CN203374282U - Head sheave chamber arrangement structure of mine underground grounded multi-rope lifting system - Google Patents

Head sheave chamber arrangement structure of mine underground grounded multi-rope lifting system Download PDF

Info

Publication number
CN203374282U
CN203374282U CN201320335261.XU CN201320335261U CN203374282U CN 203374282 U CN203374282 U CN 203374282U CN 201320335261 U CN201320335261 U CN 201320335261U CN 203374282 U CN203374282 U CN 203374282U
Authority
CN
China
Prior art keywords
head sheave
chamber
inspection platform
lower head
arrangement structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320335261.XU
Other languages
Chinese (zh)
Inventor
王清来
庄永晓
刘荣乐
曾庆荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Nerin Engineering Co Ltd
Original Assignee
China Nerin Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Nerin Engineering Co Ltd filed Critical China Nerin Engineering Co Ltd
Priority to CN201320335261.XU priority Critical patent/CN203374282U/en
Application granted granted Critical
Publication of CN203374282U publication Critical patent/CN203374282U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model relates to a head sheave chamber arrangement structure of a mine underground grounded multi-rope lifting system. The ground of an upper head sheave chamber and the ground of a lower head sheave chamber are correspondingly provided with an upper head sheave overhaul platform and a lower head sheave overhaul platform respectively, the position of the upper head sheave chamber and the position of the lower head sheave chamber are staggered in a front-and-back mode, the position of the upper head sheave overhaul platform and the position of the lower head sheave overhaul platform are correspondingly staggered in a front-and-back mode, therefore, an upper head sheave overhaul platform protruding section and a lower head sheave overhaul platform protruding section are formed and respectively located on a stable rock face fixedly, and a pedestrian ladder stand is arranged between the upper head sheave overhaul platform and the lower head sheave overhaul platform. According to the head sheave chamber arrangement structure, the shortcomings that the head sheave overhaul platforms are complex in arrangement and the work amount is large are overcome, investment is saved, the construction period is saved, stability and reliability of the head sheave chamber arrangement structure are facilitated, and the head sheave chamber arrangement structure can be safely and rapidly constructed with high quality.

Description

Mine down-hole lands multi rope winding system head sheave chamber arrangement structure
Technical field
The utility model relates to a kind of mine down-hole multi rope winding system, and particularly mine down-hole lands multi rope winding system head sheave chamber arrangement structure.
Background technology
At present, mine down-hole multi rope winding system head sheave chamber is the important component part of interior shaft system, belongs to key project.If adopt conventional same section arrangement form, the chamber section of configuration is larger, upper head sheave inspection platform area is larger, be unfavorable for Stability Analysis of Structures, engineering quantity also can correspondingly increase, can cause difficulty of construction to strengthen and the duration growth, thereby construction speed and the construction costs of whole engineering impacted.
Summary of the invention
Technical problem to be solved in the utility model is to provide a kind of novel head sheave chamber arrangement structure, land multi rope winding system head sheave chamber inspection platform the shortcomings such as complexity, engineering quantity are large are set to overcome mine down-hole, and realize safety, high-quality, construction fast.
In order to address the above problem, the technical solution adopted in the utility model is as follows: mine down-hole lands multi rope winding system head sheave chamber arrangement structure, comprise the head sheave chamber, lower head sheave chamber, upper head sheave chamber, the ground of lower head sheave chamber correspondence respectively is provided with the head sheave inspection platform, lower head sheave inspection platform, it is characterized in that: described upper head sheave chamber and described lower head sheave chamber front and back position stagger, and upper head sheave inspection platform and lower head sheave inspection platform front and back position be corresponding staggering also, head sheave inspection platform nose section and lower head sheave inspection platform nose section on formation, upper head sheave inspection platform nose section and lower head sheave inspection platform nose section holder respectively fall within stable rock face, be provided with People's Bank of China's cat ladder between upper head sheave inspection platform and lower head sheave inspection platform.
The utility model has the advantage of: before and after (1) upper and lower head sheave chamber, part is staggeredly arranged, and is conducive to the stability of structure and the security reliability of construction; (2) upper and lower head sheave inspection platform all drops on and stablizes on rocky ground, has reduced the steel platform area of upper head sheave chamber.This arrangement has overcome head sheave chamber inspection platform the shortcomings such as complexity, engineering quantity are large has been set, and has not only saved investment to have saved the construction period but also be conducive to the Stability Analysis of Structures reliability, be a kind of can safety, high-quality, the construct arrangement of head sheave chamber fast.
The accompanying drawing explanation
Fig. 1 is the utility model head sheave chamber arrangement construction profile;
Fig. 2 is the utility model head sheave chamber arrangement structure section figure.
In figure, 1, upper head sheave chamber; 2, lower head sheave chamber; 3, People's Bank of China's cat ladder; 4, rope race; 5, upper head sheave inspection platform; 6, lower head sheave inspection platform, L1, upper head sheave inspection platform nose section, L2, lower head sheave inspection platform nose section.
The specific embodiment
Describe the utility model mine down-hole in detail below in conjunction with accompanying drawing and land the embodiment of multi rope winding system head sheave chamber arrangement structure.As Fig. 1, shown in Fig. 2, mine down-hole lands multi rope winding system head sheave chamber arrangement structure, comprise head sheave chamber 1, lower head sheave chamber 2, upper head sheave chamber 1, the ground of lower head sheave chamber 2 correspondence respectively is provided with head sheave inspection platform 5, lower head sheave inspection platform 6, it is characterized in that: described upper head sheave chamber 1 staggers with described lower head sheave chamber 2 front and back positions, and upper head sheave inspection platform 5 and lower head sheave inspection platform 6 front and back positions also corresponding staggering, head sheave inspection platform nose section L1 and lower head sheave inspection platform nose section L2 on formation, upper head sheave inspection platform nose section L1 and lower head sheave inspection platform nose section L2 holder respectively fall within stable rock face, be provided with People's Bank of China's cat ladder 3 between upper head sheave inspection platform 5 and lower head sheave inspection platform 6.
Embodiment a: better embodiment of the present utility model, at first by elevator chamber excavation rope race 4, then tunnel to lower head sheave chamber 2, by lower head sheave chamber 2, adopt courtyards or layering to lead the cave method again by rope race 4, sequence construction is gone up well head sheave chamber 1, lower head sheave chamber 2, then carry out head sheave inspection platform 5 and lower head sheave inspection platform 6, in the relevant position of lower head sheave inspection platform 6, install People's Bank of China's cat ladder 3.Need to carry out the work of establishing of staying of chamber support work and upper and lower head sheave installation preformed hole and built-in fitting in work progress.Upper head sheave inspection platform nose section L1, lower head sheave inspection platform nose section L2 are staggeredly arranged, and drop on and stablize on rock face respectively.

Claims (1)

1. mine down-hole lands multi rope winding system head sheave chamber arrangement structure, comprise the head sheave chamber, lower head sheave chamber, upper head sheave chamber, the ground of lower head sheave chamber correspondence respectively is provided with the head sheave inspection platform, lower head sheave inspection platform, it is characterized in that: described upper head sheave chamber and described lower head sheave chamber front and back position stagger, and upper head sheave inspection platform and lower head sheave inspection platform front and back position be corresponding staggering also, head sheave inspection platform nose section and lower head sheave inspection platform nose section on formation, upper head sheave inspection platform nose section and lower head sheave inspection platform nose section holder respectively fall within stable rock face, be provided with People's Bank of China's cat ladder between upper head sheave inspection platform and lower head sheave inspection platform.
CN201320335261.XU 2013-06-13 2013-06-13 Head sheave chamber arrangement structure of mine underground grounded multi-rope lifting system Expired - Lifetime CN203374282U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320335261.XU CN203374282U (en) 2013-06-13 2013-06-13 Head sheave chamber arrangement structure of mine underground grounded multi-rope lifting system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320335261.XU CN203374282U (en) 2013-06-13 2013-06-13 Head sheave chamber arrangement structure of mine underground grounded multi-rope lifting system

Publications (1)

Publication Number Publication Date
CN203374282U true CN203374282U (en) 2014-01-01

Family

ID=49836824

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320335261.XU Expired - Lifetime CN203374282U (en) 2013-06-13 2013-06-13 Head sheave chamber arrangement structure of mine underground grounded multi-rope lifting system

Country Status (1)

Country Link
CN (1) CN203374282U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103967503A (en) * 2014-05-07 2014-08-06 中钢集团马鞍山矿山研究院有限公司 Production-stop-free transformation method for tower type interior shaft elevating system
CN106246187A (en) * 2016-08-25 2016-12-21 山东黄金矿业(莱州)有限公司三山岛金矿 Multiple spot arranges a kind of self well digging construction method of interior shaft sinking shaft facility
CN109353925A (en) * 2018-11-12 2019-02-19 中国恩菲工程技术有限公司 Console mode head sheave chamber and console mode lifting system

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103967503A (en) * 2014-05-07 2014-08-06 中钢集团马鞍山矿山研究院有限公司 Production-stop-free transformation method for tower type interior shaft elevating system
CN103967503B (en) * 2014-05-07 2016-02-24 中钢集团马鞍山矿山研究院有限公司 A kind of tower interior shaft Hoisting System non-stop production reformation method
CN106246187A (en) * 2016-08-25 2016-12-21 山东黄金矿业(莱州)有限公司三山岛金矿 Multiple spot arranges a kind of self well digging construction method of interior shaft sinking shaft facility
CN106246187B (en) * 2016-08-25 2018-04-27 山东黄金矿业(莱州)有限公司三山岛金矿 Multiple spot arranges a kind of self well digging construction method of interior shaft sinking shaft facility
CN109353925A (en) * 2018-11-12 2019-02-19 中国恩菲工程技术有限公司 Console mode head sheave chamber and console mode lifting system

Similar Documents

Publication Publication Date Title
CN103277106B (en) Highway tunnel three-step five-procedure excavation construction method
CN102900460B (en) Method for performing through-going seam cutting, pressure relief, permeability enhancement and quick tunneling on soft and high-outburst coal seam
CN102644476B (en) Method for pumping gas of protected layer by layer penetration and hole drilling on high-position drilling fields of protecting layer machinery tunnel
CN102168575B (en) Loose blasting gas extraction technology for horizontal branch well of coal seam floor
CN106149768B (en) A kind of float Structure and its construction method of the underground structure of fender post combination Guan Liang
CN105275471A (en) Method for determining surface mine exploiting limit
CN203374282U (en) Head sheave chamber arrangement structure of mine underground grounded multi-rope lifting system
CN102022133A (en) Regional gas underground high-pressure jet hole digging, pressure relief and outburst prevention method
CN104074538A (en) Primary extraction working face high-level suction tunnel gas extraction method
CN104234738A (en) Low-permeability coal bed multi-branch directional drilling seam cutting anti-reflection method
CN103726848B (en) Be applicable to the mining methods of recovery of gentle-inclined/inclthin thin ore body
CN109751076A (en) For being equipped with the escape structure and its escape method of the horizontal tunnel of deep shaft
CN204457791U (en) A kind ofly meet the interim air channel structure that large-diameter shield first passes through subway station
CN204357457U (en) Crawler type anchor props up machine
CN204059401U (en) Novel combined traffic tunnel
CN202718380U (en) Hydraulic climbing frame for construction of high-rise building
CN205934994U (en) Retaining pile combines guan liang's underground structure's anti structure of floating
CN203716196U (en) Rollover prevention excavator
CN103397649A (en) Double-wall steel cofferdam construction multifunctional platform and construction method thereof
CN204475350U (en) Bored pile construction system under high-voltage line
CN203891819U (en) Drill rod salvaging device
CN209724410U (en) For being equipped with the escape structure of the horizontal tunnel of deep shaft
CN209413265U (en) One kind being suitable for elevation of building decoration construction suspended rail
CN202731956U (en) Deviation preventing anchor rod
CN202969304U (en) Railings

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20140101

CX01 Expiry of patent term