, and capable of effectively solving the problems that an existing communication emergency tent is heavy in structure, inconvenient to carry and poor in anti-wind performance.

Description

The emergent tent bracket of a kind of communication
Technical field
The utility model relates to a kind of tent bracket, especially relates to the emergent tent bracket of a kind of communication.
Background technology
In the project maintenance work progresss such as communication line, machine station, while meeting accident fault, need to speedily carry out rescue work, particularly, in the situation that typhoon, heavy rain arrive, must speedily carry out rescue work in time, to guarantee that communication line is unimpeded.And in emergency work construction process, conventionally all need to build one-shot job tent, and as follows to the specific requirement of set up tent: the first, erection method is easy, can fast construction complete; The second, the tent of setting up will have certain mechanical strength, the anti-high wind of energy; Three, light, and have certain activity space.But all there is following problem in the emergent tent of current used communication: the first, wind resistance is poor, and mechanical strength does not reach actual requirement to some extent; 2, heavier, carry inconvenience.Thereby, need improve the emergent tent bracket of existing communication, solving structure heaviness that the emergent tent of existing communication exists, carry inconvenience, the problem such as wind resistance is poor.
Utility model content
Technical problem to be solved in the utility model is for above-mentioned deficiency of the prior art, provide a kind of communication emergent tent bracket, it is simple in structure, reasonable in design, expansion and folding convenient and wind loading rating is strong, result of use is good, problems such as can effectively solving structure heaviness that the emergent tent of existing communication exists, carry inconvenience, wind resistance is poor.
For solving the problems of the technologies described above, the technical solution adopted in the utility model is: the emergent tent bracket of a kind of communication, it is characterized in that: comprise the cant beam on regular polygon bracket and the multiple multiple summits that are arranged on respectively described bracket that are assembled into by multiple top rails, the structure of multiple described cant beams and size all identical and its be all laid in described bracket below, the multiple described summit of described bracket is respectively the cant beam mounting points of installing for multiple described cant beams; Multiple described top rails are all laid on same plane, and described cant beam is in upper end is arranged on described bracket and the straight-bar that rotates up and down of the described cant beam mounting points that can install around it; Between the bottom of adjacent two described cant beams, all connect by a lower transverse beam, the quantity of described lower transverse beam be multiple and its quantity identical with the quantity of top rail; The structure of multiple described lower transverse beams and size are all identical, and one of multiple described lower transverse beam composition are positioned at the regular polygon bottom bracket under described bracket, and the length of side of described bottom bracket is greater than the length of side of described bracket; Described lower transverse beam is the folding rod assembled by multiple connecting rods, and the two ends of each described lower transverse beam are all arranged on adjacent two described cant beams in hinged way; The lower end of each described cant beam is all provided with a column, and described column is arranged on cant beam and the expansion link that can rotate up and down around the lower end of its cant beam of installing for upper end; The quantity of described expansion link be multiple and its quantity identical with the quantity of top rail.
The emergent tent bracket of above-mentioned a kind of communication, is characterized in that: the two ends of each described lower transverse beam are all arranged on adjacent two described cant beams by hinge one.
The emergent tent bracket of above-mentioned a kind of communication, is characterized in that: on each described lower transverse beam, be all set with the quill that an energy moves forward and backward along be set with lower transverse beam; Described lower transverse beam is assembled by two described connecting rods, between two described connecting rods, connect by intermediate connector, spacing between two described connecting rods is less than the length of quill, and is all connected by hinge two between intermediate connector and two described connecting rods.
The emergent tent bracket of above-mentioned a kind of communication, is characterized in that: described expansion link comprise the upper loop bar of inner hollow and from the bottom to top coaxial sleeve pack the lower straight-bar in loop bar into.
The emergent tent bracket of above-mentioned a kind of communication, is characterized in that: the quantity of described top rail, cant beam and lower transverse beam is 4~8.
The emergent tent bracket of above-mentioned a kind of communication, is characterized in that: also comprise multiple anchor devices that are used in combination with multiple described expansion links respectively, the quantity of described anchor device is identical with the quantity of described expansion link; Described anchor device comprises that an earth anchor and one are fixed on the draw ring of described expansion link upper end, are connected by bracing wire between described earth anchor and draw ring.
The emergent tent bracket of above-mentioned a kind of communication, is characterized in that: between described cant beam upper end and described bracket with and lower end and described expansion link between all save and be connected by Universal active.
The emergent tent bracket of above-mentioned a kind of communication, is characterized in that: each described expansion link bottom is all provided with an anchoring piece.
The emergent tent bracket of above-mentioned a kind of communication, is characterized in that: the lower end of described upper loop bar is provided with carries out spacing column locking button to lower straight-bar.
The emergent tent bracket of above-mentioned a kind of communication, is characterized in that: described anchoring piece is ground nail.
The utility model compared with prior art has the following advantages:
1, simple in structure, lightweight, reasonable in design and input cost is lower, easy to carry.
2, processing and fabricating is easy, is mainly made up of bracket, bottom bracket, cant beam and column.
3, expansion and folding convenient, wind loading rating is strong and result of use good, practical value is high, can complete and launch and folding process easy, fast, and can effectively solve structure heaviness that the emergent tent of existing communication exists, carry inconvenience, the problem such as wind resistance is poor, effectively reduce the difficulty of construction that communication line is safeguarded.
In sum, the utility model is simple in structure, reasonable in design, expansion and folding convenient and wind loading rating is strong, result of use is good, problems such as can effectively solving structure heaviness that the emergent tent of existing communication exists, carry inconvenience, wind resistance is poor.
Below by drawings and Examples, the technical solution of the utility model is described in further detail.
Accompanying drawing explanation
Fig. 1 is use state reference map of the present utility model.
Fig. 2 is the deployed condition schematic diagram of the utility model column.
Fig. 3 is the folded state schematic diagram of the utility model column.
Fig. 4 is the deployed condition schematic diagram of the utility model lower transverse beam.
Fig. 5 is the folded state schematic diagram of the utility model lower transverse beam.
Fig. 6 is folded state schematic diagram of the present utility model.
Description of reference numerals:
1-cant beam; 2-quill; 3-Universal active joint;
4-active section locking button; 5-draw ring; 6-upper loop bar;
7-column locking button; 8-lower straight-bar; 9-ground nail;
10-bracing wire; 11-earth anchor; 12-top rail;
13-lower transverse beam; 14-hinge one; 15-hinge two;
16-intermediate connector.
The specific embodiment
As shown in Figure 1, Figure 2, shown in Fig. 3, Fig. 4, Fig. 5 and Fig. 6, the utility model comprises the cant beam 1 on regular polygon bracket and the multiple multiple summits that are arranged on respectively described bracket that are assembled into by multiple top rails 12, the structure of multiple described cant beams 1 and size all identical and its be all laid in described bracket below, the multiple described summit of described bracket is respectively the cant beam mounting points of installing for multiple described cant beams 1.Multiple described top rails 12 are all laid on same plane, and described cant beam 1 is in upper end is arranged on described bracket and the straight-bar that rotates up and down of the described cant beam mounting points that can install around it.Between the bottom of adjacent two described cant beams 1, all connect by a lower transverse beam 13, the quantity of described lower transverse beam 13 be multiple and its quantity identical with the quantity of top rail 12.The structure of multiple described lower transverse beams 13 and size are all identical, and multiple described lower transverse beams 13 form a regular polygon bottom bracket being positioned under described bracket, and the length of side of described bottom bracket is greater than the length of side of described bracket.Described lower transverse beam 13 is the folding rod assembled by multiple connecting rods, and the two ends of each described lower transverse beam 13 are all arranged on adjacent two described cant beams 1 in hinged way.The lower end of each described cant beam 1 is all provided with a column, and described column is arranged on cant beam 1 and the expansion link that can rotate up and down around the lower end of its cant beam of installing 1 for upper end.The quantity of described expansion link be multiple and its quantity identical with the quantity of top rail 12.That is to say, the length after described lower transverse beam 13 launches is greater than the length of top rail 12.And described bracket is parallel laying with described bottom bracket.
In the present embodiment, the two ends of each described lower transverse beam 13 are all arranged on adjacent two described cant beams 1 by hinge 1.
In the present embodiment, on each described lower transverse beam 13, be all set with the quill 2 that an energy moves forward and backward along be set with lower transverse beam 13.Described lower transverse beam 13 is assembled by two described connecting rods, between two described connecting rods, connect by intermediate connector 16, spacing between two described connecting rods is less than the length of quill 2, and is all connected by hinge 2 15 between intermediate connector 16 and two described connecting rods.
In the present embodiment, described hinge 1 and hinge 2 15 are connecting rod type hinge.
In actual use procedure, after the utility model is opened, quill 2 is moved and is sleeved on to hinge 2 15 outsides of intermediate connector 16 and its left and right sides, thereby make lower transverse beam 13 become an inflexible straight beam, so that cant beam 1 is carried out to horizontal support; In the time need folding the utility model, quill 2 is removed from intermediate connector 16 and the hinge 2 15 of its left and right sides, be convenient to lower transverse beam 13 folding.
In the present embodiment, between described cant beam 1 upper end and described bracket with and lower end and described expansion link between all save 3 by Universal active and be connected.
Meanwhile, on described Universal active joint 3, active section locking button 4 is installed.
In actual use procedure, after cant beam 1 launches completely, by between cant beam 1 upper end and described bracket the active section locking button 4 on the Universal active that fills joint 3 by the angle locking between cant beam 1 and described bracket; After described column launches completely, by between cant beam 1 lower end and described column the active section locking button 4 on the Universal active that fills joint 3 by between cant beam 1 and described column angle locking.
In the present embodiment, described Universal active joint 3 is integrated with cant beam 1 processing and fabricating.That is to say, the upper and lower side of described cant beam 1 is all provided with a Universal active joint 3.
When actual installation, described cant beam 1 upper end is saved 3 by Universal active and is arranged in described bracket and it forms a Trident Type node be connected adjacent two described top rails 12, and cant beam 1 lower end is saved 3 by Universal active and is arranged on described column.
In the present embodiment, described expansion link comprise the upper loop bar 6 of inner hollow and from the bottom to top coaxial sleeve pack the lower straight-bar 8 in loop bar 6 into.And the lower end of described upper loop bar 6 is provided with carries out spacing column locking button 7 to lower straight-bar 8.
Actual when the utility model is launched, first described column is rotated until described column in complete deployed condition, then by lower straight-bar 8 from the interior extraction of upper loop bar 6; In the time need folding the utility model, first lower straight-bar 8 is pushed back to upper loop bar 6 inside, more described column is upwards rotated until parallel with cant beam 1.
Meanwhile, be to increase wind resistance pulling force, the utility model also comprises multiple anchor devices that are used in combination with multiple described expansion links respectively, the quantity of described anchor device is identical with the quantity of described expansion link.Described anchor device comprises that an earth anchor 11 and one are fixed on the draw ring 5 of described expansion link upper end, are connected by bracing wire 10 between described earth anchor 11 and draw ring 5.
In the present embodiment, each described expansion link bottom is all provided with an anchoring piece.And described anchoring piece is ground nail 9, when actual installation, between described expansion link bottom and ground nail 9, be connected threadably.
When actual use, the quantity of described top rail 12, cant beam 1 and lower transverse beam 13 is 4~8.
In the present embodiment, the quantity of described top rail 12, cant beam 1 and lower transverse beam 13 is 6, thereby rated wind velocity of the present utility model is larger.When actual use, can according to specific needs, the quantity of top rail 12, cant beam 1 and lower transverse beam 13 be adjusted accordingly.
In actual use procedure, in the time that needs launch the utility model, first choose tent and set up position, again each cant beam 1 is launched, and in cant beam 1 expansion process, each lower transverse beam 13 launches until be a straight beam thereupon, now needs quill 2 to move and be sleeved on hinge 2 15 outsides of intermediate connector 16 and its left and right sides, so just completes top of the present utility model expansion process; Subsequently, each column is rotated until completely launch, then by the lower straight-bar 8 of each column from the interior extraction of upper loop bar 6; Then, be fixed on the ground fastening each column by ground nail 9; Finally, multiple described anchor devices are fixed.In the time need folding the utility model, its folding process is contrary with above-mentioned expansion process.
The above; it is only preferred embodiment of the present utility model; not the utility model is imposed any restrictions; every any simple modification of above embodiment being done according to the utility model technical spirit, change and equivalent structure change, and all still belong in the protection domain of technical solutions of the utility model.

Claims (10)

1. the emergent tent bracket of communication, it is characterized in that: comprise the cant beam (1) on regular polygon bracket and the multiple multiple summits that are arranged on respectively described bracket that are assembled into by multiple top rails (12), the structure of multiple described cant beams (1) and size all identical and its be all laid in described bracket below, the multiple described summit of described bracket is respectively the cant beam mounting points of installing for multiple described cant beams (1); Multiple described top rails (12) are all laid on same plane, and described cant beam (1) is in upper end is arranged on described bracket and the straight-bar that rotates up and down of the described cant beam mounting points that can install around it; Between the bottom of adjacent two described cant beams (1), all connect by a lower transverse beam (13), the quantity of described lower transverse beam (13) be multiple and its quantity identical with the quantity of top rail (12); Structure and the size of multiple described lower transverse beams (13) are all identical, and one of multiple described lower transverse beams (13) composition is positioned at the regular polygon bottom bracket under described bracket, and the length of side of described bottom bracket is greater than the length of side of described bracket; Described lower transverse beam (13) is the folding rod assembled by multiple connecting rods, and the two ends of each described lower transverse beam (13) are all arranged on adjacent two described cant beams (1) in hinged way; The lower end of each described cant beam (1) is all provided with a column, described column for upper end be arranged on cant beam (1) upper and can around its expansion link that rotates up and down of the lower end of the cant beam of installing (1); The quantity of described expansion link be multiple and its quantity identical with the quantity of top rail (12).
2. according to the emergent tent bracket of a kind of communication claimed in claim 1, it is characterized in that: the two ends of each described lower transverse beam (13) are all arranged on adjacent two described cant beams (1) by hinge one (14).
3. according to the emergent tent bracket of the one communication described in claim 1 or 2, it is characterized in that: on each described lower transverse beam (13), be all set with the quill (2) that an energy moves forward and backward along be set with lower transverse beam (13); Described lower transverse beam (13) is assembled by two described connecting rods, between two described connecting rods, connect by intermediate connector (16), spacing between two described connecting rods is less than the length of quill (2), and is all connected by hinge two (15) between intermediate connector (16) and two described connecting rods.
4. according to the emergent tent bracket of the one communication described in claim 1 or 2, it is characterized in that: described expansion link comprise the upper loop bar (6) of inner hollow and from the bottom to top coaxial sleeve pack the interior lower straight-bar (8) of loop bar (6) into.
5. according to the emergent tent bracket of the one communication described in claim 1 or 2, it is characterized in that: the quantity of described top rail (12), cant beam (1) and lower transverse beam (13) is 4~8.
6. according to the emergent tent bracket of the one communication described in claim 1 or 2, it is characterized in that: also comprise multiple anchor devices that are used in combination with multiple described expansion links respectively, the quantity of described anchor device is identical with the quantity of described expansion link; Described anchor device comprises that an earth anchor (11) and one are fixed on the draw ring (5) of described expansion link upper end, are connected by bracing wire (10) between described earth anchor (11) and draw ring (5).
7. according to the emergent tent bracket of the one communication described in claim 1 or 2, it is characterized in that: between described cant beam (1) upper end and described bracket with and lower end and described expansion link between all save (3) by Universal active and be connected.
8. according to the emergent tent bracket of the one communication described in claim 1 or 2, it is characterized in that: each described expansion link bottom is all provided with an anchoring piece.
9. according to the emergent tent bracket of a kind of communication claimed in claim 4, it is characterized in that: the lower end of described upper loop bar (6) is provided with carries out spacing column locking button (7) to lower straight-bar (8).
10. according to the emergent tent bracket of a kind of communication claimed in claim 8, it is characterized in that: described anchoring piece is ground nail (9).
CN201320848164.0U 2013-12-19 2013-12-19 Communication emergency tent support Expired - Fee Related CN203626382U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320848164.0U CN203626382U (en) 2013-12-19 2013-12-19 Communication emergency tent support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320848164.0U CN203626382U (en) 2013-12-19 2013-12-19 Communication emergency tent support

Publications (1)

Publication Number Publication Date
CN203626382U true CN203626382U (en) 2014-06-04

Family

ID=50812873

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320848164.0U Expired - Fee Related CN203626382U (en) 2013-12-19 2013-12-19 Communication emergency tent support

Country Status (1)

Country Link
CN (1) CN203626382U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104782612A (en) * 2015-01-30 2015-07-22 许岩 Folding duck catching shed structure
CN112399947A (en) * 2018-07-09 2021-02-23 古斯塔沃.加科梅尔库天斯基 Awning for protecting goods in severe weather
CN114667382A (en) * 2019-08-28 2022-06-24 索尔博乐有限公司 Self-adjusting sunshade assembly

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104782612A (en) * 2015-01-30 2015-07-22 许岩 Folding duck catching shed structure
CN112399947A (en) * 2018-07-09 2021-02-23 古斯塔沃.加科梅尔库天斯基 Awning for protecting goods in severe weather
CN114667382A (en) * 2019-08-28 2022-06-24 索尔博乐有限公司 Self-adjusting sunshade assembly

Similar Documents

Publication Publication Date Title
CN103075017B (en) Super-long-span cylindrical shell lattice structure construction method
CN106992353B (en) A kind of New Ring-like Type expandable truss structure
CN102653965B (en) High-redundancy beam-string truss structure and implementation method
CN203626382U (en) Communication emergency tent support
CN105048390B (en) Falling cable emergency aerial supporting device
CN203174851U (en) Connecting mechanism for limiting lower string cable of string beam
CN104319453B (en) Double-layer annular truss antenna mechanism based on passive drive
CN104196303A (en) Power transmission tower
CN202401815U (en) Novel composite insulator cross arm repairing tower of 220 kV electric transmission line
CN106450649A (en) H-structure spaceborne-antenna unfoldable mechanism
CN104947839A (en) Opening and closing film roof with lower pull cables
CN203601584U (en) Shear-fork type space stretch arm
CN103490165B (en) A kind of loop aerial deployed configuration
CN105625795B (en) A kind of adjustable messenger unfolding arm support
CN208683129U (en) Quadrangular Zhan Danyuan and can open up the space extension means of unit based on quadrangular
CN203430150U (en) Tent eave expansion mechanism for folding tent
CN211770120U (en) Platform extension device on frame-type lifting platform
CN205025154U (en) 330kVGIS distribution device place rigid connection sail formula framework
CN104878865A (en) Roof provided with radial inhaul cables and radial opening and closing membranes
CN113488759B (en) Linear truss type deployable parabolic cylinder antenna mechanism
CN103590651B (en) A kind of folding awn frame and canopy frame thereof
CN206220586U (en) A kind of Asynchronous Interconnection back-to-back converter substation bilayer outlet structure
CN201598876U (en) Large-span folding frame tent rack
CN208216993U (en) A kind of telescopic aircraft support boom device
CN202299603U (en) Tent support which is convenient to unfold and retract

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140604

Termination date: 20201219