CN203594092U - Directly buried drainage pipe bearing large equipment or movable load ground - Google Patents

Directly buried drainage pipe bearing large equipment or movable load ground Download PDF

Info

Publication number
CN203594092U
CN203594092U CN201320697437.6U CN201320697437U CN203594092U CN 203594092 U CN203594092 U CN 203594092U CN 201320697437 U CN201320697437 U CN 201320697437U CN 203594092 U CN203594092 U CN 203594092U
Authority
CN
China
Prior art keywords
pipe
steel
iron
cast
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320697437.6U
Other languages
Chinese (zh)
Inventor
李学军
张发祥
朱冠生
***
魏磊
蒙悟
陈兵章
胥俊德
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Engineering Co Ltd of China Railway 21st Bureau Group Co Ltd
Original Assignee
Second Engineering Co Ltd of China Railway 21st Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Engineering Co Ltd of China Railway 21st Bureau Group Co Ltd filed Critical Second Engineering Co Ltd of China Railway 21st Bureau Group Co Ltd
Priority to CN201320697437.6U priority Critical patent/CN203594092U/en
Application granted granted Critical
Publication of CN203594092U publication Critical patent/CN203594092U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Protection Of Pipes Against Damage, Friction, And Corrosion (AREA)

Abstract

The utility model belongs to the technical field of water supply and drainage engineering for housing construction, and relates to a directly buried drainage pipe bearing large equipment or a movable load ground. The directly buried drainage pipe bearing the large equipment or the movable load ground comprises a floor drain, a water discharging pipe and a t-branch pipe. The water discharging pipe comprises a cast-iron water discharging pipe and a steel pipe, wherein the cast-iron water discharging pipe is sleeved with the steel pipe, an internal anti-corrosion layer is arranged on the inner wall of the steel pipe, an external anti-corrosion layer is arranged on the outer wall of the steel pipe, a cast-iron pipe internal anti-corrosion layer is arranged on the inner wall of the cast-iron water discharging pipe. The t-branch pipe comprises a cast-iron t-branch pipe, wherein the cast-iron t-branch pipe is sleeved with a steel t-branch pipe, an annular steel plate is arranged on the upper end surface of a steel t-branch pipe connecting port at a butting connecting end of the floor drain, an internal anti-corrosion layer is arranged on the inner wall of the steel t-branch pipe, an external anti-corrosion layer is arranged on the outer wall of the steel t-branch pipe, and a cast-iron pipe inner anti-corrosion layer is arranged on the inner wall of the cast-iron t-branch pipe. According to the directly buried drainage pipe bearing the large equipment or the movable load ground, the cast-iron pipe is sleeved with the steel pipe, the pipes are mutually sleeved, the steel pipe is mainly used for bearing pressure and discharging a small amount of water, the cast-iron pipe is mainly used for discharging water, the advantages of the two pipes are brought into full play, and complementation of advantages and disadvantages is achieved. The directly buried drainage pipe bearing the large equipment or the movable load ground effectively solves the problem that the ground movable load causes breaking of pipelines easily due to pressure.

Description

The direct-burried gutter on carrying main equipment or dynamic load ground
Technical field
The utility model belongs to room and builds water supply and sewage work technical field, is specifically related to a kind of direct-burried gutter that carries main equipment or dynamic load ground.
Background technology
Lanzhou heavy ion medical research center magnet power supply test and debugging central steel structure belongs to industrial premises, because equipment in use can be at land drainage, again because the heavy ion experimental facilities of 30 tons (ground design is 300kpa/m) left and right is installed on ground, and its be as dynamic loading on ground, do draining trench and will increase high cost, consider that in addition dynamic load also should not arrange draining trench to the impact of structure, and open drain more there is considerable influence to equipment Foundations.In the building " specification of the buried cast iron pipe pipeline configuration of Water and Waste Water Engineering " that China Engineering Construction Standardization Association formulates, clearly state buried iron drain-pipe construction method and be not suitable for the ground that has large load in industrial enterprise, therefore can only be by gutter direct-burried.Due to direct-burried, cast iron pipe is clamp connection on the one hand, once leak, maintenance will be very difficult; In addition dynamic load, the stronger weakness of its fragility of cast iron pipe will be more outstanding.Because at present also not relevant construction technology can be for reference, therefore the selection of pipe and construction technology are large technical barriers.
Summary of the invention
The technical problems to be solved in the utility model is to provide carrying main equipment that a kind of simple in structure, long service life, cost are low or the direct-burried gutter on dynamic load ground.
It is as follows that the utility model solves the problems of the technologies described above the technical scheme of taking: a kind of direct-burried gutter that carries main equipment or dynamic load ground, comprise floor drain, gutter and threeway, it is characterized in that: gutter comprises iron drain-pipe and steel pipe iron drain-pipe outside suit steel pipe; Steel pipe inner wall is provided with interior anticorrosive coat, and outer wall of steel pipe is provided with external anti-corrosion layer, and iron drain-pipe inwall is provided with anticorrosive coat in cast iron pipe.
Threeway comprises cast iron tee piece, and cast iron tee piece outside is set with steel tee piece, is provided with doughnut-shaped steel plate with the steel tee piece interface upper surface of floor drain butt end; Steel tee piece inwall is provided with interior anticorrosive coat, and steel tee piece outer wall is provided with external anti-corrosion layer; Cast iron tee piece inwall is provided with anticorrosive coat in cast iron pipe.
The utility model carries the direct-burried gutter on main equipment or dynamic load ground, from run into technical barrier analysis, adopts single cast iron pipe or steel pipe obviously all cannot solve this difficulty, if adopt special material cost too high again; So inventor of the present utility model is from using the prerequisite of conventional material, use two kinds of tubing by stack, adopt steel pipe and cast iron pipe simultaneously, at cast iron pipe outside suit steel pipe, Guan Zhongyou pipe, a small amount of draining of holding concurrently of the main pressure-bearing of steel pipe, cast iron pipe arterial drainage, give full play to the advantage of two kinds of tubing, realize advantage and weakness complementation.
Application the utility model is compared with common pipe, and innovation has proposed to roll the way of compacting of adding water in compacting, i.e. " watertight method ", and basis, ground is sand horsestone, layering flattens and tamps, and due to intrinsic spacing between the grains of sand, follow-uply may cause foundation settlement.By pouring water, drive on the one hand the tiny grains of sand to fill space, during on the other hand for follow-up vibrating, lubrication is played in grains of sand motion, has reduced greatly the existence in space, has then avoided foundation settlement.
Application the utility model, effectively avoid the adverse effect that direct-buried pipe is leaked and material corrosion phenomenon causes, solve the severe phenomenon that pipeline that ground dynamic load easily causes crushes, with by the method comparison of reinforcing pipes measure, greatly reduce financial cost, and sand head has also obtained the application of maximum function as waste material.Making has the present situation of the gutter way on the ground of dynamic load to be improved without industrial premises.As calculated, with respect to the construction method that strengthens trench arrangement of reinforcement and reduce the impact that dynamic load causes, the construction of application the utility model is reduced expenses more than 30,000 yuan; Save construction cost more than 50%.
Accompanying drawing explanation
Fig. 1 is the surface drainage system schematic diagram of the utility model direct-burried gutter,
Fig. 2 is A-A sectional drawing of Fig. 1,
Fig. 3 is that a large figure is put in the B portion of Fig. 1,
Fig. 4 is the process chart of the utility model construction method,
Fig. 5 is the preceding pipeline base state schematic diagram of pouring water,
Fig. 6 is the each componental movement schematic diagram of pipeline foundation while rolling of pouring water,
Fig. 7 pours water to roll rear pipeline foundation view.
In figure: 1-floor drain, 2-sand head, 3-sand horsestone, 4-gutter, 5-threeway, 501-cast iron tee piece, 502-steel tee piece, 6-doughnut-shaped steel plate, 7-external anti-corrosion layer, 8-steel pipe, 9-interior anticorrosive coat, 10-iron drain-pipe, anticorrosive coat in 11-cast iron pipe, 12-sand grains movement locus, F-cal rolling active force.
The specific embodiment
Embodiment is as shown in Figures 1 and 2: a kind of direct-burried gutter that carries main equipment or dynamic load ground, comprise floor drain 1, gutter 4 and threeway 5, and gutter 2 comprises iron drain-pipe 10 and steel pipe 8, iron drain-pipe 10 outsides suit steel pipes 8; Steel pipe 8 inwalls are provided with interior anticorrosive coat 9, and steel pipe 8 outer walls are provided with external anti-corrosion layer 7, and iron drain-pipe 10 inwalls are provided with anticorrosive coat 11 in cast iron pipe.
Referring to Fig. 3: threeway 5 comprises cast iron tee piece 501, and cast iron tee piece 501 outsides are set with steel tee piece 502, is provided with doughnut-shaped steel plate 6 with the steel tee piece interface upper surface of floor drain butt end; Steel tee piece 502 inwalls are provided with interior anticorrosive coat 9, and steel tee piece 502 outer walls are provided with external anti-corrosion layer 7; Cast iron tee piece 501 inwalls are provided with anticorrosive coat 11 in cast iron pipe.
Construction method of the present utility model, comprise the steps: a, channel excavation: excavation is front according to working drawing unwrapping wire, select the method that mechanical equivalent of light excavation is combined with manual amendment to carry out channel excavation, cutting depth is 70cm below absolute altitude at the bottom of pipeline, can guarantee that like this backfill layered is at 30~35cm, sand head backfill for remaining space, excavation width is more than 1 meter, and guarantor can construct in groove; Having dug both sides, Hou Gou slope will have 10% the gradient, prevents slump;
B, be backfilling and compacted: when backfill, use the compacting of backfill limit, mechanical limit, sand horsestone backfill twice for channel bottom, each 30 cm of sand horsestone backfill thickness, need slightly watering after compacting leveling after each backfill, and the water yield is for slightly making sand horsestone surface slightly moistening; Residue 8cm is not more than the sand head backfill of 3mm and pours water and roll, tamp with particle diameter; Pipe laying after three days; Sand head be in wall plaster construction, sift out, particle diameter is less than 3mm waste material; Pour water preceding pipeline base state as shown in Figure 5: between Shi Yushi, the Sha Yushi of sand horsestone 3, hole is larger, pour water roll front need to be at the sand head 2 of sand horsestone 3 upper berth 3~5cm; Pour water each componental movement state while rolling as shown in Figure 6: under the effect of cal rolling directed force F, the tiny grains of sand start filling pore, sand head makes up vacancy, sand grains between sand horsestone 3, stone, sand head 2 distribute and move along sand grains movement locus 12, and each component starts to tend towards stability; Each component state of pouring water after rolling is as shown in Figure 7: the tiny grains of sand have been filled hole, and sand head has made up vacancy, and component distributes stable;
C, making cement buttress: calculate in advance the absolute altitude of corresponding buttress according to conduit slope, make cement buttress;
D, cast iron pipe pipeline corrosion protection and be connected: cast iron pipe is carried out to interior preservative treatment, and with antirust painting brush twice, the Sudan one time, accomplishes even thickness when brush, can not leak brush; Pipeline connects the zinc-plated clamp connection of employing stainless steel;
E, cast iron pipe water filling test: adopt existing conventional method to pour water to the cast iron pipe after connecting, guarantee that the cast iron pipe after connecting is water-tight;
F, steel pipe corrosion-proof: steel pipe inner wall brushes one times corrosion resistant coating, outer wall of steel pipe brushes one times with pitch, then with twice, cement mortar brush anti-corrosive steel tube;
G, pipeline suit: cast iron pipe entirety anti-corrosive steel tube that do not leak through water filling test, after connecting is coated, obtains suit pipeline; The connected mode of anti-corrosive steel tube is welding;
H, pipeline are installed: suit pipeline is installed to cement buttress, and after installation, outer wall of steel pipe is coated with three oily two felts; Then use again sand head backfill 4cm, then use the backfill of sand horsestone layered rolling, the compacting that adds water in the time rolling backfill is to foundation pad absolute altitude place, ground.

Claims (2)

1. a direct-burried gutter that carries main equipment or dynamic load ground, comprises floor drain, gutter and threeway, it is characterized in that: gutter (2) comprises iron drain-pipe (10) and steel pipe (8), iron drain-pipe (10) outside suit steel pipe (8); Steel pipe (8) inwall is provided with interior anticorrosive coat (9), and steel pipe (8) outer wall is provided with external anti-corrosion layer (7), and iron drain-pipe (10) inwall is provided with anticorrosive coat (11) in cast iron pipe.
2. a kind of direct-burried gutter that carries main equipment or dynamic load ground as claimed in claim 1, it is characterized in that: threeway (5) comprises cast iron tee piece (501), cast iron tee piece (501) outside is set with steel tee piece (502), is provided with doughnut-shaped steel plate (6) with the steel tee piece interface upper surface of floor drain butt end; Steel tee piece (502) inwall is provided with interior anticorrosive coat (9), and steel tee piece (502) outer wall is provided with external anti-corrosion layer (7); Cast iron tee piece (501) inwall is provided with anticorrosive coat (11) in cast iron pipe.
CN201320697437.6U 2013-11-06 2013-11-06 Directly buried drainage pipe bearing large equipment or movable load ground Expired - Lifetime CN203594092U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320697437.6U CN203594092U (en) 2013-11-06 2013-11-06 Directly buried drainage pipe bearing large equipment or movable load ground

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320697437.6U CN203594092U (en) 2013-11-06 2013-11-06 Directly buried drainage pipe bearing large equipment or movable load ground

Publications (1)

Publication Number Publication Date
CN203594092U true CN203594092U (en) 2014-05-14

Family

ID=50674988

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320697437.6U Expired - Lifetime CN203594092U (en) 2013-11-06 2013-11-06 Directly buried drainage pipe bearing large equipment or movable load ground

Country Status (1)

Country Link
CN (1) CN203594092U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103615043A (en) * 2013-11-06 2014-03-05 中铁二十一局集团第二工程有限公司 Surface directly-buried drain pipe assembly bearing large equipment or dynamic load, and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103615043A (en) * 2013-11-06 2014-03-05 中铁二十一局集团第二工程有限公司 Surface directly-buried drain pipe assembly bearing large equipment or dynamic load, and construction method thereof

Similar Documents

Publication Publication Date Title
CN110306616B (en) Construction method of sewage pipeline
CN100412275C (en) Waterproof and plugging construction method for precipitation well in foundation pit
CN103526770B (en) A kind of construction method of high antiseepage anti-floating pile raft structure
CN107587557A (en) Outdoor water engineering construction method
CN100473790C (en) Tower crane foundation for construction and manufacturing method thereof
CN101936032A (en) Method for mounting and constructing polyethylene double-wall corrugated water discharge pipe
CN103806470B (en) Mounting method produced by steel concrete manhole
CN105089081A (en) Anti-floating anchor rod construction method
CN107630500A (en) A kind of water supply and drainage construction method
US20200318306A1 (en) Construction method of reclaiming land from the sea based on basement utilization
CN110700266A (en) Underground continuous wall toe post-grouting construction method
CN104563271A (en) Plastic inspection well and construction method thereof
CN103615043B (en) Direct-burried drainpipe and the construction method thereof on carrying main equipment or dynamic load ground
CN206467695U (en) A kind of joint for sinking type empty stomach diaphram wall
CN102877538A (en) Construction method for fixing HDPE (high-density polypropylene) pipe by embedding iron wires
CN208563315U (en) A kind of pile foundation grouting behind shaft or drift lining constructing device
CN107700521B (en) Building foundation reinforcement underpinning pier and construction method thereof
CN203594092U (en) Directly buried drainage pipe bearing large equipment or movable load ground
CN212641685U (en) Underground garage drainage open ditch and blind ditch combine antiseep system
CN206529795U (en) A kind of municipal comprehensive pipeline passage of assembled
CN110808564B (en) Concrete cable trench construction process
CN107152034A (en) A kind of pipe gallery and its construction method
CN204401756U (en) The drop well that reverse construction is set up on original gutter
CN204080750U (en) Box-type suction foundation sluice structure
CN204174629U (en) A kind of light-duty precipitation well point ater-casting, underground building multi-way prevention plugging structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20140514