CN203471250U - Metal tube positioning butt-joint device - Google Patents

Metal tube positioning butt-joint device Download PDF

Info

Publication number
CN203471250U
CN203471250U CN201320589706.7U CN201320589706U CN203471250U CN 203471250 U CN203471250 U CN 203471250U CN 201320589706 U CN201320589706 U CN 201320589706U CN 203471250 U CN203471250 U CN 203471250U
Authority
CN
China
Prior art keywords
metal tube
fixture
intermediate holder
motor
pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320589706.7U
Other languages
Chinese (zh)
Inventor
王启华
吴建平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BAOSHENG CONSTRUCTION Co.,Ltd.
Baosheng System Integration Technology Co ltd
Original Assignee
YANGZHOU LIDUO STEEL STRUCTURE ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YANGZHOU LIDUO STEEL STRUCTURE ENGINEERING Co Ltd filed Critical YANGZHOU LIDUO STEEL STRUCTURE ENGINEERING Co Ltd
Priority to CN201320589706.7U priority Critical patent/CN203471250U/en
Application granted granted Critical
Publication of CN203471250U publication Critical patent/CN203471250U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Butt Welding And Welding Of Specific Article (AREA)

Abstract

The utility model discloses a metal tube positioning butt-joint device which comprises a machine frame, a fixture and a motor, wherein the fixture comprises two middle fixture bodies and two side fixture bodies, and the middle fixture bodies and the side fixture bodies are fixed to the machine frame respectively; the two middle fixture bodies are provided with a transmission shaft and both connected with an output shaft of the motor in a transmission mode. The metal tube positioning butt-joint device is simple in structure, safe and reliable, a pipeline can be rapidly positioned and clamped in high precision, polishing and turning can be carried out on a pipeline port, and welding quality is improved.

Description

A kind of metal tube location docking facilities
Technical field
The utility model relates to a kind of metal tube location docking facilities, is specifically related to a kind of device that adopts coaxial chuck to carry out the docking of metal tube location.
Background technology
Metallic conduit is widely used in the industries such as machinery, oil, chemical industry.In pipeline use procedure, when length is improper, often need to cut and welding job.For welding, how first its key problem is the high-precision pipeline mating operation that completes under low stress, thereby guarantees welding quality.In addition, before pipeline welding, interface can, because residual deformation and burr appear in cutting, in order to improve welding quality, need it to polish or turning processing conventionally before welding.In pipeline welding work in the past, pipe joint is processed conventionally manual processing separately, and not only efficiency is low and treatment effect is not good.In pipeline docking operation, mainly by spacing otic placode and adjust artificially and control, when pipeline is longer, not only can produce larger error, and efficiency is relatively low, particularly when pipeline section is non-circular, the high accuracy that is difficult to realize pipeline is docked.In welding process, manual welding there will be efficiency low equally, and quality such as cannot guarantee at the problem.Therefore, how the pipeline welding of carrying out of quick high accuracy just seems very important.
Summary of the invention
The purpose of this utility model is the defect existing in order to solve prior art, and a kind of device that can effectively realize the docking of metal tube high accuracy is provided.
In order to achieve the above object, the utility model provides a kind of metal tube location docking facilities, comprises frame, fixture and motor; Described fixture comprises two intermediate holder and is located at two both sides fixtures at two ends, and is coaxially fixed in described frame; Described two intermediate holder are connected with the output shaft transmission of described motor respectively.
Wherein intermediate holder is connected with described motor output shaft transmission by belt pulley.Frame is provided with guide rail; Described fixture is located on described guide rail.Guide rail one side is respectively equipped with knife rest and weld holder.
The utility model has the following advantages compared to existing technology: coaxial two intermediate holder that arrange of the utility model utilization position the metal tube of needs docking, and pipe joint height is overlapped; And utilize both sides fixture to support metal tube; Utilize intermediate holder rotation, facilitate cutter to polish and turning to pipe joint place; Utilize motor to drive two intermediate holder to rotate, the metal tube that achieves a butt joint rotates simultaneously, conveniently pipeline is welded simultaneously simultaneously.The utility model is simple in structure, safe and reliable, and the method for using not only can be carried out fast pipeline, hi-Fix and clamping, and can polish and turning is processed to pipe joint, improves welding quality.In addition, in welding process, automatic welding can be carried out, when improving welding efficiency, welding quality can be guaranteed.In addition, the utility model method not only can be welded circular pipe, and can weld special-shaped pipeline and not limited by caliber and duct length.
Accompanying drawing explanation
Fig. 1 is the structural representation of the utility model metal tube location docking facilities.In figure, 1,6-both sides fixture, 2,5-metal tube, 3,4-intermediate holder, 7,9-guide rail, 8-knife rest, 10-motor, 11-weld holder, 12-frame.
The specific embodiment
As shown in Figure 1, the utility model metal tube location docking facilities comprises 12, two intermediate holder of frame 3,4, two both sides fixtures 1,6, motor 10, knife rest 8 and weld holders 11.Frame 12 is provided with two closed slides 7,9.On both sides fixture 1,6 and intermediate holder 3,4 guide rail 7 located therein.Knife rest 8 and weld holder 11 are located on another guide rail 9.Fixture 1,6 upper ends in both sides are that circular (intermediate holder and both sides fixture can adopt chuck.Intermediate holder 3,4 is located in the middle of both sides fixture 1,6, and four fixtures coaxially arrange.Motor 10 connects intermediate holder 3,4 by belt pulley simultaneously, both can drive two intermediate holder with sharing rate, to rotate simultaneously, also can drive respectively a fixture to rotate (relies on arrangement of clutch to realize, not shown), and intermediate holder rotating speed can meet polishing, turning needs at a high speed, also can meet low speed welding needs.To two pipelines 2,5 that need welding, allow respectively it pass both sides fixture 1,6 and intermediate holder 3,4, fixture place adopts chuck to clamp pipe fitting.Clamping pipe 2 and 5 o'clock, make length (docking a side) that pipeline stretches out intermediate holder for 30mm(10-1000mm all can), be beneficial to improve positioning precision, prevent from producing in welding process larger stress.Subsequently, follow rest 8, polishes to pipe joint, removes interface distortion and burr, and the grinding wheel tool that wherein polishing is used is installed on knife rest, and when polishing, motor 10 drives intermediate holder 3,4 rotations of the rotating speed with 5r/min.After interface is finished dealing with, mobile intermediate holder 3,4, by steel pipe 2,5 docking.Afterwards, change motor speed, making intermediate holder rotating speed is 2r/min, and mobile weld holder is to interface, and docking port welds.After having welded, unclamp intermediate holder 3,4, from one end, extract pipeline out, complete welding job.

Claims (4)

1. a metal tube location docking facilities, is characterized in that: described metal tube location docking facilities comprises frame, fixture and motor; Described fixture comprises two intermediate holder and two both sides fixtures of being located at two ends, and is coaxially fixed in described frame; Described two intermediate holder are connected with the output shaft transmission of described motor respectively.
2. metal tube according to claim 1 location docking facilities, is characterized in that: described intermediate holder is connected with described motor output shaft transmission by belt pulley.
3. metal tube according to claim 1 location docking facilities, is characterized in that: described frame is provided with guide rail; Described fixture is located on described guide rail.
4. metal tube according to claim 3 location docking facilities, is characterized in that: described guide rail one side is respectively equipped with knife rest and weld holder.
CN201320589706.7U 2013-09-24 2013-09-24 Metal tube positioning butt-joint device Expired - Fee Related CN203471250U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320589706.7U CN203471250U (en) 2013-09-24 2013-09-24 Metal tube positioning butt-joint device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320589706.7U CN203471250U (en) 2013-09-24 2013-09-24 Metal tube positioning butt-joint device

Publications (1)

Publication Number Publication Date
CN203471250U true CN203471250U (en) 2014-03-12

Family

ID=50219659

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320589706.7U Expired - Fee Related CN203471250U (en) 2013-09-24 2013-09-24 Metal tube positioning butt-joint device

Country Status (1)

Country Link
CN (1) CN203471250U (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103962790A (en) * 2014-05-09 2014-08-06 于法周 Roller carrier used for welding barrels
CN104607859A (en) * 2014-12-11 2015-05-13 海南共享钢构有限责任公司 Tool beneficial for large circular pipe welding and welding deformation control and implementation method of tool
CN104874994A (en) * 2015-05-27 2015-09-02 安徽普伦智能装备有限公司 Composite tube assembly tool
CN105057476A (en) * 2015-07-17 2015-11-18 苏州金牛精密机械有限公司 Automatic connector for air pipe connecting ports
CN105414701A (en) * 2015-12-03 2016-03-23 无锡市晨源建筑器材有限公司 Steel pipe welding equipment
CN106151681A (en) * 2015-04-27 2016-11-23 上海海隆石油钻具有限公司 Self-propelled pipeline construction Quick Connect Kit
CN106270874A (en) * 2015-05-07 2017-01-04 苏州安嘉自动化设备有限公司 Workpiece welding method
CN108857251A (en) * 2018-07-11 2018-11-23 祖全达 A kind of power construction place track laying pipeline the service of connection devices
CN108941999A (en) * 2018-08-23 2018-12-07 德清县三中交通工程有限公司 A kind of metal pipe material welder
CN109048205A (en) * 2018-09-29 2018-12-21 李建 A kind of pipe fitting welding improved process
CN109079415A (en) * 2018-09-29 2018-12-25 李建 A kind of pipe fitting welding device
CN110238600A (en) * 2019-05-14 2019-09-17 绍兴多卡机械设备有限公司 The butt-joint process of different wall thickness steel pipe
CN113909789A (en) * 2021-12-13 2022-01-11 宁波明讯实业有限公司 New energy automobile combination tail lamp support welding position device
CN115070686A (en) * 2022-06-15 2022-09-20 杭州辰航建设有限公司 Auxiliary butt joint device for installation of drainage pipeline capable of being laid quickly

Cited By (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103962790A (en) * 2014-05-09 2014-08-06 于法周 Roller carrier used for welding barrels
CN104607859B (en) * 2014-12-11 2016-08-31 海南共享钢构有限责任公司 It is easy to Large circular sealing of tube and the frock of weld industry and its implementation
CN104607859A (en) * 2014-12-11 2015-05-13 海南共享钢构有限责任公司 Tool beneficial for large circular pipe welding and welding deformation control and implementation method of tool
CN106151681A (en) * 2015-04-27 2016-11-23 上海海隆石油钻具有限公司 Self-propelled pipeline construction Quick Connect Kit
CN106270897B (en) * 2015-05-07 2018-06-01 苏州安嘉自动化设备有限公司 Grip device and butt welding machine with biasing device
CN106270874A (en) * 2015-05-07 2017-01-04 苏州安嘉自动化设备有限公司 Workpiece welding method
CN106270912A (en) * 2015-05-07 2017-01-04 苏州安嘉自动化设备有限公司 The chuck open-and-close mechanism of butt welding machine grip device
CN106270897A (en) * 2015-05-07 2017-01-04 苏州安嘉自动化设备有限公司 Grip device with biasing device and butt welding machine
CN106270912B (en) * 2015-05-07 2018-05-01 苏州安嘉自动化设备有限公司 The chuck open-and-close mechanism of butt welding machine clamp device
CN106270874B (en) * 2015-05-07 2018-06-01 苏州安嘉自动化设备有限公司 Workpiece welding method
CN104874994A (en) * 2015-05-27 2015-09-02 安徽普伦智能装备有限公司 Composite tube assembly tool
CN105057476A (en) * 2015-07-17 2015-11-18 苏州金牛精密机械有限公司 Automatic connector for air pipe connecting ports
CN105414701A (en) * 2015-12-03 2016-03-23 无锡市晨源建筑器材有限公司 Steel pipe welding equipment
CN108857251A (en) * 2018-07-11 2018-11-23 祖全达 A kind of power construction place track laying pipeline the service of connection devices
CN108857251B (en) * 2018-07-11 2020-11-06 温州职业技术学院 Circuit laying pipeline butt joint equipment for electric power construction site
CN108941999A (en) * 2018-08-23 2018-12-07 德清县三中交通工程有限公司 A kind of metal pipe material welder
CN109048205A (en) * 2018-09-29 2018-12-21 李建 A kind of pipe fitting welding improved process
CN109079415A (en) * 2018-09-29 2018-12-25 李建 A kind of pipe fitting welding device
CN109048205B (en) * 2018-09-29 2019-09-03 泰州镭昇光电科技有限公司 A kind of pipe fitting welding improved process
CN109079415B (en) * 2018-09-29 2019-09-17 安徽鼎方金属制品有限公司 A kind of pipe fitting welding device
CN110238600A (en) * 2019-05-14 2019-09-17 绍兴多卡机械设备有限公司 The butt-joint process of different wall thickness steel pipe
CN110238600B (en) * 2019-05-14 2020-11-20 邯郸市天禾裕不锈钢复合管股份有限公司 Butt joint device for steel pipes with different wall thicknesses
CN113909789A (en) * 2021-12-13 2022-01-11 宁波明讯实业有限公司 New energy automobile combination tail lamp support welding position device
CN115070686A (en) * 2022-06-15 2022-09-20 杭州辰航建设有限公司 Auxiliary butt joint device for installation of drainage pipeline capable of being laid quickly

Similar Documents

Publication Publication Date Title
CN203471250U (en) Metal tube positioning butt-joint device
CN106737059A (en) It is a kind of can deburring steel pipe cutting device
CN203817767U (en) Full-automatic pipe cutter
CN202862256U (en) Device for automatically cutting plastic pipe
CN104191121B (en) Automatic welding mechanism for circumferential welds
CN102873342A (en) Special lathe for double end surfaces of valve
CN103317174A (en) Full-automatic pipe fitting beveling machine
CN203304656U (en) Full-automatic pipe fitting beveling machine
CN104191037A (en) Medium plate cutting machine tool
CN103418999B (en) A kind of automobile axle shaft processing technology
CN106312730A (en) Automatic end polishing device for welding pipes
CN103447823A (en) Numerical control processing machine tool of automobile half shaft
CN203437765U (en) Double-end beveling machine for pipe fitting
CN104400036B (en) Chamfer forming tool and forming process thereof
CN103949660B (en) Automatic steel beveler
CN200942467Y (en) Rotation type automatic circumferential sewing machine
KR101526521B1 (en) Welding device for pipes
CN213003586U (en) Pipeline rapid welding auxiliary device
CN104259589A (en) Synchronous maching device for inner and outer threads of pipe
CN204035696U (en) A kind of heavy caliber pipe beveler
CN204221286U (en) The radial synchronous centering clamp system of water purification pipeline
CN203830734U (en) Automatic steel chamfering machine
CN204247964U (en) A kind of MC guide ring processing special purpose lathe
CN102310337B (en) Processing method of middle joint pipe
CN208341858U (en) A kind of Production of bearing cutting equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 225819 the industrial concentration area of fan Shui town Baoying County Yangzhou city Jiangsu Province

Patentee after: BAOSHENG SYSTEM INTEGRATION TECHNOLOGY Co.,Ltd.

Address before: 225819 the industrial concentration area of fan Shui town Baoying County Yangzhou city Jiangsu Province

Patentee before: BAOSHENG CONSTRUCTION Co.,Ltd.

Address after: 225819 the industrial concentration area of fan Shui town Baoying County Yangzhou city Jiangsu Province

Patentee after: BAOSHENG CONSTRUCTION Co.,Ltd.

Address before: 225819 the industrial concentration area of fan Shui town Baoying County Yangzhou city Jiangsu Province

Patentee before: YANGZHOU LIDUO STEEL STRUCTURE ENGINEERING Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140312

Termination date: 20200924