CN203365568U - System for testing secondary device of intelligent substation automatically - Google Patents
System for testing secondary device of intelligent substation automatically Download PDFInfo
- Publication number
- CN203365568U CN203365568U CN 201320355859 CN201320355859U CN203365568U CN 203365568 U CN203365568 U CN 203365568U CN 201320355859 CN201320355859 CN 201320355859 CN 201320355859 U CN201320355859 U CN 201320355859U CN 203365568 U CN203365568 U CN 203365568U
- Authority
- CN
- China
- Prior art keywords
- secondary device
- digital
- user
- testing
- control platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Testing And Monitoring For Control Systems (AREA)
Abstract
Provided is a system for testing a secondary device of an intelligent substation automatically. The system comprises a user control platform, a digital tester and a digital secondary device, all of which are connected in sequence. By adopting a computer software technology, an intelligent equipment testing technology and an intelligent equipment communication interface technology, the system for testing the secondary device of the intelligent substation automatically realizes closed-loop automatic testing of the digital secondary device, enables the inspection work of the secondary device of the intelligent substation to be simplified, standardized, automated and have strict procedure, solves the problems of standard inspection and automatic testing of the digital secondary devices of different types efficiently, improves the existing testing work mode greatly, fills the blank in the field of the testing method of the digital secondary device, increases work efficiency and inspection quality of the inspection of the digital secondary device greatly, and achieves important reform and breakthrough for the existing inspection work mode of the digital secondary device.
Description
Technical field
The utility model belongs to electric power power transmission and transformation control technology field, particularly relates to a kind of secondary equipment of intelligent converting station Auto-Test System.
Background technology
Along with the development that scientific-technical progress and China's intelligent grid are built, intelligent substation had obtained promotion and application widely in recent years.In intelligent substation, the digitizing secondary device has been cancelled analog loopback, AC sampling and input and output adopt digital quantity fully, and this has higher requirement to check work, make traditional secondary device testing tool can not meet the needs of digitizing secondary device test.Because intelligent substation belongs to new things, the maintainer lacks test experience and the method for testing of digitizing secondary device, and this makes insufficient, the halfway situation of easy generation check in check work.
Summary of the invention
In order to address the above problem, the purpose of this utility model is to provide a kind of secondary equipment of intelligent converting station Auto-Test System.
In order to achieve the above object, the secondary equipment of intelligent converting station Auto-Test System that the utility model provides comprises: user's report control platform, digital tester and digitizing secondary device; Wherein: the operation control terminal that user's report control platform is whole test macro, it is connected with digital tester, user's report control platform mainly is comprised of master controller, storer, man-machine mutual interface and input-output device, for the demonstration storage operation of being written into of completing user steering order input, associated electrical document, extraction and detecting information, and processed, judged and finally generated test report to testing resulting data;
Digital tester is the digital detecting device for the intelligent substation electrical secondary system, and it is connected with user's report control platform by netting twine to upper, to lower, by the MMS interface, with the digitizing secondary device, is connected;
The digitizing secondary device is detected object concrete in the intelligent substation electrical secondary system.
Described digital tester and digitizing secondary device are many, every digital tester is connected with a digitizing secondary device respectively, between many digital testers, adopt mode directly in parallel to realize interconnected, wherein only have a digital tester to be connected with user's report control platform.
Described user's report control platform can replace with industrial computer or PC computer generation.
The secondary equipment of intelligent converting station Auto-Test System that the utility model provides, adopt computer software technology, the smart machine measuring technology, smart machine communication interface technology, the closed loop automatic testing of realization to the digitizing secondary device, make secondary equipment of intelligent converting station check job simplification, standardization, robotization and procedure, the standardization check and the problem of automatically testing of the digitizing secondary device of different model have effectively been solved, greatly improved existing test job mode, filled up the blank in digitizing secondary device method of testing field, work efficiency and the quality inspection of the check of digitizing secondary device have greatly been improved, major reform and the breakthrough to existing digitizing secondary device check working method.
The accompanying drawing explanation
Fig. 1 forms schematic diagram for the secondary equipment of intelligent converting station Auto-Test System that the utility model provides.
Embodiment
Secondary equipment of intelligent converting station Auto-Test System the utility model provided below in conjunction with the drawings and specific embodiments is elaborated.
As shown in Figure 1, the secondary equipment of intelligent converting station Auto-Test System that the utility model provides comprises: user's report control platform 1, digital tester 2 and digitizing secondary device 3; Wherein: the operation control terminal that user's report control platform 1 is whole test macro, it is connected with digital tester 2, user's report control platform 1 mainly is comprised of master controller, storer, man-machine mutual interface and input-output device, for the operations such as demonstration storage of being written into of completing user steering order input, associated electrical document, extraction and detecting information, and processed and judge and finally generate test report testing resulting data;
Digitizing secondary device 3 is detected object concrete in the intelligent substation electrical secondary system; Usually in the intelligent substation electrical secondary system, often include a plurality of digitizing secondary devices 3, a common test item, be directed to a digitizing secondary device 3, and a plurality of digitizing secondary devices 3 need a plurality of projects to be detected.
In described secondary equipment of intelligent converting station Auto-Test System, when the detection that comprises a plurality of projects carried out for a plurality of digitizing secondary devices 3, need many digital testers 2 of configuration, every digital tester 2 is tested for a digitizing secondary device 3 respectively; Now, every digital tester 2 is connected with a digitizing secondary device 3 respectively, between many digital testers 2, adopts mode directly in parallel to realize interconnected, and this wherein only has a digital tester 2 to be connected with user's report control platform 1.
Described user's report control platform 1 can replace with industrial computer or PC computer generation.
Secondary equipment of intelligent converting station Auto-Test System provided by the invention be take automatic test technology as basis, and the user can load test event for simulating the different faults situation according to oneself requirement and device type, by Auto-Test System, completes test and evaluation of result.After being completed, the user can be obtained from from Auto-Test System the test report of definition format.The automatic test approach step is as follows:
1. loading test event
Operating personnel can require to choose all or part of function of the equipment of being verified on user's report control platform 1 according to device type and test job, set up testing scheme, and are loaded among Auto-Test System.
2. confirmation test parameter
Operating personnel read definite value and the relevant configuration file in digitizing secondary device 3 by user's report control platform 1, in conjunction with the test job requirement, confirm the required whole parameters of test automatically.
3. start test automatically
After the whole confirmations of test parameter are errorless, operating personnel assign the beginning test instruction by user's report control platform 1, and system starts automatic test.
4. generate test report according to test result
Operating personnel will test resulting data analysis and arrangement on user's report control platform 1, and generate complete test report, and test job leaves it at that automatically.
The secondary equipment of intelligent converting station Auto-Test System that the utility model provides, be conducive to realize the simplification of secondary equipment of intelligent converting station check work, standardization, robotization and procedure, the standardization check and the problem of automatically testing of the digitizing secondary device of different model have effectively been solved, greatly improved existing test job mode, filled up the blank in digitizing secondary device method of testing field, work efficiency and the quality inspection of the check of digitizing secondary device have greatly been improved, major reform and the breakthrough to existing digitizing secondary device check working method.
Claims (3)
1. a secondary equipment of intelligent converting station Auto-Test System, it is characterized in that: described secondary equipment of intelligent converting station Auto-Test System comprises: user's report control platform (1), digital tester (2) and digitizing secondary device (3); Wherein: the operation control terminal that user's report control platform (1) is whole test macro, it is connected with digital tester (2), user's report control platform (1) mainly is comprised of master controller, storer, man-machine mutual interface and input-output device, for the demonstration storage operation of being written into of completing user steering order input, associated electrical document, extraction and detecting information, and processed, judged and finally generated test report to testing resulting data;
Digital tester (2) is the digital detecting device for the intelligent substation electrical secondary system, and it is connected with user's report control platform (1) by netting twine to upper, to lower, by the MMS interface, with digitizing secondary device (3), is connected;
Digitizing secondary device (3) is detected object concrete in the intelligent substation electrical secondary system.
2. secondary equipment of intelligent converting station Auto-Test System according to claim 1 is characterized in that: described digital tester (2) and digitizing secondary device (3) are many, every digital tester (2) is connected with a digitizing secondary device (3) respectively, between many digital testers (2), adopt mode directly in parallel to realize interconnected, wherein only have a digital tester (2) to be connected with user's report control platform (1).
3. secondary equipment of intelligent converting station Auto-Test System according to claim 1 is characterized in that: described user's report control platform (1) can replace with industrial computer or PC computer generation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320355859 CN203365568U (en) | 2013-06-20 | 2013-06-20 | System for testing secondary device of intelligent substation automatically |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320355859 CN203365568U (en) | 2013-06-20 | 2013-06-20 | System for testing secondary device of intelligent substation automatically |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203365568U true CN203365568U (en) | 2013-12-25 |
Family
ID=49813313
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201320355859 Expired - Lifetime CN203365568U (en) | 2013-06-20 | 2013-06-20 | System for testing secondary device of intelligent substation automatically |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203365568U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103308808A (en) * | 2013-06-20 | 2013-09-18 | 国家电网公司 | System and method for testing secondary device of intelligent substation automatically |
-
2013
- 2013-06-20 CN CN 201320355859 patent/CN203365568U/en not_active Expired - Lifetime
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103308808A (en) * | 2013-06-20 | 2013-09-18 | 国家电网公司 | System and method for testing secondary device of intelligent substation automatically |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103746882B (en) | The method of intelligent substation station level test | |
CN103529377B (en) | The Auto-Test System of intelligent transformer substation digital protection device and method | |
CN103323714A (en) | Automatic test method based on report template technology in intelligent substation test system | |
CN202533519U (en) | Fully automatic closed loop test system of protective relaying device | |
CN103439612B (en) | Based on the intelligent substation Auto-Test System of SCD | |
CN103308808A (en) | System and method for testing secondary device of intelligent substation automatically | |
CN104793076A (en) | Intelligent automatic test system and method | |
CN104166119B (en) | A kind of intelligent electric energy meter program Detection of Stability system based on error injection | |
CN105790443A (en) | SCD virtual terminal connection automatic testing system and method for intelligent substation | |
CN103744781A (en) | Test method and test system for interlocking software | |
CN104391244A (en) | Closed loop test method of relay protection apparatus and system thereof | |
CN204291050U (en) | A kind of dispatching and monitoring information check system | |
CN103869260A (en) | Power supply test system and method | |
CN102750301A (en) | Blueprint generating method for integrated avionic system model aiming at architecture analysis and design language (AADL) description | |
CN102998562A (en) | Power quality monitoring system based on International Electrotechnical Commission (IEC) 61850 communication protocol | |
CN103019940A (en) | Electric energy meter embedded software semi-simulation test device | |
CN104090259A (en) | Automatic gauge test platform and method based on Python script | |
CN204790554U (en) | Bus controller quality testing arrangement based on car CAN network bus | |
CN104375024A (en) | In-situ self-inspection and metering device and method of automatic test system | |
CN107453355A (en) | A kind of taiwan area topology identification method and device, computer-readable recording medium | |
CN103353857A (en) | Communication test method of integrated monitoring unit in substation | |
CN102821010B (en) | Simulator for protector | |
CN110611312B (en) | On-line simulation system and method for panoramic data of substation bay level | |
CN203365568U (en) | System for testing secondary device of intelligent substation automatically | |
CN103344850A (en) | System and method of intelligent substation automatic testing based on test formwork technology |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20131225 |