CN203514331U - Large-aperture deep well point dewatering system arranged outside foundation pit - Google Patents

Large-aperture deep well point dewatering system arranged outside foundation pit Download PDF

Info

Publication number
CN203514331U
CN203514331U CN201320525185.9U CN201320525185U CN203514331U CN 203514331 U CN203514331 U CN 203514331U CN 201320525185 U CN201320525185 U CN 201320525185U CN 203514331 U CN203514331 U CN 203514331U
Authority
CN
China
Prior art keywords
well
pipe
foundation ditch
well point
dewatering system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320525185.9U
Other languages
Chinese (zh)
Inventor
王全逵
沈威
马力
朱星德
李彦
安荣勋
盛文学
刘艳伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Fourth Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltc
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Fourth Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd, Fourth Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltc filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN201320525185.9U priority Critical patent/CN203514331U/en
Application granted granted Critical
Publication of CN203514331U publication Critical patent/CN203514331U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The utility model provides a large aperture deep-well point dewatering system of setting outside foundation ditch, includes well point pipe, water pump, drainage branch pipe and main drainage pipe, well point pipe inserts in the well hole, it inserts intraductally in the well point to drain, and its tip that stretches into well point pipe is connected with the water pump, and its other end and main drainage pipe are connected, well point pipe is arranged in the periphery of planning the excavation foundation ditch, all is provided with the valve between each drainage branch pipe and the main drainage pipe, the closed circle that encircles the periphery of planning the excavation foundation ditch that the main drainage pipe connects into gathers to the main drainage pipe, the main drainage pipe outlet end of catchmenting inserts the fire-fighting cistern. The utility model discloses easy maintenance, the efficiency of construction is high, does not influence the earlier stage construction in the foundation ditch, and is energy-concerving and environment-protective, but wide application has the foundation ditch precipitation construction at large-scale water source around the job site.

Description

Be arranged on the big diameter and deep well-points dewatering system outside foundation ditch
Technical field
The utility model relates to the precipitation system in a kind of foundation pit construction, particularly a kind of big diameter and deep well-points dewatering system being arranged on outside foundation ditch.
Background technology
Deep well point dewatering construction technology is a common technology in building foundation pit construction, but under different geological conditionss, the concrete operations of dewatering construction have very large difference, especially construction plant groundwater table is high, and be connected with large-scale water sources such as near river, river, Hu Hai, and in the time of stronger with near the complementarity at large-scale water source, the difficulty of well-points dewatering is just very large.Conventional precipitation system is that precipitation well point is arranged in plan excavation pit at present, all extraction drainings are in charge of and are all collected to leader drain and enclose in closed circle, unification arranges a by-pass valve control, the advantage of this precipitation system is that precipitation system installation is simple, can realize fast the decline of Water Level in Foundation Pit; Shortcoming is that precipitation well point is arranged in foundation ditch, and the construction in foundation ditch can only wait precipitation to finish to start, if the duration is nervous, will increase the duration pressure in later stage; In addition, for the more situation of precipitation well point, a by-pass valve control is simply set, once a dewatering well goes wrong, whole precipitation system all must quit work, and takes time and effort.In water source or gutter near the underground water that well-points dewatering is extracted normally simply enters, cannot realize effective utilization of underground water.
Utility model content
The purpose of this utility model is to provide a kind of big diameter and deep well-points dewatering system being arranged on outside foundation ditch, solve the follow-up construction of impact of existing foundation pit dewatering, in Precipitation Process, keep in repair inconvenient technical problem, solve the technical problem of the energy-conserving and environment-protective construction in foundation pit construction simultaneously.
For achieving the above object, the utility model adopts following technical scheme:
A kind of big diameter and deep well-points dewatering system being arranged on outside foundation ditch, comprise well-point pipe, water pump, draining is in charge of and leader drain, described well-point pipe inserts in wellhole, described draining is in charge of in insertion well-point pipe, its end of stretching into well-point pipe is connected with water pump, its other end is connected with leader drain, described well-point pipe is arranged in the periphery of intending excavation pit, each draining be in charge of and leader drain between be provided with valve, the closure circle of the periphery around plan excavation pit that described leader drain connects into also gathers to water header, described water header water side access fire-fighting reservoir.
The bottom surface of described well-point pipe is surrounded by screen pack.
Described well-point pipe is plastic film capicitor.
Described draining is in charge of for pvc pipe.
Described leader drain is threaded steel pipe or seamless steel pipe.
Compared with prior art the utlity model has following characteristics and beneficial effect:
By in each draining, be in charge of and leader drain between valve is set, in the time of can guaranteeing to break down in any one well point, only need close this well point, can normally work in other well points, improved efficiency of construction, ensured the construction period.
Adopt deep-well precipitation system described in the utility model, can effectively reduce groundwater table, for foundation construction provides necessary guarantee, meanwhile, because dewatering well is all arranged on outside foundation ditch, do not affect the construction in place.
In addition, this precipitation system, focuses on the water of extracting out from stratum in water for fire fighting pond, has realized energy-saving and emission-reduction, environmental protection construction.
The utility model can be widely used in the foundation pit dewatering construction that job site has large-scale water source around.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the utility model is described in more detail.
Fig. 1 is well-points dewatering system well point layout schematic diagram.
Fig. 2 is the A-A sectional view of Fig. 1.
Reference numeral: 1-intends that excavation pit, 2-fire-fighting reservoir, 3-draining are in charge of, 4-well-point pipe, 5-water pump, 6-valve, 7-leader drain, 8-screen pack, 9-water header, 10-are observed well.
The specific embodiment
Embodiment is referring to shown in Fig. 1 and Fig. 2, a kind of big diameter and deep well-points dewatering system being arranged on outside foundation ditch, comprise well-point pipe 4, water pump 5, draining is in charge of 3 and leader drain 7, described well-point pipe 4 inserts in hoistway, described draining is in charge of in 3 insertion well-point pipes 4, its end of stretching into well-point pipe 4 is connected with water pump 5, its other end is connected with leader drain 7, described well-point pipe 4 is arranged in the periphery of intending excavation pit 1, each draining be in charge of 3 and leader drain 7 between be provided with valve 6, the closure circle of the periphery around plan excavation pit 1 that described leader drain 7 connects into also gathers to water header 9, described water header 9 water side access fire-fighting reservoirs 2.
The bottom surface of described well-point pipe 4 is surrounded by screen pack 8.
Described well-point pipe 4 is plastic film capicitor.
Described draining is in charge of 3 for pvc pipe.
Described leader drain 7 is threaded steel pipe or seamless steel pipe.
Preferably, can consider every 100m, to establish a manual gate to occur that in work progress surprisingly (as haul vehicle, loader, trenching machine break) is convenient to timely repairing at leader drain.The about 1000m of length of every section of leader drain.
1) technological process
Well point measurement and positioning → dig a well mouthful, Hospice Center's cylinder → rig be in place → and boring → backfill shaft bottom sand cushion → hang divides into water pump, the complete well-point pipe → shut-in well that pulls out of installation pumping control circuit → examination normally work → precipitation of draw water → dewatering well in the gravel filtration beds → well-flushing → well casing between well casing → backfill well casing and hole wall, in the present embodiment, press the about 15m of well spacing, well depth 22m, well head aperture φ 500mm, leader drain caliber φ 325mm, draining is in charge of caliber φ 300mm and is arranged.
2) main points of operation
(1) excavation of foundation pit
First according to excavation of foundation pit sideline, carrying out the first step fetches earth, 2 the observation wells 10 of first constructing while fetching earth for the first time, the effect of observing well 10 is the speed of checking groundwater table and observing precipitation below, fetch earth as pit earthwork being excavated to the above 0.2m of phreatic line place, and carry out the support work of excavation slope.
(2) location, well point
Position: according to well location and the on-site actual situations of design, accurately make each well location and put, and carry out mark.
(3) well point construction
1) adopt rig.Aperture is generally 600mm, and with mud off, aperture arranges casing, in case aperture landslide, and establish gutter, mud sump in a side.
2) clear hole immediately after pore-forming, and well-point pipe is installed.After well-point pipe is lowered to, the chimney filter of well-point pipe part should be placed in the proper range in aquifer, and fills gravel filtrate between well-point pipe and hole wall.
3) install before water pump, by compressed air well-flushing method, clean filter well, rush dedusting slag, until the water of discharging in water header is clear by muddy change, till reaching normal water yield.
4) after water pump is installed, water pump itself and control system are done once to comprehensive careful inspection, try to draw water after qualified, after meeting the demands, proceed to normal work.
5) WATER LEVEL CHANGES in observation well, performs detailed record.

Claims (5)

1. the big diameter and deep well-points dewatering system being arranged on outside foundation ditch, comprise well-point pipe (4), water pump (5), (3) and leader drain (7) are in charge of in draining, described well-point pipe (4) inserts in wellhole, described draining is in charge of (3) and is inserted in well-point pipe (4), its end of stretching into well-point pipe (4) is connected with water pump (5), its other end is connected with leader drain (7), it is characterized in that: described well-point pipe (4) is arranged in the periphery of intending excavation pit (1), each draining is in charge of between (3) and leader drain (7) and is provided with valve (6), the closure circle of the periphery around plan excavation pit (1) that described leader drain (7) connects into also gathers to water header (9), described water header (9) water side access fire-fighting reservoir (2).
2. the big diameter and deep well-points dewatering system being arranged on outside foundation ditch according to claim 1, is characterized in that: the bottom surface of described well-point pipe (4) is surrounded by screen pack (8).
3. the big diameter and deep well-points dewatering system being arranged on outside foundation ditch according to claim 1, is characterized in that: described well-point pipe (4) is plastic film capicitor.
4. the big diameter and deep well-points dewatering system being arranged on outside foundation ditch according to claim 1, is characterized in that: described draining is in charge of (3) for pvc pipe.
5. the big diameter and deep well-points dewatering system being arranged on outside foundation ditch according to claim 1, is characterized in that: described leader drain (7) is threaded steel pipe or seamless steel pipe.
CN201320525185.9U 2013-08-27 2013-08-27 Large-aperture deep well point dewatering system arranged outside foundation pit Expired - Fee Related CN203514331U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320525185.9U CN203514331U (en) 2013-08-27 2013-08-27 Large-aperture deep well point dewatering system arranged outside foundation pit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320525185.9U CN203514331U (en) 2013-08-27 2013-08-27 Large-aperture deep well point dewatering system arranged outside foundation pit

Publications (1)

Publication Number Publication Date
CN203514331U true CN203514331U (en) 2014-04-02

Family

ID=50373286

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320525185.9U Expired - Fee Related CN203514331U (en) 2013-08-27 2013-08-27 Large-aperture deep well point dewatering system arranged outside foundation pit

Country Status (1)

Country Link
CN (1) CN203514331U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104060636A (en) * 2014-05-22 2014-09-24 中国建筑第四工程局有限公司 Depressurization and anti-floating method and device thereof for foundation construction in high water level region building

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104060636A (en) * 2014-05-22 2014-09-24 中国建筑第四工程局有限公司 Depressurization and anti-floating method and device thereof for foundation construction in high water level region building
CN104060636B (en) * 2014-05-22 2016-06-22 中国建筑第四工程局有限公司 Pressure release anti-float method during high water level regional architecture foundation construction and device

Similar Documents

Publication Publication Date Title
CN100480475C (en) Controllable one-well lamina precipitation construction method
WO2018214659A1 (en) Novel process for controlling downhole gas in abandoned mine
CN107489159A (en) Deep & thick silt matter Soft Soil Layer vacuum tube well dewatering construction structure and its construction
CN109026010B (en) A kind of mine seepage well slip casting type sinking shaft construction method
CN105625445B (en) A kind of Method on Dewatering of Foundation Pit of coastal sand soil area
CN103967028A (en) Immersed tube drainage structure and method for handling suddenly-produced foundation pit water bursting and fountains through immersed tube drainage structure
CN110029680B (en) Deep foundation pit dewatering construction method
LU500273B1 (en) New comprehensive dewatering and drainage method and drainage device for mudstone subway station
CN104314090A (en) Deep foundation pit bedrock drainage culvert and drainage system and drainage construction method thereof
CN108867673A (en) A kind of underwater prevention method in the foundation pit based on the curtain that draws water
CN105401587A (en) Water descending system for foundation pits through deep wells and shallow wells for composite stratums of large-scale foundation pits and water descending method of water descending system
CN105484277A (en) Component for tubular well precipitation construction in elevator foundation pit or sump and construction method
CN205205844U (en) Member is used in construction of tubular well precipitation in elevator foundation ditch or sump pit
CN211228566U (en) Recoverable vacuum light well point dewatering system
CN203514331U (en) Large-aperture deep well point dewatering system arranged outside foundation pit
CN105696611A (en) Foundation pit dewatering device for sand layer with high water permeability
CN214363571U (en) Underground cavern dewatering system free of influence of obstacles
CN104060636B (en) Pressure release anti-float method during high water level regional architecture foundation construction and device
CN201158823Y (en) Recoverable impact drill steel pipe downcast well
CN114250801A (en) Pipe well and light well point combined dewatering construction method
CN204626434U (en) Manual hole digging pile water stopping structure
CN204551507U (en) A kind of rock foundation ductule local dewatering device
CN103898920B (en) Foundation ditch falls, water discharge method
CN203066092U (en) Pumping and recharging dual-purpose well casing
CN203834529U (en) Pressure-relieving anti-floating device for building foundation construction in high-water-level district

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140402

Termination date: 20140827

EXPY Termination of patent right or utility model