CN203531913U - Treatment device for deepwater tailing sintering layer - Google Patents
Treatment device for deepwater tailing sintering layer Download PDFInfo
- Publication number
- CN203531913U CN203531913U CN201320697800.4U CN201320697800U CN203531913U CN 203531913 U CN203531913 U CN 203531913U CN 201320697800 U CN201320697800 U CN 201320697800U CN 203531913 U CN203531913 U CN 203531913U
- Authority
- CN
- China
- Prior art keywords
- tailing
- fixedly connected
- gripper shoe
- tailings
- ship
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Manufacture And Refinement Of Metals (AREA)
Abstract
The utility model discloses a treatment device for a deepwater tailing sintering layer. The treatment device comprises a tailing taking ship (1), wherein a drilling device is arranged at the end part of the tailing taking ship (1) and comprises a supporting plate (8) and a drill (2) fixedly connected to the supporting plate (8); one end of the supporting plate (8) is fixedly connected with the tailing taking ship (1); the other end of the supporting plate (8) is fixedly connected with a balance device; the drill (2) is fixedly connected with a drilling rod (3); the end part of the drilling rod (3) is fixedly connected with a drill bit (4). Due to the combined structural design of the tailing taking ship and the drilling device, the treatment device disclosed by the utility model can treat the deepwater tailing sintering layer, so that deep tailing taking from a tailing storehouse can be realized; the taken tailing can meet recycling production demands on valued metals such as sulfur and iron; the production efficiency can be improved; an underground filling requirement can be met, and the economical benefit of an enterprise is improved.
Description
Technical field
The utility model relates to a kind of deep water tailings sinter layer treating apparatus.
Background technology
In order to solve mine down-hole filling problem, now adopt tailing warehouse sand fetching system, by the tailings of taking-up, after sulphur, iron ore concentrate are fully reclaimed in flotation, magnetic separation, by cyclone classification, coarse fraction tailings is for underground filling, and fine-grained tailing is returned to Tailings Dam and is deposited.Along with Tailings Dam water level raises and gets sand point and pass to key dam, at 5 ~ 7 meters of of water level, there is one deck tailings sinter layer, 0.5 meter of left and right of thickness, the suction sand rifle head of getting sand ship Sand pump cannot penetrate sinter layer, can only get part fine fraction and low-grade tailings.This can cause tailings grade can not meet underground filling requirement on the one hand, causes filling potential safety hazard; Can cause on the other hand sulphur, the iron ore concentrate output of recovery too low, production efficiency is low, can not meet Production requirement.
Utility model content
The purpose of this utility model is to provide a kind of deep water tailings sinter layer treating apparatus, can realize Tailings Dam deep and get sand, makes the tailings taking out can meet underground filling requirement, and can meet the remanufacture demand of tailings.
The technical solution adopted in the utility model is: a kind of deep water tailings sinter layer treating apparatus, comprise and get sand ship, described end of getting sand ship is provided with drilling equipment, described drilling equipment comprises gripper shoe and is fixed in the rig in gripper shoe, one end of described gripper shoe with get sand ship and be fixedly connected with, the other end of gripper shoe is connected with bascule, on described rig, is connected with drilling rod, and the end of described drilling rod is connected with drill bit.
As further improvement of the utility model, described bascule comprises and is fixed in hoist engine and the upending frame of getting on sand ship, on described upending frame, be connected with wire rope, one end of described wire rope is fixedly connected with hoist engine, and the other end of wire rope is fixedly connected with gripper shoe.
As further improvement of the utility model, the diameter of described drill bit is 500 millimeters.
The beneficial effect that the utility model adopts is: the structure design that the utility model combines with drilling equipment by getting sand ship, can process deep water mine tailing sinter layer, realize Tailings Dam deep and get sand, make the tailings taking out can meet underground filling requirement, and can meet the remanufacture demand of tailings, enhance productivity.
Accompanying drawing explanation
Fig. 1 is the utility model structural representation.
Shown in figure: 1, get sand ship, 2, rig, 3, drilling rod, 4, drill bit, 5, wire rope, 6, hoist engine, 7, lifting machine, 8, gripper shoe.
The specific embodiment
Below in conjunction with Fig. 1, the utility model is described further.
As shown in Figure 1, a kind of deep water tailings sinter layer treating apparatus, comprise and get sand ship 1, the end of getting sand ship 1 is provided with drilling equipment, drilling equipment comprises gripper shoe 8 and is fixed in the rig 2 in gripper shoe 8, one end of gripper shoe 8 with get sand ship 1 and be fixedly connected with, the other end of gripper shoe 8 is connected with bascule, on rig 2, be connected with drilling rod 3, the end of drilling rod 3 is connected with drill bit 4, the diameter of drill bit 4 is 500 millimeters, bascule comprises and is fixed in hoist engine 6 and the upending frame 7 of getting on sand ship, on upending frame 7, be connected with wire rope 5, one end of wire rope 5 is fixedly connected with hoist engine 6, the other end of wire rope 5 is fixedly connected with gripper shoe 8.
The utility model in use, rig is carrying out after intensive boring Tailings Dam deep water tailings sinter layer, forming diameter is the broken region of 4 meters of left and right, utilize the suction sand rifle head of Sand pump to get sand to broken region, and periphery sinter layer bottom tailings is inhaled empty, under Action of Gravity Field, collapsed in sinter layer part to form to get sand interface, realize Tailings Dam deep and got sand, the tailings that makes to take out can meet the remanufacture demand of valuable metal sulphur, iron, enhance productivity, and can meet underground filling requirement, improve Business Economic Benefit.
Claims (3)
1. a deep water tailings sinter layer treating apparatus, comprise and get sand ship (1), the end of getting sand ship (1) described in it is characterized in that is provided with drilling equipment, described drilling equipment comprises gripper shoe (8) and is fixed in the rig (2) in gripper shoe (8), one end of described gripper shoe (8) with get sand ship (1) and be fixedly connected with, the other end of gripper shoe (8) is connected with bascule, is connected with drilling rod (3) on described rig (2), and the end of described drilling rod (3) is connected with drill bit (4).
2. a kind of deep water tailings sinter layer treating apparatus according to claim 1, it is characterized in that described bascule comprises is fixed in hoist engine (6) and the upending frame (7) of getting on sand ship, on described upending frame (7), be connected with wire rope (5), one end of described wire rope (5) is fixedly connected with hoist engine (6), and the other end of wire rope (5) is fixedly connected with gripper shoe (8).
3. a kind of deep water tailings sinter layer treating apparatus according to claim 1, the diameter that it is characterized in that described drill bit (4) is 500 millimeters.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320697800.4U CN203531913U (en) | 2013-11-07 | 2013-11-07 | Treatment device for deepwater tailing sintering layer |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320697800.4U CN203531913U (en) | 2013-11-07 | 2013-11-07 | Treatment device for deepwater tailing sintering layer |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203531913U true CN203531913U (en) | 2014-04-09 |
Family
ID=50418134
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320697800.4U Expired - Fee Related CN203531913U (en) | 2013-11-07 | 2013-11-07 | Treatment device for deepwater tailing sintering layer |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203531913U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115339576A (en) * | 2022-08-31 | 2022-11-15 | 伊春鹿鸣矿业有限公司 | Full-hydraulic multifunctional tailing pond management machine |
-
2013
- 2013-11-07 CN CN201320697800.4U patent/CN203531913U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115339576A (en) * | 2022-08-31 | 2022-11-15 | 伊春鹿鸣矿业有限公司 | Full-hydraulic multifunctional tailing pond management machine |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103696774B (en) | Aboveground down-hole parallel construction staple shaft frame development method | |
CN202832319U (en) | Drilling fluid solid control system | |
CN110006625A (en) | A kind of deep-sea ore Hydraulic Transportation System bath scaled model experimental device | |
CN203531913U (en) | Treatment device for deepwater tailing sintering layer | |
CN105888542B (en) | A kind of drilling machine of solar energy auxiliary energy supply | |
CN203531914U (en) | Deepwater tailing sintering layer treatment device | |
CN202655106U (en) | Superfine tailing fluidized mining and bacterial leaching system | |
CN203961871U (en) | Oil recovery fishing device | |
CN201738358U (en) | Tailing warehouse sand fetching device | |
CN102268992A (en) | Sand sampling method and sand sampling device of tailing pond | |
CN204677201U (en) | A kind of mechanical coal mining machine | |
CN204491325U (en) | Mine track ground roll | |
CN203209155U (en) | Flow-splitting type mineral separation mechanism | |
CN204395547U (en) | Rotational-flow high-efficient deep cone thickener | |
CN104481533A (en) | Underground mine and ore lifting method | |
CN104388672A (en) | Process for extracting gold from gold ore containing copper by using ammonia, cyanide and carbon | |
CN102764692A (en) | Superfine tailing fluidized mining and bacterial leaching system and technology | |
CN204503310U (en) | Sulphur ore resources recycling system in a kind of troilite mud | |
CN206008942U (en) | A kind of mill of magnetic iron ore underground mill selects system | |
CN203212317U (en) | Ore pulp dividing box | |
Wang et al. | Comprehensive utilization and resources of gold mining tailings | |
CN106111303B (en) | A kind of mill of magnetic iron ore underground mill selects system | |
CN104028363A (en) | Micro-power mining machine capable of obtaining both high-quality river sand and multiple metal mineral powder | |
CN103769293A (en) | Method for making building sand from tailing sand | |
CN204523225U (en) | A kind of permanent-magnet drum type magnetic separator |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140409 Termination date: 20161107 |
|
CF01 | Termination of patent right due to non-payment of annual fee |