CN203475704U - Connecting structure of pile foundation reinforcement cage reinforcing steel bars - Google Patents

Connecting structure of pile foundation reinforcement cage reinforcing steel bars Download PDF

Info

Publication number
CN203475704U
CN203475704U CN201320527854.6U CN201320527854U CN203475704U CN 203475704 U CN203475704 U CN 203475704U CN 201320527854 U CN201320527854 U CN 201320527854U CN 203475704 U CN203475704 U CN 203475704U
Authority
CN
China
Prior art keywords
steel bars
reinforcing steel
cage
pile foundation
reinforcement cage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320527854.6U
Other languages
Chinese (zh)
Inventor
张钊
朱晓明
陈干
田新平
赵军科
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC SHB First Engineering Co Ltd
Original Assignee
CCCC SHB First Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC SHB First Engineering Co Ltd filed Critical CCCC SHB First Engineering Co Ltd
Priority to CN201320527854.6U priority Critical patent/CN203475704U/en
Application granted granted Critical
Publication of CN203475704U publication Critical patent/CN203475704U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a connecting structure of pile foundation reinforcement cage reinforcing steel bars. The connecting structure comprises a first section reinforcement cage (1), a second section reinforcement cage (2) as well as a sleeve (5) with inner threads inside, wherein the first section reinforcement cage (1) comprises a plurality of first circle-shaped longitudinal reinforcing steel bars (3); the second section reinforcement cage (2) comprises a plurality of second circle-shaped longitudinal reinforcing steel bars (4); outer threads are formed at two ends of both the first longitudinal reinforcing steel bars (3) and the second longitudinal reinforcing steel bars (4); two ends of the sleeve (5) are respectively in threaded connection with the first longitudinal reinforcing steel bars (3) and the second longitudinal reinforcing steel bars (4). The connecting structure is convenient and rapid to install, high in structural stability, short in construction period and high in quality controllability, and moreover butt joint connectors of the reinforcement cages are continuous and high in precision.

Description

The syndeton of pile foundation steel bar cage reinforcing bar
Technical field
The utility model relates to the syndeton of adjacent segment reinforcing cage, specifically a kind of syndeton of pile foundation steel bar cage reinforcing bar.
Background technology
Development along with bridge technology, bridge across footpath progressively increases greatly, major diameter, overlength pile foundation steel bar cage are more and more employed in design, the features such as pile foundation steel bar cage also has that diameter is large thereupon, Heavy Weight, length is long, bar splice is many, merogenesis docks often.Because the on-the-spot installation period of reinforcing cage of major diameter, overlength pile foundation is long, therefore when assembling pile foundation steel bar cage, reinforcing cage precipitates too much and the problem that has hidden danger of quality at the bottom of easily producing collapse hole, hole, is therefore necessary to improve.
Summary of the invention
The purpose of this utility model is in order to overcome the deficiencies in the prior art part, and a kind of syndeton of pile foundation steel bar cage reinforcing bar is provided.
To achieve these goals, the technical solution of the utility model is: the syndeton of pile foundation steel bar cage reinforcing bar, comprise the first sections reinforcing cage and the second sections reinforcing cage, described the first sections reinforcing cage comprises some the first longitudinal reinforcements that are round, described the second sections reinforcing cage comprises some the second longitudinal reinforcements that are round, it is characterized in that: also comprise that inside establishes female sleeve, the two ends of described the first longitudinal reinforcement and the second longitudinal reinforcement are equipped with external screw thread, and the two ends of described sleeve are threaded with the first longitudinal reinforcement and the second longitudinal reinforcement respectively.
The shell of described sleeve is provided with rolling decorative pattern.
The cross section of described sleeve is rectangle, regular hexagon or circle.
In technique scheme, owing to being connected by sleeve between the first longitudinal reinforcement and the second longitudinal reinforcement, make assembling the first longitudinal reinforcement and the second longitudinal reinforcement that staff not only can be convenient, and improved the assembly precision between the first longitudinal reinforcement and the second longitudinal reinforcement, thereby improved the structural stability of pile foundation steel bar cage.
Compared with prior art, its advantage is the utility model:
1. because reinforcing cage is that batch production is prefabricated continuously in precasting yard, short construction period, quality controllability is strong;
2. because the utility model employing is segmented prefabricated, utilize last sections for fixed form, banjo fixing butt jointing is continuous, and banjo fixing butt jointing precision is high;
3. reinforcing bar adopts sleeve to connect, and technique is advanced, quick and easy for installation.
To sum up, the utility model is convenient and swift when mounted, and structural stability is higher, and not only short construction period, quality controllability are strong, and the banjo fixing butt jointing of reinforcing cage is continuous, and banjo fixing butt jointing precision is high.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
1-the first sections reinforcing cage in figure, 2-the second sections reinforcing cage, 3-the first longitudinal reinforcement, 4-the second longitudinal reinforcement, 5-sleeve.
The specific embodiment
Below in conjunction with accompanying drawing, describe performance of the present utility model in detail, but they do not form to restriction of the present utility model, only for example.By explanation, make advantage of the present utility model more know and easily understand simultaneously.
Consult accompanying drawing known: the syndeton of pile foundation steel bar cage reinforcing bar, comprise the first sections reinforcing cage 1 and the second sections reinforcing cage 2, described the first sections reinforcing cage 1 comprises some the first longitudinal reinforcements 3 that are round, described the second sections reinforcing cage 2 comprises some the second longitudinal reinforcements 4 that are round, it is characterized in that: also comprise that inside establishes female sleeve 5, the two ends of described the first longitudinal reinforcement 3 and the second longitudinal reinforcement 4 are equipped with external screw thread, and the two ends of described sleeve 5 are threaded with the first longitudinal reinforcement 3 and the second longitudinal reinforcement 4 respectively.
The shell of described sleeve 5 is provided with rolling decorative pattern.
The cross section of described sleeve 5 is rectangle, regular hexagon or circle.
Owing to being connected by sleeve 5 between the first longitudinal reinforcement 3 and the second longitudinal reinforcement 4, thereby make assembling the first longitudinal reinforcement and the second longitudinal reinforcement that staff not only can be convenient, and improved the assembly precision between the first longitudinal reinforcement and the second longitudinal reinforcement.
The utility model is applicable to the long L >=27m of stake, and the φ >=1m pile foundation steel bar cage construction of stake footpath, as borehole filling pile cage of reinforcement construction.
In practical work process, when assembling pile foundation steel bar cage described in the utility model, can below reinforcing cage, place a mould bases.Pile foundation steel bar cage is colligation on mould bases, utilizes front two sections of reinforcing cages as section of foundation during assembling, prefabricated next sections, and cyclic process, thus guarantee two sections of connection precision between reinforcing bar.
In practical work process, after reinforcing cage is prefabricated with groove, carry out the installation of sound detecting pipe.The merogenesis length of sound detecting pipe is consistent with the merogenesis situation of reinforcing cage.Between sound detecting pipe and reinforcing cage, every 2m left and right, with " U " type card, be fixed.Stopper plug sealing for detector tube upper port, lower end bulkhead welded seal, forbids cement paste or foreign material to enter in pipe, guarantee filling concrete after pipeline unimpeded.
In practical work process, reinforcing cage should be noted that following item when depositing and transport:
1. reinforcing cage leaves on smooth, dry place in order, faces mutually that two two reinforcing bars corresponding to reinforcing bar sections are painted mark so that field joint hangs up sign board on each reinforcing bar sections simultaneously.
2. after reinforcing cage jointing splits, reinforcing steel bars exposed screw thread must adopt protective sleeve protection, prevents screw thread damage.
3. reinforcing cage adopts special hanger to lift transhipment, prevents distortion.
In practical work process, reinforcing cage is installed and is adopted gantry crane, crawler crane or other loop wheel machine merogenesis to transfer, and adopts mechanical connection spreading reinforcing cage.Reinforcing cage is located its top after transferring and putting in place, reinforcing cage skew, floating while preventing pour concrete.
Other unaccounted part all belongs to prior art.

Claims (3)

1. the syndeton of pile foundation steel bar cage reinforcing bar, comprise the first sections reinforcing cage (1) and the second sections reinforcing cage (2), described the first sections reinforcing cage (1) comprises some the first longitudinal reinforcements (3) that are round, described the second sections reinforcing cage (2) comprises some the second longitudinal reinforcements (4) that are round, it is characterized in that:
Also comprise that inside establishes female sleeve (5), the two ends of described the first longitudinal reinforcement (3) and the second longitudinal reinforcement (4) are equipped with external screw thread, and the two ends of described sleeve (5) are threaded with the first longitudinal reinforcement (3) and the second longitudinal reinforcement (4) respectively.
2. the syndeton of pile foundation steel bar cage reinforcing bar as claimed in claim 1, is characterized in that: the shell of described sleeve (5) is provided with rolling decorative pattern.
3. the syndeton of pile foundation steel bar cage reinforcing bar as claimed in claim 1, is characterized in that: the cross section of described sleeve (5) is rectangle, regular hexagon or circle.
CN201320527854.6U 2013-08-28 2013-08-28 Connecting structure of pile foundation reinforcement cage reinforcing steel bars Expired - Fee Related CN203475704U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320527854.6U CN203475704U (en) 2013-08-28 2013-08-28 Connecting structure of pile foundation reinforcement cage reinforcing steel bars

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320527854.6U CN203475704U (en) 2013-08-28 2013-08-28 Connecting structure of pile foundation reinforcement cage reinforcing steel bars

Publications (1)

Publication Number Publication Date
CN203475704U true CN203475704U (en) 2014-03-12

Family

ID=50224058

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320527854.6U Expired - Fee Related CN203475704U (en) 2013-08-28 2013-08-28 Connecting structure of pile foundation reinforcement cage reinforcing steel bars

Country Status (1)

Country Link
CN (1) CN203475704U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106013620A (en) * 2016-07-17 2016-10-12 临汾市华基新型建材有限公司 Connection structure of main reinforcements and hoops
CN108643455A (en) * 2018-04-24 2018-10-12 东南大学 A kind of reinforcing steel bar machinery anchor docking connecting node construction and its construction method
CN109057169A (en) * 2018-09-10 2018-12-21 浙江南洋水泥制品有限公司 A kind of steel bar connecting structure of pre-cast concrete component
CN110280700A (en) * 2019-06-25 2019-09-27 中建七局安装工程有限公司 It is a kind of to facilitate overlength steel reinforcement cage segmentation docking processing system and processing method
CN112523201A (en) * 2021-01-07 2021-03-19 温州竺陌机械科技有限公司 Combined reinforcement cage structural component based on pile foundation engineering
CN113266008A (en) * 2021-06-24 2021-08-17 朱小齐 High-rise building pile foundation construction method

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106013620A (en) * 2016-07-17 2016-10-12 临汾市华基新型建材有限公司 Connection structure of main reinforcements and hoops
CN108643455A (en) * 2018-04-24 2018-10-12 东南大学 A kind of reinforcing steel bar machinery anchor docking connecting node construction and its construction method
CN109057169A (en) * 2018-09-10 2018-12-21 浙江南洋水泥制品有限公司 A kind of steel bar connecting structure of pre-cast concrete component
CN109057169B (en) * 2018-09-10 2021-04-13 安徽省英剑科技发展有限公司 Steel bar connecting structure of prefabricated cement component
CN110280700A (en) * 2019-06-25 2019-09-27 中建七局安装工程有限公司 It is a kind of to facilitate overlength steel reinforcement cage segmentation docking processing system and processing method
CN112523201A (en) * 2021-01-07 2021-03-19 温州竺陌机械科技有限公司 Combined reinforcement cage structural component based on pile foundation engineering
CN113266008A (en) * 2021-06-24 2021-08-17 朱小齐 High-rise building pile foundation construction method

Similar Documents

Publication Publication Date Title
CN203475704U (en) Connecting structure of pile foundation reinforcement cage reinforcing steel bars
CN108678775B (en) Transverse oval deformation resistant shield tunnel reinforcing structure of embedded steel plate and construction method
CN203702167U (en) Composite segment structure
CN203625890U (en) Large-diameter cast-in-situ bored pile reinforcement cage positioning device
CN103758291A (en) Shearing reinforcing type semi-grouting sleeve
CN109487912A (en) A kind of construction method of super-span truss-string-structure
CN105298021A (en) Circular steel tube concrete column and anti-buckling reinforcement and repair method thereof
CN205046680U (en) Parallel chords steel pipe truss connection structure
CN204825993U (en) Underground continuous wall stagnant water, lap guard stream joint design
CN106505484A (en) Piping lane cable laying method
CN203795601U (en) Horizontal connection node for precast concrete members
CN203188132U (en) Segmental precasting assembly structure of large bent cap cantilever
CN204431470U (en) A kind of concrete pipe pile tensioning system
CN208996478U (en) It is a kind of aerial group of same diameter steel pipe column to positioning device
CN204359161U (en) A kind of cooling stack with horizontal adapter ring girder construction
CN204151835U (en) The vertical piece structure of connection of the basement wall and cast-in-place buttress
CN203579870U (en) Prestress combined support pile steel mold structure
CN207362885U (en) A kind of prefabricated piping lane system being freely combined
CN205975996U (en) Thick liquid anchor lap joint structure and wall body
CN109519173A (en) A kind of tubular tunnel segment structure suitable for Circular Shaft
CN205369905U (en) Improved generation chimney template structure
CN204662782U (en) A kind of combined steering gear
CN204098020U (en) High-strength concrete pile cover
CN204097885U (en) For the combined steel board fixing structure of ring road bridge anti-collision wall construction
CN203307932U (en) Connection joint for prefabricated reinforced concrete column

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140312

Termination date: 20210828

CF01 Termination of patent right due to non-payment of annual fee