CN203490511U - Power supply system - Google Patents

Power supply system Download PDF

Info

Publication number
CN203490511U
CN203490511U CN201320516297.8U CN201320516297U CN203490511U CN 203490511 U CN203490511 U CN 203490511U CN 201320516297 U CN201320516297 U CN 201320516297U CN 203490511 U CN203490511 U CN 203490511U
Authority
CN
China
Prior art keywords
power supply
power
electric power
power system
module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320516297.8U
Other languages
Chinese (zh)
Inventor
金煜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SUZHOU INDUSTRIAL PARK ABLEREX ELECTRONICS Co Ltd
Original Assignee
SUZHOU INDUSTRIAL PARK ABLEREX ELECTRONICS Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SUZHOU INDUSTRIAL PARK ABLEREX ELECTRONICS Co Ltd filed Critical SUZHOU INDUSTRIAL PARK ABLEREX ELECTRONICS Co Ltd
Priority to CN201320516297.8U priority Critical patent/CN203490511U/en
Application granted granted Critical
Publication of CN203490511U publication Critical patent/CN203490511U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The utility model discloses a power supply system. The power supply system relates to the low voltage power distribution technology field, and comprises a mains supply, a battery pack and multi-path power consumption loads, and also comprises a safety power supply in which a time sharing power off device is arranged. The time sharing power off device comprises a user interaction module used for monitoring, controlling and managing the multi-path power consumption loads and setting the priorities of the power equipment, and a PLC module and an output power distribution module used for carrying out concentrated power supply control on the multipath loads. The power supply system of the utility model can save a lot of safety power supply and storage battery investment cost and the device use space by using the time sharing power off device, and can supply power to the user loads selectively and periodically according to the priorities of the user loads.

Description

A kind of electric power system
Technical field
The utility model relates to low-voltage distribution technical field, relates in particular to a kind of electric power system.
Background technology
The production of modern society is increasing to the dependence of electric power, and many fields that supply is had relatively high expectations to electric power all adopt UPS power supply.Use at present equipment safety power supply accumulator when power-off of UPS there is no difference successively to its power supply order, use common safety power supply storage battery power supply, until the power consumption of safety power supply accumulator is complete simultaneously.This mode is larger to the demand of safety power supply accumulator, and visual plant cannot obtain preferential power supply and protection.Simultaneously owing to not having a kind of effective device to be connected with multichannel loading, so also cannot realize multichannel loading is carried out to centrally connected power supply control.
Utility model content
(1) technical matters that will solve
The technical problems to be solved in the utility model is that during safety power supply power-off, how according to the priority order is carried out the power supply of selectivity, stage to consumer, makes visual plant preferentially be powered and protect.
(2) technical scheme
In order to address the above problem, the utility model provides a kind of electric power system, it is characterized in that, described electric power system comprises: the multichannel loading of civil power, electric battery and electricity consumption, described electric power system also comprises the safety power supply of built-in timesharing breaker device, and described timesharing breaker device comprises:
User interactive module, it is for setting multichannel loading being monitored, control with the priority of managing consumer;
PLC module and output distribution module, it is for carrying out centrally connected power supply control to multichannel loading.
Wherein, described user interactive module comprises visual touch screen.
Wherein, described PLC module comprises pre-set programs unit and monitoring means.
Wherein, described user interactive module is changed with described PLC module and is carried out signal transmission by D/A.
(3) beneficial effect
Electric power system described in the utility model; use timesharing breaker device can save a large amount of safety power supply accumulator costs of investment and equipment usage space; and can to it, carry out the power supply of selectivity, stage according to the priority of user load; visual plant can obtain priority protection and it can calculate safety power supply accumulator demand like this, thereby can make rationalizing to the consumption of accumulator, selects.This electric power system is carried out centrally connected power supply control to multichannel loading centered by safety power supply, can reach the object of optimal utilization electric energy and reasonable distribution electric energy, thereby greatly improves service efficiency and the safety in utilization of safety power supply.
Accompanying drawing explanation
Fig. 1 is structured flowchart of the present utility model;
Embodiment
Below in conjunction with drawings and Examples, embodiment of the present utility model is described in further detail.Following examples are used for illustrating the utility model, but are not used for limiting scope of the present utility model.
Shown in Fig. 1, described electric power system comprises: the multichannel loading 4 of civil power 1, electric battery 2 and electricity consumption, and described electric power system also comprises the safety power supply 3 of built-in timesharing breaker device 30, described timesharing breaker device 30 comprises,
User interactive module 301, it is for setting multichannel loading being monitored, control with the priority of managing consumer;
PLC module 302 and output distribution module 303, it is for carrying out centrally connected power supply control to multichannel loading 4.
Preferably, described user interactive module 301 comprises visual touch screen.
Preferably, described PLC module 302 comprises pre-set programs unit and monitoring means.
Preferably, described user interactive module 301 is changed with described PLC module 302 and is carried out signal transmission by D/A.
302 pairs of setting signals of described PLC module are processed and are produced corresponding control signal and are transferred to described output distribution module 303.Described output distribution module 303 is carried out the power supply of selectivity, stage according to the priority of setting to consumer according to control signal, make visual plant preferentially be powered and protect.Described user interactive module 301 is connected with civil power 1 and electric battery 2 by safety power supply 3, completes monitoring, control and management to one or more input, makes staff accomplish real-time control to the power supply state of civil power 1 and electric battery 2.Described user interactive module 301 carries out user's input message to be transferred to described PLC module 302 after D/A conversion.The signal that described PLC module transmits described user interactive module carries out analyzing and processing and produces corresponding control signal, and transfers signals to described output distribution module 303.The control signal of described PLC module 302 will be controlled by the power supply of 303 pairs of multichannel loadings 4 of described output distribution module.Cooperation realization by described user interactive module 301, described PLC module 302 and described output distribution module 303 is carried out centrally connected power supply control to multichannel loading.Described user load module receives user to the setting of load priority and the setting to the load supplying time, by above-mentioned set information is calculated, can draw the quantity of required accumulator.Thereby staff can obtain intuitively the demand of accumulator and can make corresponding adjustment according to accumulator demand from described User Interface.
Above embodiment is only for illustrating the utility model; and be not limitation of the utility model; the those of ordinary skill in relevant technologies field; in the situation that not departing from spirit and scope of the present utility model; can also make a variety of changes and modification; therefore all technical schemes that are equal to also belong to category of the present utility model, and scope of patent protection of the present utility model should be defined by the claims.

Claims (4)

1. an electric power system, is characterized in that, described electric power system comprises: the multichannel loading of civil power, electric battery and electricity consumption, and described electric power system also comprises the safety power supply of built-in timesharing breaker device, described timesharing breaker device comprises:
User interactive module, it is set for multichannel loading being monitored, control with the priority of managing consumer;
PLC module and output distribution module, it is for carrying out centrally connected power supply control to multichannel loading.
2. electric power system as claimed in claim 1, is characterized in that, described user interactive module comprises visual touch screen.
3. electric power system as claimed in claim 1, is characterized in that, described PLC module comprises pre-set programs unit and monitoring means.
4. electric power system as claimed in claim 1, is characterized in that, described user interactive module is changed with described PLC module and carried out signal transmission by D/A.
CN201320516297.8U 2013-08-23 2013-08-23 Power supply system Expired - Fee Related CN203490511U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320516297.8U CN203490511U (en) 2013-08-23 2013-08-23 Power supply system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320516297.8U CN203490511U (en) 2013-08-23 2013-08-23 Power supply system

Publications (1)

Publication Number Publication Date
CN203490511U true CN203490511U (en) 2014-03-19

Family

ID=50261332

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320516297.8U Expired - Fee Related CN203490511U (en) 2013-08-23 2013-08-23 Power supply system

Country Status (1)

Country Link
CN (1) CN203490511U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103472775A (en) * 2013-08-23 2013-12-25 苏州工业园区安电电子有限公司 Power supply system and power supply method
CN110120700A (en) * 2018-02-05 2019-08-13 杭州海康威视数字技术股份有限公司 Power supply system and its control method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103472775A (en) * 2013-08-23 2013-12-25 苏州工业园区安电电子有限公司 Power supply system and power supply method
CN110120700A (en) * 2018-02-05 2019-08-13 杭州海康威视数字技术股份有限公司 Power supply system and its control method

Similar Documents

Publication Publication Date Title
CN103472775A (en) Power supply system and power supply method
CN103676846B (en) A kind of intelligent control algorithm of Novel household energy management system
CN202126599U (en) Peak valley energy saver for household appliances
CN105471368A (en) Solar assembly roof system
CN203490511U (en) Power supply system
CN105262158A (en) Household energy storage control circuit
CN103401297A (en) Power utilization energy-saving device with uninterruptible power and low cost
CN202798131U (en) Integrated multi-path power supply system
CN103138369A (en) Household electricity storage-and-use system with timing control
CN103368249A (en) System and method for uninterrupted power supply
CN203502759U (en) Micro-grid central controller
CN105242565A (en) Smart home electricity utilization control system based on tiered electricity price
CN205304350U (en) Charger of different consumers of ability adaptation
CN205139998U (en) Regional power grid economic dispatch system based on time -of -use tariffs
CN201789279U (en) Special overvoltage protection device for low-voltage universal circuit breaker
CN206224282U (en) Energy consumption self-regulation device based on Power Control
CN201898371U (en) Intelligent power distribution switch
CN205212498U (en) Solar energy exchanges dual -purpose intelligent energy storage power system of direct current
CN204669226U (en) A kind of intelligent adjustable DC power supply based on CAN
CN204330026U (en) A kind of rechargeable type remote transmitting water meter
CN203481823U (en) Intelligent electricity utilization load controller
CN202333064U (en) Energy-saving type intelligent formation equipment for lithium ion battery
CN202978412U (en) Intelligent mains supply inversion switcher
CN203645359U (en) A cross-core type current transformer power supply system
CN203480292U (en) Intelligent power system suitable for elimination on the spot of distributed power supply

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140319

Termination date: 20140823

EXPY Termination of patent right or utility model