CN203475425U - Loop plate preliminary shaft steel casing device - Google Patents
Loop plate preliminary shaft steel casing device Download PDFInfo
- Publication number
- CN203475425U CN203475425U CN201320577831.6U CN201320577831U CN203475425U CN 203475425 U CN203475425 U CN 203475425U CN 201320577831 U CN201320577831 U CN 201320577831U CN 203475425 U CN203475425 U CN 203475425U
- Authority
- CN
- China
- Prior art keywords
- steel casing
- antinode plate
- antinode
- construction
- casing device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
The utility model discloses a loop plate preliminary shaft steel casing device, and belongs to the field of bridge foundation construction. The loop plate preliminary shaft steel casing device comprises an annular steel casing formed by splicing a plurality of loop plates in an end-to-end mode, the head and the tail of each loop plate are respectively provided with a preliminary shaft mechanism, the two adjacent loop plates are connected through the preliminary shaft mechanisms, at least an upper layer and a lower layer of horizontal annular beams are detachably connected and fixed to the inner wall of the steel casing, the horizontal annular beams are close to the top of the steel casing, and the uppermost layer of the horizontal annular beam is provided with lifting lugs. A construction method comprises the following steps that the prepared loop plates are spliced into the steel casing on the construction site; the horizontal annular beams are additionally arranged on the steel casing; after the steel casing device is integrally hoisted in place, a vibration hammer is used for carrying out integrated vibration and sinking on the steel casing to enable the steel casing to be in place, the horizontal annular beams are disassembled, and pile drilling construction is conducted; after the pile drilling construction is finished, the loop plates are pulled up one by one to be recycled. The loop plate preliminary shaft steel casing device is used for drilled piles with extra-large diameters, construction is more convenient, and the cost is lower.
Description
Technical field
The utility model belongs to bridge foundation construction field, is applicable to ultra-large type Bored Pile Foundation construction in water.
Background technology
1) conventional piles construction technology in water:
Steel casing is exactly in carrying out the process of pile foundation construction, because soil property is unstable, so construction reinforced bar concrete guard wall exists larger difficulty to adopt the retaining wall of steel to protect hole stake, prevents that collapse hole from avoiding affecting a kind of works of construction speed and safety.It has stable hole wall, the hole that prevents from collapsing, form mud pressure, can also isolate surface water, the effect such as starter, spud pile position, protection operation original ground.Steel casing is the important structure thing in Bored Pile Foundation of Bridge.Conventional steel casing adopts certain thickness steel plate scene or factory to roll.After completing, handling is to place, on-the-spot stake position vibration-sunk.
2) limitation of traditional construction technology:
When tradition construction technology adopts the construction of steel casing, after pile foundation construction completes, casing steel are not recyclable, thereby cause great waste; And during conventional construction, in order to meet the local stability sexual needs of casing wall body, by job specfication requirement, casing wall thickness should reach radius-thickness ratio 1/120, and therefore traditional construction technology is only suitable for the less steel casing of drilled pile diameter, when stake footpath is over 2.4 meters, when casing wall thickness is greater than 30mm, casing rolls difficulty will be increased greatly, has increased great difficulty to processing, transportation and the lifting of steel casing, and the difficulty of construction of shaking in heavy process in construction also can increase greatly.Visible, traditional handicraft has certain limitation, and particularly, in the work progress of large diameter pile, limitation is larger.
Utility model content
The purpose of this utility model is: for super-large diameter drilled pile (diameter is greater than 2.4m) construction, propose a kind of antinode plate fore shaft steel casing device of constructing more convenient, cost is lower.
The utility model object realizes by following technical proposals:
A kind of antinode plate fore shaft steel casing device, comprise by several antinode plates annular steel casing that amalgamation forms that joins end to end, described antinode plate is equipped with locking mechanism from beginning to end, adjacent wave web is connected by this locking mechanism, described steel casing inwall removably connects and is fixed with at least two-layer up and down horizontal ring beam, and the horizontal ring beam of the superiors is provided with hanger.
In such scheme, for super-large diameter drilled pile (diameter is greater than 2.4m) construction, adopt antinode plate fore shaft steel casing, each antinode plate can factory be directly realized processing also can on-the-spot processing in advance, and working (machining) efficiency is higher; Each antinode plate can become steel casing by on-the-spot direct-assembling, fast and easy and not limited by construction diameter; After large diameter pile construction, the steel of recyclable steel casing are reused, and reduce costs; The outer warpage of plane that utilizes antinode plate, increases steel casing out of plane stiffness, thereby under less wall thickness, meets structural stability requirement, and then reduce dead load, reduces lifting and drops into.Horizontal ring beam, in order to set wave web fore shaft steel casing, is convenient to lifting simultaneously.
As selection, described antinode plate becomes section closely trapezoidal by a monoblock steel plate bending, its section configuration is by the main part that is two-stage boss shape, the outside turnup in main part two ends is bent into the described locking mechanism that hook forms, and the main part two-stage boss shape opening of each antinode plate of described steel casing is arranged alternately outward in steel casing or towards steel casing.
In such scheme, special locking mechanism and combination, after making drilled pile construction, can directly pull up each antinode plate one by one, recycles.
As selection, the locking mechanism that described each antinode plate connects is perfused with waterproofing agent.
In such scheme, further improve the block-water performance of locking mechanism.
As further selection, described waterproofing agent is butter or epoxy mortar.
As selection, described horizontal ring beam is spliced to form from beginning to end by a plurality of Curved beams.
In such scheme, horizontal ring beam mounting or dismounting fast and easy, efficiency of construction is higher.
As selection, described horizontal ring beam is two-layer, and near steel casing top.
As selection, described horizontal ring beam removably connects fixing by bolt and described steel casing.
The main scheme of aforementioned the utility model and each further selection scheme thereof can independent assortment to form a plurality of schemes, be that the utility model can adopt and claimed scheme.
The beneficial effects of the utility model: this steel sheet pile shaped steel casing device, the shortcomings such as the construction of conventional steel casing is not recyclable, wall thickness large, outerplanar rigidity is little have been overcome, use this device, can save great deal of steel, reduce structure wall thickness, increase structure outerplanar rigidity, reduce super-large diameter drilled pile construction difficulty.
Accompanying drawing explanation
Fig. 1 is the antinode plate fore shaft steel casing device floor map of the utility model embodiment;
Fig. 2 is the partial enlarged drawing of Fig. 1;
Fig. 3 is antinode plate fore shaft steel casing device when lifting elevational schematic view of the utility model embodiment;
Wherein 1 is that antinode plate, 2 is that steel casing, 3 is that horizontal ring beam, 4 is that hanger, 5 is that vertical secondary beam, 6 is that hawser, 11 is locking mechanism, and 12 is main part.
The specific embodiment
Following non-limiting examples is used for illustrating the utility model.
As Figure 1-3, a kind of antinode plate fore shaft steel casing device, comprise by several antinode plates 1 annular steel casing 2 that amalgamation forms that joins end to end, antinode plate 1 head and the tail are equipped with locking mechanism 11, adjacent wave web 1 is connected by this locking mechanism 11, steel casing 2 inwalls removably connect and are fixed with bilevel horizontal ring beam 3, and horizontal ring beam 3 is near steel casing 2 tops, and the horizontal ring beam 3 of the superiors is provided with hanger 4.Antinode plate 1 becomes section closely trapezoidal by a monoblock steel plate bending, its section configuration is by the main part 12 that is two-stage boss shape, the main part 11 outside turnups in two ends are bent into the locking mechanism 11 that hook forms, and the main part 12 two-stage boss shape openings of each antinode plate 1 of steel casing 2 are in steel casing 2 or be arranged alternately outside steel casing 2.The locking mechanism 11 that each antinode plate 1 connects is perfused with waterproofing agent, and waterproofing agent is butter or epoxy mortar.Horizontal ring beam 3 is spliced to form from beginning to end by a plurality of Curved beams, and removably connects fixing by bolt and steel casing 2.Between upper and lower horizontal ring beam 3, vertical secondary beam 5 can also be set.
The construction method of aforementioned waves web fore shaft steel casing device, comprises the following steps successively:
A, the antinode plate 1 preparing is in advance assembled into steel casing 2 at the construction field (site);
B, on steel casing 2, install horizontal ring beam 3 additional;
After C, integral hoisting put in place, with vibrating hammer, steel casing 2 is carried out to integral body and shake and sink to position, the horizontal ring beam 3 of dismantling is to carry out drilled pile construction;
D, treat that drilled pile construction is complete, then each antinode plate 1 is pulled up one by one, recycle.
The foregoing is only preferred embodiment of the present utility model; not in order to limit the utility model; all any modifications of doing within spirit of the present utility model and principle, be equal to and replace and improvement etc., within all should being included in protection domain of the present utility model.
Claims (7)
1. an antinode plate fore shaft steel casing device, it is characterized in that: comprise by several antinode plates annular steel casing that amalgamation forms that joins end to end, described antinode plate is equipped with locking mechanism from beginning to end, adjacent wave web is connected by this locking mechanism, described steel casing inwall removably connects and is fixed with at least two-layer up and down horizontal ring beam, and the horizontal ring beam of the superiors is provided with hanger.
2. antinode plate fore shaft steel casing device as claimed in claim 1, it is characterized in that: described antinode plate becomes section closely trapezoidal by a monoblock steel plate bending, its section configuration is by the main part that is two-stage boss shape, the outside turnup in main part two ends is bent into the described locking mechanism that hook forms, and the main part two-stage boss shape opening of each antinode plate of described steel casing is arranged alternately outward in steel casing or towards steel casing.
3. antinode plate fore shaft steel casing device as claimed in claim 1, is characterized in that: the locking mechanism that described each antinode plate connects is perfused with waterproofing agent.
4. antinode plate fore shaft steel casing device as claimed in claim 3, is characterized in that: described waterproofing agent is butter or epoxy mortar.
5. antinode plate fore shaft steel casing device as claimed in claim 1, is characterized in that: described horizontal ring beam is spliced to form from beginning to end by a plurality of Curved beams.
6. antinode plate fore shaft steel casing device as claimed in claim 1, is characterized in that: described horizontal ring beam is two-layer, and near steel casing top.
7. antinode plate fore shaft steel casing device as claimed in claim 1, is characterized in that: described horizontal ring beam removably connects fixing by bolt and described steel casing.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320577831.6U CN203475425U (en) | 2013-09-18 | 2013-09-18 | Loop plate preliminary shaft steel casing device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320577831.6U CN203475425U (en) | 2013-09-18 | 2013-09-18 | Loop plate preliminary shaft steel casing device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203475425U true CN203475425U (en) | 2014-03-12 |
Family
ID=50223781
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320577831.6U Expired - Fee Related CN203475425U (en) | 2013-09-18 | 2013-09-18 | Loop plate preliminary shaft steel casing device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203475425U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103485340A (en) * | 2013-09-18 | 2014-01-01 | 中交二航局第四工程有限公司 | Wave-web fore-shaft steel casing device and construction method thereof |
CN104514219A (en) * | 2014-12-12 | 2015-04-15 | 中铁十九局集团有限公司 | Underwater drilled pile foundation construction system capable of recycling steel casing and construction method thereof |
CN110004922A (en) * | 2019-05-10 | 2019-07-12 | 广东远大桥梁钢结构租赁有限公司 | A kind of casing |
-
2013
- 2013-09-18 CN CN201320577831.6U patent/CN203475425U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103485340A (en) * | 2013-09-18 | 2014-01-01 | 中交二航局第四工程有限公司 | Wave-web fore-shaft steel casing device and construction method thereof |
CN103485340B (en) * | 2013-09-18 | 2016-03-30 | 中交二航局第四工程有限公司 | A kind of antinode plate fore shaft steel pile casting device and construction method thereof |
CN104514219A (en) * | 2014-12-12 | 2015-04-15 | 中铁十九局集团有限公司 | Underwater drilled pile foundation construction system capable of recycling steel casing and construction method thereof |
CN110004922A (en) * | 2019-05-10 | 2019-07-12 | 广东远大桥梁钢结构租赁有限公司 | A kind of casing |
CN110004922B (en) * | 2019-05-10 | 2024-06-04 | 广东远大路桥科技有限公司 | Protective cylinder |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107299643B (en) | Steel lattice column combined type tower crane foundation structure in foundation pit and construction method | |
CN205152976U (en) | Marine precast concrete cushion cap wind turbine foundation | |
CN103485340B (en) | A kind of antinode plate fore shaft steel pile casting device and construction method thereof | |
WO2020211175A1 (en) | Fabricated reinforced concrete bridge pier and construction method therefor | |
CN102400469A (en) | Secant pile drum type foundation and construction method thereof | |
CN201738321U (en) | Multifunctional pile machine | |
CN203475425U (en) | Loop plate preliminary shaft steel casing device | |
CN213572013U (en) | Steel pipe concrete pile pier connection structure | |
CN111851567A (en) | Wind power foundation newly built or expanded on soft foundation shallow covering layer and construction method thereof | |
CN102852094B (en) | Construction method for prefabricating composite structure of pier mounting plate pile under open marine environment | |
CN109930624A (en) | A kind of embedding petrographic province blower foundation of offshore wind farm and construction method | |
CN212561601U (en) | Wind power foundation newly built and expanded on soft foundation shallow covering layer | |
CN102041806A (en) | Construction method for inserting steel column in bored pile | |
CN108277817B (en) | Construction method of high-pile bearing platform tower crane foundation reinforcing structure | |
CN106677176B (en) | A kind of steel pile casting device convenient for recycling | |
CN111197319A (en) | Multidirectional prestress prefabricated assembled beam slab foundation of wind power generation tower | |
CN106013096A (en) | Construction method of building foundation | |
CN217680907U (en) | Interior pulling type exempts from to tear open composite forms and concrete section of thick bamboo wall | |
CN101691753B (en) | Pile mould for PCC pile and construction method for overlong PCC pile | |
CN215715542U (en) | Can have enough to meet need pipe jacking working well back wall | |
CN111962549B (en) | Anti-overturning construction method for existing tower crane under working condition of adjacent foundation pile | |
CN210766850U (en) | Ring cylinder reinforced concrete combined foundation structure | |
CN211898510U (en) | Multidirectional prestress prefabricated assembled beam slab foundation of wind power generation tower | |
CN209779672U (en) | Offshore wind power rock-socketed area fan foundation | |
CN210216491U (en) | Easily build formula tower crane foundation structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140312 Termination date: 20160918 |
|