CN203613460U - RPC railway ballast trough plate of railway steel truss girder - Google Patents
RPC railway ballast trough plate of railway steel truss girder Download PDFInfo
- Publication number
- CN203613460U CN203613460U CN201320810419.4U CN201320810419U CN203613460U CN 203613460 U CN203613460 U CN 203613460U CN 201320810419 U CN201320810419 U CN 201320810419U CN 203613460 U CN203613460 U CN 203613460U
- Authority
- CN
- China
- Prior art keywords
- railway ballast
- railway
- rpc
- trough plate
- ballast trough
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 229910000831 Steel Inorganic materials 0.000 title abstract description 17
- 239000010959 steel Substances 0.000 title abstract description 17
- 239000003351 stiffener Substances 0.000 claims description 19
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 16
- 229910052742 iron Inorganic materials 0.000 claims description 8
- 239000000463 material Substances 0.000 claims description 6
- 238000011065 in-situ storage Methods 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract description 6
- 230000000903 blocking effect Effects 0.000 abstract 3
- 230000003014 reinforcing effect Effects 0.000 abstract 1
- 238000012423 maintenance Methods 0.000 description 6
- 239000003245 coal Substances 0.000 description 4
- 239000012634 fragment Substances 0.000 description 4
- 239000004575 stone Substances 0.000 description 4
- 244000201986 Cassia tora Species 0.000 description 1
- 235000014552 Cassia tora Nutrition 0.000 description 1
- 239000004593 Epoxy Substances 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 239000012141 concentrate Substances 0.000 description 1
- 238000005336 cracking Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000004570 mortar (masonry) Substances 0.000 description 1
- 238000009417 prefabrication Methods 0.000 description 1
- 238000004080 punching Methods 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
- 238000004078 waterproofing Methods 0.000 description 1
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model relates to an RPC railway ballast trough plate of a railway steel truss girder. A highly reinforcing bar concrete slab of a steel truss girder bridge deck slab is large in self weight, the bridge deck slab can be cracked easily after being pulled, and thus maintaining is difficult. The RPC railway ballast trough plate is provided with an RPC railway ballast trough plate body which is formed by the way that branched blocks are orderly arrayed longitudinally and transversely. The railway ballast trough plate body is provided with longitudinal beam connecting preformed holes. Longitudinal stiffening ribs which are perpendicular to the railway ballast trough plate body and transverse stiffening ribs are arranged at the bottom of the railway ballast trough plate body. A ballast blocking wall and a protecting wall which are vertically arranged in the longitudinal direction are arranged on the two transverse sides of the plate face of the railway ballast trough plate body respectively. According to the RPC railway ballast trough plate of the railway steel truss girder, full-bridge railway ballast trough plates are mutually independently arranged in a blocking mode according to each railway line, so that repairing and maintaining are convenient; longitudinal beams are arranged in a blocking mode according to transportation capability and hoisting construction control sizes, hence, the railway ballast trough plate is merely used as a structure for bearing bridge deck loads and does not participate in overall stress, and the structural stress is clear.
Description
Technical field
the utility model belongs to bridge construction technical field of buildings, is specifically related to a kind of rail iron trusses RPC railway ballast frid.
Background technology
Steel bridge has that span ability is large, suitability for industrialized manufacture, constructability, be easy to the feature of repairing, and is conventional scheme in big or middle span bridge design.Steel purlin is common structure in Longspan Bridge especially, is widely used in the structures such as large-span suspension bridge, cable stayed bridge, steel braced arch, steel truss girder.Traditional open bridge floors girder steel is because noise is large, it is tired easily to produce, track stability is not enough, should not use in High-speed Railway Bridges, on the bridge of steel purlin, railway ballast frid is set, and is designed to the form of tiny fragments of stone, coal, etc. bridge floor for this reason, problem that can efficient solution Cassia tora bridge floor.Railway ballast frid mainly contains the forms such as high armored concrete plate, Orthotropic Steel Bridge Deck+concrete pavement at present.
High armored concrete plate, from great, causes main truss steel using amount to increase; Easy to crack after bridge deck tension, after cracking, structure stress is complicated and uncontrollable, and maintenance difficult has reduced the durability of structure.The Steel Bridge Deck of Orthotropic Steel Bridge Deck+concrete pavement easily produces fatigue, and concrete pavement is easy to crack, maintenance difficult; Concrete pavement and the firm anticorrosion difficulty of bridge floor contact surface; Deadweight is large, main truss steel using amount is large.
RPC (RPC) material is a kind of novel high-strength material, adopts prefabrication, and properties of product are stable, in design, adopt after suitable safety factor, can guarantee not ftracture in normal use procedure, overall performance is good, can meet well functional performance and the durability of structure.Because intensity is high, physical dimension is little compared with conventional concrete railway ballast frid, has alleviated thus dead load, reduces main truss structure steel using amount.
Summary of the invention
The purpose of this utility model is to provide a kind of rail iron trusses RPC railway ballast frid from high, stressed clear and definite, the convenient for maintaining of heavy and light, intensity.
The technical scheme that the utility model adopts is:
A kind of rail iron trusses RPC railway ballast frid, is characterized in that:
The railway ballast frid body that is provided with RPC material, railway ballast frid body is made up of piecemeal, and vertical, horizontal is neatly arranged and is formed railway ballast frid body;
On railway ballast frid body, be provided with longitudinal beam connected preformed hole, the position of longitudinal beam connected preformed hole is corresponding with the fixing peg on longeron, in order to railway ballast frid is fixed on to longeron;
Railway ballast frid body bottom is provided with longitudinal stiffener and the transverse stiffener perpendicular to railway ballast frid body, and longitudinal stiffener and transverse stiffener are orthogonal.
Railway ballast frid body upper face both lateral sides is respectively arranged with vertically longitudinal gear Zha Qiang and protecting wall, adopts the cast in situs of C50 concrete.
Described longitudinal beam connected preformed hole is arranged on the longitudinal stiffener place of railway ballast frid body.
The utlity model has following advantage:
Full-bridge railway ballast frid direction across bridge of the present utility model, by the separate piecemeal layout of carrying out of each railway line, is convenient to maintenance and maintenance; Vertical bridge, to carrying out piecemeal setting by the size of transport capacity and lifting construction control, make railway ballast frid only as bearing the structure of bridge floor load, and it is stressed not participate in entirety, and structure stress is clear and definite.And because piecemeal is arranged and prefabricated railway ballast frid, make to safeguard and change more for convenience, and minimum on railway transport capacity impact.Under regular service conditions, railway ballast frid does not ftracture, and makes the emphasis of waterproof concentrate on the longitudinal piecemeal seam crossing of railway ballast frid, is easy to solve waterproof problem, and structure durability is guaranteed.Because structure has alleviated deadweight, reduce the consumption of main truss steel, there is higher economy.
Accompanying drawing explanation
Fig. 1 is the utility model structural representation.
In figure, 1-railway ballast frid body, 2-longitudinal stiffener, 3-longitudinal beam connected preformed hole, 4-transverse stiffener, 5-protecting wall, 6-keeps off Zha Qiang.
The specific embodiment
Below in conjunction with the specific embodiment, the utility model is described in detail.
A kind of rail iron trusses RPC railway ballast frid that the utility model relates to, be applicable to steel purlin structural bridge, referring to Fig. 1, it is provided with the railway ballast frid body 1 of RPC material, railway ballast frid body 1 is nonintegrated structure, be made up of piecemeal, vertical, horizontal is neatly arranged and is formed railway ballast frid body 1, forms railway deck, suitable bridge is to block length 2.5 m and 3m, direction across bridge is divided into 2 (double track railway, one, every line railways), wide 5.05m.Railway ballast frid body 1 direction across bridge, by the separate piecemeal layout of carrying out of each railway line, is convenient to maintenance and maintenance; Vertical bridge, to for alleviating lifting weight and convenient transportation, also carries out piecemeal layout.On railway ballast frid body 1, be provided with longitudinal beam connected preformed hole 3, the position of longitudinal beam connected preformed hole 3 is corresponding with the fixing peg on longeron, in order to railway ballast frid is fixed on to longeron.Railway ballast frid body 1 bottom is provided with the longitudinal stiffener 2 and transverse stiffener 4 perpendicular to railway ballast frid body 1, and longitudinal stiffener 2 is orthogonal with transverse stiffener 4.Longitudinal beam connected preformed hole 3 is arranged on longitudinal stiffener 2 places of railway ballast frid body 1.Railway ballast frid body 1 upper face both lateral sides is respectively arranged with vertically longitudinal gear tiny fragments of stone, coal, etc. wall 6 and protecting wall 5, adopts C50 concrete to build at the scene.
When construction, use RPC (RPC) material, adopt overall punching block be prefabricated in the factory railway ballast frid body 1, longitudinal stiffener 2, longitudinal beam connected preformed hole 3 and transverse stiffener 4.Railway ballast frid body 1 is placed on the longeron of steel purlin, makes longitudinal beam connected preformed hole 3 corresponding with the peg group who has welded in advance on longeron, in longitudinal beam connected preformed hole 3, pour into epoxy mortar, realize being connected of railway ballast frid body 1 and steel purlin longeron.Field by using concrete cast-in-situ gear tiny fragments of stone, coal, etc. wall 6 and protecting wall 5, construction joint waterproof and surface waterproofing layer, complete the construction of railway ballast frid.
The mode that the utility model vertical, horizontal piecemeal is arranged, in the time causing certain tiny fragments of stone, coal, etc. frid that clears the way to go wrong in non-normal use situation, can only seal wherein and in a railway line situation, it be changed and is keeped in repair, and reaches the object to using minimum interference.
It is cited that content of the present utility model is not limited to embodiment, and the conversion of any equivalence that those of ordinary skills take technical solutions of the utility model by reading the utility model manual, is claim of the present utility model and contains.
Claims (3)
1. a rail iron trusses RPC railway ballast frid, is characterized in that:
The railway ballast frid body (1) that is provided with RPC material, railway ballast frid body (1) is made up of piecemeal, and vertical, horizontal is neatly arranged and is formed railway ballast frid body (1);
On railway ballast frid body (1), be provided with longitudinal beam connected preformed hole (3), the position of longitudinal beam connected preformed hole (3) is corresponding with the fixing peg on longeron, in order to railway ballast frid is fixed on to longeron;
Railway ballast frid body (1) bottom is provided with the longitudinal stiffener (2) and transverse stiffener (4) perpendicular to railway ballast frid body (1), and longitudinal stiffener (2) is orthogonal with transverse stiffener (4).
2. a kind of rail iron trusses RPC railway ballast frid according to claim 1, is characterized in that:
Railway ballast frid body (1) upper face both lateral sides is respectively arranged with vertically longitudinal gear Zha Qiang (6) and protecting wall (5), adopts the cast in situs of C50 concrete.
3. a kind of rail iron trusses RPC railway ballast frid according to claim 2, is characterized in that:
Described longitudinal beam connected preformed hole (3) is arranged on the longitudinal stiffener (2) of railway ballast frid body (1) and locates.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320810419.4U CN203613460U (en) | 2013-12-11 | 2013-12-11 | RPC railway ballast trough plate of railway steel truss girder |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320810419.4U CN203613460U (en) | 2013-12-11 | 2013-12-11 | RPC railway ballast trough plate of railway steel truss girder |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203613460U true CN203613460U (en) | 2014-05-28 |
Family
ID=50766116
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320810419.4U Expired - Lifetime CN203613460U (en) | 2013-12-11 | 2013-12-11 | RPC railway ballast trough plate of railway steel truss girder |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203613460U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104562931A (en) * | 2014-12-30 | 2015-04-29 | 邵旭东 | Bridge deck unit without transverse surface tensioned joints, bridge structure without transverse surface tensioned joints and construction method of bridge structure |
CN105442400A (en) * | 2015-12-11 | 2016-03-30 | 中国铁路总公司 | Reinforcing method of 64-meter spanned steel railway truss suitable for heavy haul train with 30t axle weight |
CN106917356A (en) * | 2017-03-13 | 2017-07-04 | 中铁四局集团钢结构有限公司 | A kind of new steel truss girder bridge railway ballast frid Efficient installation method |
-
2013
- 2013-12-11 CN CN201320810419.4U patent/CN203613460U/en not_active Expired - Lifetime
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104562931A (en) * | 2014-12-30 | 2015-04-29 | 邵旭东 | Bridge deck unit without transverse surface tensioned joints, bridge structure without transverse surface tensioned joints and construction method of bridge structure |
CN104562931B (en) * | 2014-12-30 | 2016-06-08 | 邵旭东 | The seam bridge floor unit of tension without lateral surfaces, bridge structure and construction method thereof |
CN105442400A (en) * | 2015-12-11 | 2016-03-30 | 中国铁路总公司 | Reinforcing method of 64-meter spanned steel railway truss suitable for heavy haul train with 30t axle weight |
CN105442400B (en) * | 2015-12-11 | 2017-01-25 | 中国铁路总公司 | Reinforcing method of 64-meter spanned steel railway truss suitable for heavy haul train with 30t axle weight |
CN106917356A (en) * | 2017-03-13 | 2017-07-04 | 中铁四局集团钢结构有限公司 | A kind of new steel truss girder bridge railway ballast frid Efficient installation method |
CN106917356B (en) * | 2017-03-13 | 2018-07-27 | 中铁四局集团钢结构有限公司 | A kind of novel steel truss girder bridge railway ballast frid Efficient installation method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203768784U (en) | Super toughness concrete plate-steel beam light combined bridge structure | |
CN204530418U (en) | A kind of steel plate combination beam bridge | |
CN204662235U (en) | A kind of steel plate combination T beam bridge | |
CN106400666A (en) | Prestressed concrete-corrugated web steel box connecting beam hybrid beam structural system | |
CN106567320B (en) | The local gravity rigidity and auxiliary suspension cable structure system of large span stayed-cable bridge | |
CN108824162A (en) | A kind of steel_concrete composite beam and its construction method using plain plate and corrugated sheet steel mixing web | |
CN103924505A (en) | Prefabricated steel-concrete combination T beam with corrugated steel web and construction method | |
CN101440598B (en) | Steel box-concrete combined box plate arch structure and construction method thereof | |
CN204919302U (en) | Few main girder structure of wave form steel web | |
CN108867319A (en) | A kind of steel-UHPC combination beam and construction method for cable-stayed bridge | |
CN105133486A (en) | Corrugated steel web few-main-beam structure | |
CN203613460U (en) | RPC railway ballast trough plate of railway steel truss girder | |
CN206328669U (en) | The narrow composite beam of steel box of new concrete | |
CN206800173U (en) | Floorings Prestressed Concrete I Beams are poured after a kind of railway | |
CN203462395U (en) | Stiffened steel truss-concrete beam combined bridge structure | |
CN208668245U (en) | A kind of steel-UHPC combination beam construction for cable-stayed bridge | |
CN112982139A (en) | Wide-width large-span hybrid beam and short-tower cable-stayed bridge system and construction method thereof | |
CN111979893A (en) | Box-shaped combined beam of railway long-span cable-stayed bridge | |
CN104533114A (en) | Seacoast flexible direct-current convertor station valve hall combined building structural system | |
CN203603073U (en) | Reinforced concrete lattice type composite platform beam of elevated station | |
CN208933808U (en) | Using the steel_concrete composite beam of plain plate and corrugated sheet steel mixing web | |
CN103437274A (en) | Bridge structure with combination of stiffening steel truss and concrete beam | |
CN207793846U (en) | A kind of overhead railway platform beams | |
CN207812185U (en) | A kind of suspension type bottom plate opening combinations box prestressed rail beam system | |
CN105648898A (en) | Prefabricated ultra-high-performance concrete half-through beam units, bridge beam structure and construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20140528 |