CN203452011U - Functionally detachable supporting leg structure for bridge girder erection machine - Google Patents

Functionally detachable supporting leg structure for bridge girder erection machine Download PDF

Info

Publication number
CN203452011U
CN203452011U CN201320534909.6U CN201320534909U CN203452011U CN 203452011 U CN203452011 U CN 203452011U CN 201320534909 U CN201320534909 U CN 201320534909U CN 203452011 U CN203452011 U CN 203452011U
Authority
CN
China
Prior art keywords
supporting leg
nose girder
bridge
supporting
leg
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320534909.6U
Other languages
Chinese (zh)
Inventor
胡超
张智莹
王光欣
陈家乐
杨磊
王朋
刘俊生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Engineering Machinery Research and Design Institute Co Ltd
Original Assignee
China Railway Science and Industry Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Science and Industry Group Co Ltd filed Critical China Railway Science and Industry Group Co Ltd
Priority to CN201320534909.6U priority Critical patent/CN203452011U/en
Application granted granted Critical
Publication of CN203452011U publication Critical patent/CN203452011U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a functionally detachable supporting leg structure for a bridge girder erection machine. The functionally detachable supporting leg structure for the bridge girder erection machine comprises supporting and hanging wheels, lifting vertical pillars, vertical pillar oil cylinders, a transverse motion mechanism and a cross beam, wherein the supporting and hanging wheels are independent components, bear a stressed component supporting the load and a functional component for walking of a supporting leg, and are connected with a support leg part through bolts. The lifting vertical pillars, the transverse motion mechanism and the cross beam are respectively designed to a symmetrical and detachable structure, and have the same functions and organization arrangement.

Description

A kind of for Bridge Erector can functional split-type leg structure
Technical field
The utility model belongs to railway construction machine apparatus field, be specifically related to a kind of can functional split-type supporting leg.
Background technology
In nose girder, supporting leg is vitals of split type tunnel Bridge Erector, at present in tunnel Bridge Erector industry market, Bridge Erector carrying leg structure form has variation, but under all kinds of working conditions, mostly adopt monolithic functional structure form to realize construction working condition requirement, and when bearing heavy duty, supporting leg cross sectional dimensions requires larger, adopting existing structure form to realize this Bridge Erector supporting leg is lifted upper and lower bridge floor and is had inconvenience more, Bridge Erector carry out circuit first and last bridge beam set up operation time to construction, bring a large amount of back works, greatly reduce efficiency of construction.
Utility model content
The purpose of this utility model is for the problems referred to above, provide a kind of for Bridge Erector can functional split-type supporting leg.Described can functional split-type leg structure, carrying supporting leg can be carried out to symmetry half-and-half splits, thereby significantly reduced supporting leg area of section size, by equipment, carry crane gear supporting leg is lifted step by step from nose girder below and makes it bridge floor top through neutral gear in the middle of nose girder, be fixed on plane on nose girder and set position.
For achieving the above object, the technical scheme that the utility model adopts is:
A kind of can functional split-type leg structure, described structure comprises holder change gear, lifting column, transverse-moving mechanism, crossbeam, wherein holding in the palm change gear is an individual components, bear the stressed member of support bearing and the functional part of supporting leg traveling, by bolt, partly connect with supporting leg, and lifting column, transverse-moving mechanism, crossbeam are all designed to the symmetrical detachable structure that makes, there is identical function and arrangement of mechanism, so that Bridge Erector, when carrying out first and last bridge Beams Erection Construction, is realized quickly and easily supporting leg and is lifted upper and lower bridge floor.
When splitting supporting leg, holder change gear is separated with supporting leg column, hangs on nose girder lower railway plate, moves together with nose girder.
Of the present utility modelly can functional split-type supporting leg carrying supporting leg be designed to symmetrical detachable structure form, when normal erecting beam construction operation, the symmetrical two parts of this supporting leg are coupled to each other by bolt, form overall structure and bear construction load.During conducting transmission line first and last bridge erection, this supporting leg is interfered bridge erection because of meeting and is constructed, need the upper bridge floor of lifting, the easy fractionation at this moment this supporting leg being divided into two, lifts respectively through completing the upper bridge floor operation of supporting leg lifting to nose girder upper surface on neutral gear in the middle of nose girder.
In nose girder, supporting leg is a most important carrying supporting leg in nose girder supporting leg, and when nose girder bears beam sheet load, Beam transportation vehicle load with self load, nose girder is relative with supporting leg static, is static overload; When taking out nose girder, nose girder supporting leg only bears nose girder deadweight, and nose girder and supporting leg relative motion, be dynamic underloading; These two kinds of operating modes are transferred to construction load on supporting leg by different supporting way, bear all load, and the conversion of these two kinds of bearing modes are realized by the supporting leg column combining by custom-designed a set of switching mechanism on supporting leg.
Beneficial effect
(1) this supporting leg adopts symmetrical structure layout, is arranged symmetrically with telescopic oil cylinder, transverse-moving mechanism, unbalance loading phenomenon in the time of can preventing mechanism kinematic;
(2) this supporting leg adopts detachable structure design, has solved well the problem of the upper bridge floor of supporting leg lifting, can not need other auxiliary crane gear, directly by equipment, carries jack machinism by the upper bridge floor of supporting leg lifting.Solved supporting leg sectional dimension large and cannot be through the problem of nose girder neutral gear.
(3) required aid equipment while having reduced the construction of Bridge Erector first and last hole, has reduced workload and labour intensity, has significantly improved efficiency of construction.
Accompanying drawing explanation
Fig. 1 is front view that can functional split-type supporting leg of the present utility model;
Fig. 2 is lateral view that can functional split-type supporting leg of the present utility model;
Fig. 3 is split figure that can functional split-type supporting leg of the present utility model.
In figure, 1, nose girder 2, holder change gear 3, lifting column 4, column oil cylinder 5 transverse-moving mechanisms 6, crossbeam
The specific embodiment
Below in conjunction with accompanying drawing, the utility model is elaborated, thereby so that advantage of the present utility model and feature can be easier to be it will be appreciated by those skilled in the art that, protection domain of the present utility model is made to more explicit defining.
A kind of can functional split-type leg structure, described structure comprises holder change gear, lifting column, transverse-moving mechanism, crossbeam, wherein holding in the palm change gear is an individual components, bear the stressed member of support bearing and the functional part of supporting leg traveling, by bolt, partly connect with supporting leg, and lifting column, transverse-moving mechanism, crossbeam are all designed to the symmetrical detachable structure that makes, there is identical function and arrangement of mechanism, so that Bridge Erector, when carrying out first and last bridge Beams Erection Construction, is realized quickly and easily supporting leg and is lifted upper and lower bridge floor.
When splitting supporting leg, holder change gear is separated with supporting leg column, hangs on nose girder lower railway plate, moves together with nose girder.
Of the present utility modelly can functional split-type supporting leg carrying supporting leg be designed to symmetrical detachable structure form, when normal erecting beam construction operation, the symmetrical two parts of this supporting leg are coupled to each other by bolt, form overall structure and bear construction load.During conducting transmission line first and last bridge erection, this supporting leg is interfered bridge erection because of meeting and is constructed, need the upper bridge floor of lifting, the easy fractionation at this moment this supporting leg being divided into two, lifts respectively through completing the upper bridge floor operation of supporting leg lifting to nose girder upper surface on neutral gear in the middle of nose girder.
In nose girder, supporting leg is a most important carrying supporting leg in nose girder supporting leg, and when nose girder bears beam sheet load, Beam transportation vehicle load with self load, nose girder is relative with supporting leg static, is static overload; When taking out nose girder, nose girder supporting leg only bears nose girder deadweight, and nose girder and supporting leg relative motion, be dynamic underloading; These two kinds of operating modes are transferred to construction load on supporting leg by different supporting way, bear all load, and the conversion of these two kinds of bearing modes are realized by the supporting leg column combining by custom-designed a set of switching mechanism on supporting leg.
Finally it should be noted that: obviously, above-described embodiment is only for the utility model example is clearly described, and the not restriction to embodiment.For those of ordinary skill in the field, can also make other changes in different forms on the basis of the above description.Here exhaustive without also giving all embodiments.And the apparent variation of being amplified out thus or change are still among protection domain of the present utility model.

Claims (2)

  1. One kind for Bridge Erector can functional split-type leg structure, it is characterized in that: described structure comprises holder change gear, lifting column, transverse-moving mechanism, crossbeam, wherein holding in the palm change gear is an individual components, to bear the direct stressed member of support loads and the functional part of supporting leg traveling, by bolt, partly connect with supporting leg, and by lifting column, transverse-moving mechanism, crossbeam is all designed to symmetrical detachable structure, there is identical function and arrangement of mechanism, so that Bridge Erector is when carrying out first and last bridge Beams Erection Construction, realize quickly and easily supporting leg and lifted upper and lower bridge floor.
  2. 2. leg structure according to claim 1, is characterized in that: when splitting supporting leg, holder change gear is separated with supporting leg column, hangs on nose girder lower railway plate, moves together with nose girder.Supporting leg column is partly divided into two, and branch lifts through the upper and lower bridge floor of nose girder neutral gear.
CN201320534909.6U 2013-08-30 2013-08-30 Functionally detachable supporting leg structure for bridge girder erection machine Expired - Fee Related CN203452011U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320534909.6U CN203452011U (en) 2013-08-30 2013-08-30 Functionally detachable supporting leg structure for bridge girder erection machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320534909.6U CN203452011U (en) 2013-08-30 2013-08-30 Functionally detachable supporting leg structure for bridge girder erection machine

Publications (1)

Publication Number Publication Date
CN203452011U true CN203452011U (en) 2014-02-26

Family

ID=50131903

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320534909.6U Expired - Fee Related CN203452011U (en) 2013-08-30 2013-08-30 Functionally detachable supporting leg structure for bridge girder erection machine

Country Status (1)

Country Link
CN (1) CN203452011U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107012798A (en) * 2017-05-22 2017-08-04 中铁工程机械研究设计院有限公司 A kind of Bridge Erector supporting leg stand under load equalising control device and method
CN110607755A (en) * 2019-10-15 2019-12-24 合肥正浩机械科技有限公司 Supporting leg adjusting mechanism for erecting last span of bridge erecting machine
CN111074792A (en) * 2020-01-03 2020-04-28 北京中铁建北方路桥工程有限公司 Large-span bridge fabrication machine and sliding device thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107012798A (en) * 2017-05-22 2017-08-04 中铁工程机械研究设计院有限公司 A kind of Bridge Erector supporting leg stand under load equalising control device and method
CN110607755A (en) * 2019-10-15 2019-12-24 合肥正浩机械科技有限公司 Supporting leg adjusting mechanism for erecting last span of bridge erecting machine
CN110607755B (en) * 2019-10-15 2021-04-06 合肥正浩机械科技有限公司 Supporting leg adjusting mechanism for erecting last span of bridge erecting machine
CN111074792A (en) * 2020-01-03 2020-04-28 北京中铁建北方路桥工程有限公司 Large-span bridge fabrication machine and sliding device thereof

Similar Documents

Publication Publication Date Title
CN204875552U (en) Frame bridge crane vertical lift structure
CN203452011U (en) Functionally detachable supporting leg structure for bridge girder erection machine
CN202688884U (en) Back support leg walking support lifting mechanism of highway bridge girder erection machine
CN202491789U (en) Track chassis provided with constant-pressure landing leg systems
CN205114934U (en) Jacking device for civil engineering
CN103321156A (en) Foldable through-tunnel bridge girder erection machine rear support leg and application thereof
CN203684113U (en) Automatic beam placement platform device
CN204356663U (en) The rear support leg of novel large-tonnage Bridge Erector
CN203699742U (en) Chassis supporting structure of hoisting machinery and crane
CN202214125U (en) Crane girder combined hoisting device with auxiliary truss
CN202323733U (en) Bridge girder erection machine rear supporting leg capable of walking independently
CN102659041B (en) Engineering machinery
CN201817777U (en) Cantilever crane structure of highway bridge erecting machine
CN201598977U (en) Novel wheel type integrally-moving drilling machine
CN204356659U (en) The rear auxiliary support apparatus of novel large-tonnage Bridge Erector
CN102351130B (en) Crawler crane and counterweight supporting device thereof
CN103088758B (en) Steel girder rod piece assembling movable and telescopic high-strength bolt screwing platform
CN103663199B (en) Elevator machinery
CN201809139U (en) Secondary beam mechanism of overhead working truck
CN203603064U (en) Slide way of luffing crane
CN101463728A (en) Hoisting stand for mining
CN205689224U (en) Running gear before a kind of rubber-tyred being applied to mobile inverted arch trestle
CN104514200A (en) Rear auxiliary support device for novel large-tonnage bridging machine
CN204265328U (en) Telescopic hoist assembling device
CN203699712U (en) Automatic gradient adjusting type portal crane

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA RAILWAY ENGINEERING MACHINERY RESEARCH + DES

Free format text: FORMER OWNER: CHINA RAILWAY SCIENCE + INDUSTRY GROUP CO., LTD.

Effective date: 20150422

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 430066 WUHAN, HUBEI PROVINCE TO: 430077 WUHAN, HUBEI PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20150422

Address after: 430077 Hongshan, Wuhan, Xu Xu East Street, No. 55

Patentee after: CHINA RAILWAY ENGINEERING MACHINERY RESEARCH & DESIGN INSTITUTE Co.,Ltd.

Address before: 430066, 45 East Main Street, Wuchang District, Hubei, Wuhan

Patentee before: CHINA RAILWAY SCIENCE & INDUSTRY GROUP Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140226

Termination date: 20210830