CN203411930U - Fixed direct burial type guardrail - Google Patents

Fixed direct burial type guardrail Download PDF

Info

Publication number
CN203411930U
CN203411930U CN201320438668.5U CN201320438668U CN203411930U CN 203411930 U CN203411930 U CN 203411930U CN 201320438668 U CN201320438668 U CN 201320438668U CN 203411930 U CN203411930 U CN 203411930U
Authority
CN
China
Prior art keywords
layer
concrete
guardrail
vertical column
direct burial
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320438668.5U
Other languages
Chinese (zh)
Inventor
郁永清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Yongxi Environment Science & Technology Co Ltd
Original Assignee
Shanghai Yongxi Environment Science & Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Yongxi Environment Science & Technology Co Ltd filed Critical Shanghai Yongxi Environment Science & Technology Co Ltd
Priority to CN201320438668.5U priority Critical patent/CN203411930U/en
Application granted granted Critical
Publication of CN203411930U publication Critical patent/CN203411930U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Fencing (AREA)

Abstract

The utility model relates to the technical field of guardrails, and in particular relates to a fixed direct burial type guardrail which comprises a guardrail vertical column, a soil layer and a concrete layer. The guardrail is characterized in that one end of the guardrail vertical column is positioned above the soil layer; the other end of the guardrail vertical column penetrates through the soil layer and is positioned inside the concrete layer; a concrete leveling layer is arranged below the concrete layer; and a broken stone hardcore is arranged below the concrete leveling layer. Compared with the prior art, the thrust face and the strength of the guardrail vertical column are improved as the tail end of the guardrail vertical column penetrates through the soil layer and is directly inserted into the concrete layer, and reinforcing bars penetrate through the tail end of the guardrail vertical column, so that the fixed direct burial type guardrail is applicable to severe weather.

Description

A kind of fixedly direct burial guardrail
Technical field
The utility model relates to guard bar technique field, specifically a kind of fixedly direct burial guardrail.
Background technology
Traditional guardrail is to be all directly connected with ground by cement, when running into the atrocious weathers such as typhoon, heavy rain, guardrail is easy to be flushed away or is blown down, and causes guardrail not play when separating traveling lane, increase the burden of traffic, directly affect driver's life security.
Summary of the invention
The utility model, for overcoming the deficiencies in the prior art, runs through dirt bed by the end of fence upright, is directly inserted into layer of concrete, and adopts reinforcing bar to run through the end of fence upright, and stress surface and the intensity of increase fence upright, make it more adapt to atrocious weather.
For achieving the above object, design a kind of fixedly direct burial guardrail, comprise fence upright, dirt bed, layer of concrete, it is characterized in that: one end of fence upright is positioned at the top of dirt bed, the other end of fence upright runs through dirt bed, be positioned at layer of concrete, the below of layer of concrete is provided with concrete leveling layer, and the below of concrete leveling layer is provided with hardcore bed.
The lower end of described fence upright is provided with reinforcing bar, and reinforcing bar runs through respectively fence upright from left to right and from front to back.
Described reinforcing bar is at least provided with 2.
Described layer of concrete is C20 concrete.
The utility model compared with the existing technology, runs through dirt bed by the end of fence upright, is directly inserted into layer of concrete, and adopts reinforcing bar to run through the end of fence upright, and stress surface and the intensity of increase fence upright, make it more adapt to atrocious weather.
Accompanying drawing explanation
Fig. 1 is the utility model structural representation.
Referring to Fig. 1,1 is fence upright, and 2 is dirt bed, and 3 is layer of concrete, and 4 is reinforcing bar, and 5 is concrete leveling layer, and 6 is hardcore bed.
The specific embodiment
With reference to the accompanying drawings the utility model is described further below.
As shown in Figure 1, one end of fence upright 1 is positioned at the top of dirt bed 2, and the other end of fence upright 1 runs through dirt bed 2, is positioned at layer of concrete 3, and the below of layer of concrete 3 is provided with concrete leveling layer 5, and the below of concrete leveling layer 5 is provided with hardcore bed 6.
The lower end of fence upright 1 is provided with reinforcing bar 4, and reinforcing bar 4 runs through respectively fence upright 1 from left to right and from front to back.
Reinforcing bar 4 is at least provided with 2.
Layer of concrete 3 is C20 concrete.
The end of fence upright 1 is run through to dirt bed 2, be directly inserted into layer of concrete 3, and adopt reinforcing bar 4 to run through the end of fence upright 1, the intensity of increase guardrail, makes it more adapt to atrocious weather.

Claims (4)

1. a fixing direct burial guardrail, comprise fence upright, dirt bed, layer of concrete, it is characterized in that: one end of fence upright (1) is positioned at the top of dirt bed (2), the other end of fence upright (1) runs through dirt bed (2), be positioned at layer of concrete (3), the below of layer of concrete (3) is provided with concrete leveling layer (5), and the below of concrete leveling layer (5) is provided with hardcore bed (6).
2. a kind of fixedly direct burial guardrail according to claim 1, is characterized in that: the lower end of described fence upright (1) is provided with reinforcing bar (4), and reinforcing bar (4) runs through respectively fence upright (1) from left to right and from front to back.
3. a kind of fixedly direct burial guardrail according to claim 2, is characterized in that: described reinforcing bar (4) is at least provided with 2.
4. a kind of fixedly direct burial guardrail according to claim 1, is characterized in that: described layer of concrete (3) is C20 concrete.
CN201320438668.5U 2013-07-22 2013-07-22 Fixed direct burial type guardrail Expired - Fee Related CN203411930U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320438668.5U CN203411930U (en) 2013-07-22 2013-07-22 Fixed direct burial type guardrail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320438668.5U CN203411930U (en) 2013-07-22 2013-07-22 Fixed direct burial type guardrail

Publications (1)

Publication Number Publication Date
CN203411930U true CN203411930U (en) 2014-01-29

Family

ID=49974830

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320438668.5U Expired - Fee Related CN203411930U (en) 2013-07-22 2013-07-22 Fixed direct burial type guardrail

Country Status (1)

Country Link
CN (1) CN203411930U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107354889A (en) * 2017-08-24 2017-11-17 邵海霞 A kind of safeguard structure and its construction method for highway
CN109027890A (en) * 2018-06-22 2018-12-18 湖南耐普恩科技有限公司 A kind of high, normal, basic three sections of associative form variable for bright super capacitor optical road lamp

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107354889A (en) * 2017-08-24 2017-11-17 邵海霞 A kind of safeguard structure and its construction method for highway
CN109027890A (en) * 2018-06-22 2018-12-18 湖南耐普恩科技有限公司 A kind of high, normal, basic three sections of associative form variable for bright super capacitor optical road lamp

Similar Documents

Publication Publication Date Title
CN203411930U (en) Fixed direct burial type guardrail
CN205604213U (en) But height -adjusting's sand barrier
CN204940966U (en) A kind of economical Underground Garage Pillar web frame
CN201695296U (en) Floor tile with rapid draining
CN206486847U (en) A kind of road guard-rail of fix stably
CN103147386B (en) Approach bridge vehicle
CN205277434U (en) Tunnel portal pre -reinforcing structure
CN203411932U (en) Fixed pre-buried guardrail
CN206646392U (en) A kind of modular bridge structure
CN205400759U (en) Special U shaped steel support of city subway construction
CN103696370B (en) A kind of Quick bridge construction method and structure
CN204898683U (en) Underground structure of high strength
CN2893071Y (en) Electrified railway contact network poles foundation
CN207093108U (en) Gob side entry retaining crosses cutting eye supporting facility
CN209025015U (en) A kind of median of ecological, environmental protective
CN205576663U (en) Highway weak soil layer stake composite foundation
CN203700954U (en) Bridge guard railing
CN202250119U (en) Totally-enclosed U-shaped shed support frame for roadway supporting
CN202577323U (en) Tying reinforcing structure for surface fissures of large dangerous rock
CN101892844A (en) Method for excavating tunnels undergoing advanced bolting by using CRD
CN205134135U (en) Take curb of railing
CN203008939U (en) Hydraulic support with bottom lifting device
CN205077415U (en) Stake of anticollision obstacle
CN204370354U (en) A kind of traffic guardrail of combined convenient dismounting
CN201080586Y (en) Path-changing type overpass

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20140129

CX01 Expiry of patent term
CU01 Correction of utility model

Correction item: Termination upon expiration of patent

Correct: Revocation of Patent Expiration and Termination

False: Expiration and Termination of 39 Volume 3201 Patent on August 8, 2023

Number: 32-01

Volume: 39

CU01 Correction of utility model
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140129

CF01 Termination of patent right due to non-payment of annual fee