CN203487680U - Courtyard structure for integrated suspended ceiling - Google Patents

Courtyard structure for integrated suspended ceiling Download PDF

Info

Publication number
CN203487680U
CN203487680U CN201320625885.5U CN201320625885U CN203487680U CN 203487680 U CN203487680 U CN 203487680U CN 201320625885 U CN201320625885 U CN 201320625885U CN 203487680 U CN203487680 U CN 203487680U
Authority
CN
China
Prior art keywords
lattice beam
liang
plate
lattice
clamping section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201320625885.5U
Other languages
Chinese (zh)
Inventor
徐惠峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIAXING GELER INTEGRATED CEILING TECHNOLOGY Co Ltd
Original Assignee
JIAXING GELER INTEGRATED CEILING TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIAXING GELER INTEGRATED CEILING TECHNOLOGY Co Ltd filed Critical JIAXING GELER INTEGRATED CEILING TECHNOLOGY Co Ltd
Priority to CN201320625885.5U priority Critical patent/CN203487680U/en
Application granted granted Critical
Publication of CN203487680U publication Critical patent/CN203487680U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Images

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model provides a courtyard structure for an integrated suspended ceiling. The courtyard structure comprises at least two clamping beams installed on an indoor ceiling in a parallel mode and used for installing panels, and first lattice beams vertically installed on the clamping beams, wherein the first lattice beams are installed on the clamping beams through connection parts. The first lattice beams and the connection parts are provided with bending portions and hanging plates respectively, wherein the bending portions and the hanging plates are mutually matched. The clamping beams and the connection parts are provided with clamping portions and first protruding portions respectively, wherein the clamping portions and the first protruding portions are mutually matched. Through matching of the hanging plates and the bending portions, the connection parts are installed on the first lattice beams. Through matching of the first protruding portions and the clamping portions, the connection parts are installed on the clamping beams. The courtyard structure for the integrated suspended ceiling is simple in overall structure. Through the connection parts, vertical installation of the first lattice beams is changed into parallel installation, after installation, the overall layering sense of the integrated suspended ceiling is strong, and the decoration effect is good.

Description

A kind of sky well construction for Integral ceiling
Technical field
The utility model relates to the building materials field of interior decoration, relates in particular to a kind of sky well construction for Integral ceiling.
Background technology
In existing assembled ceiling structure, the general form of rider keel and day well construction combination that adopts is installed hang ceiling panel, main joist is lifted on ceiling by being fixed of screw mandrel and setscrew, rider keel is fixedly mounted on main joist and is positioned at the below of main joist, the aluminium beam in day well construction by with rider keel coordinate longitudinally, be laterally evenly arranged on indoor top.When the installation direction of aluminium beam is parallel with rider keel, by the buckle being arranged on aluminium beam, be directly installed on rider keel with coordinating of rider keel, when the installation direction of aluminium beam and the installation direction of rider keel are when vertical, need to be fixed connection by securing member or other devices.Fixed form when aluminium beam is vertically connected with rider keel is comparatively complicated, be difficult for carrying out Fast Installation, and then installation effectiveness is lower.
The mounting structure of existing indoor suspended ceiling panel is all tiling structure, between each piece hang ceiling panel, near installation, does not decorate bulkhead between adjacent panels, and the outward appearance of ceiling structure is comparatively single, and third dimension is not strong, poor visual effect.
Publication number is that the Chinese invention patent of CN103276843A has been announced a kind of ceiling structure with decorative effect, include the main joist of plastic material, be vertically set on the rider keel of the plastic material between two adjacent main joists, and be connected to the panel between two adjacent main joists and two adjacent rider keels; Main joist lower end is connected with the connector of a plastic material, and connector lower end is socketed with the panel of metal material; Rider keel lower end is socketed with the secondary connector of a plastic material, and the lower end of secondary connector is also arranged with panel.Main joist and rider keel top are equipped with the panel fastener of an opening down setting, and panel fastener is provided with the clamp arm coordinating with main joist or rider keel sidewall.The lower end of main joist, rider keel is equipped with downward opening card interface, and connector, secondary connector are respectively by being arranged on main joist, rider keel with coordinating of card interface.The both sides of connector, both lower ends of secondary connector are equipped with outwards horizontally extending lower wall built-up, panel end face is the rectangle of upper end open, upper end open place is provided with along the wall that articulates extending in opposite directions, and by articulating the cooperation of wall and lower wall built-up, panel is socketed on connector and secondary connector.
The panel that above-mentioned ceiling structure utilizes connector, secondary connector to install has certain decorative effect, but overall structure is comparatively complicated, and integral installation intensity is low.For main joist and rider keel are installed, need to be at vertical and horizontal installation panel fastener all, and in order to make panel all in one plane, main joist and rider keel need be installed at grade, in order to make the setting height(from bottom) of rider keel and main joist identical, the height that rider keel panel fastener is installed needs identical with the height that main joist panel fastener is installed, so, the length that rider keel panel fastener is installed need equal adjacent two width of installing between main joist panel fastener, the every panel fastener that rider keel is installed need repeat respectively to fix, so, the workload of installing is very large, affect installation effectiveness.Panel is connected by major and minor keel and the major and minor connector suitable with major and minor keel length, and the amount of parts install needing is many, and overall weight is large, ceiling structure to bear weight large.
Utility model content
In order to solve the shortcoming and defect existing in above-mentioned prior art, the utility model provide a kind of simple in structure, installation effectiveness is high, and excellent decoration effect for Integral ceiling sky well construction.
In order to realize above-mentioned technical purpose, the sky well construction for Integral ceiling that the utility model provides, comprise at least two Ka Liang that are installed in parallel in indoor ceiling for installation panel, also comprise the first lattice beam being vertically mounted on Ka Liang, described the first lattice beam is arranged on Ka Liang by least two connectors, on the first lattice beam and connector, be respectively equipped with the kink and the link plate that cooperatively interact, on Ka Liang and connector, be respectively equipped with the clamping section and the first protuberance that cooperatively interact, by the cooperation of link plate and kink, connector is arranged on the first lattice beam, by the cooperation of the first protuberance and clamping section, connector is arranged on Ka Liang.
When the installation direction of the first lattice beam is vertical with Ka Liang, by the effect of connector, will vertically connects and change parallel connection into, simplify syndeton, improve the efficiency of integral installation.
Preferably, described Ka Liang comprises a base plate and two blocks of side plates that are connected respectively with base plate both sides, the end of the side that is not connected with base plate on described two blocks of side plates is bent to form clamping section, two side plate opposite tilts are connected with base plate, and the side plate distance that is positioned at clamping section one side is less than the distance of the side that is connected with base plate.
Preferably, described the first lattice beam comprises the first lattice beam body, and described kink is two, and two kinks dorsad opening be arranged on an external surface of the first lattice beam body; Described connector comprises junction plate, and described link plate is fixedly installed on the two ends of junction plate one side, and described link plate and kink shape are adaptive; The first protuberance that described junction plate coordinates with clamping section in the outwardly formation of regional area of length direction; Connector is arranged on the first lattice beam by the cooperation of link plate and kink, and the cooperation by the first protuberance and clamping section is arranged on the first lattice beam on Ka Liang.
Clamping section on clamping section clamp connection on Ka Liang, makes the first lattice beam be lifted on Ka Liang by connector.
Preferably, also comprise and be evenly arranged on two the second lattice beams between adjacent the first lattice beam, described the second lattice beam is provided with the second protuberance coordinating with the upper clamping section of Ka Liang, and the second lattice beam is arranged on Ka Liang by the cooperation of the second protuberance and clamping section.
Preferably, described the second lattice beam comprises the second lattice beam body, an external surface of described the second lattice beam body is provided with two parallel outwardly connecting portions, the second protuberance that on described connecting portion length direction, the outwardly formation of regional area coordinates with clamping section, the second lattice beam is arranged on two adjacent Ka Liang by the cooperation of the second protuberance and clamping section.
Adjacent two the first lattice beams and adjacent two the second lattice beams are combined to form a cell, and some panels are installed in a cell, can be according to the size of the big or small adjustment unit lattice of actual fitting case and panel.In addition, the installation of the second lattice beam is comparatively simple, and the second lattice beam is directly lifted on Ka Liang by the cooperation of the second protuberance and Ka Liang clamping section.
Preferably, also comprise the limit lattice beam that is arranged on ceiling structure integral circumferential edge, described limit lattice beam comprises limit lattice beam body, and an external surface of described limit lattice beam body is provided with fixed part outwardly and bending.Utilize securing member by can directly limit lattice beam being fixed on to the top of vertical body of wall with coordinating of fixed part.
Preferably, described the first lattice beam, the second lattice beam and limit lattice beam are the hollow profile of thin-walled shape.So be convenient to alleviate integrally-built weight, reduce the load-bearing of Ka Liang and fixed card boom device, improve the application life of Ka Liang and fixed card boom device.
Preferably, the external surface that described the first lattice beam is provided with kink is provided with outwardly and is positioned at the extension in kink both sides outsides.Extension is in order to determine the installation site of panel, and it is overlapping that while avoiding panel installation adjacent with the first lattice beam, the part of panel is positioned at top and first lattice beam of the first lattice beam, and the layout that affects integral installation need to be done over again and be adjusted.
Preferably, the cross sectional shape of described junction plate is T shape, comprises horizontal direction composing plate and vertical direction composing plate, and described link plate is arranged on the horizontal direction composing plate of junction plate by securing member.Comprise horizontal direction composing plate and vertical direction composing plate, described link plate is arranged on the horizontal direction composing plate of junction plate by securing member.Connector is aluminium extruded sections part, adopts split-type structural, and junction plate, link plate extrusion modling respectively, be then fixedly installed togather, if adopt integral structure, die casting is comparatively complicated, and qualification rate is low, and cost of production is large.
The sky well construction for Integral ceiling that the utility model provides, overall structure is simple, and the first lattice beam and the second lattice beam can be conveniently installed, and after installation, the stereovision of Integral ceiling integral body is strong, and decorative effect is better.
In the mounting method of this day well construction that the utility model provides, installation steps are simple, by the effect of connector, change the first lattice beam into parallel connection with the vertical connection between card beam, so, the method for lifting the first lattice beam is simple, without using complicated fastening devices, installs.
The sky well construction that the utility model provides only need be installed a Ka Liang in direction, the first lattice beam is arranged on Ka Liang by several connectors, the second lattice beam is directly installed on Ka Liang, without installing by other devices, reduce the workload that Ka Liang installs, and simplified syndeton, alleviated whole weight, reduce the active force that card joist support is subject to, be convenient to improve the application life of ceiling structure integral body.
Accompanying drawing explanation
Fig. 1 is the end view of the first lattice beam in the utility model embodiment;
Fig. 2 is the end view of the second lattice beam in the utility model embodiment;
Fig. 3 is the zoomed-in view at A place in Fig. 2;
Fig. 4 is the structural representation of limit lattice beam in the utility model embodiment;
Fig. 5 is the structural representation of connector in the utility model embodiment;
Fig. 6 is the end view of Ka Liang in the utility model embodiment;
Fig. 7 is the structural representation of panel in the utility model embodiment;
Fig. 8 is the zoomed-in view at B place in Fig. 7;
Fig. 9 is that in the utility model embodiment, the first lattice beam is arranged on the structural representation on Ka Liang;
Figure 10 is that in the utility model embodiment, the second lattice beam is arranged on the structural representation on Ka Liang;
Figure 11 be after utilizing the utility model embodiment to complete to install the structural representation of furred ceiling integral body.
In figure, 1-the first lattice beam, 11-the first lattice beam body, 12-kink, 13-extension, 2-the second lattice beam, 21-the second lattice beam body, 22-connecting portion, 23-the second protuberance, 3-limit lattice beam, 31-limit lattice beam body, 32-fixed part, 4-connector, 41-junction plate, 42-link plate, 43-the first protuberance, 5-Ka Liang, 51-base plate, 52-side plate, 53-transition part, 54-clamping section, 6-panel, 61-panel body, 62-fixed head, 63-fixture block.
The specific embodiment
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail.
Referring to accompanying drawing.The sky well construction for Integral ceiling that the utility model embodiment provides, comprises at least two card beams 5 for installation panel 6 that be arranged in parallel, is vertically mounted on the first lattice beam 1 on Ka Liang and is installed in parallel in the second lattice beam 2 on Ka Liang.The second lattice beam 2 is arranged between two the first adjacent lattice beams 1, and panel 6 is arranged on card beam 5 and between two the first adjacent lattice beams 1 and two the second adjacent lattice beams 2.
Card beam 5 comprises a base plate 51 and two blocks of side plates 52 that are connected respectively with base plate both sides, the end of the side that is not connected with base plate on two blocks of side plates is bent to form clamping section 54, two side plate opposite tilts are connected with base plate, and the side plate distance that is positioned at clamping section one side is less than the distance of the side that is connected with base plate.
In the present embodiment, the base plate of card on beam 5 51, two blocks of side plates 52 adopt integral structures, form the side plate of inclination after two lateral bucklings of base plate, and the position bending between base plate and side plate forms transition part 53, so can improve the intensity of card beam integral body, and then improve the load-bearing scope of Ka Liang.
Panel 6 comprises panel body 61, the circumferential edge of panel body is provided with the fixed head vertical with panel body 62, the height at fixed head marginal position place is little compared with the height of center position, on fixed head, be evenly provided with the fixture block 63 that one side is protruded to panel body center, panel is arranged on card beam 5 by the cooperation of fixture block and the upper clamping section 54 of Ka Liang.
The utility model embodiment also comprises that connector 4, the first lattice beams 1 are arranged on card beam 5 by connector 4.The first lattice beam 1 comprises that an external surface of the first lattice beam body 11, the first lattice beam bodies is provided with opening and crooked kink 12 dorsad; Connector 4 comprises junction plate 41 and is arranged on junction plate one side and is positioned at the link plate 42 at junction plate two ends, and link plate and kink shape are adaptive, and connector is arranged on the first lattice beam 1 by the cooperation of link plate and kink.The junction plate 41 of connector is provided with the first protuberance 43 outwardly along junction plate length direction and that coordinate with clamping section 54 on Ka Liang, and connector 4 is arranged on Ka Liang upper 5 by the cooperation of the first protuberance and clamping section.
In the present embodiment, in order to reduce the processing cost of connector, junction plate 41 on connector 4 and link plate 42 adopt split-type structural, the cross sectional shape of junction plate 41 is T shape, comprise horizontal direction composing plate and vertical direction composing plate, link plate is by securing member or be welded on the horizontal direction composing plate of junction plate.In order more directly to confirm the installation site of panel, the external surface that the first lattice beam 1 is provided with kink 12 is provided with outwardly and is positioned at the extension 13 in outside, kink both sides.
The second lattice beam 2 comprises the second lattice beam body 21, an external surface of the second lattice beam body is provided with two parallel outwardly connecting portions 22, connecting portion is provided with along the second lattice beam length direction and extends and the cooperation by the second protuberance and clamping section is arranged on two adjacent card beams 5 with the second protuberance 23, the second lattice beams of the upper clamping section of Ka Liang 54 adaptations.
The utility model embodiment also comprises the limit lattice beam 3 that is arranged on ceiling structure integral circumferential edge, and limit lattice beam comprises limit lattice beam body 31, and an external surface of limit lattice beam body is provided with fixed part 32 outwardly and bending.
In the present embodiment, in order to alleviate the weight of day well construction, the first lattice beam 1, the second lattice beam 2 and limit lattice beam 3 are the hollow profile of thin-walled shape.
Step when the sky well construction for Integral ceiling of the utility model embodiment is installed is as follows:
1. utilize securing member limit lattice beam 3 to be fixedly mounted on to the top of vertical wall;
2. by connector 4, the cooperation by link plate 42 and kink 12 is arranged on the first lattice beam 1, according to the length of the first lattice beam, on the length direction of the first lattice beam, is evenly arranged connector;
3. the cooperation by clamping section 54 on the first protuberance 43 on connector and card beam 5 is arranged on connector on Ka Liang;
4. second lattice beam 2 is installed between two adjacent the first lattice beams, and the cooperation of going up clamping section by the second protuberance and Ka Liang on the second lattice beam is arranged on Ka Liang;
5. by erecting of panel on Ka Liang, the installation site of panel is between the second lattice beam and two the first adjacent lattice beams;
6. according to the specification of panel, some panels are installed, the cooperation by another root second lattice beam by the second protuberance and clamping section is arranged on Ka Liang, and two the second adjacent lattice beams and two the first adjacent lattice beams form cells;
7. according to the area of furred ceiling, repeat installation unit lattice, complete the integrally-built installation of Integral ceiling.
The sky well construction for Integral ceiling that the utility model embodiment provides, the first lattice beam lifts on Ka Liang by connector, connector changes the first lattice beam into parallel installation between the two with the at right angle setting between card beam, simplify mounting means and mounting structure, make the installation of the first lattice beam more quick, improve installation effectiveness.
In the utility model embodiment, the distribution situation of the first lattice beam and the second lattice beam can be adjusted according to the panel of different size.In the accompanying drawing of the utility model embodiment, the end surface shape of the first lattice beam main body, the second lattice beam main body and limit lattice beam main body is all rectangle, and certainly, three's end surface shape is not restricted to rectangle, can need to convert according to different uses.In order to increase visual effect, can increase pattern by the viewable portion after the first lattice beam, the second lattice beam and limit lattice beam are installed.Also can be that three adopts light transmissive material, by fluorescent tube or with circuit, be arranged in day well construction, improve indoor illuminating effect.
In a word, the foregoing is only preferred embodiment of the present utility model, every equalization of doing according to the utility model changes and modifies, and all should belong to the protection domain that the utility model is applied for a patent.

Claims (9)

  1. One kind for Integral ceiling sky well construction, it is characterized in that, comprise at least two Ka Liang (5) that are installed in parallel in indoor ceiling for installation panel (6), also comprise the first lattice beam (1) being vertically mounted on Ka Liang, described the first lattice beam is arranged on Ka Liang (5) by least two connectors (4), on the first lattice beam and connector, be respectively equipped with the kink (12) and the link plate (42) that cooperatively interact, on Ka Liang and connector, be respectively equipped with the clamping section (54) and the first protuberance (43) that cooperatively interact, by the cooperation of link plate and kink, connector is arranged on the first lattice beam, by the cooperation of the first protuberance and clamping section, connector is arranged on Ka Liang.
  2. According to claim 1 for Integral ceiling sky well construction, it is characterized in that, described Ka Liang (5) comprises a base plate (51) and the two blocks of side plates (52) that are connected respectively with base plate both sides, the end of the side that is not connected with base plate on described two blocks of side plates is bent to form clamping section (54), two side plate opposite tilts are connected with base plate, and the side plate distance that is positioned at clamping section one side is less than the distance of the side that is connected with base plate.
  3. According to claim 2 for Integral ceiling sky well construction, it is characterized in that, described the first lattice beam (1) comprises the first lattice beam body (11), and described kink (12) is two, and two kinks dorsad opening be arranged on an external surface of the first lattice beam body; Described connector (4) comprises junction plate (41), and described link plate (42) is fixedly installed on the two ends of junction plate one side, and described link plate and kink shape are adaptive; The first protuberance (43) that described junction plate coordinates with clamping section (54) in the outwardly formation of regional area of length direction; Connector is arranged on the first lattice beam by the cooperation of link plate and kink, and the cooperation by the first protuberance and clamping section is arranged on the first lattice beam on Ka Liang.
  4. 4. according to the sky well construction for Integral ceiling described in claim 2 or 3, it is characterized in that, also comprise and be evenly arranged on two the second lattice beams (2) between adjacent the first lattice beam, described the second lattice beam (2) is provided with the second protuberance (23) coordinating with the upper clamping section (54) of Ka Liang, and the second lattice beam is arranged on Ka Liang by the cooperation of the second protuberance and clamping section.
  5. According to claim 4 for Integral ceiling sky well construction, it is characterized in that, described the second lattice beam (2) comprises the second lattice beam body (21), an external surface of described the second lattice beam body is provided with two parallel outwardly connecting portions (22), the second protuberance (23) that on described connecting portion length direction, the outwardly formation of regional area coordinates with clamping section (54), the second lattice beam is arranged on two adjacent Ka Liang (5) by the cooperation of the second protuberance and clamping section.
  6. According to claim 4 for Integral ceiling sky well construction, it is characterized in that, also comprise the limit lattice beam (3) that is arranged on ceiling structure integral circumferential edge, described limit lattice beam comprises limit lattice beam body (31), and an external surface of described limit lattice beam body is provided with fixed part (32) outwardly and bending.
  7. According to claim 5 for install Integral ceiling sky well construction, it is characterized in that, described the first lattice beam (1), the second lattice beam (2) and limit lattice beam (3) are the hollow profile of thin-walled shape.
  8. 8. the sky well construction for Integral ceiling according to claim 7, is characterized in that, the external surface that described the first lattice beam (1) is provided with kink (12) is provided with outwardly and is positioned at the extension (13) in outside, kink both sides.
  9. According to claim 4 for Integral ceiling sky well construction, it is characterized in that, the cross sectional shape of described junction plate (41) is T shape, comprises horizontal direction composing plate and vertical direction composing plate, and described link plate is by securing member or be welded on the horizontal direction composing plate of junction plate.
CN201320625885.5U 2013-10-11 2013-10-11 Courtyard structure for integrated suspended ceiling Withdrawn - After Issue CN203487680U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320625885.5U CN203487680U (en) 2013-10-11 2013-10-11 Courtyard structure for integrated suspended ceiling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320625885.5U CN203487680U (en) 2013-10-11 2013-10-11 Courtyard structure for integrated suspended ceiling

Publications (1)

Publication Number Publication Date
CN203487680U true CN203487680U (en) 2014-03-19

Family

ID=50258521

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320625885.5U Withdrawn - After Issue CN203487680U (en) 2013-10-11 2013-10-11 Courtyard structure for integrated suspended ceiling

Country Status (1)

Country Link
CN (1) CN203487680U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103572879A (en) * 2013-10-11 2014-02-12 嘉兴格勒集成吊顶科技有限公司 Raise structure for integrated suspended ceiling and installation method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103572879A (en) * 2013-10-11 2014-02-12 嘉兴格勒集成吊顶科技有限公司 Raise structure for integrated suspended ceiling and installation method thereof

Similar Documents

Publication Publication Date Title
CN101878341B (en) Frame structure for installation of wall panel of building, and wall panel installation device and wall panel installation method using same
CN203626111U (en) GRG (Glassfiber Reinforced Gypsum) decorated suspended ceiling system of ceiling
CN105178479A (en) Construction method of super high-rise component type smart glass curtain wall
CN102900193B (en) Cellular board ceiling system
CN201250469Y (en) Corrugated plate ceiling
CN204475513U (en) A kind of building structure
CN104481075A (en) Hanging and connecting system for suspended ceiling
CN103572879B (en) For the sky well construction of Integral ceiling
CN203487680U (en) Courtyard structure for integrated suspended ceiling
CN104044601A (en) Suspension section bar of in-built part of urban rail vehicle
CN202390970U (en) Text curtain wall
CN202202464U (en) Honeycomb panel ceiling system
CN216973984U (en) Pull rod supporting and decorating system for sun-shading truss of station house
CN204418467U (en) A kind of secondary roof construction of indoor suspended ceiling
CN201292595Y (en) Support framework for architectural decoration
CN201268906Y (en) Hoisting ceiling structure
CN216920972U (en) Connection structure of furred ceiling board and wallboard of whole bathroom
CN202658823U (en) Integrated suspended ceiling provided with curved panels
CN204299020U (en) A kind of mounting system of furred ceiling
CN102535696B (en) Improved large-size hidden-frame glass curtain wall system
CN104533005A (en) Ceiling connecting piece and ceiling with ceiling connecting pieces
CN202227557U (en) Keel and cellular board suspended ceiling system constructed by same
CN203307983U (en) Ceiling keel component
CN203361434U (en) Large-scale suspended ceiling structure with thin-wall metal plate
CN217679934U (en) Folding shape smallpox and suspended ceiling

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20140319

Effective date of abandoning: 20160106

AV01 Patent right actively abandoned

Granted publication date: 20140319

Effective date of abandoning: 20160106

C25 Abandonment of patent right or utility model to avoid double patenting