CN203439906U - I-beam sling - Google Patents

I-beam sling Download PDF

Info

Publication number
CN203439906U
CN203439906U CN201320536346.4U CN201320536346U CN203439906U CN 203439906 U CN203439906 U CN 203439906U CN 201320536346 U CN201320536346 U CN 201320536346U CN 203439906 U CN203439906 U CN 203439906U
Authority
CN
China
Prior art keywords
beam section
steel rope
jig
steel wire
wire rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320536346.4U
Other languages
Chinese (zh)
Inventor
卢正茂
马龙
薛继彪
钟万斌
蒋小平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CNPC Xibu Drilling Engineering Co Ltd
Original Assignee
CNPC Xibu Drilling Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CNPC Xibu Drilling Engineering Co Ltd filed Critical CNPC Xibu Drilling Engineering Co Ltd
Priority to CN201320536346.4U priority Critical patent/CN203439906U/en
Application granted granted Critical
Publication of CN203439906U publication Critical patent/CN203439906U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model relates to the technical field of slings, in particular to an I-beam sling which comprises a left steel wire rope, a flying ring, a pressing sleeve, a right steel wire rope, a left I-steel clamp and a right I-beam clamp; after the upper end of the left steel wire rope passes through the flying ring and is bent back, the upper end of the left steel wire rope and the corresponding left steel wire rope are fixedly mounted through the pressing sleeve to form a left connecting ring; after the upper end of the right steel wire rope passes through the flying ring and is bent back, the upper end of the right steel wire rope and the corresponding right steel wire rope are fixedly mounted through the pressing sleeve to form a right connecting ring; lifting holes are respectively formed in the left I-beam clamp and the right I-beam clamp. The I-beam sling has a reasonable and compact structure, and is convenient to use. Before lifting, the I-beam clamps are respectively hung at two ends of I-beam, so that the security risk of slippage caused by the steel wire ropes are directly hung on a lifting hook is avoided, the problem that the operation is troublesome during the process of lifting the I-beam is solved, the hoisting operation is safe and fast, time and labor are reduced, and the working efficiency is improved.

Description

I-beam section hoist cable instrument
Technical field
the utility model relates to hoist cable tool device technical field, is a kind of I-beam section hoist cable instrument.
Background technology
along with the development of science and technology and economic society, also more and more higher for the requirement of safety, because the lifting of I-beam section does not now have special-purpose suspender efficiently, make the slinger of I-beam section operate loaded down with trivial details, inefficiency., before lifting I-beam section, with steel rope, I-beam section is bundled at present, then steel rope is wound around on suspension hook to a circle, lift by crane, in lifting process, steel rope is easy to occur slippage, causes existing in hoisting process huge potential safety hazard.
Summary of the invention
the utility model provides a kind of I-beam section hoist cable instrument, has overcome the deficiency of above-mentioned prior art, and it can effectively solve the problem of the sling device that there is no at present special-purpose I-beam section.
the technical solution of the utility model realizes by following measures: a kind of I-beam section hoist cable instrument, comprises left steel rope, suspension ring, gland, right steel rope, left I-beam section jig and right I-beam section jig; The upper end of left steel rope is fixedly installed togather and is formed left coupling link by gland with corresponding left steel rope after passing suspension ring back bending; The upper end of right steel rope is fixedly installed togather and is formed right coupling link by gland with corresponding right steel rope after passing suspension ring back bending; On left I-beam section jig and right I-beam section jig, all there is lifting hole(eyelet), the lower end of left steel rope is fixedly installed togather and is formed left jig ring by gland with corresponding left steel rope after through the lifting hole(eyelet) on left I-beam section jig back bending, and the lower end of right steel rope is fixedly installed togather and is formed right jig ring by gland with corresponding right steel rope after through the lifting hole(eyelet) on right I-beam section jig back bending.
the further optimization and/or improvements to above-mentioned utility model technical scheme below:
above-mentioned left I-beam section jig and right I-beam section jig include body, and the top of body is provided with lifting hole(eyelet), and there are respectively left draw-in groove and right draw-in groove in the lower left side of body and right side, and to the right, the opening of right draw-in groove left for the opening of left draw-in groove.
above-mentioned gland is aluminum rectangular tube.
the utility model reasonable and compact in structure, easy to use.Before lifting, I-beam section jig is tangled respectively to I-beam section two ends, evaded steel rope and directly hung over the security risk that causes slippage on suspension hook, solved in the operation of lifting I-beam section and operated loaded down with trivial details problem, realize lifting operation safety, quick, time saving and energy saving, improved work efficiency.
Accompanying drawing explanation
accompanying drawing 1 is the main TV structure schematic diagram of the utility model most preferred embodiment.
accompanying drawing 2 is that the A-A of accompanying drawing 1 is to sectional structure schematic diagram.
accompanying drawing 3 is the structural representation of left I-beam section jig and right I-beam section jig.
coding in accompanying drawing is respectively: 1 is left steel rope, and 2 is suspension ring, and 3 is gland, 4 is left coupling link, and 5 is right steel rope, and 6 is right coupling link, 7 is lifting hole(eyelet), 8 is left jig ring, and 9 is right jig ring, and 10 is body, 11 is left draw-in groove, 12 is right draw-in groove, and 13 is left I-beam section jig, and 14 is right I-beam section jig.
The specific embodiment
the utility model is not subject to the restriction of following embodiment, can determine concrete embodiment according to the technical solution of the utility model and actual conditions.
in the utility model, for convenience of description, the description of the relative position relation of each parts is to be all described according to the Butut mode of Figure of description 1, as: the position relationship of upper and lower, left and right etc. is to determine according to the Butut direction of Figure of description.
below in conjunction with embodiment and accompanying drawing, the utility model is further described:
as shown in accompanying drawing 1,2, this I-beam section hoist cable instrument comprises left steel rope, suspension ring, gland, right steel rope, left I-beam section jig and right I-beam section jig; The upper end of left steel rope 1 is also fixedly installed togather and is formed left coupling link 4 by gland 3 with corresponding left steel rope 1 after back bending through suspension ring 2; The upper end of right steel rope 5 is also fixedly installed togather and is formed right coupling link 6 by gland 3 with corresponding right steel rope 5 after back bending through suspension ring 2; On left I-beam section jig 13 and right I-beam section jig 14, all there is lifting hole(eyelet) 7, the lower end of left steel rope 1 is also fixedly installed togather and is formed left jig ring 8 by gland 3 with corresponding left steel rope 1 after back bending through the lifting hole(eyelet) 7 on left I-beam section jig 13, and the lower end of right steel rope 5 is also fixedly installed togather and is formed right jig ring 9 by gland 3 with corresponding right steel rope 5 after back bending through the lifting hole(eyelet) 7 on right I-beam section jig 14.During use, left I-beam section jig 13 and right I-beam section jig 14 are stuck in to the two ends of I-beam section, evade steel rope and directly hung over the security risk that causes slippage on suspension hook, solved in the operation of lifting I-beam section and operated loaded down with trivial details problem, realize lifting operation safety, quick, time saving and energy saving, improved work efficiency.
can according to actual needs, above-mentioned I-beam section hoist cable instrument be made further optimization and/or improvements:
as shown in accompanying drawing 1,2, left I-beam section jig 13 and right I-beam section jig 14 include body 10, and the top of body 10 is provided with lifting hole(eyelet) 7, and there are respectively left draw-in groove 11 and right draw-in groove 12 in the lower left side of body 10 and right side, to the right, the opening of right draw-in groove 12 left for the opening of left draw-in groove 11.
as shown in accompanying drawing 1,2, gland 3 is aluminum rectangular tube.Plasticity, the intensity of aluminum rectangular tube are better.
above technical characterictic has formed most preferred embodiment of the present utility model, and it has stronger comformability and best implementation result, can increase and decrease according to actual needs non-essential technical characterictic, meets the demand of different situations.

Claims (3)

1. an I-beam section hoist cable instrument, is characterized in that comprising left steel rope, suspension ring, gland, right steel rope, left I-beam section jig and right I-beam section jig; The upper end of left steel rope is fixedly installed togather and is formed left coupling link by gland with corresponding left steel rope after passing suspension ring back bending; The upper end of right steel rope is fixedly installed togather and is formed right coupling link by gland with corresponding right steel rope after passing suspension ring back bending; On left I-beam section jig and right I-beam section jig, all there is lifting hole(eyelet), the lower end of left steel rope is fixedly installed togather and is formed left jig ring by gland with corresponding left steel rope after through the lifting hole(eyelet) on left I-beam section jig back bending, and the lower end of right steel rope is fixedly installed togather and is formed right jig ring by gland with corresponding right steel rope after through the lifting hole(eyelet) on right I-beam section jig back bending.
2. I-beam section hoist cable instrument according to claim 1, it is characterized in that left I-beam section jig and right I-beam section jig include body, the top of body is provided with lifting hole(eyelet), there are respectively left draw-in groove and right draw-in groove in the lower left side of body and right side, to the right, the opening of right draw-in groove left for the opening of left draw-in groove.
3. I-beam section hoist cable instrument according to claim 1 and 2, is characterized in that gland is aluminum rectangular tube.
CN201320536346.4U 2013-08-30 2013-08-30 I-beam sling Expired - Fee Related CN203439906U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320536346.4U CN203439906U (en) 2013-08-30 2013-08-30 I-beam sling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320536346.4U CN203439906U (en) 2013-08-30 2013-08-30 I-beam sling

Publications (1)

Publication Number Publication Date
CN203439906U true CN203439906U (en) 2014-02-19

Family

ID=50090974

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320536346.4U Expired - Fee Related CN203439906U (en) 2013-08-30 2013-08-30 I-beam sling

Country Status (1)

Country Link
CN (1) CN203439906U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107021415A (en) * 2017-04-28 2017-08-08 丁灏 A kind of Current Collector Sleave

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107021415A (en) * 2017-04-28 2017-08-08 丁灏 A kind of Current Collector Sleave

Similar Documents

Publication Publication Date Title
CN202296824U (en) Steel wire rope sling
CN202107425U (en) Oil drum sling
CN202265308U (en) Combined hoisting device for pipeline steel plate hoisting
CN202094562U (en) Suspension type synchronous hoisting system for pipe type bus
CN202488034U (en) Lifting device for electric transmission line of angle iron tower
CN104022459A (en) 10 KV distribution line pole-mounted wire suspension device
CN204185103U (en) Shaped steel tackle
CN203439906U (en) I-beam sling
CN203529710U (en) Special device for hoisting cable reel
CN202465041U (en) Lifting appliance of air brick seat for steel ladle
CN202575711U (en) Appliance for lifting ring pieces
CN205973449U (en) Jack -up handling rigging of buffering pulley
CN104724615A (en) Penetrating and winding method of large-diameter variable-amplitude steel wire rope of large moving-arm type tower crane
CN202864681U (en) Plate hook for tubular pile
CN204873428U (en) Wear -resisting channel -section steel hoist cable instrument
CN203612824U (en) Turnover tool for anodal carbon block
CN208916602U (en) Cement electric pole boom hoisting
CN202488035U (en) Hoisting device for maintenance of power transmission line above concrete poles
CN202897821U (en) Fixture for baking-free bricks
CN202414964U (en) Travelling crane hoisting auxiliary device
CN203295025U (en) Clamping tool for hoisting single H beam
CN203545452U (en) Steel plate hook
CN204980969U (en) European style hoist hoisting mechanism
CN204139571U (en) Straddle block formula hitch
CN201932808U (en) Lifting appliance

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140219

Termination date: 20200830

CF01 Termination of patent right due to non-payment of annual fee