CN203383151U - 桥体两侧注浆装置 - Google Patents
桥体两侧注浆装置 Download PDFInfo
- Publication number
- CN203383151U CN203383151U CN201320483987.8U CN201320483987U CN203383151U CN 203383151 U CN203383151 U CN 203383151U CN 201320483987 U CN201320483987 U CN 201320483987U CN 203383151 U CN203383151 U CN 203383151U
- Authority
- CN
- China
- Prior art keywords
- grouting
- sides
- pontic
- grouting device
- tubes
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
一种桥体两侧注浆装置。其由多根相隔距离水平设置在大型箱体两侧立墙外表面上的带有梅花形注浆孔的注浆花管组成,并且注浆花管的长度与其设置部位的立墙长度相等。本实用新型提供的桥体两侧注浆装置是利用设置在大型箱体两侧立墙上的带孔注浆管对桥体两侧路基进行注浆,从而达到固化填充土体的作用,使该处路基具有一定的承受力,从而保护铁路路基,进而保证列车能够安全通行。另外,本装置具有结构简单、成本低、便于施工等优点。
Description
技术领域
本实用新型属于铁路施工技术领域,特别是涉及一种桥体两侧注浆装置。
背景技术
随着交通运输业的飞速发展,已有的交通设施已无法满足要求。当既有铁路和公路交叉时,通常的做法是在既有铁路和公路交汇处的既有铁路下方架设框架桥。当需要新建或置换旧的框架桥时,目前常用的框架桥施工方法是采用顶进法,即在既有铁路的一侧利用顶进设备将组成框架桥主体的大型箱体穿过既有铁路下方的地基土而向另一侧顶进。但是,这种顶进法存在下列问题:受大型箱体顶进过程中的扰动以及列车振动的影响,顶进完成后,桥体两侧的路基经常会出现土体松散、孔洞等现象。众所周知,路基是铁路的主要支撑结构,一旦出现松散、孔洞,势必会影响铁路线路的正常使用与安全,但受大型箱体两侧立墙的限制,桥体两侧的地基土又无法在顶进后再进行加固。因此如何对大型箱体两侧的路基土体进行加固已成为摆在本领域技术人员面前的重要课题。
发明内容
为了解决上述问题,本实用新型的目有在于提供一种能够保证列车安全和正常使用的桥体两侧注浆装置。
为了达到上述目的,本实用新型提供的桥体两侧注浆装置由多根相隔距离水平设置在大型箱体两侧立墙外表面上的带有梅花形注浆孔的注浆花管组成,并且注浆花管的长度与其设置部位的立墙长度相等。
所述的每侧立墙上部的注浆花管排布密度小于下部的注浆花管排布密度。
所述的相邻注浆花管之间的间距为0.6-1米。
本实用新型提供的桥体两侧注浆装置是利用设置在大型箱体两侧立墙上的带孔注浆管对桥体两侧路基进行注浆,从而达到固化填充土体的作用,使该处路基具有一定的承受力,从而保护铁路路基,进而保证列车能够安全通行。另外,本装置具有结构简单、成本低、便于施工等优点。
附图说明
图1为安装有本实用新型提供的桥体两侧注浆装置的大型箱体结构侧视图。
具体实施方式
下面结合附图和具体实施例对本实用新型提供的桥体两侧注浆装置进行详细说明。
如图1所示,本实用新型提供的桥体两侧注浆装置由多根相隔距离水平设置在大型箱体1两侧立墙外表面上的带有梅花形注浆孔2的注浆花管3组成,并且注浆花管3的长度与其设置部位的立墙长度相等。
所述的每侧立墙上部的注浆花管3排布密度小于下部的注浆花管3排布密度。
所述的相邻注浆花管3之间的间距为0.6-1米。
现将本实用新型提供的桥体两侧注浆装置使用方法阐述如下:首先在待顶进的大型箱体1两侧立墙外表面上设置好本实用新型提供的桥体两侧注浆装置,然后开始顶进,大型箱体1顶进就位后立即利用注浆机从注浆花管3的一端或两端注浆,根据路基地质情况通常选用由水玻璃和超细水泥混合而成的浆液,该浆液将从注浆孔2中喷射并填充在大型箱体1两侧的地基土体中,最后固化而达到所需的强度。注浆完成后可利用雷达物探仪进行质量检测。
Claims (3)
1.一种桥体两侧注浆装置,其特征在于:所述的桥体两侧注浆装置由多根相隔距离水平设置在大型箱体(1)两侧立墙外表面上的带有梅花形注浆孔(2)的注浆花管(3)组成,并且注浆花管(3)的长度与其设置部位的立墙长度相等。
2.根据权利要求1所述的桥体两侧注浆装置,其特征在于:所述的每侧立墙上部的注浆花管(3)排布密度小于下部的注浆花管(3)排布密度。
3.根据权利要求1所述的桥体两侧注浆装置,其特征在于:所述的相邻注浆花管(3)之间的间距为0.6-1米。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320483987.8U CN203383151U (zh) | 2013-08-08 | 2013-08-08 | 桥体两侧注浆装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320483987.8U CN203383151U (zh) | 2013-08-08 | 2013-08-08 | 桥体两侧注浆装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203383151U true CN203383151U (zh) | 2014-01-08 |
Family
ID=49871662
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320483987.8U Expired - Fee Related CN203383151U (zh) | 2013-08-08 | 2013-08-08 | 桥体两侧注浆装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203383151U (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103696416A (zh) * | 2014-01-17 | 2014-04-02 | 黄滨 | 一种地基处理新方法 |
CN105908631A (zh) * | 2016-05-11 | 2016-08-31 | 中铁十四局集团第二工程有限公司 | 一种预埋式钢混结合部压浆填充装置及施工方法 |
CN110094216A (zh) * | 2019-05-31 | 2019-08-06 | 中铁第四勘察设计院集团有限公司 | 一种分离式隧道地层补偿注浆*** |
-
2013
- 2013-08-08 CN CN201320483987.8U patent/CN203383151U/zh not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103696416A (zh) * | 2014-01-17 | 2014-04-02 | 黄滨 | 一种地基处理新方法 |
CN105908631A (zh) * | 2016-05-11 | 2016-08-31 | 中铁十四局集团第二工程有限公司 | 一种预埋式钢混结合部压浆填充装置及施工方法 |
CN105908631B (zh) * | 2016-05-11 | 2017-12-19 | 中铁十四局集团第二工程有限公司 | 一种预埋式钢混结合部压浆填充装置及施工方法 |
CN110094216A (zh) * | 2019-05-31 | 2019-08-06 | 中铁第四勘察设计院集团有限公司 | 一种分离式隧道地层补偿注浆*** |
CN110094216B (zh) * | 2019-05-31 | 2024-05-03 | 中铁第四勘察设计院集团有限公司 | 一种分离式隧道地层补偿注浆*** |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103276639B (zh) | 一种深厚层松软土地区的路基结构 | |
US20140314502A1 (en) | Polymer grouting method for uplifting ballastless track of high-speed rail | |
CN103981777B (zh) | 一种地铁减震隔振弹性混合轻质道床 | |
CN202595591U (zh) | 用于岩溶地区隧道溶腔路基的微型钢管桩桩网结构 | |
CN203383151U (zh) | 桥体两侧注浆装置 | |
CN103215863A (zh) | 高速铁路无砟轨道抬升高聚物注浆方法 | |
CN104947721B (zh) | 一种地铁车辆段试车线复合隔振屏障 | |
CN108166395B (zh) | 一种跨越营业线修建梁桥的施工方法 | |
CN203475472U (zh) | 电力电缆槽手孔井 | |
CN103578346B (zh) | 一种简支梁桥教学仿真结构体 | |
CN105350409A (zh) | 城市轨道交通长枕式钢弹簧浮置板道床道岔施工方法 | |
CN102392402A (zh) | 顶进施工中路桥过渡段注浆施工方法 | |
CN203795460U (zh) | 一种压重式塔式起重机基础结构 | |
CN204174481U (zh) | 软土地区现代有轨电车桥台过渡板结构 | |
CN203958138U (zh) | 利用高架桥底净空建设的高架轻型轨道 | |
CN207130545U (zh) | 高速铁路活动断裂带区域路基结构 | |
CN103243662B (zh) | 一种既有铁路桥梁的改造加固方法 | |
CN105236265B (zh) | 一种门式起重机轨道加固方法及加固结构 | |
CN202688805U (zh) | 支撑螺柱设于模板外的排架单元 | |
CN106274556A (zh) | 一种接触网杆改移方法 | |
CN105926392B (zh) | 用于减弱路基间相互影响的托盘式挡土墙结构 | |
CN207130542U (zh) | 一种用于隧道内的新型嵌入式轨道*** | |
CN206486798U (zh) | 地下轨道上方高架桥的桥头结构 | |
CN204509876U (zh) | 一种跨线桥立体防护结构 | |
CN104878694B (zh) | 一种简单的桥面铺装标高控制方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140108 Termination date: 20210808 |